Y1DA--585-337 Expand Pharmacy and Radiology (MINOR) PR 585-26-4-337-0003

VETERANS AFFAIRS, DEPARTMENT OF

Notice type
Solicitation
Solicitation #
36C77626B0016
NAICS
236220
PSC
Y1DA
Set-aside
Service-Disabled Veteran-Owned Small Business Set Aside
Posted
June 16, 2026
Response due
June 18, 2026
Place of performance
MI

What this opportunity is

The Department of Veterans Affairs is soliciting bids for a minor construction project to expand pharmacy and radiology facilities in Iron Mountain, MI. This opportunity is set aside for Service-Disabled Veteran-Owned Small Businesses, making it suitable for small firms with relevant experience in construction. Interested contractors should note that this is a solicitation notice, indicating that they will need to prepare and submit a bid to compete for the contract.

Analysis by Mindy, grounded in the SAM.gov notice.

Description

-- 1 of 2192 -- PAGE INTENTIONALLY LEFT BLANK -- 2 of 2192 -- 10-24 Expand Pharmacy and Radiology 00 01 10-1 DEPARTMENT OF VETERANS AFFAIRS VHA MASTER SPECIFICATIONS TABLE OF CONTENTS Section 00 01 10 DIVISION 00 - SPECIAL SECTIONS DATE 00 01 10 Table of Contents 10-24 00 01 15 List of Drawing Sheets 10-24 00 31 32 Geotechnical Data Geotechnical Investigation Report 01-21 Geotechnical Investigation Report Supplement 02-21 DIVISION 01 – GENERAL REQUIREMENTS 01 00 00 General Requirements 11-21 01 32 16.15 Project Schedules 11-21 01 33 23 Shop Drawings, Product Data, and Samples 06-21 01 35 26 Safety Requirements 11-21 01 42 19 Reference Standards 11-20 01 45 00 Quality Control 02-21 01 45 29 Testing Laboratory Services 02-23 01 57 19 Temporary Environmental Controls 01-11 01 74 19 Construction Waste Management 11-21 01 91 00 General Commissioning Requirements Commissioning Plan – Design Phase 10-24 DIVISION 02 – EXISTING CONDITIONS 02 41 00 Demolition 08-17 02 82 13.13 Glovebag Asbestos Abatement DIVISION 03 – CONCRETE 03 30 00 Cast-In-Place Concrete 11-22 03 35 00 Sealed Concrete Finishing 03 45 00 Precast Architectural Concrete 01-21 DIVISION 04 – MASONRY 04 05 13.02 Mortar for Reinforced Block Masonry 11-22 04 05 16 Grout for Reinforced Block Masonry 11-22 04 21 13 Brick Unit Masonry 08-17 04 22 35 Reinforced Block Masonry 11-22 DIVISION 05 – METALS 05 12 00 Structural Steel Framing 11-22 05 31 00 Steel Decking 11-22 05 36 00 Composite Metal Decking 11-22 05 40 00 Cold Formed Metal Framing 11-22 05 50 00 Metal Fabrications 08-18 DIVISION 06 – WOOD, PLASTICS AND COMPOSITES 06 10 00 Rough Carpentry 10-17 06 20 00 Finish Carpentry 01-21 -- 3 of 2192 -- 10-24 Expand Pharmacy and Radiology 00 01 10-2 DIVISION 07 – THERMAL AND MOISTURE PROTECTION 07 13 52 Modified Bituminous Sheet Waterproofing 01-21 07 18 13 Pedestrian Traffic Coatings 01-21 07 21 13 Thermal Insulation 01-21 07 21 63 Fluid-Applied Insulation Coating 07 22 00 Roof and Deck Insulation 01-21 07 27 26 Fluid-Applied Air and Vapor Barrier 07 40 00 Roofing and Siding Panels 01-21 07 53 23 Ethylene-Propylene-Diene-Monomer Roofing 01-21 07 60 00 Flashing and Sheet Metal 01-21 07 71 00 Roof Specialties 01-21 07 81 00 Applied Fireproofing 10-17 07 84 00 Firestopping 01-21 07 92 00 Joint Sealants 10-17 07 95 13 Expansion Joint Cover Assemblies 01-21 DIVISION 08 – OPENINGS 08 11 13 Hollow Metal Doors and Frames 01-21 08 14 00 Interior Wood Doors 01-21 08 31 13 Access Doors and Frames 01-21 08 34 53 Security Doors and