Federal Contractor Profile
Defense Systems And Solutions
$3.2B obligated·394 awards·1 agencies·2 NAICS
Federal Contracts
Showing contracts 601–650 of 902 total. Sorted by action date, most recent first. Excludes $0 modifications.
| Date | Agency | PIID | NAICS | Description | Amount |
|---|---|---|---|---|---|
| Aug 23, 2021 | Department of DefenseW6QK ACC-RSA | W58RGZ20F0327 | 336413 | IT PROVIDES THE NAVAL UNDERSEA WARFARE CENTER (NUWC) WITH A 2-7-9 BAY PROTOTYPE STRUCTURALLY INTEGRATED ENCLOSURE (SIE) FOR PMS397 MANAGED WEAPONS PLATFORMS. | $702K |
| Aug 13, 2021 | Department of DefenseW6QK ACC-RSA | W58RGZ20F0349 | 336413 | ARMY PALLETIZED FIELD ARTILLERY LAUNCHER (PFAL) SUPPORT | $129K |
| Aug 11, 2021 | Department of DefenseW6QK ACC-RSA | W58RGZ19F0485 | 336413 | THE CONTRACTOR IS REQUIRED TO PROVIDE REPLACEMENT BUSHINGS AND REPAIR INBOARD EDGES ON H-60M OUTBOARD STABILATORS. | $16K |
| Aug 11, 2021 | Department of DefenseW6QK ACC-RSA | W58RGZ21F0206 | 336413 | EFFORT REQUIRED FOR THE AFGHANISTAN MODIFICATIONS ON UH-60A HELICOPTERS. | $2.9M |
| Aug 8, 2021 | Department of DefenseW6QK ACC-RSA | W58RGZ19F0500 | 336413 | BUILD&INTEGRATE AUTONOMOUS UNDERWATER VEHICLE SYSTEM COMPONENTS FOR THE NEXT GENERATION MARK 18 FAMILY REMUS 600 AUV. | $10M |
| Aug 6, 2021 | Department of DefenseW6QK ACC-RSA | W58RGZ20F0270 | 336413 | PROVIDE AN EVALUATION OF TSS AND ITS ANCILLARY EQUIPMENT WITH RESPECT TO OBSOLESCENCE, REPAIR REQUIREMENTS, AND SUPPORTABILITY, AS WELL AS TO REPAIR A SUBSET OF THE EVALUATED COMPONENTS USING RESIDUAL(GFM) INVENTORIES AND RETURN THEM TO SERVICE. | $527K |
| Aug 2, 2021 | Department of DefenseW6QK ACC-RSA | W58RGZ21F0102 | 336413 | H-60 CUSTOMS AND BOARDER PROTECTION (CBP) SPARES | $1.2M |
| Aug 2, 2021 | Department of DefenseW6QK ACC-RSA | W58RGZ21F0285 | 336413 | ORDER W58RGZ-21-F-0285 UNDER CONTRACT W58RGZ-18-D-0001 (RBA 22596) FOR THE PURCHASE OF 17 ERCA INCREMENT 2 SUPPORT ASSEMBLIES. | $13M |
| Aug 2, 2021 | Department of DefenseW6QK ACC ANAD | W911KF21F0108 | 336992 | VARIOUS SUPPORT SERVICES TO ANNISTON ARMY DEPOT FOR TECHNICAL, ENGINEERING, PROGRAM MANAGEMENT, AND INTEGRATION SERVICE FOR THE PLASTISOL COATING OF STOWAGE FRAMES- - 4TH OPT YEAR | $17K |
| Jul 23, 2021 | Department of DefenseW6QK ACC-RSA | W58RGZ20F0619 | 336413 | STATEMENT OF WORK (SOW) FOR APPLICATION OF APKWS AND ANTI-JAMMING GPS CAPABILITIES ON MD530F HELICOPTERS REV 1 | $4.0M |
