Home/Contractors/Aerojet Rocketdyne Of De, INC/contracts

Federal Contractor Profile

Aerojet Rocketdyne Of De, INC

$3.4B obligated·48 awards·3 agencies·10 NAICS

Federal Contracts

Showing contracts 150 of 196 total. Sorted by action date, most recent first. Excludes $0 modifications.

DateAgencyPIIDNAICSDescriptionAmount
Mar 30, 2026National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTERNNM16AA02C541712IGF::CT::IGF RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING SIX RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION, IMPROVEMENTS IN MANUFACTURING, AND CERTIFICATION FOR FLIGHT PROGRAM.$26M
Feb 20, 2026National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTERNNM16AA02C541712IGF::CT::IGF RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING SIX RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION, IMPROVEMENTS IN MANUFACTURING, AND CERTIFICATION FOR FLIGHT PROGRAM.$30M
Jan 20, 2026National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTERNNM16AA02C541712IGF::CT::IGF RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING SIX RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION, IMPROVEMENTS IN MANUFACTURING, AND CERTIFICATION FOR FLIGHT PROGRAM.$18M
Dec 19, 2025National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTERNNM16AA02C541712IGF::CT::IGF RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING SIX RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION, IMPROVEMENTS IN MANUFACTURING, AND CERTIFICATION FOR FLIGHT PROGRAM.$30M
Nov 25, 2025National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTERNNM16AA02C541712IGF::CT::IGF RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING SIX RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION, IMPROVEMENTS IN MANUFACTURING, AND CERTIFICATION FOR FLIGHT PROGRAM.$51M
Nov 13, 2025National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTERNNM16AA02C541712IGF::CT::IGF RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING SIX RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION, IMPROVEMENTS IN MANUFACTURING, AND CERTIFICATION FOR FLIGHT PROGRAM.$4.8M
Oct 30, 2025National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTERNNM16AA02C541712IGF::CT::IGF RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING SIX RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION, IMPROVEMENTS IN MANUFACTURING, AND CERTIFICATION FOR FLIGHT PROGRAM.$2.0M
Sep 12, 2025National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTERNNM16AA02C541712IGF::CT::IGF RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING SIX RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION, IMPROVEMENTS IN MANUFACTURING, AND CERTIFICATION FOR FLIGHT PROGRAM.$4.3M
Aug 12, 2025National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTERNNM16AA02C541712IGF::CT::IGF RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING SIX RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION, IMPROVEMENTS IN MANUFACTURING, AND CERTIFICATION FOR FLIGHT PROGRAM.$36M
Jul 23, 2025National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTERNNM16AA02C541712IGF::CT::IGF RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING SIX RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION, IMPROVEMENTS IN MANUFACTURING, AND CERTIFICATION FOR FLIGHT PROGRAM.$17K
Jul 21, 2025National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTERNNM16AA02C541712IGF::CT::IGF RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING SIX RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION, IMPROVEMENTS IN MANUFACTURING, AND CERTIFICATION FOR FLIGHT PROGRAM.$45M
Jun 6, 2025National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTERNNM16AA02C541712IGF::CT::IGF RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING SIX RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION, IMPROVEMENTS IN MANUFACTURING, AND CERTIFICATION FOR FLIGHT PROGRAM.$21M
May 1, 2025National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTERNNM16AA02C541712IGF::CT::IGF RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING SIX RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION, IMPROVEMENTS IN MANUFACTURING, AND CERTIFICATION FOR FLIGHT PROGRAM.$27M
Mar 6, 2025National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTERNNM16AA02C541712IGF::CT::IGF RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING SIX RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION, IMPROVEMENTS IN MANUFACTURING, AND CERTIFICATION FOR FLIGHT PROGRAM.$41M
Jan 31, 2025National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTERNNM16AA02C541712IGF::CT::IGF RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING SIX RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION, IMPROVEMENTS IN MANUFACTURING, AND CERTIFICATION FOR FLIGHT PROGRAM.$15M
