| May 30, 2019 | Department of the InteriorIMR SANTA FE(12100) | 140P1319F0060 | 236220 | REMOVE TWO UNDERGROUND STORAGE TANKS - CAVE | $81K |
| May 30, 2019 | Department of the InteriorIMR SANTA FE(12100) | 140P1319F0061 | 236220 | IGF::CL::IGF, DEMOLISH, REMOVE AND REPLACE SECURITY FENCING AT SEWAGE LAGOONS WITHIN PADRE ISLAND NATIONAL SEASHORE. | $107K |
| May 29, 2019 | Department of the InteriorIMR SANTA FE(12100) | 140P1319F0057 | 236220 | IGF::CT::IGF, PAINT BUILDING EXTERIORS AT RIO GRANDE VILLAGE HOUSING, CASTOLON HOUSING AND PUMPHOUSES WITHIN BIG BEND NATIONAL PARK. | $165K |
| May 23, 2019 | Department of the InteriorIMR SANTA FE(12100) | 140P1319F0055 | 236220 | GUADALUPE MOUNTAINS NATIONAL PARK - HOUSING STUCCO | $129K |
| Apr 22, 2019 | Department of the InteriorIMR SANTA FE(12100) | 140P1319F0046 | 236220 | TREE&STUMP REMOVAL - OSTB | $10K |
| Apr 18, 2019 | Department of the InteriorIMR SANTA FE(12100) | 140P1318F0291 | 236220 | IGF::OT::IGF THE PRIMARY WORK OF THIS PROJECT INCLUDES, BUT IT NOT LIMITED TO, THE REMOVAL AND REPLACEMENT OF APPROXIMATELY 13,200 SQ. FT. OF MEMBRANE ROOFING ON SIX RESIDENTIAL UNITS (RESIDENCE 4,5,6,7,8,&13) AT EL MORRO NATIONAL MONUMENT. GENERAL TASKS WILL INCLUDE: REMOVAL OF EXISTING MEMBRANE ROOFING SYSTEMS AND ALL UNDERLYING ROOFING COMPONENTS; PREPARATION AND REPAIR OF DECKING; REMOVAL AND REPLACEMENT OF GUTTERS AND DOWNSPOUTS; INSTALLATION OF NEW PVC MEMBRANE ROOFING SYSTEM AND ALL APPURTENANCE; REPAIR WOOD TRIM UNDER GUTTERS AND DOWN SPOUTS; PRIME AND PAINT WOOD TRIM/FASCIA, ISSUE A 20 YEAR WARRANTY ON LABOR AND MATERIALS FROM ROOFING SYSTEM MANUFACTURE. ALL WORK, TERMS AND CONDITIONS, CLAUSES AND PROVISION, AS STATED IN TASK ORDER REQUEST, WITH ALL ATTACHMENTS, IS HEREIN EXPRESSLY INCORPORATED INTO THIS CONTRACT. | $27K |
| Apr 17, 2019 | Department of the InteriorIMR SANTA FE(12100) | 140P1319F0038 | 236220 | REPAIR LEAKING WATERLINE - ELMO THE PRIMARY WORK OF THIS PROJECT INCLUDES, BUT IS NOT LIMITED TO, EXCAVATION TO EXPOSE THE WATERLINE BREAK, REMOVAL OF THE BROKEN SECTION OF PIPE AND REPLACEMENT IN KIND, INSTALLATION OF RESTRAINED REPAIR COUPLINGS BETWEEN THE EXISTING AND NEW PIPE, BACKFILL AND COMPACTION OVER THE REPAIR, AND DISINFECTION. | $36K |
| Apr 17, 2019 | Department of the InteriorIMR SANTA FE(12100) | 140P1319F0041 | 236220 | OSTB ABATE VINYL TILE RMS 120,121,121A | $73K |
| Apr 11, 2019 | Department of the InteriorIMR SANTA FE(12100) | 140P1318F0171 | 236220 | X:NOGRN, SALINAS PUEBLOS MISSIONS - REPLACE BUILDING COMPONENTS, ABO | $6K |
