Tornado Damage Repairs at the USDA-ARS U.S. Horticultural Research Laboratory, Ft. Pierce, Florida
AGRICULTURE, DEPARTMENT OF
Notice type
Solicitation
Solicitation #
1232SA26R0020
NAICS
236220
PSC
Z2JZ
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Posted
June 12, 2026
Response due
June 22, 2026
Place of performance
Fort Pierce, FL
What this opportunity is
The U.S. Department of Agriculture is seeking a contractor to perform tornado damage repairs at the USDA-ARS U.S. Horticultural Research Laboratory in Ft. Pierce, Florida. This opportunity is set aside for total small businesses under NAICS code 236220, which covers commercial and institutional building construction. Interested small businesses should note that this is a solicitation notice, indicating they can submit bids for the project.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
SPECIFICATIONS
Repair Tornado Damage
USDA-ARS
US Horticultural Research Laboratory
2001 S Rock Rd
Ft. Pierce, FL 34945
Prepared For:
U.S. Department Of Agriculture
Agricultural Research Service (ARS)
A-E Contract No.
12405B21D0003
A-E Order No.
1232SA25F0461
Prepared By:
The Johnson-McAdams Firm, P.A.
Greenwood, Mississippi
April 27, 2026
-- 1 of 566 --
-- 2 of 566 --
REPAIR TORNADO DAMAGE 4825
PROJECT TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 00 01 01/20 WARRANTY OF CONSTRUCTION
01 00 11 06/20 GENERAL PARAGRAPHS
01 00 21 01/20 CONTRACTOR QUALITY CONTROL
01 01 00 February 29, 2024 GENERAL REQUIREMENTS
01 33 00 08/18 SUBMITTAL PROCEDURES
01 35 26 01/20 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 02/19, CHG 1: 08/23 SOURCES FOR REFERENCE PUBLICATIONS
01 50 00 01/20 PROJECT CLOSEOUT
01 57 50 10/19 TEMPORARY ENVIRONMENTAL CONTROLS
01 78 23 08/15 OPERATION AND MAINTENANCE DATA
DIVISION 02 - EXISTING CONDITIONS
02 41 00 08/22 DEMOLITION
02 81 00 08/25 TRANSPORTATION AND DISPOSAL OF
HAZARDOUS MATERIALS
02 82 00 08/25 ASBESTOS REMEDIATION
DIVISION 03 - CONCRETE
03 30 00 02/19 CAST-IN-PLACE CONCRETE
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 61 14 08/25 STEEL STANDING SEAM ROOFING
07 92 00 08/23 JOINT SEALANTS
DIVISION 13 - SPECIAL CONSTRUCTION
13 34 13 05/11 GREENHOUSES
13 34 19 08/20, CHG 1: 02/21 METAL BUILDING SYSTEMS
DIVISION 22 - PLUMBING
22 00 00 05/24, CHG 1: 11/24 PLUMBING, GENERAL PURPOSE
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 03 00.00 20 08/10, CHG 3: 08/18 BASIC MECHANICAL MATERIALS AND METHODS
23 07 00 02/13, CHG 7: 05/20 THERMAL INSULATION FOR MECHANICAL
SYSTEMS
23 11 20 05/20 FACILITY GAS PIPING
23 23 00 08/21 REFRIGERANT PIPING
23 30 00 02/25 HVAC AIR DISTRIBUTION
23 80 20.00 10 05/20 GAS-FIRED HEATING EQUIPMENT
23 81 00 05/24 DECENTRALIZED UNITARY HVAC EQUIPMENT
23 83 00.00 20 04/06 ELECTRIC SPACE HEATING EQUIPMENT
DIVISION 26 - ELECTRICAL
26 20 00 05/25, CHG 1: 08/25 INTERIOR DISTRIBUTION SYSTEM
26 41 00 08/23 LIGHTNING PROTECTION SYSTEM
26 51 00 05/20, CHG 2: 11/21 INTERIOR LIGHTING
DIVISION 27 - COMMUNICATIONS
PROJECT TABLE OF CONTENTS Page 1
-- 3 of 566 --
REPAIR TORNADO DAMAGE 4825
27 10 00 05/25 BUILDING TELECOMMUNICATIONS CABLING
SYSTEM
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 10 05 05/24 ELECTRONIC SECURITY SYSTEMS (ESS)
28 31 70 08/20 INTERIOR FIRE ALARM SYSTEM, ADDRESSABLE
DIVISION 31 - EARTHWORK
31 00 00 08/08 EARTHWORK
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 92 19 10/06 SEEDING
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 2
-- 4 of 566 --
REPAIR TORNADO DAMAGE 4825
SECTION 01 00 01
WARRANTY OF CONSTRUCTION
01/20
PART 1 GENERAL
1.1 WARRANTY OF CONSTRUCTION
1.1.1 General
In addition to any other warranties set out elsewhere in this contract,
the Contractor warrants that work performed under this contract conforms
to the contract requirements and is free of any defect of equipment,
material or design furnished, or workmanship performed by the Contractor
or any of his subcontractors or suppliers at any tier. Such warranty
shall continue for a period of one year from the date of final acceptance
of the project. Under this warranty, the Contractor shall remedy at his
own expense any such failure to conform or any such defect. In addition,
the Contractor shall remedy at his own expense any damage to Government
owned or controlled real or personal property, when that damage is the
result of the Contractor's failure to conform to contract requirements or
any such defect of equipment, material, workmanship, or design. The
Contractor shall also restore any work damaged in fulfilling the terms of
this clause. The Contractor's warranty with respect to work repaired or
replaced hereunder will run for one year from the date of such repair or
replacement.