| Jul 14, 2021 | Department of DefenseW6QK ACC-RSA | W58RGZ21F0321 | 336413 | AIRCRAFT SURVIVABILITY PRODUCT IMPROVEMENT (ASPI) KITS | $18M |
| Jul 12, 2021 | Department of DefenseW6QK ACC-RSA | W58RGZ20F0493 | 336413 | (SOW) IDENTIFIES REQUIREMENTS TO BE ACCOMPLISHED BY THE CONTRACTOR IN SUPPORT OF THE PROTOTYPE INTEGRATION FACILITY (PIF) EXTENDED RANGE CANNON ARTILLERY (ERCA) PROGRAM. | $879K |
| Jul 9, 2021 | Department of DefenseW6QK ACC-RSA | W58RGZ20F0097 | 336413 | THE PROTOTYPE INTEGRATION FACILITY FOR THE GROUND&FLIGHT SUPPORT TO CONDUCT AVIATION INDUSTRY OPERATIONS IN THE PIF AIRCRAFT HANGER LOCATED AT BUILDING 4803 AIRFIELD ROAD AND BUILDING 5405. | $794K |
| Jul 8, 2021 | Department of DefenseW6QK ACC-RSA | W58RGZ21F0383 | 336413 | THIS STATEMENT OF WORK (SOW) DEFINES THE EFFORT REQUIRED FOR THE REMOVAL/INSTALLATION OF SMALL TACTICAL TERMINALS (STT), AND PROVIDE ONSITE SUPPORT FOR USG PERSONNEL TO UPGRADE THE LINK | $1.1M |
| Jul 7, 2021 | Department of DefenseW6QK ACC-RSA | W58RGZ21F0319 | 336413 | INDONESIA FMS OIL LAB KIT. | $1.2M |
| Jun 25, 2021 | Department of DefenseW6QK ACC-RSA | W58RGZ20F0497 | 336413 | THE MILITARY SEALIFT COMMAND CONTAINER (MSC-C) IS A 20 FOOT ISO CONTAINER USED FOR CHARGING LITHIUM ION BATTERIES ON MILITARY SEALIFT CONTAINERS. | $200K |
| Jun 25, 2021 | Department of DefenseW6QK ACC-RSA | W58RGZ21F0332 | 336413 | DEMONSTRATION AND TEST, UPDATING THE PRODUCT DRAWINGS, RE-DESIGN OF AND ADDING NEW DRAWINGS FOR THE FIN FITTING ASSEMBLY (FFA) TO BE PROVIDED BY THE AIR FORCE AND ALSO UPDATING THE JOB GUIDE. | $761K |
| Jun 23, 2021 | Department of DefenseW6QK ACC-RSA | W58RGZ20F0293 | 336413 | H-53 MODIFICATIONS/INSTALLS | $598K |
| Jun 22, 2021 | Department of DefenseW6QK ACC-RSA | W58RGZ20F0154 | 336413 | THE PURPOSE OF THIS PROJECT IS TO PROVIDE ENGINEERING AND MANUFACTURING OF THE WIRELESS AT-PLATFORM TEST SET (WATS) AND ASSOCIATED TEST SUPPORT END OF LINE (EOL) HARDWARE IN SUPPORT OF THE TEST MEASUREMENT DIAGNOSTIC EQUIPMENT (TMDE) PROJECT OFFICE. | $907K |
| Jun 17, 2021 | Department of DefenseW6QK ACC ANAD | W911KF21F0090 | 336992 | VARIOUS SUPPORT SERVICES FOR THE JAB KITS | $352K |
| Jun 7, 2021 | Department of DefenseW6QK ACC-RSA | W58RGZ21F0239 | 336413 | FY21 H-60M INITIAL FIELDING PACKAGE | $3.1M |
