Home/Contractors/All-rite Construction, INC./contracts

Federal Contractor Profile

All-rite Construction, INC.

$54M obligated·412 awards·2 agencies·5 NAICS

Federal Contracts

Showing contracts 351400 of 486 total. Sorted by action date, most recent first. Excludes $0 modifications.

DateAgencyPIIDNAICSDescriptionAmount
Aug 2, 2018Department of the InteriorIMR INTERMOUNTAIN REGION(1200)140P1218F0109236220IGF::OT::IGF:: HVAC SYSTEMS AT CAPULIN VOLCANO NATIONAL MONUMENT$127K
Aug 2, 2018Department of the InteriorIMR SANTA FE(12100)140P1318F0189236220BAND RE-ROOF HISTORIC BUILDING 28$71K
Aug 2, 2018Department of the InteriorIMR SANTA FE(12100)140P1318F0190236220BAND RE-ROOF HISTORIC BUILDING 23$71K
Jul 27, 2018Department of the InteriorIMR SANTA FE(12100)140P1318F0186236220X:NOGRN, GILA CLIFF DWELLINGS NM - REMOVE AND REPLACE CEDAR SHINGLES$87K
Jul 27, 2018Department of the InteriorIMR SANTA FE(12100)140P1318F0185236220IGF::CL::IGF:, CONSTRUCTION, RECONDITIONING OF YARBOROUGH PASS ROAD IN PADRE ISLAND NS. DUE TO RECORD RAINFALL, FLOODING AND STANDING FLOOD WATERS, THE ROAD HAS LOST ITS STRUCTURAL INTEGRITY AND HAS BECOME SEVERELY RUTTED FROM VEHICULAR TRAFFIC.$110K
Jul 23, 2018Department of the InteriorIMR SANTA FE(12100)140P1318F0051236220REHAB LOWER ROUGH CANYON COMFORT STATION - AMIS$189K
Jul 23, 2018Department of the InteriorIMR SANTA FE(12100)140P1318F0174236220X:NOGRN, AZTEC RUINS NATIONAL MONUMENT-RESURFACE TWO TRAILS-PMIS#251916$81K
Jul 23, 2018Department of the InteriorIMR SANTA FE(12100)140P1318F0173236220AMIS DEMOLISH OLD CONCESSION STORE-BARGE$79K
Jul 20, 2018Department of the InteriorIMR SANTA FE(12100)140P1318F0171236220X:NOGRN, SALINAS PUEBLOS MISSIONS - REPLACE BUILDING COMPONENTS, ABO$177K
Jul 19, 2018Department of the InteriorIMR SANTA FE(12100)140P1318F0047236220REHAB ADA COMPLIANT BOARDWALK - WHSA$331K
Jul 18, 2018Department of the InteriorIMR SANTA FE(12100)140P1318F0127236220EL MORRO NATIONAL MONUMENT - REPLACE ROOFS ON VC/ADMIN/SHOP$10K
Jul 18, 2018Department of the InteriorIMR SANTA FE(12100)140P1318F0167236220IGF::OT::IGF PADRE ISLAND BIRD ISLAND BASIN CAMPGROUND - SHORELINE STABILIZATION THE PRIMARY WORK OF THIS PROJECT INCLUDES, BUT IS NOT LIMITED TO THE PROVIDING OF ALL SUPPLIES AND MATERIALS NEEDED TO ADEQUATELY COMPLETE THE INSTALLATION OF A RIPARIAN (RIP RAP) BREAK WALL AT SHORELINE STABILIZATION BIRD ISLAND BASIN CAMPGROUND. THE BREAK WALL WILL BE LIMITED TO 500 LINIER FEET OF BANK STABILIZATIONS PER THE ATTACHED SCOPE OF WORK. SCOPE OF WORK: ALL WORK, TERMS AND CONDITIONS, CLAUSES AND PROVISION, AS STATED IN TASK ORDER REQUEST #0040397109, WITH ALL ATTACHMENTS, IS HEREIN EXPRESSLY INCORPORATED INTO THIS CONTRACT.$99K
