Z2DA--Solicitation No. 36C26126R0041 Project 593-26-103, Renovate Education Building Training Hub

VETERANS AFFAIRS, DEPARTMENT OF

Notice type
Solicitation
Solicitation #
36C26126R0041
NAICS
236220
PSC
Z2DA
Set-aside
Service-Disabled Veteran-Owned Small Business Set Aside
Posted
June 16, 2026
Response due
June 24, 2026
Place of performance
North Las Vegas, NV

What this opportunity is

The Department of Veterans Affairs is soliciting proposals for the renovation of the Education Building Training Hub under Project 593-26-103, with a focus on construction services. This opportunity is set aside for Service-Disabled Veteran-Owned Small Businesses, making it particularly suitable for qualified small firms in this category. Interested bidders should note that the proposal submission deadline has been extended to June 24, 2026, and submissions must be emailed directly to the designated contact.

Analysis by Mindy, grounded in the SAM.gov notice.

Description

VA Southern Nevada Healthcare System North Las Vegas, NV Technical Specifications Project Number 593-26-103 Renovate Education Building Training Hub March 16th, 2026 -- 1 of 565 -- 03-01-2026 00 01 10-1 DEPARTMENT OF VETERANS AFFAIRS VHA MASTER SPECIFICATIONS TABLE OF CONTENTS Section 00 01 10 SECTION NO DIVISION AND SECTION TITLES DATE DIVISION 01 - GENERAL REQUIREMENTS 01 00 00 General Requirements Nov-21 01 33 23 Shop Drawings, Product Data, and Samples Mar-26 01 35 26 Safety Requirements May-24 01 42 19 Reference Standards Nov-20 01 45 00 Quality Control Feb-21 01 57 19 Temporary Environmental Controls Jan-21 01 74 19 Construction Waste Management Apr-22 01 81 13 Sustainable Construction Requirements Oct-17 01 91 00 General Commissioning Requirements Apr-22 DIVISION 02 – EXISTING CONDITIONS 02 41 00 Demolition Aug-17 DIVISION 05 – METALS 05 40 00 Cold Metal Framing Jan-21 05 50 00 Metal Fabrications Aug-18 DIVISION 07 - THERMAL AND MOISTURE PROTECTION -- 2 of 565 -- 03-01-2026 00 01 10-2 07 21 13 Thermal Insulation Jan-21 07 84 00 Firestopping Jan-21 07 92 00 Joint Sealants Apr-22 DIVISION 08 - OPENINGS 08 14 00 Interior Wood Doors Jan-21 08 71 00 Door Hardware Mar-24 DIVISION 09 – FINISHES 09 05 16 Subsurface Preparation for Floor Finishes Feb-26 09 06 00 Schedule for Finishes Jan-21 09 22 16 Non-Structural Metal Framing Jun-18 09 29 00 Gypsum Board Apr-20 09 51 00 Acoustical Ceilings Dec-18 09 65 13 Resilient Base Jan-21 09 66 16 Terrazzo Floor Tile Oct-25 09 68 00 Carpeting Jan-21 09 91 00 Painting Jan-21 DIVISION 10 – SPECIALTIES 10 22 26.13 Accordion Folding Partitions Jan-21 10 26 00 Wall and Door Protection Jan-21 -- 3 of 565 -- 03-01-2026 00 01 10-3 DIVISION 11 – EQUIPMENT 11 05 12 General Motor Requirements for Equipment Jan-21 DIVISION 13 - SPECIAL CONSTRUCTION 13 05 41 Seismic Restraint Requirements for Non- Structural Components Jan-21 DIVISION 26 – ELECTRICAL 26 05 11 Requirements for Electrical Installations Nov-22 26 05 13 Medium-Voltage Cables Jun-25 26 05 19 Low-Voltage Electrical Power Conductors and Cables Nov-22 26 05 26 Grounding and Bonding for Electrical Systems Nov-22 26 05 33 Raceway and Boxes for Electrical Systems Nov-22 26 08 00 Commissioning of Electrical Systems Nov-16 26 09 23 Lighting Controls Nov-22 26 27 26 Wiring Devices Nov-22 26 51 00 Interior Lighting Mar-24 DIVISION 27 – COMMUNICATIONS 27 05 11 Requirements for Communications Installations Sep-19 27 05 26 Grounding and Bonding for Communications Systems Jun-15 27 05 33 Raceways and Boxes for Communications Systems Oct-18 -- 4 of 565 -- 03-01-2026 00 01 10-4 27 08 00 Commissioning of Communications Systems Nov-16 27 10 00 Control, Communication and Signal Wiring Jun-15 27 11 00 Telecommunications Room Fittings Jun-15 27 15 00 Communications Structured Cabling Jan-16 -- 5 of 565 -- 11-01-21 01 00 00 -1 SECTION 01 00 00 GENERAL REQUIREMENTS GENERAL 1.1 SAFETY REQUIREMENTS A. Refer to section 01 35 26, SAFETY REQUIREMENTS for safety and infection control requirements. 1.2 GENERAL INTENTION A. Contractor shall completely prepare site for building operations, including demolition and removal of existing structures, and furnish labor and materials and perform work for Renovate Education Building Training Hub as required by drawings and specifications. B. Visits to the site by Bidders may be made only by appointment with the Medical Center Engineering Officer. C. All employees of general contractor and subcontractors shall comply with VA security management program and obtain permission of the VA police, be identified by project and employer, and restricted from unauthorized access. 1.3 STATEMENT OF BID ITEM(S) A. ITEM I, RENOVATE EDUCATION BUILDING TRAINING HUB: Work includes general construction, alterations, repair, installation, and any other necessary removal of existing structures and construction and certain other items to support the renovation. 1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR A. Specifications and contract documents may be obtained from the website where the solicitation is posted. Additional copies will be at Contractor's expense. 1.5 CONSTRUCTION SECURITY REQUIREMENTS A. Security Plan: -- 6 of 565 -- 11-01-21 01 00 00 -2 1. The security plan defines both physical and administrative security procedures that will remain effective for the entire duration of the project. 2. The General Contractor is responsible for assuring that all sub-contractors working on the project and their employees also comply with these regulations. B. Security Procedures: 1. General Contractor’s employees shall not enter the project site without appropriate badge. They may also be subject to inspection of their personal effects when entering or leaving the project site. 2. Before starting work the General Contractor shall give one week’s notice to the Contracting Officer so that security arrangements can be provided for the employees. This notice is separate from any notices required for utility shutdown described later in this section. 3. No photography of VA premises is allowed without written permission of the Contracting Officer. Patients and staff are not to be photographed at any time. 4. VA reserves the right to close down or shut down the project site and order General Contractor’s employees off the premises in the event of a national emergency. The General Contractor may return to the site only with the written approval of the Contracting Officer. C. Key Control: 1. The General Contractor shall provide duplicate keys and lock combinations to the Contracting officers representative (COR) for the purpose of security inspections of every area of project including tool boxes and parked machines and take any emergency action. D. Document Control: -- 7 of 565 -- 11-01-21 01 00 00 -3 1. Before starting any work, the General Contractor/Sub Contractors shall submit an electronic security memorandum describing the approach to following goals and maintaining confidentiality of “sensitive info

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.

View the original notice on SAM.gov ↗

Similar Active Opportunities (NAICS 236220)