Z--Wickersham Trailhead Improvements
INTERIOR, DEPARTMENT OF THE
Notice type
Combined Synopsis/Solicitation
Solicitation #
140L6326Q0017
NAICS
237990
PSC
Z1PZ
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Posted
June 16, 2026
Response due
June 27, 2026
What this opportunity is
The Bureau of Land Management is seeking a contractor for improvements to the Wickersham trailhead in Alaska, classified under NAICS 237990. This opportunity is set aside for total small businesses, making it suitable for small contractors looking to engage in federal projects. Interested parties should monitor the SAM.gov website for the solicitation, which will be available on or about June 12, 2026, and be prepared to submit offers by June 26, 2026.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
BUREAU OF LAND MANAGEMENT SPECIFICATION INDEX
WICKERSHAM TRAILHEAD IMPROVEMENTS
MILE 28 ELLIOT HWY, ALASKA
Index - 1
DIVISION 01 GENERAL REQUIREMENTS
01 10 00 Summary
01 20 00 Bid Items and Schedule of Values
01 31 00 Project Management and Coordination
01 32 00 Construction Progress Documentation
01 32 20 Photographic Documentation
01 33 00 Submittal Procedures
01 40 00 Quality Requirements
01 42 00 References
01 50 00 Temporary Facilities and Controls
01 57 00 Temporary Traffic Control
01 57 23 SWPPP
01 60 00 Product Requirements
01 64 00 Government Furnished Products
01 70 00 Execution Requirements
01 71 23 Field Engineering
01 77 00 Closeout Procedures
01 78 10 Project Record Documents
01 78 23 Operation and Maintenance Data
DIVISION 02 DEMOLITION
02 40 00 Site Demolition
DIVISION 03 CONCRETE
03 30 00 Cast-In-Place Concrete
DIVISION 06 WOOD, PLASTICS, AND COMPOSITES
06 10 00 Rough Carpentry
06 15 00 Wood Decking
06 20 00 Finish Carpentry
DIVISION 07 THERMAL AND MOISTURE PROTECTION
07 41 13 Metal Roof Panels
07 62 00 Sheet Metal Flashing and Trim
07 92 00 Joint Sealants
DIVISION 08 OPENINGS
08 11 00 Metal Doors and Frames
08 71 00 Door Hardware
DIVISION 09 FINISHES
09 91 00 Painting
09 93 00 Staining and Transparent Finishing
-- 1 of 229 --
BUREAU OF LAND MANAGEMENT SPECIFICATION INDEX
WICKERSHAM TRAILHEAD IMPROVEMENTS
MILE 28 ELLIOT HWY, ALASKA
Index - 2
DIVISION 10 SPECIALTIES
10 14 53 Traffic Signage
10 81 00 Vault Toilet Accessories
DIVISION 31 EARTHWORK
31 10 00 Site Clearing
31 20 00 Earth Moving
DIVISION 32 EXTERIOR IMPROVEMENTS
32 33 00 Site Furnishings
32 90 00 Plant Salvage and Transplant
32 92 00 Turf and Grasses
-- 2 of 229 --
BUREAU OF LAND MANAGEMENT SECTION 01 10 00
WICKERSHAM TRAILHEAD IMPROVEMENTS SUMMARY
MILE 28 ELLIOT HWY, ALASKA
01 10 00- 1
PART 1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary
Conditions and Division 1 Specification Sections, apply to this Section
1.2 SUMMARY
A. This Section includes the following:
1. Work covered by the Contract Documents.
2. Work under other Contracts.
3. Geotechnical data.
4. Use of premises.
5. Government occupancy requirements.
6. Work phasing.
7. Specification formats and conventions.
1.3 WORK COVERED BY CONTRACT DOCUMENTS
A. Project Identification: Wickersham Trailhead Improvements
1. Project Location: Approximately Mile 28 Elliot Highway at the BLM Wickersham
dome trailhead.
B. The Work consists of the following:
1. The Work includes improvements to the existing trailhead including removal
and replacement of vault toilets, new loading ramp, new kiosk, roadwork, and
parking area expansion. The Work also includes deconstruction/obliteration of
existing culvert, signs and other features no longer used in the new layout.