| Apr 3, 2019 | Department of the InteriorIMR SANTA FE(12100) | 140P1319F0034 | 236220 | REPAIR SEDIMENT TANK FLOOR AND VENT THE SCOPE OF WORK FOR THIS PROJECT IS TO FURNISH AND INSTALL A NEW STEEL FLOOR IN THE BOTTOM OF THE EXISTING SEDIMENTATION TANK. THE NEW STEEL FLOOR CAN BE CUT INTO SECTIONS (UP TO A MAXIMUM OF 4 EACH 12 FEET WIDE SECTIONS) SO THAT IT CAN BE FIT INTO THE EXISTING TANK. THE STEEL FLOOR SHALL BE PLACED OVER THE EXISTING STEEL FLOOR. | $62K |
| Feb 12, 2019 | Department of the InteriorIMR SANTA FE(12100) | 140P1319F0017 | 236220 | DECOMMISSION TWO EXISTING R.V. SPOTS AND INSTALL NEW AT PERSIMMON GAP, BIG BEND NATIONAL PARK. INSTALL ONE NEW R.V. SPOT NEXT TO THE FENCE SURROUNDING THE WATER STORAGE TANK PER DRAWINGS. RUN 4" SCH 40 PVC NORTH WEST TOWARDS POWER POLE AND INSTALL 1000 GALLON HOLDING TANK FOR R.V. SEPTIC. THE CONTRACTOR SHALL COMPLY WITH ALL APPLICABLE CODES AND REGULATIONS OF AUTHORITIES HAVING JURISDICTION. THIS WORK CAN BEGIN IN MARCH AFTER SPRING BREAK. | $20K |
| Dec 18, 2018 | Department of the InteriorIMR SANTA FE(12100) | 140P1318F0228 | 236220 | IGF::OT::IGF IMPROVE ACCESSIBILITY AT PANTHER JUNCTION VISITOR CENTER AT BIG BEND NATIONAL PARK. THE PRIMARY WORK OF THIS PROJECT INCLUDES, BUT IS NOT LIMITED TO, IMPROVING THE VISITOR AND EMPLOYEE ACCESSIBILITY TO THE PUBLIC RESTROOMS, VISITOR CENTER, PARKING LOTS, AND PARK HEADQUARTERS. THIS PROJECT IS INTENDED TO PROVIDE ABAAS COMPLIANT RESTROOMS, PARKING SPACES, WALKWAYS, SIDEWALKS, RAMPS, AND AUTOMATIC DOORS TO THE EXISTING VISITOR CENTER AND PARK HEADQUARTERS. THE WORK INCLUDES THE BACK EMPLOYEE PARKING AREA TO THE SOUTH OF THE BUILDING COMPLEX. THIS WORK WILL ESTABLISH SEVERAL WHEELCHAIR ACCESSIBLE ROUTES INTO THE BUILDING COMPLEX. DUE TO FUNDING LIMITATIONS WE WILL NOT AWARD OPTION ITEMS #1 MAILROOM DOOR AND OPTION ITEM #2 REPLACE WALKING TRAIL UNTIL THE NEW FISCAL YEAR, WHICH WILL BEGIN AFTER OCTOBER 1, 2018. ALL WORK, TERMS AND CONDITIONS, CLAUSES AND PROVISIONS, AS STATED IN TASK ORDER REQUEST #0040398704, WITH ALL ATTACHMENTS, IS HEREIN EXPRESSLY INCORPORATED INTO THIS CONTRACT. | $24K |
| Dec 17, 2018 | Department of the InteriorIMR SANTA FE(12100) | 140P1318F0245 | 236220 | FOUN REPLACE VISITOR CENTER ROOF | $8K |
| Nov 15, 2018 | Department of the InteriorIMR SANTA FE(12100) | 140P1319F0005 | 236220 | CX:NOGRN, CHAMIZAL NATIONAL MEMORIAL - FIRE ALARM SYSTEM UPGRADE VOICE ADD | $120K |
| Nov 6, 2018 | Department of the InteriorIMR SANTA FE(12100) | 140P1319F0004 | 236220 | RE-ROOF HISTORIC BLDG. 20 - BAND | $80K |