Jul 18, 2018Department of the InteriorIMR SANTA FE(12100)140P1318F0169236220IGF::OT::IGF REHABILITATE FREEZER-COOLER AT KLEIN SHOP, LYNDON B. JOHNSON NATIONAL HISTORICAL PARK STONEWALL, TEXAS. THE PRIMARY WORK OF THIS PROJECT INCLUDES, BUT IS NOT LIMITED TO THE REHABILITATION OF THE FREEZER-COOLER. WORK INCLUDES RAISING THE COMBO UNIT OFF THE GROUND TO INSERT NEW METAL SUPPORTS NEXT TO EXISTING AND REPAIR WOOD FLOORS; FILL OPENINGS AND GAPS, RE-ATTACH, CLEAN, PREP AND PAINTING THE EXTERIOR METAL AND DOORS; REFURBISH THE DOOR ACCESSORIES TO WORKING CONDITION; AND REMOVING THE INTERIOR COMPONENTS TO USE THE UNITS FOR STORAGE. THE CORRUGATED METAL PANELS OF THE SHED AND FRAMING WILL BE NEED TO REMOVED, RE-INSTALLED AND PAINTED TO PERFORM THE WORK ON THE FREEZER-COOLER UNIT. ALL WORK, TERMS AND CONDITIONS, CLAUSES AND PROVISION, AS STATED IN TASK ORDER REQUEST 0040395155, WITH ALL ATTACHMENTS, IS HEREIN EXPRESSLY INCORPORATED INTO THIS CONTRACT.$59K
Jul 18, 2018Department of the InteriorIMR SANTA FE(12100)140P1318F0168236220X:NOGRN, SALINAS PUEBLOS MISSIONS - QUARAI REPLACE SEPTIC SYS DIST BX$13K
Jul 16, 2018Department of the InteriorIMR SANTA FE(12100)140P1318F0165236220X:NOGRN, EL MALPAIS NATIONAL MONUMENT - REMODEL FIRE CACHE AT NM-53$41K
Jul 12, 2018Department of the InteriorIMR SANTA FE(12100)140P1318F0161236220PAAL CONSTRUC MONUMENT/RELOCATE EXISTING$48K
Jul 11, 2018Department of the InteriorIMR SANTA FE(12100)140P1318F0158236220ELMO-REPLACE UNDERGROUND PROPANE TANK$33K
Jul 10, 2018Department of the InteriorIMR SANTA FE(12100)140P1318F0153236220X:NOGRN, PETROGLYPH NATIONAL MONUMENT-REPAIR RE-STUCCO BAN.SEATS/WALLS$38K
Jul 10, 2018Department of the InteriorIMR SANTA FE(12100)140P1318F0127236220EL MORRO NATIONAL MONUMENT - REPLACE ROOFS ON VC/ADMIN/SHOP$133K
Jul 9, 2018Department of the InteriorIMR SANTA FE(12100)140P1318F0152236220ELMO-REPAIRS TO VISITOR CENTER COURTYARD$52K
Jul 5, 2018Department of the InteriorIMR SANTA FE(12100)140P1318F0145236220IGF::CT::IGF X:NOGRN,REPLACE ROADWAY GATES THROUGHOUT BIG BEND NATIONAL PARK.$165K
Jul 5, 2018Department of the InteriorIMR SANTA FE(12100)140P1318F0147236220IGF::CT::IGF X:NOGRN, REPAIR/REPLACE VISITOR CENTER MAIN LOBBY WINDOW SYSTEM AT EL MALPAIS N.M.$57K
Jul 3, 2018Department of the InteriorIMR SANTA FE(12100)140P1318F0140236220AZTEC RUINS NATIONAL MONUMENT - PAINT EXTERIOR TRIM-BLDGS$15K
Jun 19, 2018Department of the InteriorIMR SANTA FE(12100)140P1318F0127236220EL MORRO NATIONAL MONUMENT - REPLACE ROOFS ON VC/ADMIN/SHOP$170K
Jun 18, 2018Department of the InteriorIMR SANTA FE(12100)140P1318F0049236220REPLACE 16 SOLAR LIGHTING FIXTURES ALONG TRAIL - CHAM$179K
