Home/Contractors/All-rite Construction, INC./contracts

Federal Contractor Profile

All-rite Construction, INC.

$54M obligated·412 awards·2 agencies·5 NAICS

Federal Contracts

Showing contracts 251300 of 486 total. Sorted by action date, most recent first. Excludes $0 modifications.

DateAgencyPIIDNAICSDescriptionAmount
Feb 10, 2020Department of the InteriorIMR SANTA FE(12100)140P1319F0116236220AZRU 206791 REHAB EXTERIOR WALLS CR BLDG$24K
Feb 3, 2020Department of the InteriorIMR SANTA FE(12100)140P1320F0027236220SAN ANTONIO MISSIONS NATIONAL HISTORICAL PARK - DEMOLISH POOLEY RESIDENCE LOCATED AT 8971 SOUTH PRESA STREET PER THE SCOPE OF WORK. ALL WORK WILL BE ACCOMPLISHED UNDER THE SUPERVISION OF A LICENSED CONTRACTOR AND ACCORDING TO THE SCOPE OF WORK$52K
Jan 30, 2020Department of the InteriorIMR SANTA FE(12100)140P1320F0008236220OSTB REHABILITATE RESTROOMS AT OSTB$11K
Jan 21, 2020Department of the InteriorIMR SANTA FE(12100)140P1320F0004236220OSTB REHABILITATE, ADOBE WALLS, BANCOS AND FOUNTAIN$144K
Dec 19, 2019Department of the InteriorIMR SANTA FE(12100)140P1320F0009236220ELMA CONCRETE WORK AT VISITOR CENTER (REPLACE SIDEWALK AND NEW SIDEWALK)$180K
Dec 17, 2019Department of the InteriorIMR SANTA FE(12100)140P1319F0119236220RESURFACE&REALIGN MAIN VISITOR TRAILS - BAND THE PRIMARY WORK OF THIS PROJECT INCLUDES, BUT IS NOT LIMITED TO, REMOVING EXISTING STONES THAT LINE THE TRAIL AND INSTALLING NEW CONCRETE WALKWAY OVER EXISTING ASPHALT. THE WORK WILL ALSO INCLUDE$333K
Dec 13, 2019Department of the InteriorIMR SANTA FE(12100)140P1320F0008236220OSTB REHABILITATE RESTROOMS AT OSTB$126K
Dec 4, 2019Department of the InteriorIMR SANTA FE(12100)140P1320F0010236220BAND- ENTRANCE GATE REPAIR AND UPGRADE$80K
Nov 14, 2019Department of the InteriorIMR SANTA FE(12100)140P1320F0005236220LYNDON B. JOHNSON NATIONAL HISTORICAL PARK. THIS CONTRACT INCLUDES ALL LABOR, MATERIALS AND EQUIPMENT IN ORDER TO REPAIR DAMAGED WINDOW AND SCREEN FEATURES, SURFACE PREPARATION, AND PAINTING INTERIOR AND EXTERIOR WINDOW PAINTED SURFACES. AS PER$147K
Nov 13, 2019Department of the InteriorIMR SANTA FE(12100)140P1320F0004236220OSTB REHABILITATE, ADOBE WALLS, BANCOS AND FOUNTAIN$764K
Nov 12, 2019Department of the InteriorIMR SANTA FE(12100)140P1320F0003236220WHSA - LAKE LUCERO BACKFILL$77K
Oct 28, 2019Department of the InteriorIMR SANTA FE(12100)140P1319F0077236220CHCU REHAB VC COMFORT STATION-THE COMFORT STATION AT THE VISITOR CENTER IS IN NEED OF REHABILITATION DUE TO ROOF LEAKAGE AND WEAR AND TEAR ON THE INTERIOR FIXTURES. REPAIRS INCLUDE BUT ARE NOT LIMITED TO CEILING REPAIRS, ROOF REPLACEMENT, WOOD STUDS$2K
Oct 23, 2019Department of the InteriorIMR SANTA FE(12100)140P1320F0001236220OSTB - REHAB ADOBE WALLS, BANCOS AND FOUNTAIN$506K