| Sep 26, 2018 | Department of the InteriorIMR SANTA FE(12100) | 140P1318F0292 | 236220 | IGF::OT::IGF EMERGENCY WATER LINE REPAIRS/EXCAVATION AT GUADALUPE MOUNTAINS NATIONAL PARK. THIS PROJECT CONSISTS OF EXCAVATING, REPAIR OF WATER LINE AND REHAB OF ANY DEMOLITION AT THE GUADALUPE MOUNTAINS VISITOR CENTER. HERE ARE THE MAJOR ITEMS TO BE ADDRESSED: PROPERLY BARRICADE WORK AREA FROM PUBLIC. DEMO EXISTING CONCRETE SLAB, DOES NOT INCLUDE DEMO IF NEEDED UNDER BUILDING OR FOOTINGS. EXCAVATE TO PROPER DEPTH OF WATER LINE TO EXPOSE LINES AND FITTINGS. REPAIR LINES AND FITTINGS AS NEEDED. PROVIDE PROPER SHORING AND SAFETY CONTROLS. BACKFILL AREA AND COMPACT AS NEEDED. INSTALL CONCRETE SLAB AS NEEDED. CLEAN AREA OF ALL DEBRIS AND LEAVE AREA TIDY. ALL WORK, TERMS AND CONDITIONS, CLAUSES AND PROVISIONS, AS STATED IN TASK ORDER REQUEST, WITH ALL ATTACHMENTS, IS HEREIN EXPRESSLY INCORPORATED INTO THIS CONTRACT. | $18K |
| Sep 24, 2018 | Department of the InteriorIMR SANTA FE(12100) | 140P1318F0169 | 236220 | IGF::OT::IGF REHABILITATE FREEZER-COOLER AT KLEIN SHOP, LYNDON B. JOHNSON NATIONAL HISTORICAL PARK STONEWALL, TEXAS. THE PRIMARY WORK OF THIS PROJECT INCLUDES, BUT IS NOT LIMITED TO THE REHABILITATION OF THE FREEZER-COOLER. WORK INCLUDES RAISING THE COMBO UNIT OFF THE GROUND TO INSERT NEW METAL SUPPORTS NEXT TO EXISTING AND REPAIR WOOD FLOORS; FILL OPENINGS AND GAPS, RE-ATTACH, CLEAN, PREP AND PAINTING THE EXTERIOR METAL AND DOORS; REFURBISH THE DOOR ACCESSORIES TO WORKING CONDITION; AND REMOVING THE INTERIOR COMPONENTS TO USE THE UNITS FOR STORAGE. THE CORRUGATED METAL PANELS OF THE SHED AND FRAMING WILL BE NEED TO REMOVED, RE-INSTALLED AND PAINTED TO PERFORM THE WORK ON THE FREEZER-COOLER UNIT. ALL WORK, TERMS AND CONDITIONS, CLAUSES AND PROVISION, AS STATED IN TASK ORDER REQUEST 0040395155, WITH ALL ATTACHMENTS, IS HEREIN EXPRESSLY INCORPORATED INTO THIS CONTRACT. | $14K |
| Sep 24, 2018 | Department of the InteriorIMR SANTA FE(12100) | 140P1318F0291 | 236220 | IGF::OT::IGF THE PRIMARY WORK OF THIS PROJECT INCLUDES, BUT IT NOT LIMITED TO, THE REMOVAL AND REPLACEMENT OF APPROXIMATELY 13,200 SQ. FT. OF MEMBRANE ROOFING ON SIX RESIDENTIAL UNITS (RESIDENCE 4,5,6,7,8,&13) AT EL MORRO NATIONAL MONUMENT. GENERAL TASKS WILL INCLUDE: REMOVAL OF EXISTING MEMBRANE ROOFING SYSTEMS AND ALL UNDERLYING ROOFING COMPONENTS; PREPARATION AND REPAIR OF DECKING; REMOVAL AND REPLACEMENT OF GUTTERS AND DOWNSPOUTS; INSTALLATION OF NEW PVC MEMBRANE ROOFING SYSTEM AND ALL APPURTENANCE; REPAIR WOOD TRIM UNDER GUTTERS AND DOWN SPOUTS; PRIME AND PAINT WOOD TRIM/FASCIA, ISSUE A 20 YEAR WARRANTY ON LABOR AND MATERIALS FROM ROOFING SYSTEM MANUFACTURE. ALL WORK, TERMS AND CONDITIONS, CLAUSES AND PROVISION, AS STATED IN TASK ORDER REQUEST, WITH ALL ATTACHMENTS, IS HEREIN EXPRESSLY INCORPORATED INTO THIS CONTRACT. | $403K |
| Sep 20, 2018 | Department of the InteriorIMR SANTA FE(12100) | 140P1318F0090 | 236220 | REPLACE 2ND STORY AIR CONDITIONING SYSTEM - OSTB | $30K |