May 30, 2018Department of the InteriorIMR SANTA FE(12100)140P1318F0100236220PECO RE-STUCCO MAIN UNIT BUILDINGS$27K
May 29, 2018Department of the InteriorIMR SANTA FE(12100)140P1318F0111236220SAN ANTONIO MISSIONS NATIONAL HISTORICAL PARK-SEAL JOINTS AT PARK VC$87K
May 10, 2018Department of the InteriorIMR SANTA FE(12100)140P1318F0098236220WASHITA BATTLEFIELD NATIONAL HISTORICAL SITE-PAINT VISITOR CENTER INTERIOR WALLS$88K
Apr 25, 2018Department of the InteriorIMR SANTA FE(12100)140P1318F0092236220CHCU: DEFERRED MAINTENANCE FOR DUPLEXES$150K
Apr 23, 2018Department of the InteriorIMR SANTA FE(12100)140P1318F0091236220CHAMIZAL NATIONAL MONUMENT-REPLACE FIRE ALARM SYSTEM$80K
Apr 20, 2018Department of the InteriorIMR SANTA FE(12100)140P1318F0090236220REPLACE 2ND STORY AIR CONDITIONING SYSTEM - OSTB$87K
Apr 4, 2018Department of the InteriorIMR SANTA FE(12100)140P1318F0072236220IGF::CT::IGF, CONSTRUCTION, PROVIDE, DELIVER, DESIGN AND INSTALL MISSION 66 SHADE STRUCTURES TO WHITE SANDS NATIONAL MONUMENT.$36K
Mar 20, 2018Department of the InteriorIMR SANTA FE(12100)140P1318F0067236220BIBE -SUPPL.AND INSTALL CB WINDOW/DOORS$37K
Mar 6, 2018Department of the InteriorIMR SANTA FE(12100)140P1318F0052236220EMERGENCY ROOF REPLACEMENT - PETR$76K
Feb 28, 2018Department of the InteriorIMR SANTA FE(12100)140P1318F0042236220CHCU-ADDITONAL WORK TO BUILDING EXTER APTS A&B$38K
Jan 12, 2018Department of the InteriorIMR SANTA FE(12100)INP16PD03808236220IGF::OT::IGF P16PD03808 - DISCONNECT 50,000 GALLON WATER TANK FROM POTABLE WATER SYSTEM - GICL$5K
Jan 8, 2018Department of the InteriorIMR SANTA FE(12100)140P1318F0026236220REQUIRED CONTRACT MINIMUM AWARD --- $5,000.00$5K
Nov 21, 2017Department of the InteriorFWS SOUTHWEST REGIONAL OFFICEINF17PC00131238160IGF::OT::IGF BOSQUE BIO BULDING&QTRS #3$17K
Oct 19, 2017Department of the InteriorIMR SANTA FE(12100)140P1318P0002238160AMIS REPLACE ROTTEN DECKING, RC ROOF-REPLACEMENT OF 24 SHEETS OF 4' X 8'3/4' PLYWOOD.$5K
Aug 29, 2017Department of the InteriorIMR INTERMOUNTAIN REGION(1200)INP17PD01763236220IGF::OT::IGF MULTIPURPOSE ROOM WINDOWS AND DOORS AND ROOF AT CAPULIN VOLCANO NATIONAL MONUMENT.$359
Aug 22, 2017Department of the InteriorIMR SANTA FE(12100)INP17PD02611236220IGF::OT::IGF CEILING DEMO, AND ASBESTOS ABATEMENT - LYJO THE PRIMARY WORK OF THIS PROJECT INCLUDES, BUT IS NOT LIMITED TO THE DEMOLITION, REMOVAL AND DISPOSAL OF THE CEILING, AND ASBESTOS-CONTAINING MATERIAL (ACM), FROM THE LIVING ROOM OF THE TEXAS WHITE HOUSE.$20K
Aug 22, 2017Department of the InteriorIMR SANTA FE(12100)INP17PD01983236220IGF::OT::IGF REPAIR STORM WINDOWS&SCREENS - OSTB$36K
