Y1DZ--FY26: NRM (PROJ: 516-22-112) BB - Upgrade IV Mixing Room for USP 800 Compliance Lee County VA Clinic Cape Coral, FL
VETERANS AFFAIRS, DEPARTMENT OF
Notice type
Solicitation
Solicitation #
36C24826R0113
NAICS
236220
PSC
Y1DZ
Set-aside
Service-Disabled Veteran-Owned Small Business Set Aside
Posted
May 22, 2026
Response due
June 12, 2026
Place of performance
Bay Pines, FL
What this opportunity is
The Department of Veterans Affairs is seeking a contractor to upgrade the Pharmacy IV Mixing Room at the C.W. “Bill” Young VAMC in Cape Coral, Florida, to comply with USP 800 standards. This project is set aside for Service-Disabled Veteran-Owned Small Businesses under NAICS code 236220. Interested contractors should note that this is a solicitation notice, indicating the need to prepare bids rather than simply track the opportunity.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
Upgrade Pharmacy IV Mixing Room USP 797/800
C.W. “Bill” Young VAMC
Lee County HCC
Cape Coral, Florida
December 23, 2025
Bid Documents (BD) Submittal
Specifications
Project Number: 516-22-112
TMM# 2303
-- 1 of 774 --
-- 2 of 774 --
Project No.: 516-22-112 12-23-2025
Upgrade Pharmacy IV Mixing Room USP 797/800
C.W. “Bill” Young VAMC - Lee County HCC
Cape Coral, Florida
00 01 10-1
DEPARTMENT OF VETERANS AFFAIRS
VHA MASTER SPECIFICATIONS
TABLE OF CONTENTS
Section 00 01 10
SECTION NO. DIVISION AND SECTION TITLES DATE
00 01 10 Table of Contents 11-25
00 01 15 List of Drawing Sheets 05-20
DIVISION 01 - GENERAL REQUIREMENTS
01 00 00 General Requirements 11-21
01 32 16.15 Project Schedules (Small Projects – Design/Bid/Build 01-24
01 33 23 Shop Drawings, Product Data, and Samples 11-23
01 42 19 Reference Standards 11-20
01 45 29 Testing Laboratory Services 11-18
01 45 35 Special Inspections 06-21
01 57 19 Temporary Environmental Controls 01-21
01 74 19 Construction Waste Management 04-22
01 81 13 Sustainable Construction Requirements 10-17
01 91 00 General Commissioning Requirements 04-22
DIVISION 05 – METALS
05 12 00 Structural Steel Framing 11-18
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 84 00 Firestopping 01-21
07 92 00 Joint Sealants 04-22
DIVISION 08 - OPENINGS
08 11 13 Hollow Metal Doors and Frames 01-21
08 31 13 Access Doors and Frames 04-22
08 71 00 Door Hardware 03-24
08 71 13.11 Low Energy Power Assist Door Operators 01-21
08 80 00 Glazing 01-21
08 90 00 Louvers and Vents 01-21
DIVISION 09 – FINISHES
09 05 16 Subsurface Preparation for Floor Finishes 01-21
09 22 16 Non-Structural Metal Framing 06-18
09 29 00 Gypsum Board 04-20
09 67 23.30 Resinous (Epoxy Resin Composition) Mortar Flooring
(RES-3)
01-21
09 91 00 Painting 01-21
DIVISION 22 – PLUMBING
22 05 11 Common Work Results for Plumbing 12-22
22 05 23 General-Duty Valves for Plumbing Piping 09-20
22 07 11 Plumbing Insulation 09-19
-- 3 of 774 --
Project No.: 516-22-112 12-23-2025
Upgrade Pharmacy IV Mixing Room USP 797/800
C.W. “Bill” Young VAMC - Lee County HCC
Cape Coral, Florida
00 01 10-2
SECTION NO. DIVISION AND SECTION TITLES DATE
22 11 00 Facility Water Distribution 05-21
22 13 00 Facility Sanitary and Vent Piping 09-20
22 40 00 Plumbing Fixtures 12-22
DIVISION 23 – HEATING, VENTILATING, AND AIR
CONDITIONING (HVAC)
23 05 11 Common Work Results for HVAC 04-22
23 05 12 General Motor Requirements for HVAC and Steam
Generation Equipment
02-20
23 05 41 Noise and Vibration Control for HVAC Piping and
Equipment
02-20
23 05 93 Testing, Adjusting, and Balancing for HVAC 02-20
23 07 11 HVAC and Boiler Plant Insulation 02-20
23 08 00 Commissioning of HVAC Systems 04-22
23 09 23 Direct-Digital Control System for HVAC 08-20
23 21 13 Hydronic Piping 02-20
23 25 00 HVAC Water Treatment 02-20
23 31 00 HVAC Ducts and Casings 02-20
23 34 00 HVAC Fans 02-20
23 37 00 Air Outlets and Inlets 02-20
23 40 00 HVAC Air Cleaning Devices 03-20
23 73 00 Indoor Central-Station Air-Handling Units 03-20
23 82 16 Air Coils 03-20
DIVISION 26 – ELECTRICAL
26 05 11 Requirements for Electrical Installations 11-22
26 05 19 Low-Voltage Electrical Power Conductors and Cables 11-22
26 05 26 Grounding and Bonding for Electrical Systems 11-22
26 05 33 Raceway and Boxes for Electrical Systems 11-22
26 27 26 Wiring Devices 11-22
26 29 11 Motor Controllers 11-22
-- 4 of 774 --
Project No.: 516-22-112 11-19-2025
Upgrade Pharmacy IV Mixing Room USP 797/800
C.W. “Bill” Young VAMC - Lee County HCC
Cape Coral, Florida 05-01-20
00 01 15 - 1
SECTION 00 01 15
LIST OF DRAWING SHEETS
The drawings listed below accompanying this specification form a part of
the contract.