| Jun 3, 2021 | Department of DefenseW6QK ACC-RSA | W58RGZ19F0674 | 336413 | SUPPORT OF THE LITTORAL COMBAT SHIP PROGRAM EXECUTE OFFICE PMS 505 AND THE MISSION PACKAGE SUPPORT FACILITY IN DEPLOYMENT OF HIGH QUALITY HARDWARE ON TIME AND ON BUDGET, ALLOWING INTEGRATION OF THIS HARDWARE INTO A JOINT OPERATIONAL ENVIRONMENT. | $682K |
| Jun 3, 2021 | Department of DefenseW6QK ACC-RSA | W58RGZ19F0212 | 336413 | THIS SOW DEFINES THE EFFORT REQUIRED TO ESTABLISH A PREVENTIVE MAINTENANCE SCHEDULE FOR ON-SITE MANUFACTURING EQUIPMENT SPECIFIED BY THE GOVERNMENT FURNISHED EQUIPMENT (GFE) LIST ALONG WITH PURCHASING, MAINTAINING SPARE PARTS AND FLUIDS FOR A SAFE AND EFFECTIVE OPERATION TO MINIMIZE LOST TIME DUE TO REPAIRS. THIS IS A COST PLUS FIXED FEE COMPLETION EFFORT NOT TO EXCEED 12 MONTHS, WITH 4 ADDITIONAL 12 MONTH OPTIONS. | $411K |
| May 27, 2021 | Department of DefenseW6QK ACC-RSA | W58RGZ20F0526 | 336413 | PROVIDE FIELDING SUPPORT PACKAGES (FSP)S TO: THE ROYAL SAUDI LAND FORCES AVIATION COMMAND (RSLFAC), FMS CASE SR-B-ZAD AND THE TAIWAN ARMY FMS CASE TW-B-YZC. | $1000K |
| May 26, 2021 | Department of DefenseW6QK ACC-RSA | W58RGZ20F0492 | 336413 | ONE (1) CH-53E AIRCRAFT. RESET ACTIVITIES WILL IMPROVE THE MATERIAL CONDITION OF THE AIRCRAFT AND RETURN THE H-53 TO AN OPERATIONAL STATUS. | $386K |
| May 20, 2021 | Department of DefenseW6QK ACC-RSA | W58RGZ19F0632 | 336413 | THE PURPOSE OF THIS STATEMENT OF WORK (SOW) IS TO DELINEATE IN GENERAL TERMS, THE OVERALL REQUIREMENTS OF THE H-60V MEDEVAC DESIGN AND INTEGRATION, INCLUDING THE INTEGRATION OF A NOSE MOUNTED FORWARD LOOKING INFRARED (FLIR | $455K |
| May 20, 2021 | Department of DefenseW6QK ACC-RSA | W58RGZ21F0206 | 336413 | EFFORT REQUIRED FOR THE AFGHANISTAN MODIFICATIONS ON UH-60A HELICOPTERS. | $3.1M |
| May 18, 2021 | Department of DefenseW6QK ACC-RSA | W58RGZ20F0261 | 336413 | THE PURPOSE OF THIS EFFORT IS TO PROVIDE ENGINEERING, DESIGN AND MANUFACTURING OF THE NATIONAL GUARD VEHICLE DIAGNOSTIC TEST SET (VDTS). | $2.4M |
| May 11, 2021 | Department of DefenseW6QK ACC-RSA | W58RGZ21F0127 | 336413 | A REQUIREMENT FOR 100 60KVA GENERATOR A-KITS. THIS STATEMENT OF WORK INCLUDES A BASE EFFORT FOR 100 60 KVA GENERATOR A-KITS, AND SIX (6) OPTIONS, EACH FOR AN ADDITIONAL 100 60KVA GENERATOR A-KITS. | $773K |
| May 11, 2021 | Department of DefenseW6QK ACC-RSA | W58RGZ21F0284 | 336413 | ORDER W58RGZ-21-F-0284 UNDER CONTRACT W58RGZ-18-D-0001, BASE EFFORT, (QUANTITY: 75) AUTOMATIC VOLTAGE REGULATOR (AVR)-2B A-KITS. | $2.3M |