| Sep 19, 2018 | Department of the InteriorIMR SANTA FE(12100) | 140P1318F0282 | 236220 | WATER SYSTEM REPAIRS - VALL | $114K |
| Sep 19, 2018 | Department of the InteriorIMR SANTA FE(12100) | 140P1318F0278 | 236220 | CAVE CYCLIC REPLACEMENT Q 22 SEPTIC | $31K |
| Sep 13, 2018 | Department of the InteriorIMR SANTA FE(12100) | 140P1318F0261 | 236220 | SHED AND SITE DEMOLITION - VALL | $388K |
| Sep 13, 2018 | Department of the InteriorIMR SANTA FE(12100) | 140P1318F0264 | 236220 | REPLACE VC HVAC UNITS - BITH | $171K |
| Sep 12, 2018 | Department of the InteriorIMR SANTA FE(12100) | 140P1318F0258 | 236220 | SHED AND SITE DEMOLITION - VALL | $22K |
| Sep 12, 2018 | Department of the InteriorIMR SANTA FE(12100) | 140P1318F0256 | 236220 | RE-ROOF HISTORIC BLDG. 32 - BAND | $110K |
| Sep 12, 2018 | Department of the InteriorIMR SANTA FE(12100) | 140P1318F0257 | 236220 | CHIC - REPLACE WINDOWS ON SUP HOUSE | $225K |
| Sep 12, 2018 | Department of the InteriorIMR SANTA FE(12100) | 140P1318F0259 | 236220 | BAND REPLACE HB12 A/C MULTI SPLIT SYSTEM | $35K |
| Sep 11, 2018 | Department of the InteriorIMR SANTA FE(12100) | 140P1318F0254 | 236220 | RE-ROOF HISTORIC BLDG. 08 - BAND | $143K |
| Sep 11, 2018 | Department of the InteriorIMR SANTA FE(12100) | 140P1318F0252 | 236220 | REPLACE NON-ACCESSIBLE SIDEWALK - GUMO | $39K |
| Sep 10, 2018 | Department of the InteriorIMR SANTA FE(12100) | 140P1318F0245 | 236220 | FOUN REPLACE VISITOR CENTER ROOF | $325K |
| Sep 10, 2018 | Department of the InteriorIMR SANTA FE(12100) | 140P1318F0250 | 236220 | REMOVE VC UNDERGROUND STORAGE TANK - CAVE | $65K |
| Sep 10, 2018 | Department of the InteriorIMR SANTA FE(12100) | 140P1318F0089 | 236220 | RESTORE REPLACE HISTORIC VC SUPPORT POLES - WHSA | $68K |
| Sep 10, 2018 | Department of the InteriorIMR SANTA FE(12100) | 140P1318F0249 | 236220 | REPLACE GAS WALL HEATERS - BAND | $32K |
| Sep 4, 2018 | Department of the InteriorIMR SANTA FE(12100) | 140P1318F0091 | 236220 | CHAMIZAL NATIONAL MONUMENT-REPLACE FIRE ALARM SYSTEM | $5K |
| Aug 31, 2018 | Department of the InteriorIMR SANTA FE(12100) | 140P1318F0239 | 236220 | IGF::CT::IGF X:NOGRN PRESERVATION OF CASTOLON ROOFS AND STRUCTURES AT BIG BEND NATIONAL PARK | $97K |
| Aug 30, 2018 | Department of the InteriorIMR SANTA FE(12100) | 140P1318F0237 | 236220 | VALL - CYCLIC MAINTENANCE (BOND CABIN) | $143K |
| Aug 29, 2018 | Department of the InteriorIMR SANTA FE(12100) | 140P1318F0233 | 236220 | IGF::OT::IGF THE PRIMARY WORK OF THIS PROJECT INCLUDES, BUT IS NOT LIMITED TO, INSTALLATION OF NEW SOLAR LIGHTS ON EXISTING POLES. LIGHTS SHOULD BE NO LESS THAN 40W EACH. INSTALLED AT THE APPROPRIATE HEIGHT FOR MAXIMUM ILLUMINATION ON GROUND UNDERNEATH POLES. EXISTING SOLAR LIGHTS ARE TO BE REMOVED AND RECYCLED IF POSSIBLE, GENERAL SITE CLEANUP. | $141K |
