Z2DA--Solicitation No. 36C26126R0041 Project 593-26-103, Renovate Education Building Training Hub
VETERANS AFFAIRS, DEPARTMENT OF
Notice type
Solicitation
Solicitation #
36C26126R0041
NAICS
236220
PSC
Z2DA
Set-aside
Service-Disabled Veteran-Owned Small Business Set Aside
Posted
June 16, 2026
Response due
June 24, 2026
Place of performance
North Las Vegas, NV
What this opportunity is
The Department of Veterans Affairs is soliciting proposals for the renovation of the Education Building Training Hub under Project 593-26-103, with a focus on construction services. This opportunity is set aside for Service-Disabled Veteran-Owned Small Businesses, making it particularly suitable for qualified small firms in this category. Interested bidders should note that the proposal submission deadline has been extended to June 24, 2026, and submissions must be emailed directly to the designated contact.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
VA Southern Nevada Healthcare System
North Las Vegas, NV
Technical Specifications
Project Number
593-26-103
Renovate Education Building Training Hub
March 16th, 2026
-- 1 of 565 --
03-01-2026
00 01 10-1
DEPARTMENT OF VETERANS AFFAIRS
VHA MASTER SPECIFICATIONS
TABLE OF CONTENTS
Section 00 01 10
SECTION NO DIVISION AND SECTION TITLES DATE
DIVISION 01 - GENERAL
REQUIREMENTS
01 00 00 General Requirements Nov-21
01 33 23 Shop Drawings, Product
Data, and Samples
Mar-26
01 35 26 Safety Requirements May-24
01 42 19 Reference Standards Nov-20
01 45 00 Quality Control Feb-21
01 57 19 Temporary Environmental
Controls
Jan-21
01 74 19 Construction Waste
Management
Apr-22
01 81 13 Sustainable Construction
Requirements
Oct-17
01 91 00 General Commissioning
Requirements
Apr-22
DIVISION 02 – EXISTING
CONDITIONS
02 41 00 Demolition Aug-17
DIVISION 05 – METALS
05 40 00 Cold Metal Framing Jan-21
05 50 00 Metal Fabrications Aug-18
DIVISION 07 - THERMAL AND
MOISTURE PROTECTION
-- 2 of 565 --
03-01-2026
00 01 10-2
07 21 13 Thermal Insulation Jan-21
07 84 00 Firestopping Jan-21
07 92 00 Joint Sealants Apr-22
DIVISION 08 - OPENINGS
08 14 00 Interior Wood Doors Jan-21
08 71 00 Door Hardware Mar-24
DIVISION 09 – FINISHES
09 05 16 Subsurface Preparation for
Floor Finishes
Feb-26
09 06 00 Schedule for Finishes Jan-21
09 22 16 Non-Structural Metal
Framing
Jun-18
09 29 00 Gypsum Board Apr-20
09 51 00 Acoustical Ceilings Dec-18
09 65 13 Resilient Base Jan-21
09 66 16 Terrazzo Floor Tile Oct-25
09 68 00 Carpeting Jan-21
09 91 00 Painting Jan-21
DIVISION 10 – SPECIALTIES
10 22 26.13 Accordion Folding
Partitions
Jan-21
10 26 00 Wall and Door Protection Jan-21
-- 3 of 565 --
03-01-2026
00 01 10-3
DIVISION 11 – EQUIPMENT
11 05 12 General Motor Requirements
for Equipment
Jan-21
DIVISION 13 - SPECIAL
CONSTRUCTION
13 05 41 Seismic Restraint
Requirements for Non-
Structural Components
Jan-21
DIVISION 26 – ELECTRICAL
26 05 11 Requirements for Electrical
Installations
Nov-22
26 05 13 Medium-Voltage Cables Jun-25
26 05 19 Low-Voltage Electrical
Power Conductors and Cables
Nov-22
26 05 26 Grounding and Bonding for
Electrical Systems
Nov-22
26 05 33 Raceway and Boxes for
Electrical Systems
Nov-22
26 08 00 Commissioning of Electrical
Systems
Nov-16
26 09 23 Lighting Controls Nov-22
26 27 26 Wiring Devices Nov-22
26 51 00 Interior Lighting Mar-24
DIVISION 27 –
COMMUNICATIONS
27 05 11 Requirements for
Communications
Installations
Sep-19
27 05 26 Grounding and Bonding for
Communications Systems
Jun-15
27 05 33 Raceways and Boxes for
Communications Systems
Oct-18
-- 4 of 565 --
03-01-2026
00 01 10-4
27 08 00 Commissioning of
Communications Systems
Nov-16
27 10 00 Control, Communication and
Signal Wiring
Jun-15
27 11 00 Telecommunications Room
Fittings
Jun-15
27 15 00 Communications Structured
Cabling
Jan-16
-- 5 of 565 --
11-01-21
01 00 00 -1
SECTION 01 00 00
GENERAL REQUIREMENTS
GENERAL
1.1 SAFETY REQUIREMENTS
A. Refer to section 01 35 26, SAFETY REQUIREMENTS for safety
and infection control requirements.
1.2 GENERAL INTENTION
A. Contractor shall completely prepare site for building
operations, including demolition and removal of existing
structures, and furnish labor and materials and perform
work for Renovate Education Building Training Hub as
required by drawings and specifications.
B. Visits to the site by Bidders may be made only by
appointment with the Medical Center Engineering Officer.
C. All employees of general contractor and subcontractors
shall comply with VA security management program and obtain
permission of the VA police, be identified by project and
employer, and restricted from unauthorized access.
1.3 STATEMENT OF BID ITEM(S)
A. ITEM I, RENOVATE EDUCATION BUILDING TRAINING HUB: Work
includes general construction, alterations, repair,
installation, and any other necessary removal of existing
structures and construction and certain other items to
support the renovation.
1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR
A. Specifications and contract documents may be obtained from
the website where the solicitation is posted. Additional
copies will be at Contractor's expense.
1.5 CONSTRUCTION SECURITY REQUIREMENTS
A. Security Plan:
-- 6 of 565 --
11-01-21
01 00 00 -2
1. The security plan defines both physical and
administrative security procedures that will remain
effective for the entire duration of the project.
2. The General Contractor is responsible for assuring that
all sub-contractors working on the project and their
employees also comply with these regulations.
B. Security Procedures:
1. General Contractor’s employees shall not enter the
project site without appropriate badge. They may also be
subject to inspection of their personal effects when
entering or leaving the project site.
2. Before starting work the General Contractor shall give
one week’s notice to the Contracting Officer so that
security arrangements can be provided for the employees.
This notice is separate from any notices required for
utility shutdown described later in this section.
3. No photography of VA premises is allowed without written
permission of the Contracting Officer. Patients and staff
are not to be photographed at any time.
4. VA reserves the right to close down or shut down the
project site and order General Contractor’s employees off
the premises in the event of a national emergency. The
General Contractor may return to the site only with the
written approval of the Contracting Officer.
C. Key Control:
1. The General Contractor shall provide duplicate keys and
lock combinations to the Contracting officers
representative (COR) for the purpose of security
inspections of every area of project including tool boxes
and parked machines and take any emergency action.
D. Document Control:
-- 7 of 565 --
11-01-21
01 00 00 -3
1. Before starting any work, the General Contractor/Sub
Contractors shall submit an electronic security
memorandum describing the approach to following goals and
maintaining confidentiality of “sensitive info…
Source: SAM.gov, as posted. Verify the current solicitation before responding.