What this opportunity is
The Department of Defense is seeking quotations related to the USNS Puerto Rico, specifically for various technical specifications and repair plans outlined in multiple NAVSEA drawings and documents. This opportunity is open to all businesses, as there is no set-aside for small businesses. Interested contractors should note that the notice type is a solicitation, indicating they will need to prepare and submit a bid based on the provided specifications and drawings.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
ATTACHMENT J-5
ATTACHMENT J-5
REQUEST FOR SPECIFICATION CLARIFICATION
QUESTION:
1. There are difficulties in preparing the quotation, and if you provide the reference files
below, we will be able to make an accurate quotation.
2. Please verify red text in WI 461 & 515.
WI Reference
105 NAVSEA Drawing No. 588-001, Flight Deck Tie Down Numbering Scheme
105 T-EPF Flight Deck Tie Down (FDTD) Cup Fitting Colored Map
105 NAVSEA Drawing No. 8443387 Rev M, JHSV Paint Schedule
110 ABS Hull Supplement Survey Document (HSSD) for USNS PUERTO RICO
110 General Arrangement and Profile Drawing 8807534
114 TEPF11_USNS PTR Structural Deficiency Log Master_24DEC2025
114 SDL Inserts_24DEC2025
120 NAVSEA Drawing 8442884
120 NAVSEA Drawing 8443392
120 Dwg 8393682
151 Repair Plan PR-CCO-122-01, Potable Tank Repair Plan dtd 06 Feb 2025
151 DWG 8444516, Potable Water Tanks
152 DWG 2025-R-2800-100-1001, Bow Shell Repair Plan REVA
152 DWG 630-100-04-203 - Welding Details and Construction Tolerances, Rev D or later
153 NAVSEA Drawing No. 8443364 REV H missing
153 NAVSEA Drawing No. 8442862, 636-097-01-201-SRD Capacity Plan
153 Tank Survey Status Form
155 MSC Drawing #8614850, Frame 70, Main Deck, 11.5M OCL BHD Modifications &
374-IR-588-QC- collision bulkhead penetration
155 NAVSEA Drawing #8444192_E, BERPS and WERPS Arrangement and Details
155 NAVSEA Drawing #8442897_G, Structural Plan Main Deck (Ref 2.1.6) &
#8442923_G, Structural Plan Main Deck Hull Void 70-82 STBD
155 NAVSEA Drawing #8442891_L, Typical Structural Frames Hull Void 52-70 (Ref
2.1.4) & #8442899_H, Superstructure Structural Frames
155 MSC General Technical Requirements (GTR) No. 7081122
156A NAVSEA Drawing 492-8613222 Rev A_SRD Aviation Visual Landing Aid (VLA)
and Lighting Arrangement
156A NAVSEA Drawing No. 803-1916300 / 804-1213717, Aircraft Securing Fittings
163 NAVSEA Drawing No. 588-8444203, Flight Deck Safety Net and Coaming Drawing
163 NAVAIRSYSCOM Air Capable Ship Aviation Facilities Bulletin No. 1
163 NAVSEA Drawing No. 804-8436625, Safety Nets, Deck Edge, Aluminum Frame,
Synthetic Net
165 NAVSEA Drawing No. 8445660, Booklet of General Plans
199 MSC Drawing 613-8614649, Lifting Lug Arrangement Modifications
199 MSC Drawing 120-8614650, Structural Fire Protection Mission Bay Modifications
201 NAVSEA Tech Manual S9233-EM-MMC-010
-- 1 of 6 --
201 NAVSEA Tech Manual S9560-ES-MMC-010
201 NAVSEA Tech Manual S9241-DA-MMC-010
201 NAVSEA Tech Manual TM-WJ-JHSV-02
302A NAVSEA Drawing No. 324-8445374, Power and Lighting System One-Line Diagram
320 NAVSEA Drawing No. 320-8443072, Electrical AC System Overview Line Diagram
351 NAVSEA Tech Manual S9324-LZ-MMC-010, Main Switchboard Model 630
351 NAVSEA Drawing No. 324-8443134
351 NAVSEA Drawing No. 324-8443135
351 MSFSC SWIRRR 020, Switchboard and Electrical Control Cabinet Survey, Cleaning
and Repair
461 Not including Enclosure 2.2.1/2.2.2
503 NAVSEA Technical Manual S9593-FP-MMC-010, Sewage Treatment Plant, Type II
Model TW-HMX-6104
505 Tech Manual S9531-DK-MMC-010, Reverse Osmosis Desalination Plant
512 NAVSEA Final Technical Manual S9169-BE-MMC-010, Stern Ramp Model A07364
514 Drawing No. F165291
515
Work Item 523 is not included in the work item list in this ROH, but “Shipyard Work
Item 523 - Stern Ramp Fiber Rope Replacement Interim Docking” is mentioned in the
para 2.1 of WI-0515 specification.
