What this opportunity is
The Department of the Interior is seeking a total small business to provide design development and construction document services for the rehabilitation of climbing facilities at Camp Muir in Mount Rainier National Park, Washington. This project falls under NAICS code 236220 and includes the creation of 100% construction documents and specifications. As a solicitation notice, interested small businesses should prepare to submit bids, ensuring they meet the requirements outlined in the provided specifications.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
REHABILITATE CLIMBING FACILITIES AT CAMP MUIR
TITLE II DESIGN DEVELOPMENT AND CONSTRUCTION DOCUMENTS SERVICES
MOUNT RAINIER NATIONAL PARK, PIERCE COUNTY, WASHINGTON
100% CONSTRUCTION DOCUMENTS - SPECIFICATION
140P8525F0011
PMIS # 307228
DECEMBER 03, 2025
9882
JASON W. SWIFT
REGISTERED
ARCHITECT
STATE OF WASHINGTON
-- 1 of 136 --
REHABILITATE CLIMBING FACILITIES AT CAMP MUIR
100% CONSTRUCTION DOCUMENTS - SPECIFICATION
ECI 12.03.2025 140P8525F0011
-- 2 of 136 --
Mount Rainier National Park
Rehabilitate Climbing Facilities at Camp Muir
PMIS # 307228 000110 - 1 Table of Contents
SECTION 000110
TABLE OF CONTENTS
PROCUREMENT AND CONTRACTING REQUIREMENTS
DIVISION 00 -- PROCUREMENT AND CONTRACTING REQUIREMENTS
000101 - Project Title Page
000110 - Table of Contents
NPS Procurement and Contracting Standard Sections
SPECIFICATIONS
DIVISION 01 -- GENERAL REQUIREMENTS
011000 - Summary
012500 - Substitution Procedures
013000 - Administrative Requirements
013216 - Construction Progress Schedule
014000 - Quality Requirements
014216 - Definitions
015000 - Temporary Facilities and Controls
015713 - Temporary Erosion and Sediment Control
016000 - Product Requirements
017000 - Execution and Closeout Requirements
017419 - Construction Waste Management and Disposal
017800 - Closeout Submittals
DIVISION 02 -- EXISTING CONDITIONS
024100 - Demolition
DIVISION 03 -- CONCRETE (NOT USED)
DIVISION 04 -- MASONRY
044313 - Stone Masonry Veneer
DIVISION 05 -- METALS
051200 - Structural Steel Framing
054000 - Cold-Formed Metal Framing
055000 - Metal Fabrications
055100 - Metal Stairs
DIVISION 06 -- WOOD, PLASTICS, AND COMPOSITES
061000 - Rough Carpentry
061529 - Nail Laminated Timber
061600 - Structural Sheathing
061723 - Parallel Strand Lumber
062000 - Finish Carpentry
DIVISION 07 -- THERMAL AND MOISTURE PROTECTION
072700 - Air Barriers
075300 - Elastomeric Membrane Roofing
076200 - Sheet Metal Flashing and Trim
-- 3 of 136 --
Mount Rainier National Park
Rehabilitate Climbing Facilities at Camp Muir
PMIS # 307228 000110 - 2 Table of Contents
079200 - Joint Sealants
DIVISION 08 -- OPENINGS
085113 - Aluminum Windows
087100 - Door Hardware
089100 - Louvers
DIVISION 09 -- FINISHES (NOT USED)
DIVISION 10 -- SPECIALTIES
101423 - Panel Signage
104400 - Fire Protection Specialties
105617 - Wall Mounted Standards and Shelving
DIVISION 11 -- EQUIPMENT
114000 - Foodservice Equipment
DIVISION 12 -- FURNISHINGS (NOT USED)
DIVISION 13 -- SPECIAL CONSTRUCTION (NOT USED)
DIVISION 14 -- CONVEYING EQUIPMENT (NOT USED)
DIVISION 21 -- FIRE SUPPRESSION (NOT USED)
DIVISION 22 -- PLUMBING (NOT USED)
DIVISION 23 -- HEATING, VENTILATING, AND AIR-CONDITIONING (HVAC) (NOT USED)
DIVISION 25 -- INTEGRATED AUTOMATION (NOT USED)
DIVISION 26 -- ELECTRICAL
2600000 - Electrical General Requirements.