| Aug 29, 2018 | Department of the InteriorIMR SANTA FE(12100) | 140P1318F0234 | 236220 | PETR - CORRECT VC PARKING ACCESSIBILITY | $82K |
| Aug 29, 2018 | Department of the InteriorIMR SANTA FE(12100) | 140P1318F0232 | 236220 | X:NOGRN, SALINAS PUEBLO MISSIONS - REPLACE BUILDING COMPONENTS, QUARAI | $214K |
| Aug 28, 2018 | Department of the InteriorIMR SANTA FE(12100) | 140P1318F0230 | 236220 | IGF::OT::IGF THE PRIMARY WORK OF THIS PROJECT INCLUDES, BUT IS NOT LIMITED TO, THE REHABILITATION AND REPLACEMENT OF THE INTERIOR FINISHES AT THE CHISOS BASIN VISITOR CENTER AT BIG BEND NATIONAL PARK. THE BUILDING'S INTERIOR WILL BE REPAINTED, THE LIGHTING UPGRADED, AND THE CARPETS AND CEILING TILE WILL BE REPLACED. AN AUTOMATIC DOOR (ABAAS) OPENER WILL BE INSTALLED ON THE FRONT DOOR ALONG WITH A PUSH BUTTON ON THE EXTERIOR AND INTERIOR. A NEW CONTACT COUNTER WILL BE CONSTRUCTED THAT MEETS ABAAS ACCESSIBILITY AND OTHER INTERIOR MODIFICATION AS OUTLINED IN THE SCOPE OF WORK. | $72K |
| Aug 24, 2018 | Department of the InteriorIMR SANTA FE(12100) | 140P1318F0228 | 236220 | IGF::OT::IGF IMPROVE ACCESSIBILITY AT PANTHER JUNCTION VISITOR CENTER AT BIG BEND NATIONAL PARK. THE PRIMARY WORK OF THIS PROJECT INCLUDES, BUT IS NOT LIMITED TO, IMPROVING THE VISITOR AND EMPLOYEE ACCESSIBILITY TO THE PUBLIC RESTROOMS, VISITOR CENTER, PARKING LOTS, AND PARK HEADQUARTERS. THIS PROJECT IS INTENDED TO PROVIDE ABAAS COMPLIANT RESTROOMS, PARKING SPACES, WALKWAYS, SIDEWALKS, RAMPS, AND AUTOMATIC DOORS TO THE EXISTING VISITOR CENTER AND PARK HEADQUARTERS. THE WORK INCLUDES THE BACK EMPLOYEE PARKING AREA TO THE SOUTH OF THE BUILDING COMPLEX. THIS WORK WILL ESTABLISH SEVERAL WHEELCHAIR ACCESSIBLE ROUTES INTO THE BUILDING COMPLEX. DUE TO FUNDING LIMITATIONS WE WILL NOT AWARD OPTION ITEMS #1 MAILROOM DOOR AND OPTION ITEM #2 REPLACE WALKING TRAIL UNTIL THE NEW FISCAL YEAR, WHICH WILL BEGIN AFTER OCTOBER 1, 2018. ALL WORK, TERMS AND CONDITIONS, CLAUSES AND PROVISIONS, AS STATED IN TASK ORDER REQUEST #0040398704, WITH ALL ATTACHMENTS, IS HEREIN EXPRESSLY INCORPORATED INTO THIS CONTRACT. | $157K |
| Aug 24, 2018 | Department of the InteriorIMR SANTA FE(12100) | 140P1318F0227 | 236220 | IGF:OT::IGF REHABILITATE MAVERICK ENTRANCE STATION AT BIG BEND NATIONAL PARK. THE PRIMARY WORK OF THIS PROJECT INCLUDES, BUT IS NOT LIMITED TO, THE REMOVAL AND REPLACEMENT OF; EXTERIOR AND INTERIOR LIGHTING FIXTURES; 200 SQUARE FEET OF FLOORING INCLUDING ANTI-FATIGUE MATTING; INTERIOR AND EXTERIOR PAINTING; REPLACING ONE WINDOW, ONE DOOR, AND COMPOSTING TOILET; PLASTER