Dec 17, 2024National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTERNNM16AA02C541712IGF::CT::IGF RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING SIX RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION, IMPROVEMENTS IN MANUFACTURING, AND CERTIFICATION FOR FLIGHT PROGRAM.$21M
Oct 11, 2024National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTERNNM16AA02C541712IGF::CT::IGF RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING SIX RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION, IMPROVEMENTS IN MANUFACTURING, AND CERTIFICATION FOR FLIGHT PROGRAM.$89M
Sep 13, 2024National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTERNNM16AA02C541712IGF::CT::IGF RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING SIX RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION, IMPROVEMENTS IN MANUFACTURING, AND CERTIFICATION FOR FLIGHT PROGRAM.$23M
Sep 11, 2024National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTERNNM16AA02C541712IGF::CT::IGF RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING SIX RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION, IMPROVEMENTS IN MANUFACTURING, AND CERTIFICATION FOR FLIGHT PROGRAM.$1.4M
Jul 12, 2024National Aeronautics and Space AdministrationNASA HEADQUARTERS80HQTR24CA004541715CONTRACTOR TO PROVIDE RESEARCH REPORTS ON STUDIES ABOUT HOW TO MAKE MARS ASCENT VEHICLE LIGHTER AND MORE EFFICIENT.$718K
Jul 3, 2024National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTERNNM16AA02C541712IGF::CT::IGF RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING SIX RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION, IMPROVEMENTS IN MANUFACTURING, AND CERTIFICATION FOR FLIGHT PROGRAM.$50M
Jul 3, 2024National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTERNNM16AA02C541712IGF::CT::IGF RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING SIX RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION, IMPROVEMENTS IN MANUFACTURING, AND CERTIFICATION FOR FLIGHT PROGRAM.$53M
Apr 26, 2024National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTERNNM16AA02C541712IGF::CT::IGF RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING SIX RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION, IMPROVEMENTS IN MANUFACTURING, AND CERTIFICATION FOR FLIGHT PROGRAM.$119M
Mar 22, 2024Department of DefenseFA8650 USAF AFMC AFRL PZL AFRL/PZLFA865018F2080541715PRESSURE GAIN PROPULSION (PGP) RAMJET DEMONSTRATION$50K
Mar 7, 2024National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTERNNM16AA02C541712IGF::CT::IGF RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING SIX RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION, IMPROVEMENTS IN MANUFACTURING, AND CERTIFICATION FOR FLIGHT PROGRAM.$19M
Feb 16, 2024National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTERNNM16AA02C541712IGF::CT::IGF RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING SIX RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION, IMPROVEMENTS IN MANUFACTURING, AND CERTIFICATION FOR FLIGHT PROGRAM.$46M
Jan 25, 2024National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTERNNM16AA02C541712IGF::CT::IGF RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING SIX RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION, IMPROVEMENTS IN MANUFACTURING, AND CERTIFICATION FOR FLIGHT PROGRAM.$24M
Dec 20, 2023National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTERNNM16AA02C541712IGF::CT::IGF RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING SIX RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION, IMPROVEMENTS IN MANUFACTURING, AND CERTIFICATION FOR FLIGHT PROGRAM.$30M
Dec 5, 2023Department of DefenseFA8650 USAF AFMC AFRL PZL AFRL/PZLFA865023C5709541715NEXT GENERATION ADDITIVELY MANUFACTURED EXHAUST CONTROL DUCT ENABLING HYPERSONIC AFFORDABILITY$680K
Nov 13, 2023National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTERNNM16AA02C541712IGF::CT::IGF RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING SIX RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION, IMPROVEMENTS IN MANUFACTURING, AND CERTIFICATION FOR FLIGHT PROGRAM.$3.8M
Aug 28, 2023National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTERNNM16AA02C541712IGF::CT::IGF RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING SIX RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION, IMPROVEMENTS IN MANUFACTURING, AND CERTIFICATION FOR FLIGHT PROGRAM.$3.5M
Aug 22, 2023Department of DefenseFA8650 USAF AFMC AFRL PZL AFRL/PZLFA865023C5709541715NEXT GENERATION ADDITIVELY MANUFACTURED EXHAUST CONTROL DUCT ENABLING HYPERSONIC AFFORDABILITY$247K
