Y--MORA-CAMP MUIR GUIDE BUILDINGS

INTERIOR, DEPARTMENT OF THE

Notice type
Solicitation
Solicitation #
140P8526R0002
NAICS
236220
PSC
Y1QA
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Posted
June 16, 2026
Response due
June 26, 2026

What this opportunity is

The Department of the Interior is seeking a total small business to provide design development and construction document services for the rehabilitation of climbing facilities at Camp Muir in Mount Rainier National Park, Washington. This project falls under NAICS code 236220 and includes the creation of 100% construction documents and specifications. As a solicitation notice, interested small businesses should prepare to submit bids, ensuring they meet the requirements outlined in the provided specifications.

Analysis by Mindy, grounded in the SAM.gov notice.

Description

REHABILITATE CLIMBING FACILITIES AT CAMP MUIR TITLE II DESIGN DEVELOPMENT AND CONSTRUCTION DOCUMENTS SERVICES MOUNT RAINIER NATIONAL PARK, PIERCE COUNTY, WASHINGTON 100% CONSTRUCTION DOCUMENTS - SPECIFICATION 140P8525F0011 PMIS # 307228 DECEMBER 03, 2025 9882 JASON W. SWIFT REGISTERED ARCHITECT STATE OF WASHINGTON -- 1 of 136 -- REHABILITATE CLIMBING FACILITIES AT CAMP MUIR 100% CONSTRUCTION DOCUMENTS - SPECIFICATION ECI 12.03.2025 140P8525F0011 -- 2 of 136 -- Mount Rainier National Park Rehabilitate Climbing Facilities at Camp Muir PMIS # 307228 000110 - 1 Table of Contents SECTION 000110 TABLE OF CONTENTS PROCUREMENT AND CONTRACTING REQUIREMENTS DIVISION 00 -- PROCUREMENT AND CONTRACTING REQUIREMENTS 000101 - Project Title Page 000110 - Table of Contents NPS Procurement and Contracting Standard Sections SPECIFICATIONS DIVISION 01 -- GENERAL REQUIREMENTS 011000 - Summary 012500 - Substitution Procedures 013000 - Administrative Requirements 013216 - Construction Progress Schedule 014000 - Quality Requirements 014216 - Definitions 015000 - Temporary Facilities and Controls 015713 - Temporary Erosion and Sediment Control 016000 - Product Requirements 017000 - Execution and Closeout Requirements 017419 - Construction Waste Management and Disposal 017800 - Closeout Submittals DIVISION 02 -- EXISTING CONDITIONS 024100 - Demolition DIVISION 03 -- CONCRETE (NOT USED) DIVISION 04 -- MASONRY 044313 - Stone Masonry Veneer DIVISION 05 -- METALS 051200 - Structural Steel Framing 054000 - Cold-Formed Metal Framing 055000 - Metal Fabrications 055100 - Metal Stairs DIVISION 06 -- WOOD, PLASTICS, AND COMPOSITES 061000 - Rough Carpentry 061529 - Nail Laminated Timber 061600 - Structural Sheathing 061723 - Parallel Strand Lumber 062000 - Finish Carpentry DIVISION 07 -- THERMAL AND MOISTURE PROTECTION 072700 - Air Barriers 075300 - Elastomeric Membrane Roofing 076200 - Sheet Metal Flashing and Trim -- 3 of 136 -- Mount Rainier National Park Rehabilitate Climbing Facilities at Camp Muir PMIS # 307228 000110 - 2 Table of Contents 079200 - Joint Sealants DIVISION 08 -- OPENINGS 085113 - Aluminum Windows 087100 - Door Hardware 089100 - Louvers DIVISION 09 -- FINISHES (NOT USED) DIVISION 10 -- SPECIALTIES 101423 - Panel Signage 104400 - Fire Protection Specialties 105617 - Wall Mounted Standards and Shelving DIVISION 11 -- EQUIPMENT 114000 - Foodservice Equipment DIVISION 12 -- FURNISHINGS (NOT USED) DIVISION 13 -- SPECIAL CONSTRUCTION (NOT USED) DIVISION 14 -- CONVEYING EQUIPMENT (NOT USED) DIVISION 21 -- FIRE SUPPRESSION (NOT USED) DIVISION 22 -- PLUMBING (NOT USED) DIVISION 23 -- HEATING, VENTILATING, AND AIR-CONDITIONING (HVAC) (NOT USED) DIVISION 25 -- INTEGRATED AUTOMATION (NOT USED) DIVISION 26 -- ELECTRICAL 2600000 - Electrical General Requirements. 