Sep 26, 2019Department of the InteriorIMR SANTA FE(12100)140P1319F0227236220REHAB VC EXTERIOR ENVELOPE - ELMA$577K
Sep 25, 2019Department of the InteriorIMR SANTA FE(12100)140P1319F0222236220140P1319F0222 - REPLACE WATER SYSTEM VALVES&SEWAGE LAGOON VALVES - CAVE$259K
Sep 25, 2019Department of the InteriorIMR SANTA FE(12100)140P1319F0119236220RESURFACE&REALIGN MAIN VISITOR TRAILS - BAND THE PRIMARY WORK OF THIS PROJECT INCLUDES, BUT IS NOT LIMITED TO, REMOVING EXISTING STONES THAT LINE THE TRAIL AND INSTALLING NEW CONCRETE WALKWAY OVER EXISTING ASPHALT. THE WORK WILL ALSO INCLUDE$650K
Sep 24, 2019Department of the InteriorIMR ARIZONA(12400)140P1519F0157236220NAVA-EXPAND PHOTO VOLTAIC ENERGY SYSTEM$110K
Sep 24, 2019Department of the InteriorIMR ARIZONA(12400)140P1519F0158236220REPAIR CALABAZAS SHELTER, TUMACACORI NATIONAL HISTORIC PARK$135K
Sep 23, 2019Department of the InteriorIMR ARIZONA(12400)140P1519F0155236220GRCA REPLACE CLINIC EMERGENCY ENTR DOORS$144K
Sep 22, 2019Department of the InteriorIMR SANTA FE(12100)140P1318F0252236220REPLACE NON-ACCESSIBLE SIDEWALK - GUMO$29K
Sep 22, 2019Department of the InteriorIMR SANTA FE(12100)140P1319F0213236220DEMO SEPTIC TANK - BAND$20K
Sep 22, 2019Department of the InteriorIMR SANTA FE(12100)140P1319F0214236220REPLACE WATER FOUNTAIN - BAND$20K
Sep 22, 2019Department of the InteriorIMR SANTA FE(12100)140P1319F0216236220POWERLINE&POLE REMOVAL - PHASE 2 - BIBE$97K
Sep 19, 2019Department of the InteriorIMR SANTA FE(12100)140P1319F0208236220SAN ANTONIO MISSIONS - REPAIR ESPADA AQUEDUCT EROSION$172K
Sep 17, 2019Department of the InteriorIMR SANTA FE(12100)140P1319F0194236220CHIC - REHAB TRAVERTINE VC$249K
Sep 17, 2019Department of the InteriorIMR SANTA FE(12100)140P1319F0198236220CORRECT WATER TANK FOR CODE COMPLIANCE$281K
Sep 17, 2019Department of the InteriorIMR ARIZONA(12400)140P1519F0146236220GLCA - WAHWEAP UTILITY DATA COLLECTION$312K
Sep 16, 2019Department of the InteriorIMR SANTA FE(12100)140P1319F0168236220X:NOGRN, PADRE ISLAND NATIONAL SEASHORE - REPLACE WASTE WATER EQUIPMENT$864K
Sep 16, 2019Department of the InteriorIMR SANTA FE(12100)140P1319F0192236220REMOVE AND REPLACE LP STORAGE TANK, NEW CONCRETE PAD AND FENCING AT EL MORRO NATIONAL MONUMENT.$22K
Sep 16, 2019Department of the InteriorIMR ARIZONA(12400)140P1519F0144236220GRCA REPLACE EL TOVAR WATER METER - BASE$232K
Sep 13, 2019Department of the InteriorIMR SANTA FE(12100)140P1319F0185236220STRIPE RANCH ROADS AND VISITOR CENTER/RANCH PARKING AREAS: CRACK SEAL RANCH PARKING AREAS; MODIFY BACK 40 CULVERT AND RESURFACE BACK 40 ROAD AT LYNDON B. JOHNSON NATIONAL HISTORICAL PARK. THE WORK CONSISTS OF FURNISHING ALL LABOR, MATERIAL, EQUIP$168K
