U.S. Senate Mail Processing Conveyor System

SENATE, THE

Notice type
Solicitation
Solicitation #
2026-R-047
NAICS
333922
PSC
R604
Set-aside
No Set aside used
Posted
July 6, 2026
Response due
July 30, 2026
Place of performance
Washington, DC

What this opportunity is

The U.S. Senate is seeking a contractor to provide a complete replacement mail processing conveyor system for its Office of the Sergeant at Arms in Landover, Maryland. This opportunity is open to all businesses, as there is no set-aside for small businesses. The project involves delivering, installing, and integrating a new system that supports existing mail screening workflows and X-ray processes. Interested vendors should note that this is a solicitation notice, indicating the need to prepare a bid rather than simply track the opportunity.

Analysis by Mindy, grounded in the SAM.gov notice.

Description

U.S. Senate, Office of the Sergeant at Arms Mail Processing Conveyor System REQUEST FOR QUOTATION (RFQ) STATEMENT OF WORK 1. INTRODUCTION The United States Senate, Office of the Sergeant at Arms (SAA) requires a Contractor to provide a complete, fully operational replacement mail processing conveyor system at the SAA designated mail processing facility in Landover, Maryland. The replacement system shall support the existing mail screening workflow, integrate with the existing X-ray operational process, and replace the existing conveyor system with new conveyor equipment, controls, supports, wiring, and accessories required for a turnkey system. The purpose of this Statement of Work (SOW) is to define the minimum technical, operational, delivery, installation, testing, acceptance, warranty, and closeout requirements for the Mail Processing Conveyor System. The Contractor shall furnish all management, supervision, labor, materials, equipment, tools, lift equipment, freight, rigging, staging, controls, electrical work, testing, documentation, training, and warranty support necessary to deliver a complete and production ready system. 2. BACKGROUND The existing PMW conveyor system supports the SAA mail handling and X-ray screening process. The current operating model includes an upstream gravity conveyor feeding mail into the existing X-ray machine, an accumulation and stop-and-release zone downstream of the X-ray machine, operator release through a foot switch, and a downstream conveyance and divert/sort path for processed mail. The replacement system is required to preserve the existing mail processing workflow while improving reliability, maintainability, controls integration, and system supportability. The replacement system shall be designed and installed within the existing operational environment, subject to field verification, approved shop drawings, SAA security requirements, approved outage windows, and coordination with Senate operations. The existing X-ray machine is not being replaced under this SOW. The Contractor shall coordinate installation and controls integration with the existing X-ray workflow and shall not modify, move, operate, or connect to the X-ray machine except as expressly authorized in writing by the SAA. -- 1 of 17 -- 3. DESCRIPTION OF SERVICES The Contractor shall propose, furnish, deliver, install, integrate, test, and warranty a replacement Conveyor System consisting of motorized roller conveyor, gravity conveyor, a right angle divert/sort device or equivalent mail divert function, supports, side guides, controls, wiring, sensors, emergency stops, protective features, and all associated accessories required for a complete operational system. The Contractor shall disconnect, dismantle, remove, and dispose of the existing conveyor equipment, unless the SAA identifies components that must be retained, salvaged, or transferred for Government disposition. The Contractor shall protect surrounding facilities, equipment, finishes, the existing X-ray machine, and Senate property throughout removal, delivery, staging, installation, start-up, testing, and closeout. 4. REQUIRED TECHNICAL FEATURES 4.1 Technical Drawings Attachment A – Technical Drawings provides the technical drawing references and component descriptions used for the existing conveyor component baseline and minimum salient characteristics for the replacement Conveyor System. The Contractor shall review Attachment A, verify the applicability of each component during the site visit and field verification, and cross reference the proposed design to the applicable Attachment A sections. The Contractor shall identify any differences between the proposed components and Attachment A. Section Reference No. Component Description Use 1 LSB-34 Intermediate bed; 120 inches long by 36 inches wide; 3-inch roller centers; 8- inch-deep non-pop-out frames; standard roller bearings; no speed-up spools; Paint Code 0000. Gravity/straight conveyor baseline reference. 2 LSB-37 90-degree curved bed; 36 inches wide; 3-inch roller center system with 2-inch roller center setup; speed up spools; 8-inch-deep non-pop-out frames; high- speed roller bearings. Curved gravity/conveyor baseline reference near X-ray workflow. 3 LSB-443, LSB-445, LSB-474 Intermediate PE accumulator beds; right hand shaft; 60-inch and 120-inch lengths by 36 inches wide; 3-inch roller centers; 30-inch accumulation zones; 8-inch-deep non-pop-out frames; standard roller bearings; Paint Code 0000. Accumulation/motorized conveyor baseline reference. 4 LSB-473 Drive bed PE accumulator; right hand shaft; 60 inches long by 36 inches wide; 3-inch roller centers; 30-inch accumulation zones; standard bearings; 75 FPM operating speed; 2 HP mounted control; PS256A-03B1 control; #800967 direct drive. Drive/accumulation section baseline reference. 5 LSB-477 Drive bed; 36 inches long by 36 inches wide; 3-inch roller centers; 8-inch-deep non-pop-out frames; standard roller bearings; 70 FPM operating speed; 2 HP direct drive; no automatic frequency control. Drive section baseline reference. 6 LSB-478 Intermediate PE accumulator bed; right-hand shaft; 30 inches long by 36 inches wide; 3-inch roller centers; 30-inch accumulation zones; standard roller bearings; Paint Code 0000. Short accumulation section baseline reference. 7 LSB-479 Right angle two-way transition bed; 48 inches long by 36 inches wide; 3-inch roller centers; 16-inch-deep non-pop-out frames; five transfer belts; standard configuration; no speed-up spool. Divert/sort transition baseline reference. -- 2 of 17 -- 4.2 Requirements Matrix Technical requirements are listed in the Excel Worksheet (Attach B – Requirements Matrix). Offerors shall complete the Requirements Matrix and indicate whether the proposed system does not meet, meets, or exceeds each requirement. Requirements designated as Mandatory (M) must be met for a proposal to be eligible for award, unless the SAA determines,

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.

View the original notice on SAM.gov ↗

Similar Active Opportunities (NAICS 333922)