Z--Wickersham Trailhead Improvements

INTERIOR, DEPARTMENT OF THE

Notice type
Combined Synopsis/Solicitation
Solicitation #
140L6326Q0017
NAICS
237990
PSC
Z1PZ
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Posted
June 16, 2026
Response due
June 27, 2026

What this opportunity is

The Bureau of Land Management is seeking a contractor for improvements to the Wickersham trailhead in Alaska, classified under NAICS 237990. This opportunity is set aside for total small businesses, making it suitable for small contractors looking to engage in federal projects. Interested parties should monitor the SAM.gov website for the solicitation, which will be available on or about June 12, 2026, and be prepared to submit offers by June 26, 2026.

Analysis by Mindy, grounded in the SAM.gov notice.

Description

BUREAU OF LAND MANAGEMENT SPECIFICATION INDEX WICKERSHAM TRAILHEAD IMPROVEMENTS MILE 28 ELLIOT HWY, ALASKA Index - 1 DIVISION 01 GENERAL REQUIREMENTS 01 10 00 Summary 01 20 00 Bid Items and Schedule of Values 01 31 00 Project Management and Coordination 01 32 00 Construction Progress Documentation 01 32 20 Photographic Documentation 01 33 00 Submittal Procedures 01 40 00 Quality Requirements 01 42 00 References 01 50 00 Temporary Facilities and Controls 01 57 00 Temporary Traffic Control 01 57 23 SWPPP 01 60 00 Product Requirements 01 64 00 Government Furnished Products 01 70 00 Execution Requirements 01 71 23 Field Engineering 01 77 00 Closeout Procedures 01 78 10 Project Record Documents 01 78 23 Operation and Maintenance Data DIVISION 02 DEMOLITION 02 40 00 Site Demolition DIVISION 03 CONCRETE 03 30 00 Cast-In-Place Concrete DIVISION 06 WOOD, PLASTICS, AND COMPOSITES 06 10 00 Rough Carpentry 06 15 00 Wood Decking 06 20 00 Finish Carpentry DIVISION 07 THERMAL AND MOISTURE PROTECTION 07 41 13 Metal Roof Panels 07 62 00 Sheet Metal Flashing and Trim 07 92 00 Joint Sealants DIVISION 08 OPENINGS 08 11 00 Metal Doors and Frames 08 71 00 Door Hardware DIVISION 09 FINISHES 09 91 00 Painting 09 93 00 Staining and Transparent Finishing -- 1 of 229 -- BUREAU OF LAND MANAGEMENT SPECIFICATION INDEX WICKERSHAM TRAILHEAD IMPROVEMENTS MILE 28 ELLIOT HWY, ALASKA Index - 2 DIVISION 10 SPECIALTIES 10 14 53 Traffic Signage 10 81 00 Vault Toilet Accessories DIVISION 31 EARTHWORK 31 10 00 Site Clearing 31 20 00 Earth Moving DIVISION 32 EXTERIOR IMPROVEMENTS 32 33 00 Site Furnishings 32 90 00 Plant Salvage and Transplant 32 92 00 Turf and Grasses -- 2 of 229 -- BUREAU OF LAND MANAGEMENT SECTION 01 10 00 WICKERSHAM TRAILHEAD IMPROVEMENTS SUMMARY MILE 28 ELLIOT HWY, ALASKA 01 10 00- 1 PART 1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section 1.2 SUMMARY A. This Section includes the following: 1. Work covered by the Contract Documents. 2. Work under other Contracts. 3. Geotechnical data. 4. Use of premises. 5. Government occupancy requirements. 6. Work phasing. 7. Specification formats and conventions. 1.3 WORK COVERED BY CONTRACT DOCUMENTS A. Project Identification: Wickersham Trailhead Improvements 1. Project Location: Approximately Mile 28 Elliot Highway at the BLM Wickersham dome trailhead. B. The Work consists of the following: 1. The Work includes improvements to the existing trailhead including removal and replacement of vault toilets, new loading ramp, new kiosk, roadwork, and parking area expansion. The Work also includes deconstruction/obliteration of existing culvert, signs and other features no longer used in the new layout. C. Project will be constructed under a single prime contract. 1.4 WORK UNDER OTHER CONTRACTS A. Cooperate fully with separate contractors so work on those contracts may be carried out smoothly, without interfering with or delaying work under this Contract. Coordinate the Work of this Contract with work performed under separate contracts. -- 3 of 229 -- BUREAU OF LAND MANAGEMENT SECTION 01 10 00 WICKERSHAM TRAILHEAD IMPROVEMENTS SUMMARY MILE 28 ELLIOT HWY, ALASKA 01 10 00- 2 1.5 GEOTECHNICAL DATA A. Geotechnical Report: There is no existing geotechnical information available for this site. Determination of actual subsurface soil conditions shall be Contractor's responsibility. 1.6 USE OF PREMISES A. Contractor shall have full use of premises for construction operations, including use of Project site, for the construction period. Contractor's use of premises is limited only by Public Use and Government right to perform work or to retain other contractors on por- tions of Project. B. PUBLIC USE: Contractor will be allowed to close the site to public use for up to 45 con- secutive calendar days. 1. The government will make alternate routes available to the public during the closure. Temporary traffic control of the project site is the responsibility of the Contractor. C. Schedule and sequence operations necessary to complete the work, including coordina- tion with other crafts relative to the Contractor's requirements. Schedule Work in such manner as to avoid delays in overall construction and permit proper installation of work. D. Use of Site: Limit use of premises to areas within the Contract limits indicated. Do not disturb portions of Project site beyond areas in which the Work is indicated. 1. Government Occupancy: Allow for Government access of Project site. Govern- ment personnel will need access to the site to remove salvaged items and to perform construction progress inspections. 2. Driveways and Entrances: Keep driveways and entrances serving premises clear and available to Public (except during closure), Government, Government em- ployees, and emergency vehicles at all times. Do not use these areas for parking or storage of materials. a. Schedule deliveries to minimize space and time requirements for stor- age of materials and equipment on-site. E. Utilities: It is the Contractor’s responsibility to locate and protect all existing utilities. 1.7 GOVERNMENT OCCUPANCY REQUIREMENTS A. Partial Government Occupancy: Government will require access to the premises during entire construction period, with the exception of areas under construction. Cooperate with Government during construction operations to minimize conflicts and facilitate -- 4 of 229 -- BUREAU OF LAND MANAGEMENT SECTION 01 10 00 WICKERSHAM TRAILHEAD IMPROVEMENTS SUMMARY MILE 28 ELLIOT HWY, ALASKA 01 10 00- 3 Government usage. Perform the Work so as not to interfere with Government opera- tions. 1.8 WORK PHASING A. Provide and maintain temporary toilet(s) for public and project use before removing ex- isting toilets. Provide temporary toilet(s) for the duration of the project until the new to

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.

View the original notice on SAM.gov ↗

Similar Active Opportunities (NAICS 237990)