Sep 11, 2019Department of the InteriorIMR SANTA FE(12100)140P1319F0081236220SEWAGE LAGOONS LINER REPLACEMENTS - CAVE THE PRIMARY WORK OF THIS PROJECT INCLUDES, BUT IS NOT LIMITED TO, DEMOLISHING AND REMOVING ALL EXISTING SEWAGE LAGOON POND LINERS AT CARLSBAD CAVERNS NATIONAL PARK.$837K
Sep 10, 2019Department of the InteriorIMR SANTA FE(12100)140P1319F0171236220140P1319F0171 - UPGRADE HVAC - ELECTRICAL AT HB15$113K
Sep 10, 2019Department of the InteriorIMR ARIZONA(12400)140P1519F0132236220ARIZONA MAJOR ACQUISITION BUYING OFFICE TASK ORDER UTILIZING THE BASE SABER CONTRACT FOR CHIRICAHUA NATIONAL MONUMENT, HEADQUARTERS BUILDING GARAGE REPURPOSE. -PER QUOTED ON PROPOSAL DATED 9/4/2019 ALL-RITE POINT OF CONTACT, ROBERT SHULTIS, ROBERT$141K
Sep 10, 2019Department of the InteriorIMR SANTA FE(12100)140P1319F0160236220REPLACE 5 LBJ CORRUGATED METAL ROOFS AND INSTALL INSULATION ON THE SHOW BARN AND AUTO SHOP WALLS, ALL LOCATED AT LYNDON B. JOHNSON NATIONAL HISTORICAL PARK. THE WORK CONSISTS OF ALL LABOR, MATERIAL, EQUIPMENT AND INCIDENTALS TO REMOVE THE EXISTIN$317K
Sep 5, 2019Department of the InteriorIMR SANTA FE(12100)140P1319F0163236220REPAIR&RE-SURFACE VC EXTERIOR WALLS - WHSA$60K
Sep 4, 2019Department of the InteriorIMR SANTA FE(12100)140P1319F0159236220REPLACE SIDING&PAINT EXTERIOR MOORE&BRYAN BUILDINGS AT LYNDON B. JOHNSON NATIONAL HISTORICAL PARK. UNDER THIS CONTRACT, THE NATIONAL PARK SERVICE (NPS) EXPECTS TO ACCOMPLISH THE FOLLOWING WORK. 1. REMOVE AND PROPERLY DISPOSE OF EXI$101K
Aug 29, 2019Department of the InteriorIMR ARIZONA(12400)140P1519F0119236220CASA GRANDE RUINS NM (CAGR) REQUIRES THE UTLILIZATION OF THE AZ SABER CONTRACT FOR ROOF REPLACEMENT. YOUR POINT OF CONTACT FOR CASA GRAND RUINS IS ALYCIA HAYES, 520-213-3165, ALYCIA_HAYES@NPS.GOV LOCATION: NPS, CASA GRANDE RUINS NM 1100 RUINS$74K
Aug 29, 2019Department of the InteriorIMR SANTA FE(12100)140P1319F0152236220X:NOGRN, SAN ANTONIO MISSIONS NATIONAL HISTORICAL PARK - PARKING PAVEMENT TREATMENT$66K
Aug 27, 2019Department of the InteriorIMR SANTA FE(12100)140P1319F0145236220REPLACE CEDAR ROOF AND REPAIR RAFTERS AT PALO ALTO BATTLEFIELD NATIONAL HISTORICAL PARK$53K
Aug 26, 2019Department of the InteriorIMR SANTA FE(12100)140P1319F0140236220BIBE - RE-ROOF Q229$74K
Aug 20, 2019Department of the InteriorIMR SANTA FE(12100)140P1319F0061236220IGF::CL::IGF, DEMOLISH, REMOVE AND REPLACE SECURITY FENCING AT SEWAGE LAGOONS WITHIN PADRE ISLAND NATIONAL SEASHORE.$5K
Aug 20, 2019Department of the InteriorIMR SANTA FE(12100)140P1319F0126236220ELMA - REPLACE VISITOR CENTER ROOF$306K
Aug 13, 2019Department of the InteriorIMR SANTA FE(12100)140P1319F0116236220AZRU 206791 REHAB EXTERIOR WALLS CR BLDG$179K