AND DRYWALL REPAIR, REMOVAL OF EXISTING EXTRA WINDOW AC PACKAGE UNIT; REPLACEMENT OF ALARM SYSTEM AND FIRE/SMOKE SENSORS, INCLUDING NEW CO2 SENSORS AND HORN/STROBE UNITS AN REPLACE COUNTER TOP WITH NEW COUNTER TOP WITH SHELVING; REMOVE HALL SINK AND EXPAND RESTROOM STORAGE AREA; INSTALL FOUR NEW EXTERIOR CCTV CAMERAS ON EXTERIOR OF BUILDING AND ROUTE TO NEW MONITOR/HDD RECORDER AT THE TICKET WINDOW TO MONITOR TRAFFIC AND VISITORS AT DOOR. ALL WORK, TERMS AND CONDITIONS, CLAUSES, PROVISIONS, AS STATED IN TASK ORDER REQUEST 0040398703, WITH ALL ATTACHMENTS, IS HEREIN EXPRESSLY INCORPORATED INTO THIS CONTRACT. | $75K |
| Aug 23, 2018 | Department of the InteriorIMR SANTA FE(12100) | 140P1318F0225 | 236220 | IGF::CT::IGF X:NOGRN REPLACE HISTORIC BUILDING ROOF ON PLATT RANGER STATION, CHICKASAW NRA. | $153K |
| Aug 20, 2018 | Department of the InteriorIMR SANTA FE(12100) | 140P1318F0215 | 236220 | BAND RE-ROOF HISTORIC BUILDING 12 | $53K |
| Aug 17, 2018 | Department of the InteriorIMR SANTA FE(12100) | 140P1318F0213 | 236220 | IGF::CT::IGF REMOVE AND REPLACE 2,000 LF OF EXISTING FENCE AND REPLACE IN THE SAME LOCATION. RESTORING CEDAR RAIL FENCE SHALL RETAIN THEIR PURPOSE FOR PROTECTION&PARKING. | $75K |
| Aug 16, 2018 | Department of the InteriorIMR SANTA FE(12100) | 140P1318F0212 | 236220 | IGF::OT::IGF LYNDON B. JOHNSON NATIONAL HISTORICAL PARK - REPLACE CARPET AT HEADQUARTERS. WORK INCLUDES, BUT IS NOT LIMITED TO REMOVAL OF THE EXISTING ROLLED CARPET, WHICH ARE GLUED TO THE CONCRETE FLOOR; PREPARATION OF THE CONCRETE FLOOR; AND INSTALLATION OF NEW CARPET TILES INCLUDING ANY NECESSARY EDGE AND/OR THRESHOLD/TRANSITION STRIPS. THERE IS APPROXIMATELY 9,276 SQUARE FEET OF EXISTING ROLLED CARPET REQUIRING REMOVAL. A ACTUAL WORK CANNOT BEGIN UNTIL AFTER OCTOBER 1, 2018. ALL WORK, TERMS AND CONDITIONS, CLAUSES AND PROVISIONS, AS STATED IN TASK ORDER REQUEST 0040403474, WITH ALL ATTACHMENTS, IS HEREIN EXPRESSLY INCORPORATED INTO THIS CONTRACT. | $176K |
| Aug 14, 2018 | Department of the InteriorIMR SANTA FE(12100) | 140P1318F0206 | 236220 | BAND-REPLACE HVAC AND COMPONENTS HB-16 | $32K |
| Aug 9, 2018 | Department of the InteriorIMR SANTA FE(12100) | 140P1318F0200 | 236220 | CAVE CLEANING/CLEARING VAULTS, WATERLINE | $51K |
| Aug 7, 2018 | Department of the InteriorIMR SANTA FE(12100) | 140P1318F0195 | 236220 | REPLACE GSA WAREHOUSE YARD GATE | $36K |
| Aug 6, 2018 | Department of the InteriorIMR SANTA FE(12100) | 140P1318F0194 | 236220 | ELMO - REPAIRS TO CONCRETE STAIRS | $102K |
Get Alerted Before All-rite Construction, INC.'s Next Recompete
Mindy monitors active contracts and flags recompetes 12 months out so you can position to compete.
Start Free