| May 5, 2021 | Department of DefenseW6QK ACC-RSA | W58RGZ19F0247 | 336413 | COMNAVAIRSYSCOM PROGRAM MANAGER AIR (PMA) -275 HAS A REQUIREMENT FOR THE PROTOTYPE INTEGRATION FACILITY (PIF) TO DEVELOP A V-22 COMMERCIAL MAINTENANCE CAPABILITY TO HELP SOLVE THE UNDER REQUIREMENT NEEDS FOR THE V-22 FLEET READINESS. UNDER THE PLANNED MAINTENANCE INTERVAL (PMI) SPECIFICATION THE AIRCRAFT IS REQUIRED EVERY 1,740 HOURS TO COMPLETELY INSPECT FOR THE STRUCTURE, MECHANICAL/DRIVETRAIN AND AVIONIC DAMAGES. THE WORKS INCLUDE V-22 AIRCRAFT INDUCTION, PLANNED MAINTENANCE INTERVAL (PMI) INSPECTION, DISCREPANCY CORRECTION, SCHEDULED MAINTENANCE AND TECHNICAL DIRECTIVE COMPLIANCE. INCLUDED ARE THE ASSOCIATED PROGRAM MANAGEMENT AND LOGISTICS SUPPORT PLANNING REQUIREMENTS. | $1.9M |
| Apr 28, 2021 | Department of DefenseW6QK ACC-RSA | W58RGZ20F0495 | 336413 | MAST MOUNTED ASSEMBLY CONTAINERS FOR LONG TERM STORAGE AND DAMAGE FREE SHIPPING OF THE APACHE FIRE CONTROL RADAR. TECHNICAL DATA PACKAGE AND SPECIFIC LOGISTICS DOCUMENTATION. OPTION FOR ADDITIONAL MMA CONTAINERS FOR USG. | $4.3M |
| Apr 27, 2021 | Department of DefenseW6QK ACC-RSA | W58RGZ19F0632 | 336413 | THE PURPOSE OF THIS STATEMENT OF WORK (SOW) IS TO DELINEATE IN GENERAL TERMS, THE OVERALL REQUIREMENTS OF THE H-60V MEDEVAC DESIGN AND INTEGRATION, INCLUDING THE INTEGRATION OF A NOSE MOUNTED FORWARD LOOKING INFRARED (FLIR | $240K |
| Apr 27, 2021 | Department of DefenseW6QK ACC-RSA | W58RGZ19F0686 | 336413 | SUPPORT NAVAIRSYSCOM PMA275 FOR THE PROCUREMENT, MANUFACTURING, INTEGRATION, KITTING, DELIVERY, AND INSTALLATION OF MISSION COMPUTER OBSOLESCENCE INITIATIVE RETROFIT KITS UNDER ECP-873 R4 FOR THE U.S. MARINE CORPS VARIANT OF THE MV-22. | $7.6M |
| Apr 23, 2021 | Department of DefenseW6QK ACC-RSA | W58RGZ19F0247 | 336413 | COMNAVAIRSYSCOM PROGRAM MANAGER AIR (PMA) -275 HAS A REQUIREMENT FOR THE PROTOTYPE INTEGRATION FACILITY (PIF) TO DEVELOP A V-22 COMMERCIAL MAINTENANCE CAPABILITY TO HELP SOLVE THE UNDER REQUIREMENT NEEDS FOR THE V-22 FLEET READINESS. UNDER THE PLANNED MAINTENANCE INTERVAL (PMI) SPECIFICATION THE AIRCRAFT IS REQUIRED EVERY 1,740 HOURS TO COMPLETELY INSPECT FOR THE STRUCTURE, MECHANICAL/DRIVETRAIN AND AVIONIC DAMAGES. THE WORKS INCLUDE V-22 AIRCRAFT INDUCTION, PLANNED MAINTENANCE INTERVAL (PMI) INSPECTION, DISCREPANCY CORRECTION, SCHEDULED MAINTENANCE AND TECHNICAL DIRECTIVE COMPLIANCE. INCLUDED ARE THE ASSOCIATED PROGRAM MANAGEMENT AND LOGISTICS SUPPORT PLANNING REQUIREMENTS. | $58K |