Jul 24, 2019Department of the InteriorIMR SANTA FE(12100)140P1318F0230236220IGF::OT::IGF THE PRIMARY WORK OF THIS PROJECT INCLUDES, BUT IS NOT LIMITED TO, THE REHABILITATION AND REPLACEMENT OF THE INTERIOR FINISHES AT THE CHISOS BASIN VISITOR CENTER AT BIG BEND NATIONAL PARK. THE BUILDING'S INTERIOR WILL BE REPAINTED, THE LIGHTING UPGRADED, AND THE CARPETS AND CEILING TILE WILL BE REPLACED. AN AUTOMATIC DOOR (ABAAS) OPENER WILL BE INSTALLED ON THE FRONT DOOR ALONG WITH A PUSH BUTTON ON THE EXTERIOR AND INTERIOR. A NEW CONTACT COUNTER WILL BE CONSTRUCTED THAT MEETS ABAAS ACCESSIBILITY AND OTHER INTERIOR MODIFICATION AS OUTLINED IN THE SCOPE OF WORK.$2K
Jul 23, 2019Department of the InteriorIMR SANTA FE(12100)140P1319F0087236220PAINT EXTERIOR OF TRI-PLEXES - CAVE THE PRIMARY WORK OF THIS PROJECT INCLUDES, BUT IS NOT LIMITED TO, PATCHING AND PAINTING THE ENTIRETY OF THE EXTERIOR OF TWO TRIPLEX UNITS (25 AND 28) AND ASSOCIATED RETAINING WALLS. ALL PATCHED AREAS WILL MATCH$88K
Jul 9, 2019Department of the InteriorIMR SANTA FE(12100)140P1319F0077236220CHCU REHAB VC COMFORT STATION-THE COMFORT STATION AT THE VISITOR CENTER IS IN NEED OF REHABILITATION DUE TO ROOF LEAKAGE AND WEAR AND TEAR ON THE INTERIOR FIXTURES. REPAIRS INCLUDE BUT ARE NOT LIMITED TO CEILING REPAIRS, ROOF REPLACEMENT, WOOD STUDS$138K
Jun 27, 2019Department of the InteriorIMR ARIZONA(12400)140P1519F0067236220AZ MABO - SABER IDIQ MINIMUM GUARANTEE$2K
Jun 19, 2019Department of the InteriorIMR SANTA FE(12100)140P1318F0291236220IGF::OT::IGF THE PRIMARY WORK OF THIS PROJECT INCLUDES, BUT IT NOT LIMITED TO, THE REMOVAL AND REPLACEMENT OF APPROXIMATELY 13,200 SQ. FT. OF MEMBRANE ROOFING ON SIX RESIDENTIAL UNITS (RESIDENCE 4,5,6,7,8,&13) AT EL MORRO NATIONAL MONUMENT. GENERAL TASKS WILL INCLUDE: REMOVAL OF EXISTING MEMBRANE ROOFING SYSTEMS AND ALL UNDERLYING ROOFING COMPONENTS; PREPARATION AND REPAIR OF DECKING; REMOVAL AND REPLACEMENT OF GUTTERS AND DOWNSPOUTS; INSTALLATION OF NEW PVC MEMBRANE ROOFING SYSTEM AND ALL APPURTENANCE; REPAIR WOOD TRIM UNDER GUTTERS AND DOWN SPOUTS; PRIME AND PAINT WOOD TRIM/FASCIA, ISSUE A 20 YEAR WARRANTY ON LABOR AND MATERIALS FROM ROOFING SYSTEM MANUFACTURE. ALL WORK, TERMS AND CONDITIONS, CLAUSES AND PROVISION, AS STATED IN TASK ORDER REQUEST, WITH ALL ATTACHMENTS, IS HEREIN EXPRESSLY INCORPORATED INTO THIS CONTRACT.$36K
May 30, 2019Department of the InteriorIMR SANTA FE(12100)140P1319F0061236220IGF::CL::IGF, DEMOLISH, REMOVE AND REPLACE SECURITY FENCING AT SEWAGE LAGOONS WITHIN PADRE ISLAND NATIONAL SEASHORE.$107K

Get Alerted Before All-rite Construction, INC.'s Next Recompete

Mindy monitors active contracts and flags recompetes 12 months out so you can position to compete.

Start Free