Jun 5, 2023National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTERNNM16AA02C541712IGF::CT::IGF RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING SIX RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION, IMPROVEMENTS IN MANUFACTURING, AND CERTIFICATION FOR FLIGHT PROGRAM.$158M
Apr 28, 2023Department of DefenseFA8650 USAF AFMC AFRL PZL AFRL/PZLFA865018F2080541715PRESSURE GAIN PROPULSION (PGP) RAMJET DEMONSTRATION$259K
Mar 27, 2023Department of DefenseFA8650 USAF AFMC AFRL PZL AFRL/PZLFA865023C5709541715NEXT GENERATION ADDITIVELY MANUFACTURED EXHAUST CONTROL DUCT ENABLING HYPERSONIC AFFORDABILITY$523K
Feb 25, 2023National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTERNNM16AA02C541712IGF::CT::IGF RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING SIX RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION, IMPROVEMENTS IN MANUFACTURING, AND CERTIFICATION FOR FLIGHT PROGRAM.$115M
Jan 13, 2023National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTERNNM16AA02C541712IGF::CT::IGF RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING SIX RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION, IMPROVEMENTS IN MANUFACTURING, AND CERTIFICATION FOR FLIGHT PROGRAM.$28M
Jan 6, 2023Department of DefenseFA8650 USAF AFMC AFRL PZL AFRL/PZLFA865018F2080541715PRESSURE GAIN PROPULSION (PGP) RAMJET DEMONSTRATION$430K
Nov 22, 2022Department of DefenseFA8650 USAF AFMC AFRL PZL AFRL/PZLFA865023C5709541715NEXT GENERATION ADDITIVELY MANUFACTURED EXHAUST CONTROL DUCT ENABLING HYPERSONIC AFFORDABILITY$200K
Nov 18, 2022Department of DefenseFA8650 USAF AFMC AFRL PZL AFRL/PZLFA865018F2080541715PRESSURE GAIN PROPULSION (PGP) RAMJET DEMONSTRATION$181K
Oct 18, 2022National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTERNNM16AA02C541712IGF::CT::IGF RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING SIX RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION, IMPROVEMENTS IN MANUFACTURING, AND CERTIFICATION FOR FLIGHT PROGRAM.$41M
Aug 17, 2022National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTERNNM16AA02C541712IGF::CT::IGF RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING SIX RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION, IMPROVEMENTS IN MANUFACTURING, AND CERTIFICATION FOR FLIGHT PROGRAM.$4.0M
Jun 8, 2022National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTERNNM16AA02C541712IGF::CT::IGF RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING SIX RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION, IMPROVEMENTS IN MANUFACTURING, AND CERTIFICATION FOR FLIGHT PROGRAM.$49M
May 11, 2022National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTERNNM16AA02C541712IGF::CT::IGF RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING SIX RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION, IMPROVEMENTS IN MANUFACTURING, AND CERTIFICATION FOR FLIGHT PROGRAM.$84M
Apr 21, 2022Department of DefenseFA8650 USAF AFMC AFRL PZL AFRL/PZLFA865018F2080541715PRESSURE GAIN PROPULSION (PGP) RAMJET DEMONSTRATION$1.0M
Apr 18, 2022National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTERNNM16AA02C541712IGF::CT::IGF RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING SIX RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION, IMPROVEMENTS IN MANUFACTURING, AND CERTIFICATION FOR FLIGHT PROGRAM.$63M
Mar 17, 2022National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTERNNM16AA02C541712IGF::CT::IGF RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING SIX RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION, IMPROVEMENTS IN MANUFACTURING, AND CERTIFICATION FOR FLIGHT PROGRAM.$23M
Feb 25, 2022National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTERNNM16AA02C541712IGF::CT::IGF RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING SIX RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION, IMPROVEMENTS IN MANUFACTURING, AND CERTIFICATION FOR FLIGHT PROGRAM.$13M
Dec 13, 2021National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTERNNM16AA02C541712IGF::CT::IGF RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING SIX RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION, IMPROVEMENTS IN MANUFACTURING, AND CERTIFICATION FOR FLIGHT PROGRAM.$40M
Oct 21, 2021National Aeronautics and Space AdministrationNASA MARSHALL SPACE FLIGHT CENTERNNM16AA02C541712IGF::CT::IGF RS-25 PRODUCTION RESTART TO BE UNDERTAKEN BY THE CONTRACTOR IN SUPPORT OF PROVIDING SIX RS-25 ENGINES MODIFIED AS NECESSARY FOR THE TECHNICAL REQUIREMENTS UNDER THE SPACE LAUNCH SYSTEM, RECERTIFICATION OF PRODUCTION, IMPROVEMENTS IN MANUFACTURING, AND CERTIFICATION FOR FLIGHT PROGRAM.$27M

Get Alerted Before Aerojet Rocketdyne Of De, INC's Next Recompete

Mindy monitors active contracts and flags recompetes 12 months out so you can position to compete.

Start Free