| Apr 22, 2021 | Department of DefenseW6QK ACC-RSA | W58RGZ21F0305 | 336413 | REQUIREMENT TO PROVIDE FULLY QUALIFIED PRODUCTION ADVANCED MULTI-FUNCTION DISPLAY (AMFD) UNITS | $5.9M |
| Apr 20, 2021 | Department of DefenseW6QK ACC-RSA | W58RGZ21F0266 | 336413 | CROATIA H-60M TECH SUPPLY PACKAGE, FMS CASE HR-B-UBQ | $4.2M |
| Apr 20, 2021 | Department of DefenseW6QK ACC-RSA | W58RGZ21F0266 | 336413 | CROATIA H-60M TECH SUPPLY PACKAGE, FMS CASE HR-B-UBQ | $0 |
| Apr 16, 2021 | Department of DefenseW6QK ACC-RSA | W58RGZ20F0493 | 336413 | (SOW) IDENTIFIES REQUIREMENTS TO BE ACCOMPLISHED BY THE CONTRACTOR IN SUPPORT OF THE PROTOTYPE INTEGRATION FACILITY (PIF) EXTENDED RANGE CANNON ARTILLERY (ERCA) PROGRAM. | $590K |
| Apr 16, 2021 | Department of DefenseW6QK ACC-RSA | W58RGZ19F0184 | 336413 | THE CONTRACTOR SHALL PROVIDE MANAGEMENT, ENGINEERING, TECHNICAL, AND ALL NECESSARY SUPPORT TO CONDUCT THE SITE SURVEY AND SITE SPECIFIC EIP FOR THE GROUND-BASED SENSE AND AVOID LIGHTWEIGHT SURVEILLANCE TARGET ACQUISITION RADAR SYSTEM. | $1.6M |
| Apr 16, 2021 | Department of DefenseW6QK ACC-RSA | W58RGZ19F0247 | 336413 | COMNAVAIRSYSCOM PROGRAM MANAGER AIR (PMA) -275 HAS A REQUIREMENT FOR THE PROTOTYPE INTEGRATION FACILITY (PIF) TO DEVELOP A V-22 COMMERCIAL MAINTENANCE CAPABILITY TO HELP SOLVE THE UNDER REQUIREMENT NEEDS FOR THE V-22 FLEET READINESS. UNDER THE PLANNED MAINTENANCE INTERVAL (PMI) SPECIFICATION THE AIRCRAFT IS REQUIRED EVERY 1,740 HOURS TO COMPLETELY INSPECT FOR THE STRUCTURE, MECHANICAL/DRIVETRAIN AND AVIONIC DAMAGES. THE WORKS INCLUDE V-22 AIRCRAFT INDUCTION, PLANNED MAINTENANCE INTERVAL (PMI) INSPECTION, DISCREPANCY CORRECTION, SCHEDULED MAINTENANCE AND TECHNICAL DIRECTIVE COMPLIANCE. INCLUDED ARE THE ASSOCIATED PROGRAM MANAGEMENT AND LOGISTICS SUPPORT PLANNING REQUIREMENTS. | $497K |
| Apr 15, 2021 | Department of DefenseW6QK ACC-RSA | W58RGZ19F0650 | 336413 | THIS STATEMENT OF WORK DEFINES THE EFFORT REQUIRED TO DEVELOP AND DELIVER THE TECHNICAL DATA TIME COMPLIANCE TECHNICAL ORDERS TCTOS ENGINEERING AND PROVISIONING RELATING TO THE ESTS AND ALLOW THE UPGRADE OF THE ESTS TO A31U182403 AND A31U182404 | $63K |
| Apr 15, 2021 | Department of DefenseW6QK ACC-RSA | W58RGZ20F0112 | 336413 | 60K IMPROVED ENVIRONMENTAL CONTROL UNIT (IECU) BLOCK II | $86K |