260526 - Grounding and Bonding for Electrical Systems
260529 - Hangers and Supports for Electrical Systems
260533 - Raceway and Boxes for Electrical Systems
264100 - Facility Lightning Protection
DIVISION 27 -- COMMUNICATIONS (NOT USED)
DIVISION 28 -- ELECTRONIC SAFETY AND SECURITY (NOT USED)
DIVISION 29 -- RESERVED (NOT USED)
DIVISION 30 -- RESERVED (NOT USED)
DIVISION 31 -- EARTHWORK
312000 - Earth Moving
313600 – Gabions
DIVISION 32 -- EXTERIOR IMPROVEMENTS (NOT USED)
DIVISION 33 -- UTILITIES (NOT USED)
END OF SECTION
-- 4 of 136 --
Mount Rainier National Park
Rehabilitate Climbing Facilities at Camp Muir
PMIS # 307228 011000 - 1 Summary
SECTION 011000
SUMMARY
PART 1 GENERAL
1.01 PROJECT
A. Project Name: Rehabilitate Climbing Facilities at Camp Muir
B. Owner's Name: National Park Service.
1.02 DESCRIPTION OF ALTERATIONS WORK
A. Scope generally includes removal of an existing modular building and replacement with two
new climbing shelters, plus associated site stabilization work.
B. Scope of demolition and removal work is indicated on drawings and specified in Section
024100.
1.03 CONTRACTOR USE OF SITE
A. Construction Operations: Limited to areas noted on Drawings.
1. Locate and conduct construction activities in ways that will limit disturbance to site.
B. Arrange use of site to allow:
1. Access through the site by guided climbing companies and members of the public.
C. Provide access to and from site as required by law and by Owner:
1. Do not obstruct roadways, sidewalks, or other public ways without permit.
PART 2 PRODUCTS - NOT USED
PART 3 EXECUTION - NOT USED
END OF SECTION
-- 5 of 136 --
This page intentionally left blank
-- 6 of 136 --
Mount Rainier National Park
Rehabilitate Climbing Facilities at Camp Muir
PMIS # 307228 012500 - 1 Substitution Procedures
SECTION 012500
SUBSTITUTION PROCEDURES
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Procedural requirements for proposed substitutions.
1.02 DEFINITIONS
A. Substitutions: Changes from Contract Documents requirements proposed by Contractor to
materials, products, assemblies, and equipment.
1. Substitutions for Cause: Proposed due to changed Project circumstances beyond
Contractor's control.
a. Unavailability.
b. Regulatory changes.
2. Substitutions for Convenience: Proposed due to possibility of offering substantial
advantage to the Project.
a. Substitution requests offering advantages solely to the Contractor will not be
considered.
1.03 REFERENCE STANDARDS
A. CSI/CSC Form 1.5C - Substitution Request (During the Bidding/Negotiating Stage); Current
Edition.
B. CSI/CSC Form 13.1A - Substitution Request (After the Bidding/Negotiating Phase); Current
Edition.
PART 2 PRODUCTS - NOT USED
PART 3 EXECUTION
3.01 GENERAL REQUIREMENTS
A. A Substitution Request for products, assemblies, materials, and equipment constitutes a
representation that the submitter:
1. Has investigated proposed product and determined that it meets or exceeds the quality
level of the specified product, equipment, assembly, or system.
2. Agrees to provide the same warranty for the substitution as for the specified product.
3. Agrees to coordinate installation and make changes to other work that may be required for
the work to …
Source: SAM.gov, as posted. Verify the current solicitation before responding.