TINKER AFB MAC BOA WWYK230053 - Replace Vault and Fuel Tank, B3202

DEPT OF DEFENSE

Notice type
Presolicitation
Solicitation #
FA813726R0023
NAICS
236220
PSC
Z2GC
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Posted
June 16, 2026
Response due
June 19, 2026
Place of performance
OK

What this opportunity is

The Department of Defense is seeking a contractor to replace a vault and fuel tank at Tinker Air Force Base, Oklahoma, under NAICS code 236220. This opportunity is set aside for total small businesses, making it suitable for small contractors looking to engage in federal projects. As a presolicitation notice, interested businesses should monitor the opportunity closely for the upcoming solicitation details rather than submitting bids at this stage.

Analysis by Mindy, grounded in the SAM.gov notice.

Description

(a) (b) (c) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r) Line Acti vity # Transm ittal # Specification Section SD # Submittal Description Item Submitted Paragraph # Classification: GOVT or A/E Reviewer Submit Approval Needed By Material Needed By Action Code Date Of Action Date FWD to APPR / Auth Date RCD From CONTR Date FWD To Other Revwr Date RCD From Other Reviewer Action Code Date Of Action Mailed To CONTR/ Date RCD From APPR Authority Remarks 1 00 70 00 01 Preconstruction Submittals Entry Access List 1.6 G 2 00 70 00 01 Preconstruction Submittals Key Issue Receipt 1.3.12.1 3 00 70 00 06 Test Reports Pre-Construction Testing Record 1.3.11 G 4 00 70 00 07 Certificates Welding, Cutting and Brazing Permit 1.4 G 5 00 70 00 07 Certificates Framed Instructions 1.8 6 00 70 00 11 Closeout Submittals Key Return Receipt 1.3.12.1 7 00 71 00 01 Preconstruction Submittals Health and Safety Plan 1.3 G 8 00 71 00 01 Preconstruction Submittals Internal Combustion Engines Plan 1.3.5 G 9 00 71 00 01 Preconstruction Submittals Entry Authority List 1.5.2 10 00 71 00 01 Preconstruction Submittals Vehicle Entry Authority List 1.5.2 G 11 00 71 00 01 Preconstruction Submittals Equipment and Material Storage 1.5 G 12 00 71 00 01 Preconstruction Submittals Contractor Offices and Plants 1.5 G 13 00 71 00 01 Preconstruction Submittals Designated Waste and Disposal Areas 1.5 G 14 00 71 00 01 Preconstruction Submittals Construction Phasing Plan 1.5 G 16 00 71 00 01 Preconstruction Submittals FAA Form 7460-1 1.5.3 G 17 00 71 00 07 Certificates Safety Meetings 1.3 18 00 71 00 07 Certificates FOD Awareness and Prevention Training 1.4 19 00 72 00 01 Preconstruction Submittals Restoration Plan 1.3.2 G 20 00 72 00 01 Preconstruction Submittals Storm Water Pollution Prevention Plan 1.3.3.2 G 21 00 72 00 01 Preconstruction Submittals Water System Construction Permit 1.3.3.6 G 22 00 72 00 01 Preconstruction Submittals AF Form 3952 Chemical/Hazardous Material Request/Authorization 1.4 G 23 00 72 00 01 Preconstruction Submittals Spray Painting Plan 1.9 G 24 00 72 00 01 Preconstruction Submittals Environmental Management System Awareness Training 1.1 26 00 72 00 03 Product Data Affirmative Procurement Documentation or Green Statement 1.3.10 G Provide only one. Reference specification for additional information 27 00 72 00 06 Test Reports AF Form 487 Generator Operating Log (Inspection and Testing) 1.3.8.1 G 28 00 72 00 07 Cerificates Fire Ant Federal Compliance Agreement or state phyto-sanitary certificate 