CW “Bill” Young VAMC – Lee County HCC (516-22-
112)
SECTION 00 01 15
LIST OF DRAWINGS
The drawings listed below accompanying this specification form a part of the
contract.
Drawing No. Title
GENERAL INFORMATION
GI001 COVER SHEET
GI002 NOTES, ABBREVIATIONS, & LEGENDS
GI003 PARTIAL FIRST FLOOR AND SECOND FLOOR ICRA PLANS
STRUCTURAL
S001 STRUCTURAL NOTES
S101 DEMOLITION AND FRAMING PLANS
S501 STEEL DETAILS
ARCHITECTURAL
LS101 PARTIAL FIRST FLOOR AND THIRD FLOOR LIFE SAFETY
PLANS
AD101 PARTIAL FIRST FLOOR AND ENLARGED PLANS -
DEMOLITION
AD102 PARTIAL SECOND FLOOR AND ENLARGED PLANS -
DEMOLITION
AD111 PARTIAL FIRST FLOOR AND ENLARGED PLANS -
DEMOLITION
AE101 PARTIAL FIRST FLOOR PLAN AND ELEVATIONS
AE102 PARTIAL SECOND FLOOR AND THRID FLOOR PLAN –
LOW PENTHOUSE
AE111 PARTIAL FIRST FLOOR REFLECTED CEILING PLAN
AE501 FRAMING DETAILS
AE601 ROOM FINISH, DOOR AND FRAME SCHEDULES & DETAILS
-- 5 of 774 --
Project No.: 516-22-112 11-19-2025
Upgrade Pharmacy IV Mixing Room USP 797/800
C.W. “Bill” Young VAMC - Lee County HCC
Cape Coral, Florida 05-01-20
00 01 15 - 2
PLUMBING
P001 PLUMBING ABBREVIATINS, SCHEDULES AND NOTES
P101 1ST FLOOR PHARMACY PLAN - PLUMBING
MECHANICAL
M001 MECHANICAL LEGEND, ABBREVIATIONS, AND NOTES
M002 MECHANICAL NOTES
MD101 PARTIAL FIRST FLOOR AND ENLARGED HVAC
DEMOLITION PLAN
MD102 PARTIAL FIRST FLOOR AND ENLARGED PIPING
DEMOLITION PLAN
M101 PARTIAL FIRST FLOOR AND ENLARGED HVAC -
NEW WORK PLAN
M102 PARTIAL FIRST FLOOR AND ENLARGED PIPING -
NEW WORK PLAN
M501 HVAC DETAILS
M502 MECHANICAL PIPING DETAILS
M503 MECHANICAL PIPING AND EQUIPMENT DETAILS
M601 MECHANICAL SCHEDULES
M800 VA STATION GENERAL CONTROL NOTES AND LEGEND
M801 CONTROL SCHEMATIC, SEQUENCE OF CONTROL, AND
CONTROL POINT - MECHANICAL
ELECTRICAL
E001 ELECTRICAL GENERAL NOTES AND ABBREVIATIONS
E002 ELECTRICAL LEGEND
ED101 ELECTRICAL DEMOLITION PLAN
EP101 ELECTRICAL NEW WORK PLAN
E501 ELECTRICAL DETAILS
E621 ELECTRICAL SCHEDULES
- - - E N D - - -
-- 6 of 774 --
Project No.: 516-22-112 12-23-2025
Upgrade Pharmacy IV Mixing Room USP 797/800
C.W. “Bill” Young VAMC - Lee County HCC
Cape Coral, Florida 05-01-20
00 01 15 - 1
SECTION 00 01 15
LIST OF DRAWING SHEETS
The drawings listed below accompanying this specification form a part of
the contract.
CW “Bill” Young VAMC – Lee County HCC (516-22-11…
Source: SAM.gov, as posted. Verify the current solicitation before responding.
Pursue this opportunity with Mindy
See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.
View the original notice on SAM.gov ↗Similar Active Opportunities (NAICS 236220)
BLDG 31B New Roofing Below Grade Structure
HEALTH AND HUMAN SERVICES, DEPARTMENT OF · Solicitation · due June 26, 2026
Progressive Design-Build Services under Other Transaction Authority Project: Multi-Domain Cyber and Intel Operations Center, Joint Base San Antonio, Lackland AFB Texas
DEPT OF DEFENSE · Special Notice
Repair BEQ HP135
DEPT OF DEFENSE · Combined Synopsis/Solicitation · due July 16, 2026
P-1458 2nd Radio Battalion Complex, Phase 2, Parachute and Supply Facilities
DEPT OF DEFENSE · Solicitation · due May 28, 2025
Orrin Hatch U.S. Courthouse LED Lighting Upgrade
GENERAL SERVICES ADMINISTRATION · Solicitation · due July 9, 2026
Z1DA--Correct Martinez and Mare Island Generator Fuel Lines
VETERANS AFFAIRS, DEPARTMENT OF · Solicitation · due June 24, 2026