| Apr 15, 2021 | Department of DefenseW6QK ACC-RSA | W58RGZ20F0279 | 336413 | REVISE AND DEVELOP STANDARD OPERATING PROCEDURES (SOP) AND UNIT SERVICE ORDERS (USO) FOR THE QATAR ARMED FORCES (QAF) IN SUPPORT OF AH-64E APACHE SUPPLY, AVIATION MAINTENANCE AND AVIATION OPERATION PROGRAMS | $74K |
| Apr 15, 2021 | Department of DefenseW6QK ACC-RSA | W58RGZ21F0137 | 336413 | H-60M GENERATOR INSTALL KITS | $6.0M |
| Apr 12, 2021 | Department of DefenseW6QK ACC-RSA | W58RGZ19F0187 | 336413 | THE PURPOSE OF THIS STATEMENT OF WORK (SOW) IS TO DEFINE THE EFFORT TO PROVIDE TWO (2) EACH HH-60L MODIFICATION KITS IAW DRAWING PACKAGE 1063667, AND PROVIDE INSTALLATION OF PROVIDED KITS ON TWO (2) EACH HH-60L AIRCRAFT. | $52K |
| Apr 2, 2021 | Department of DefenseW6QK ACC-RSA | W58RGZ19F0266 | 336413 | PROVIDE APACHE SUPPORT KITS FOR FOREIGN MILITARY SALES (FMS) ROYAL NETHERLANDS AIR FORCE, UNITED ARAB EMIRATES AND QATAR. | $196K |
| Apr 2, 2021 | Department of DefenseW6QK ACC-RSA | W58RGZ19F0544 | 336413 | THE REQUIREMENT FOR VALIDATION INSTALLATIONS ON APACHE AH-64E. THE CONTRACTOR WILL VERIFY THE GFE KIT CONFIGURATIONS, TECHNICAL DATA PACKAGES, DEVELOPMENT SUSTAINMENT OF MODIFICATION WORK ORDER OTHER SUPPORT DOCUMENTS FOR INSTALLATION ACTIVITIES. | $71K |
| Apr 2, 2021 | Department of DefenseW6QK ACC-RSA | W58RGZ19F0247 | 336413 | COMNAVAIRSYSCOM PROGRAM MANAGER AIR (PMA) -275 HAS A REQUIREMENT FOR THE PROTOTYPE INTEGRATION FACILITY (PIF) TO DEVELOP A V-22 COMMERCIAL MAINTENANCE CAPABILITY TO HELP SOLVE THE UNDER REQUIREMENT NEEDS FOR THE V-22 FLEET READINESS. UNDER THE PLANNED MAINTENANCE INTERVAL (PMI) SPECIFICATION THE AIRCRAFT IS REQUIRED EVERY 1,740 HOURS TO COMPLETELY INSPECT FOR THE STRUCTURE, MECHANICAL/DRIVETRAIN AND AVIONIC DAMAGES. THE WORKS INCLUDE V-22 AIRCRAFT INDUCTION, PLANNED MAINTENANCE INTERVAL (PMI) INSPECTION, DISCREPANCY CORRECTION, SCHEDULED MAINTENANCE AND TECHNICAL DIRECTIVE COMPLIANCE. INCLUDED ARE THE ASSOCIATED PROGRAM MANAGEMENT AND LOGISTICS SUPPORT PLANNING REQUIREMENTS. | $1.9M |
| Mar 31, 2021 | Department of DefenseW6QK ACC ANAD | W911KF21F0070 | 336992 | VARIOUS SUPPORT SERVICES TO ANAD FOR TECHNICAL, ENGINEERING, PROGRAM MANAGEMENT, AND INTEGRATION SERVICE FOR STORAGE OPTIMIZATION FOR BUILDINGS 127, 479, 513, 516. | $60K |
Get Alerted Before Defense Systems And Solutions's Next Recompete
Mindy monitors active contracts and flags recompetes 12 months out so you can position to compete.
Start Free