Aug 17, 2017Department of the InteriorIMR SANTA FE(12100)INP17PD02515236220IGF::OT::IGF CAVE REPAIR BLDGS 10&41 LEAKING ROOFS$35K
Aug 17, 2017Department of the InteriorIMR SANTA FE(12100)INP17PD01981236220IGF::OT::IGF REHABILITATE CEMETERY WALL AND ORNAMENTAL WROUGHT IRON FENCE AT LYNDON B. JOHNSON NATIONAL HISTORICAL PARK. SCOPE OF WORK: ALL WORK, TERMS AND CONDITIONS, CLAUSES, AS STATED IN SOLICITATION T0040340129, WITH ALL ATTACHMENTS, IS HEREIN EXPRESSLY INCORPORATED INTO THIS CONTRACT. THE WORK CONSISTS OF ALL LABOR, MATERIAL, EQUIPMENT TO CLEAN, REPOINT AND RECAP MASONRY BOUNDARY WALL WITH PILASTERS AND ENLARGED CORNER PIERS TOPPED WITH DECORATIVE CONCRETE FINIALS. WORK INCLUDES REMOVAL OF ANY MODERN PORTLAND CEMENT REPAIRS, REPLACE ANY MISSING MORTAR, AND REPOINT ALL CRACKS AND HOLES. LINE ITEMS ARE ALSO PROVIDED TO PAINT OR POWDER COAT IRON WORK. REPOINT WALL SURFACE(BOTH SIDES) APPROXIMATELY 6,417 SF. APPROXIMATELY 2,140 FS OR 31% OF WALL SURFACE WILL BE CLEANED AND REPOINTED TOTAL COST $102,060.79. REHABILITATE FOUR (4) WROUGHT IRON GATES AND 120 LF OF FENCE AROUND FLOWER BED: REMOVE, CLEAN POWDER COAT AND REPLACE DECORATIVE WROUGHT IRON FENCING. REPLACE MISSING PIECES AND REPAIR TO WORKING CONDITION TOTAL COST OF $39,987.27. REHABILITATE STONE COLUMNS: REPAIR, STRAIGHTEN AND INSTALL CONCRETE FOOTINGS UNDER FOUR (4) STONE COLUMNS THAT ARE LEANING AT A COST OF $8,655.05. REBUILD WALL: REBUILD AND REPOINT APPROXIMATELY 8 LF FOOT OF WALL WHERE A TREE FELL, WILL REBUILD AT A COST OF $1,475.66. CONCRETE WALL CAP: REMOVE AND REPLACE APPROXIMATELY 600 LF FEET OF WALL CAP AT A COST OF $67,821.23. A TOTAL COST OF $220,000.00$12K
Aug 16, 2017Department of the InteriorFWS SOUTHWEST REGIONAL OFFICEINF17PC00131238160IGF::OT::IGF BOSQUE BIO BULDING&QTRS #3$234K
Aug 10, 2017Department of the InteriorIMR SANTA FE(12100)INP17PD02341236220IGF::OT::IGF CHCU-REHAB APT. BUILDINGS A&B$54K
Aug 4, 2017Department of the InteriorIMR SANTA FE(12100)INP17PD02198236220IGF::OT::IGF REPLACE UNDERSIZED IRRIGATION WELL PUMP, MOTOR&VFD - CHAM$87K
Aug 3, 2017Department of the InteriorIMR SANTA FE(12100)INP17PD02180236220IGF::OT::IGF QUARTERS 2 STUCCO REPAIR - WHSA$38K
Jul 26, 2017Department of the InteriorIMR SANTA FE(12100)INP17PD02048236220IGF::OT::IGF RE-ROOF SUPERINTENDENT'S OFFICE (BLDG. 18) - BAND$67K
Jul 26, 2017Department of the InteriorIMR SANTA FE(12100)INP17PD02058236220IGF::OT::IGF RE-ROOF ENTRANCE STATION (BLDG. 26) - BAND$9K

Get Alerted Before All-rite Construction, INC.'s Next Recompete

Mindy monitors active contracts and flags recompetes 12 months out so you can position to compete.

Start Free