Frames 01-21 08 41 13 Aluminum-Framed Entrances and Storefronts 01-21 08 56 20 Pass-Thru Cabinets 08 56 53 Blast Resistant Windows 02-16 08 56 59 Security Windows 01-21 08 71 00 Door Hardware 08-22 08 71 13.11 Low Energy Power Assist Door Operators 01-21 08 80 00 Glazing 01-21 08 87 00 Glazing Surface Films 08 90 00 Louvers and Vents 01-21 DIVISION 09 – FINISHES 09 05 16 Subsurface Preparation for Floor Finishes 01-21 09 06 00 Schedule for Finishes 09 22 16 Non-structural Metal Framing 06-18 09 29 00 Gypsum Board 04-20 09 30 13 Ceramic/Porcelain Tiling 01-21 09 51 00 Acoustical Ceilings 12-18 09 65 13 Resilient Base and Accessories 01-21 09 65 16 Resilient Sheet Flooring 05-18 09 65 19 Resilient Tile Flooring 05-18 09 68 00 Carpeting 01-21 09 91 00 Painting 01-21 09 96 59 Resinous Specialty Glazed Coating Systems for Walls, Ceilings, Wallboard, and Block CMU 01-21 DIVISION 10 – SPECIALTIES 10 26 00 Wall and Door Protection 01-21 10 26 41 Ballistic Rated Panels 10 28 00 Toilet, Bath and Laundry Accessories 01-21 10 44 13 Fire Extinguisher Cabinets 08-18 10 51 13 Formed Metal Lockers -- 4 of 2192 -- 10-24 Expand Pharmacy and Radiology 00 01 10-3 DIVISION 12 – FURNISHINGS 12 24 00 Window Shades 08-17 12 32 00 Manufactured Wood Casework 01-21 12 36 00 Countertops 12-18 DIVISION 13 – SPECIAL CONSTRUCTION 13 49 26 Modular RFI / EMI Shielding Rooms 10-22 DIVISION 14 – CONVEYING SYSTEM 14 92 00 Pneumatic Tube System Relocation/Modification DIVISION 21 – FIRE SUPPRESSION 21 13 13 Wet-Pipe Sprinkler Systems 06-15 Fire Pump Report DIVISION 22 – PLUMBING 22 05 11 Common Work Results for Plumbing 09-20 22 05 12 General Motor Requirements for Plumbing Equipment 09-20 22 05 19 Meters and Gages for Plumbing Piping 09-20 22 05 23 General-Duty Valves for Plumbing Piping 09-20 22 07 11 Plumbing Insulation 09-19 22 08 00 Commissioning of Plumbing Systems 11-16 22 11 00 Facility Water Distribution 05-21 22 13 00 Facility Sanitary and Vent Piping 09-20 22 14 00 Facility Storm Drainage 09-15 22 14 29 Sump Pumps 09-15 22 15 00 Compressed-Air Systems 09-20 22 40 00 Plumbing Fixtures 09-15 22 62 00 Vacuum Systems for Healthcare Facilities 09-15 22 63 00 Gas Systems for Healthcare Facilities 09-15 DIVISION 23 – HEATING, VENTILATING, AND AIR CONDITIONING (HVAC) 23 01 30.51 HVAC Air Duct Cleaning 23 05 11 Common Work Results for HVAC 02-20 23 05 12 General Motor Requirements for HVAC and Steam Generation Equipment 02-20 23 05 14 Variable Frequency Drives 23 05 41 Noise and Vibration Control for HVAC Piping & Equipment 02-20 23 05 93 Testing, Adjusting, and Balancing for HVAC 02-20 23 07 11 HVAC and Boiler Plant Insulation 02-20 23 08 00 Commissioning of HVAC Systems 02-20 23 09 23 Direct-Digital Control System for HVAC 08-20 23 09 93 Sequence of Operation for HVAC Controls 23 21 13 Hydronic Piping 02-20 23 22 13 Steam and Condensate Heating Piping 02-20 23 25 00 HVAC Water Treatment 02-20 23 31 00 HVAC Ducts and Casings 02-20 23 34 00 HVAC Fans 02-20 23 36 00 Air Terminal Units 02-20 23 37 00 Air Outlets and Inlets 02-20 -- 5 of 2192 -- 10-24 Expand Pharmacy and Radiology 00 01 10-4 23 40 00 HVAC Air Cleaning Devices 03-20 23 73 00 Indoor Central-Station Air-Handling Units 03-20 23 81 23 Computer Room Air Conditioners 03-20 23 82

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.

View the original notice on SAM.gov ↗

Similar Active Opportunities (NAICS 236220)