Description
USCGC HUDSON (WLIC 801)
SPECIFICATION FOR DOCKSIDE REPAIRS
FY2026
Developed By: Erik C Elasik
(Rev-0, 15 October 2025)
-- 1 of 14 --
USCGC HUDSON (WLIC-160A) DOCKSIDE AVAILABILITY FY2026
35 (Rev-0)
25903_ESD_0924_FLT
REC_25903_FLT_160 WLIC ‘A’ Class (ALL) (0323)
WORK ITEM 7: Hull Fittings, Weight Handling Rigging Hardware,
Inspect and Test
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to inspect and test designated
hull fittings, listed in Table 1.
TABLE 1 - DESIGNATED ATON HULL FITTINGS
QTY DESCRIPTION LOCATION
3 Pad Eye, 1-1/4” Main Deck, Frame -1, P/S and CL
4 Pad Eye, 1-1/4” Main Deck, Frame 11, P/S
2 Pad Eye, 1-1/4” Main Deck, Frame 17, P/S
2 Pad Eye, 1-1/4” Main Deck, Frame 20, P/S
4 Pad Eye, 1-1/4” Main Deck, Frame 22, P/S
4 Pad Eye, 1-1/4” Main Deck, Frame 49, P/S
2 Pad Eye, 1-1/4” Main Deck, Frame 79, P/S
1.2 Government-furnished property.
None.
2. REFERENCES
COAST GUARD DRAWINGS
Coast Guard Drawing FL 1204-3, Rev A, Welded Padeyes & Links
COAST GUARD PUBLICATIONS
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2020,
General Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2020,
Welding and Allied Processes
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2020,
Requirements for Preservation of Ship Structures
OTHER REFERENCES
None
-- 2 of 14 --
USCGC HUDSON (WLIC-160A) DOCKSIDE AVAILABILITY FY2026
36 (Rev-0)
3. REQUIREMENTS
3.1 General.
3.1.1 CIR.
None.
3.1.2 Tech Rep.
Not applicable.
3.1.3 Protective measures - general. The Contractor shall furnish and install all protective coverings to
seal off and protect all non-affected vessel's components, equipment, and spaces in the vicinity of the
work area against contamination during the performance of work. Upon completion of work, the
Contractor shall remove all installed protective measures, inspect for the presence of contamination, and
return all contaminated equipment, components, and spaces to original condition of cleanliness.
3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec
0000, paragraph 3.3.5 (Interferences).
3.2 Inspection and test particulars. The Contractor shall accomplish the following inspections for all
designated fittings, and submit a CFR.
3.2.1 Visual. Perform a visual inspection of fitting structures and associated foundations, for evidence of
fractures, excessive wear, deformation, and corrosion.
3.2.2 NDE. Structurally inspect all fittings, including foundation welds, by NDE methods in accordance
with SFLC Std Spec 0740, Appendix C. If a NDE method that requires coating removal is selected,
perform subsequent touch-up preservation in accordance with SFLC Std Spec 6310, paragraph 3.1.13
(Touch-ups and minor coating repairs).
NOTE
Common NDE methods not requiring coating removal include, but are not
limited to:
a. Radiographic Testing (RT).
b. Ultrasonic Testing (UT).
c. Eddy Current Testing (ET).
3.2.3 Measurements. Measure and record each pad-eye diameter (“A” dimension), shown on Coast
Guard Drawing FL 1204-3 as guidance.
3.2.4 Pull-test. In lieu of NDE, the Contractor may pull-test all pad eyes in accordance with SFLC Std
Spec 5000, paragraph 3.2.7 (Pull-Test), using the working load provided in Coast Guard Drawing FL
1204-3 for each designated pad eye size. Visually inspect all welds for signs of damage, after completion
of pull-test.
-- 3 of 14 --
USCGC HUDSON (WLIC-160A) DOCKSIDE AVAILABILITY FY2026
37 (Rev-0)
4. NOTES
This section is not applicable to this work item.
-- 4 of 14 --
USCGC HUDSON (WLIC-160A) DOCKSIDE AVAILABILITY FY2026
38 (Rev-0)
57300_XdckWnchInspctSrvc_ACC_0121_IBCT
REC_57300_XdckWnch_IBCT_160 WLIC (ALL) (1014)
WORK ITEM 8: Crossdeck Winch, Inspect & Service
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to inspect and service the Utility
Air Winch Model HU-40 Series.
1.2 Government-furnished property.
None.
2. REFERENCES
COAST GUARD DRAWINGS
Coast Guard Fleet Drawing FL-1112-18, Rev -, HU40 Series Spud Winch Foundation
COAST GUARD PUBLICATIONS
Coast Guard Technical Publication (TP) 4958, Section A, Amendment 1; Mar 2011, Utility Air
Winch Model HU-40 Series
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2020,
General Requirements
Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2020,
Auxiliary Machine Systems
OTHER REFERENCES
None
3. REQUIREMENTS
3.1 General.
3.1.1 CIR.
None.
3.1.2 Tech Rep.
Not applicable.
-- 5 of 14 --
USCGC HUDSON (WLIC-160A) DOCKSIDE AVAILABILITY FY2026
39 (Rev-0)
3.1.3 Protective measures. The Contractor must furnish and install all protective measures in accordance
with SFLC Std Spec 0000, paragraph 3.3.3 (Vessel component, space, and equipment protection).
3.1.4 Interferences. The Contractor must handle all interferences in accordance with SFLC Std Spec
0000, paragraph 3.3.5 (Interferences).
3.2 Renewal task particulars. The Contractor must perform the tasks designated in Table 1 below, in
accordance with SFLC Std Spec 5000:
TABLE 1 – REQUIRED TASKS
ADDITION REQUIREMENTS
# TASK TYPE
(SFLC STD
SPEC 5000
PARA. REF.)
QTY COMPONENT
OR
ASSEMBLY
APPENDIX
AND PARA.
FROM SFLC
STD SPEC
5000
OTHER
1 Operate and
Inspect
6 3.2.1 (Operate
and Inspect)
D2.1 (Fastener
assemblies)
D2.1 (Fastener
assemblies)
Submit CFR.
2 NDE and
Preserve
6 Winch
Foundation
3.2.4
(Preservation)
3.2.5 (NDE)
1. Finish coat color: black (17038).
2. Areas to NDE:
…- All weld joints connecting winch
foundations to the deck
…- Winch feet
3. Submit CFR.
3 Renew 6 Wire Rope
Assembly
D2.2 (Wire
Rope
Assemblies)
Wire rope particulars:
Each set is as follows:
- Nominal diameter: 5/8 inch.
- Nominal strength: 6x37 XXIPS IWRC
RRL
- Length of rope required: 150 ft per
assembly
- End fitting type: Poured spelter or fiege
4 Groom and
Lubricate
6 Winch 3.2.6 (Groom
and lubr…