1.1.2 Notification and Compliance
The Government shall notify the Contractor in writing within a reasonable
time after the discovery of any failure, defect, or damage. Should the
Contractor fail to remedy any failure, defect, or damage described in
paragraph 1.1.1 above within a reasonable time after receipt of notice
thereof, the Government shall have the right to replace or repair and have
the cost billed to the Contractor.
1.2 EXPRESSED WARRANTY
In addition to the other rights and remedies provided by this clause, all
subcontractors', manufacturers', and suppliers' warranties expressed or
implied, respecting any work and materials shall, at the direction of the
Government, be enforced by the Contractor for the benefit of the
Government. In such case, if the Contractor's warranty under paragraph
1.1.1 above has expired, any suit directed by the Government to enforce a
subcontractor's, manufacturer's, or supplier's warranty shall be at the
expense of the Government. The Contractor shall obtain any warranties
which the subcontractors, manufacturers, or suppliers would give in normal
commercial practice. If so directed by the Contracting Officer, the
Contractor shall require any such warranties to be executed in writing to
the Government.
1.3 LATENT DEFECTS
The Warranty specified herein shall not limit the Government's rights with
respect to latent defects, gross mistake, or fraud.
SECTION 01 00 01 Page 1
-- 5 of 566 --
REPAIR TORNADO DAMAGE 4825
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
Not used.
-- End of Section --
SECTION 01 00 01 Page 2
-- 6 of 566 --
REPAIR TORNADO DAMAGE 4825
SECTION 01 00 11
GENERAL PARAGRAPHS
06/20
PART 1 GENERAL
1.1 DESCRIPTION OF WORK
1.1.1 Work To Be Done
The work to be done consists of furnishing all labor, materials, and
equipment and performing all work in strict accordance with these
specifications for Repair Tornado Damage - U.S. Horticultural Research
Laboratory, Ft. Pierce, FL. Bidder shall provide Base Bid pricing as
defined in the contract documents.
1.1.2 Post Bid Requirements
Provide the bidding contractior'…
Source: SAM.gov, as posted. Verify the current solicitation before responding.
Pursue this opportunity with Mindy
See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.
View the original notice on SAM.gov ↗Similar Active Opportunities (NAICS 236220)
BLDG 31B New Roofing Below Grade Structure
HEALTH AND HUMAN SERVICES, DEPARTMENT OF · Solicitation · due June 26, 2026
Progressive Design-Build Services under Other Transaction Authority Project: Multi-Domain Cyber and Intel Operations Center, Joint Base San Antonio, Lackland AFB Texas
DEPT OF DEFENSE · Special Notice
Repair BEQ HP135
DEPT OF DEFENSE · Combined Synopsis/Solicitation · due July 16, 2026
P-1458 2nd Radio Battalion Complex, Phase 2, Parachute and Supply Facilities
DEPT OF DEFENSE · Solicitation · due May 28, 2025
Orrin Hatch U.S. Courthouse LED Lighting Upgrade
GENERAL SERVICES ADMINISTRATION · Solicitation · due July 9, 2026
Z1DA--Correct Martinez and Mare Island Generator Fuel Lines
VETERANS AFFAIRS, DEPARTMENT OF · Solicitation · due June 24, 2026