260526 - Grounding and Bonding for Electrical Systems 260529 - Hangers and Supports for Electrical Systems 260533 - Raceway and Boxes for Electrical Systems 264100 - Facility Lightning Protection DIVISION 27 -- COMMUNICATIONS (NOT USED) DIVISION 28 -- ELECTRONIC SAFETY AND SECURITY (NOT USED) DIVISION 29 -- RESERVED (NOT USED) DIVISION 30 -- RESERVED (NOT USED) DIVISION 31 -- EARTHWORK 312000 - Earth Moving 313600 – Gabions DIVISION 32 -- EXTERIOR IMPROVEMENTS (NOT USED) DIVISION 33 -- UTILITIES (NOT USED) END OF SECTION -- 4 of 136 -- Mount Rainier National Park Rehabilitate Climbing Facilities at Camp Muir PMIS # 307228 011000 - 1 Summary SECTION 011000 SUMMARY PART 1 GENERAL 1.01 PROJECT A. Project Name: Rehabilitate Climbing Facilities at Camp Muir B. Owner's Name: National Park Service. 1.02 DESCRIPTION OF ALTERATIONS WORK A. Scope generally includes removal of an existing modular building and replacement with two new climbing shelters, plus associated site stabilization work. B. Scope of demolition and removal work is indicated on drawings and specified in Section 024100. 1.03 CONTRACTOR USE OF SITE A. Construction Operations: Limited to areas noted on Drawings. 1. Locate and conduct construction activities in ways that will limit disturbance to site. B. Arrange use of site to allow: 1. Access through the site by guided climbing companies and members of the public. C. Provide access to and from site as required by law and by Owner: 1. Do not obstruct roadways, sidewalks, or other public ways without permit. PART 2 PRODUCTS - NOT USED PART 3 EXECUTION - NOT USED END OF SECTION -- 5 of 136 -- This page intentionally left blank -- 6 of 136 -- Mount Rainier National Park Rehabilitate Climbing Facilities at Camp Muir PMIS # 307228 012500 - 1 Substitution Procedures SECTION 012500 SUBSTITUTION PROCEDURES PART 1 GENERAL 1.01 SECTION INCLUDES A. Procedural requirements for proposed substitutions. 1.02 DEFINITIONS A. Substitutions: Changes from Contract Documents requirements proposed by Contractor to materials, products, assemblies, and equipment. 1. Substitutions for Cause: Proposed due to changed Project circumstances beyond Contractor's control. a. Unavailability. b. Regulatory changes. 2. Substitutions for Convenience: Proposed due to possibility of offering substantial advantage to the Project. a. Substitution requests offering advantages solely to the Contractor will not be considered. 1.03 REFERENCE STANDARDS A. CSI/CSC Form 1.5C - Substitution Request (During the Bidding/Negotiating Stage); Current Edition. B. CSI/CSC Form 13.1A - Substitution Request (After the Bidding/Negotiating Phase); Current Edition. PART 2 PRODUCTS - NOT USED PART 3 EXECUTION 3.01 GENERAL REQUIREMENTS A. A Substitution Request for products, assemblies, materials, and equipment constitutes a representation that the submitter: 1. Has investigated proposed product and determined that it meets or exceeds the quality level of the specified product, equipment, assembly, or system. 2. Agrees to provide the same warranty for the substitution as for the specified product. 3. Agrees to coordinate installation and make changes to other work that may be required for the work to

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.

View the original notice on SAM.gov ↗

Similar Active Opportunities (NAICS 236220)