C. Project will be constructed under a single prime contract.
1.4 WORK UNDER OTHER CONTRACTS
A. Cooperate fully with separate contractors so work on those contracts may be carried
out smoothly, without interfering with or delaying work under this Contract. Coordinate
the Work of this Contract with work performed under separate contracts.
-- 3 of 229 --
BUREAU OF LAND MANAGEMENT SECTION 01 10 00
WICKERSHAM TRAILHEAD IMPROVEMENTS SUMMARY
MILE 28 ELLIOT HWY, ALASKA
01 10 00- 2
1.5 GEOTECHNICAL DATA
A. Geotechnical Report: There is no existing geotechnical information available for this site.
Determination of actual subsurface soil conditions shall be Contractor's responsibility.
1.6 USE OF PREMISES
A. Contractor shall have full use of premises for construction operations, including use of
Project site, for the construction period. Contractor's use of premises is limited only by
Public Use and Government right to perform work or to retain other contractors on por-
tions of Project.
B. PUBLIC USE: Contractor will be allowed to close the site to public use for up to 45 con-
secutive calendar days.
1. The government will make alternate routes available to the public during the
closure. Temporary traffic control of the project site is the responsibility of the
Contractor.
C. Schedule and sequence operations necessary to complete the work, including coordina-
tion with other crafts relative to the Contractor's requirements. Schedule Work in such
manner as to avoid delays in overall construction and permit proper installation of work.
D. Use of Site: Limit use of premises to areas within the Contract limits indicated. Do not
disturb portions of Project site beyond areas in which the Work is indicated.
1. Government Occupancy: Allow for Government access of Project site. Govern-
ment personnel will need access to the site to remove salvaged items and to
perform construction progress inspections.
2. Driveways and Entrances: Keep driveways and entrances serving premises clear
and available to Public (except during closure), Government, Government em-
ployees, and emergency vehicles at all times. Do not use these areas for parking
or storage of materials.
a. Schedule deliveries to minimize space and time requirements for stor-
age of materials and equipment on-site.
E. Utilities: It is the Contractor’s responsibility to locate and protect all existing utilities.
1.7 GOVERNMENT OCCUPANCY REQUIREMENTS
A. Partial Government Occupancy: Government will require access to the premises during
entire construction period, with the exception of areas under construction. Cooperate
with Government during construction operations to minimize conflicts and facilitate
-- 4 of 229 --
BUREAU OF LAND MANAGEMENT SECTION 01 10 00
WICKERSHAM TRAILHEAD IMPROVEMENTS SUMMARY
MILE 28 ELLIOT HWY, ALASKA
01 10 00- 3
Government usage. Perform the Work so as not to interfere with Government opera-
tions.
1.8 WORK PHASING
A. Provide and maintain temporary toilet(s) for public and project use before removing ex-
isting toilets. Provide temporary toilet(s) for the duration of the project until the new
to…
Source: SAM.gov, as posted. Verify the current solicitation before responding.
Pursue this opportunity with Mindy
See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.
View the original notice on SAM.gov ↗Similar Active Opportunities (NAICS 237990)
Fort Eustis Dredge Material Management Area (FEDMMA) construction project
DEPT OF DEFENSE · Solicitation · due July 23, 2026
RENO BOTTOMS HREP - STAGE 2 - ICE HAUL SLOUGH
DEPT OF DEFENSE · Solicitation · due July 21, 2026
Horizontal Construction Multiple Award Contract (MAC)
DEPT OF DEFENSE · Solicitation · due July 30, 2026
Water Resources Branch Quarterly Industry Day for Coastal and Navigation Projects
DEPT OF DEFENSE · Special Notice · due July 17, 2026
PALM BEACH HARBOR, SOUTH JETTY REHABILITATION 2026, PALM BEACH COUNTY, FLORIDA
DEPT OF DEFENSE · Sources Sought · due July 17, 2026
West Shore Lake Pontchartrain, Louisiana, Hurricane and Storm Damage Risk Reduction Project, WSLP-103A Levee, Floodwall and Gate, Sta. 819+87 B/L to Sta. 827+95 B/L, St. John the Baptist Parish, Louisiana ED 24-025
DEPT OF DEFENSE · Solicitation · due June 16, 2026