532 Drawing No. 8807528, Schematic – Bilge System
801A No. 512-8444465, Schematic Chilled Water System
801A S6230-CY-MMC-010, Air Conditioning Chilled Water Unit Model 146R-6KR
801A S9516-CE-MMC-010, Ship’s Stores Refrigeration System, Model ADR-234Q
802 512-8612640 Schematic – Machinery and Equipment Ventilation System
910 MSC Drawing No. 160-8443389, Anode Arrangement and Installation Drawing
910 MSC Drawing No. 182-8442909, Jet Duct Anode Arrangement
934 NAVSEA Drawing No. 256-8443038, Details - Sea Intakes
934 NAVSEA Drawing No. 256-8443037, Arrangement - Sea Intakes
934 NAVSEA Drawing No. 630-8443386, Corrosion Prevention and Control Plan
934 NAVSEA Drawing No. 526-8443242, Schematic - Deck Drains
1001 0978-LP-035-3010, Tech Manual Single Probe Fueling System
1003 Drawing No. 492-8443197, Aviation Visual Landing (VLA) And Lighting
Arrangement
ANSWER:
There is no WI 523 included in the current work package; therefore, no fiber rope
replacement is required under that work item.
Please refer to the attached latest revision of WI 515. The references highlighted in red are
attached. All other references should have been provided previously.
EQUEST FOR SPECIFICATION CLARIFICATION
NAME OF CONTRACTOR: HANWHA OCEAN
SPECIFICATION ITEM NO.: 546 PARA. NO.7.4.2
-- 2 of 6 --
ATTACHMENT J-5
ATTACHMENT J-5
TITLE: Clarification of para 7.4.2
QUESTION:
1. Regarding para. No. 7.4.2, OEM’s thought an error that occurred within copy & paste.
Please identify this.
ANSWER: This was answered on 06/02/2026.
ANSWER: MSC concurs with the OEM's recommendation. Section 7.4.2 (b), Deck Crane
Hydraulic Winch Tear Down Inspection, is not required for this maintenance period.
Please remove this item 7.4.2 (b) from the scope of work.
b. A tear down inspection should include the hoist being completely disassembled, cleaned
and inspected and replacement of all worn, cracked, corroded or distorted parts such as pins,
bearings, shafts, gears, brake rotors, brake plates, drum and base. All seals and o-rings should
be replaced during a tear down inspection.
Note that 7.4.2 (a) is still required.
a. Take a lube oil sample and send off for analysis. Drain and dispose of remaining oil.
Replace with new oil.
SPECIFICATION ITEM NO.: 570 PARA. NO.7.4.2 / 7.4.9 / 7.4.10
TITLE: Quantity of DOT/TC type extinguisher
QUESTION:
1. To prepare accurate quotation, we’d like to know how many DOT or TC type
extinguishers are equipped in the vessel.
ANSWER:
Vessel is equipped with 43 CO2 extinguishers, hence 43 total DOT type extinguishers
SPECIFICATION ITEM NO.: 574C PARA. NO.
TITLE: Specification of each shutters
-- 3 of 6 --
QUESTION:
1. Please prov…
Source: SAM.gov, as posted. Verify the current solicitation before responding.
Pursue this opportunity with Mindy
See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.
View the original notice on SAM.gov ↗Similar Active Opportunities (NAICS 336611)
USCGC WAESCHE FUEL OIL PUMP (FOP) MOTOR
HOMELAND SECURITY, DEPARTMENT OF · Special Notice · due July 3, 2026
Overhaul (soft kits only) and testing of Marotta valves
DEPT OF DEFENSE · Award Notice
FY26 DRY-DOCKING AND MAINTENANCE OF U.S. ARMY LANDING CRAFT, LCM-8529
DEPT OF DEFENSE · Presolicitation · due July 3, 2026
Ship's Service Turbine Generators (SSTGs) No. 1 and No. 2
DEPT OF DEFENSE · Presolicitation · due June 24, 2026
CGC MAPLE RED GEAR TECH ASSIST
HOMELAND SECURITY, DEPARTMENT OF · Combined Synopsis/Solicitation · due June 22, 2026
USS BLUE RIDGE (LCC-19) FY26 CNO DSRA TYCOM# 4 (Yokosuka, Japan)
DEPT OF DEFENSE · Solicitation · due July 20, 2026