1.3.4.1 29 00 72 00 07 Cerificates Monthly Hazardous Material Usage Report 1.4 G Provide 1st week of each month during construction 32 00 72 00 08 Manufacturer's Instructions Safety Data Sheets/Material Safety Data Sheets 1.4 33 00 72 00 11 Closeout Submittals Notice of Termination (ODEQ Form 640-572) 1.3.3.2 G 34 00 72 00 - Attch 2 01 Preconstruction Submittals Documentation of Training/ Experience C.2 C.13 TITLE: Tinker AFB General Requirements Specification (Div 00-01) SUBMITTAL REGISTER JOB NAME: WWYK230053 - Repair Vault Tank B3202 LOCATION: B3202 Tinker AFB, OK CONTRACT NO: CONTRACTOR: (d) CONTRACTOR ACTION CONTRACTOR SCHEDULE DATES APPROVING AUTHORITY Submittal Register_v3_03/07/22 -- 1 of 4 -- (a) (b) (c) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r) Line Acti vity # Transm ittal # Specification Section SD # Submittal Description Item Submitted Paragraph # Classification: GOVT or A/E Reviewer Submit Approval Needed By Material Needed By Action Code Date Of Action Date FWD to APPR / Auth Date RCD From CONTR Date FWD To Other Revwr Date RCD From Other Reviewer Action Code Date Of Action Mailed To CONTR/ Date RCD From APPR Authority Remarks (d) CONTRACTOR ACTION CONTRACTOR SCHEDULE DATES APPROVING AUTHORITY 36 00 72 00 - Attch 2 01 Preconstruction Submittals Regulatory Agency Notification C.3 37 00 72 00 - Attch 2 01 Preconstruction Submittals Security Documentation C.4 38 00 72 00 - Attch 2 01 Preconstruction Submittals Communications C.5 39 00 72 00 - Attch 2 01 Preconstruction Submittals Step-by-Step Abatement Procedures C.6 G 40 00 72 00 - Attch 2 01 Preconstruction Submittals Glovebag Procedures C.7 G 42 00 72 00 - Attch 2 01 Preconstruction Submittals Respirator Protection Program C.9 43 00 72 00 - Attch 2 01 Preconstruction Submittals Encapsulation Procedures C.11 G 44 00 72 00 - Attch 2 01 Preconstruction Submittals Landfill Qualifications C.14 45 00 72 00 - Attch 2 01 Preconstruction Submittals Work Schedule C.16 46 00 72 00 - Attch 2 01 Preconstruction Submittals Emergency Plans and Fire Prevention Plans C.17 G 47 00 72 00 - Attch 2 01 Preconstruction Submittals Written Hazardous Communication Program C.18 48 00 72 00 - Attch 2 01 Preconstruction Submittals Rental Equipment C.19 49 00 72 00 - Attch 2 07 Cerificates Manufacturer’s Certifications C.10 50 00 72 00 - Attch 2 07 Cerificates Laboratory and Monitoring Qualifications/Certifications C.12 51 00 72 00 - Attch 2 07 Cerificates Asbestos Waste Transporter Certification of Insurance C.13 52 00 72 00 - Attch 2 08 Manufacturer's Instructions Safety Data Sheets/Material Safety Data Sheets C.15 53 00 72 00 - Attch 2 11 Closeout Submittals Waste Disposal Receipt M.1(1) G 54 00 72 00 - Attch 2 11 Closeout Submittals Air Sampling Results M.1(2) G 55 00 72 00 - Attch 3 01 Preconstruction Submittals Documentation of Training/ Experience C.1 56 00 72 00 - Attch 3 01 Preconstruction Submittals Employee Physicals C.2 57 00 72 00 - Attch 3 01 Preconstruction Submittals Security Documentation C.3 58 00 72 00 - Attch 3 01 Preconstruction Submittals Step-by-Step Abatement Procedures Plan C.4 G 59 00 72 00 - Attch 3 01 Preconstruction Submittals Full Containment Construction Procedures/Drawings C.5 G 60

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.

View the original notice on SAM.gov ↗

Similar Active Opportunities (NAICS 236220)