What this opportunity is
The Department of Defense is seeking a contractor to install a new video intercom system at the control tower in Building 7104 on Ellsworth Air Force Base, South Dakota. This total small business set-aside opportunity under NAICS 238210 is suitable for small businesses specializing in audio/visual installation and telecommunications. Interested contractors should note that this is a solicitation notice, indicating that they can submit bids to fulfill the outlined requirements, including the removal of existing equipment and installation of new systems.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
Performance Work Statement
ATC Intercom System
11 May 2026
1. Requirement: Remove the existing, inoperable intercom located on the 2nd, 3rd, 6th and 8th
floors of the control tower (Bldg. 7104). Install a new intercom with 2-way audio/visual
capabilities on the 2nd, 3rd, 6th and 8th floors. Install a call button with audio/visual capabilities
on the 1st floor foyer.
2. Background: The control tower is equipped with a voice-only intercom system located on the
2nd, 3rd, 6th and 8th floors. The call button was located in the 1st floor entrance foyer between
the outside door and the cypher lock door. It is believed this intercom system was installed when
the control tower was built. Several years ago, the intercom system stopped working. Over the
years, attempts were made by Facility Managers to get the intercom repaired; however, neither
28th Communications Squadron nor the 28th Civil Engineers Squadron provide maintenance
and/or repairs for intercom systems. Eventually, the call button was removed and a telephone
was installed.
3. Program Objective: The objective of this requirement is for the contractor to install and test a
new intercom with both audio and visual capabilities on the 2nd, 3rd, 6th and 8th floors of the
control tower to satisfy user’s performance requirements. The contractor shall be responsible for
providing and installing an audio/visual intercom that meets the following objectives for the air
traffic control tower located in Building 7104 on Ellsworth Air Force Base, South Dakota.
4. Contract Objectives: Contractor shall be responsible for providing the following:
a) Remove all pre-existing intercom equipment to include all wires.
b) Remove the telephone on the 1st floor entrance foyer located between the outside door
and the cypher lock door and replace with a call button with audio and video capability. If
possible, install the new call button in the same location as the telephone. However, if
unable, the call button can be installed in a different location within the same general
area.
c) The call button must be programmed to call the tower cab (8th floor) first when
activated. The person answering the call must be able to see and hear the person
attempting to gain entry.
d) If there is nobody in the tower cab, the call button must have the capability to call the
2nd, 3rd, and 6th floors individually. As with the cab, the occupants on the 2nd, 3rd, and
6th floors must be able to see and hear clearly.
-- 1 of 5 --
e) All stations on the 2nd, 3rd, 6th and 8th floors must have the capability to call each
other.
f) The installer will securely attach all new equipment to the wall in the same location as
the old equipment. If the intercom is a desktop device, then a small shelf will be placed at
the same location as the old intercom.
g) The intercom must be a closed system with no internet dependency.
h) The intercom must be AC powered.
i) The intercom will not be required to lock/unlock the front door.
j) The installer will provide operating instructions and training for the new system.
k) Training will be provided to the control tower primary or alternate facility manager
who will, in turn, provide training for the rest of the facility.
l) Install all equipment, cords, and miscellaneous parts in a clean and professional
manner.
m) Ensure all damage to paint/surfaces/walls/flooring that is a direct result of installing
the new intercom are repaired. The contractor is not responsible for repairing any
preexisting damage.
n) Ensure all intercom equipment meets USAF requirements and are obtained from
authorized vendors.
o) Notify the primary/alternate facility manager of the number of personnel that with be
working on the project at least 24 hours in advance if the number of workers is different
than the predetermined number. This requirement is to ensure the necessary escorts are
available.
5. Configuration Management: Establishment of a baseline to define the configuration of the
intercom and demonstrated capability to satisfy the user’s performance requirements.
6. Site Visit: A site visit will be offered to allow for review of the existing intercom system
currently in place and provide contractor ability to take any needed measurements as well as
gain a visible understanding of room layout and function.
7. Warranty & Instructional Documents: All warranty and instructional documents will be
provided to the 28th Contracting Squadron and Installation Deployment Officer, primary or
alternate point of contact (POC), prior to technician departure.
8. Delivery Service Date: This service is to be completed within 180 calendar days of contract
award date. Specific date to be coordinated with the Primary or Alternate POC(s) following
contract award.
-- 2 of 5 --
a) The Contractor must coordinate all deliveries with the primary or alternate POC(s)
prior to shipping any items (Name of POC(s) to be provided at time of contract award).
b) Contractor shall make use of commercial best practices in the packing and shipment of
products, unless otherwise stated in this order.
c) Offers need to be submitted based on shipment to the following delivery address:
814 Kenney Road Bldg. 7104
Ellsworth, SD 57706
9. Site Restoration/Debris Removal: Contractor shall protect all government and non-
government property and personnel on base from inconvenience, damage, and/or injury. All
damaged areas during the assembly/installation process should be restored to their original
condition.
10. Site Cleanup: Prior to assembly/installation completion, the Contractor shall remove all
debris and surplus materials from the workplace. The primary or alternate Facility Manager will
show the contractor where equipment and materials that are required to complete the work effort
may be stored on-site during the project. The contractor shall return all disturbed areas to their
original condition upon completion of the installation. All Equipment and residuals removed
from this project shall be disposed of by t…