Federal Contractor Profile
Defense Systems And Solutions
$3.2B obligated·394 awards·1 agencies·2 NAICS
Federal Contracts
Showing contracts 651–700 of 902 total. Sorted by action date, most recent first. Excludes $0 modifications.
| Date | Agency | PIID | NAICS | Description | Amount |
|---|---|---|---|---|---|
| Mar 31, 2021 | Department of DefenseW6QK ACC-RSA | W58RGZ20F0220 | 336413 | IN 2007, THE NAVAL AIR SYSTEMS COMMAND (NAVAIR) PARTNERED WITH THE AMRDEC PROTOTYPE INTEGRATION FACILITY (PIF) TO BUILD A LIMITED QUANTITY OF TOPOGRAPHIC SUPPORT SET (TSS) SYSTEMS FOR THEIR SPECIAL FORCES. | $224K |
| Mar 26, 2021 | Department of DefenseW6QK ACC-RSA | W58RGZ21F0232 | 336413 | AVIATION SYSTEMS INSTRUMENT LANDING SYSTEM (ILS) INTEGRATION, | $6.9M |
| Mar 25, 2021 | Department of DefenseW6QK ACC-RSA | W58RGZ21F0135 | 336413 | PATRIOT ADVANCED CAPABILITY MISSILE SEGMENT ENHANCEMENT | $32M |
| Mar 25, 2021 | Department of DefenseW6QK ACC-RSA | W58RGZ19F0483 | 336413 | THE STATEMENT OF WORK (SOW) DEFINES THE EFFORT REQUIRED FOR THE MODERNIZATION AND FIELDING OF THE PITOT STATIC TEST SYSTEM (PSTS). | $7.4M |
| Mar 25, 2021 | Department of DefenseW6QK ACC-RSA | W58RGZ19F0687 | 336413 | THIS STATEMENT OF WORK DEFINES THE EFFORT REQUIRED FOR THE PROCUREMENT, INTEGRATION, AND INSTALLATION OF APACHE MISSION ESSENTIAL PACKAGES. ADDITIONALLY, THE CONTRACTOR WILL VERIFY THE KIT CONFIGURATIONS, TECHNICAL DATA PACKAGES, MODIFICATION WORK | $965K |
| Mar 23, 2021 | Department of DefenseW6QK ACC-RSA | W58RGZ19F0488 | 336413 | PROVIDE TECHNICAL&ENGINEERING SPT OF 3 LOWER TIER PROJECT OFC PATRIOT LAUNCHER STATIONS AND 1 VIRTUAL LAUNCHER STATION; PROVIDE TECHNICAL SUPPORT FOR THE LAUNCHER STATION TEST SET ETHERNET INTERFACE;&SUPPORT MODS&TEST TO PATRIOT FIELDING EQUIPMENT. | $286K |
| Mar 23, 2021 | Department of DefenseW6QK ACC-RSA | W58RGZ21F0234 | 336413 | THIS STATEMENT OF WORK (SOW) DEFINES THE EFFORT TO PROVIDE LOGISTICAL AND QUALITY SUPPORT FOR THE APACHE PARTS, COMPONENTS, AND SUPPORT EQUIPMENT. | $1.4M |
| Mar 19, 2021 | Department of DefenseW6QK ACC-RSA | W58RGZ20F0257 | 336413 | SOW DEFINES THE EFFORT REQUIRED TO SUPPORT NAVAL AIR SYSTEMS COMMAND V-22 (JPO) BY CONDUCTING THE RECEIPT, ACCEPTANCE INSPECTION, PRESERVATION, UPKEEP AND TECHNICAL EVALUATION FOR THE CONFIGURATION UPGRADE OF ONE (1) MV-22B OSPREY BUNO 165848. | $1.1M |
| Mar 18, 2021 | Department of DefenseW6QK ACC-RSA | W58RGZ20F0217 | 336413 | TERMINAL HIGH ALTITUDE AREA DEFENSE REMOTE LAUNCHER KIT COMMUNICATION PACKAGE. | $77K |
| Mar 15, 2021 | Department of DefenseW6QK ACC-RSA | W58RGZ19F0489 | 336413 | NAVAIRSYSCOM PMA-275 FOR THE PROCUREMENT, MANUFACTURING, INTEGRATION, KITTING, DELIVERY, AND INSTALLATION OF MISSION COMPUTER OBSOLESCENCE INITIATIVE (MCOI) RETROFIT KITS AND COMMON AIRCRAFT PORTABLE REPROGRAMMING EQUIPMENT (CAPRE) GBE FILLPORT KITS. | $5.8M |
| Mar 12, 2021 | Department of DefenseW6QK ACC-RSA | W58RGZ20F0617 | 336413 | INTEGRATION OF APACHE AH-64D MODERNIZED TARGET ACQUISITION DESIGNATION ASSEMBLY (MTADS) AND INTEGRATION TRAINING OF EGYPTIAN AIR FORCE (EAF) AIRCRAFT MAINTAINERS IN SUPPORT OF FMS CASE EB-VBT-168. | $1.1M |
| Mar 12, 2021 | Department of DefenseW6QK ACC-RSA | W58RGZ20F0430 | 336413 | PROVIDE TWO (2) EACH HH-60L MODIFICATION KITS IAW DRAWING PACKAGE 1063667, AND PROVIDE INSTALLATION OF PROVIDED KITS ON HH-60L AIRCRAFT. | $2.4M |
| Mar 10, 2021 | Department of DefenseW6QK ACC-RSA | W58RGZ21F0146 | 336413 | US BASE CAR | $6.4M |
| Mar 9, 2021 | Department of DefenseW6QK ACC-RSA | W58RGZ20F0330 | 336413 | INSTALL THREE (3) EACH HH-60L MODIFICATION KITS IAW DRAWING PACKAGE 1063667 | $766K |
| Mar 8, 2021 | Department of DefenseW6QK ACC-RSA | W58RGZ21F0152 | 336413 | H-60 BLACKHAWK AIRCRAFT COMMON INFRARED COUNTERMEASURE (CIRCM)/FEDERATED ADVANCED NAVIGATIONAL SYSTEM (FANS) DECONFLICT VALIDATION AND VERIFICATION | $2.1M |
| Mar 4, 2021 | Department of DefenseW6QK ACC-RSA | W58RGZ19F0247 | 336413 | COMNAVAIRSYSCOM PROGRAM MANAGER AIR (PMA) -275 HAS A REQUIREMENT FOR THE PROTOTYPE INTEGRATION FACILITY (PIF) TO DEVELOP A V-22 COMMERCIAL MAINTENANCE CAPABILITY TO HELP SOLVE THE UNDER REQUIREMENT NEEDS FOR THE V-22 FLEET READINESS. UNDER THE PLANNED MAINTENANCE INTERVAL (PMI) SPECIFICATION THE AIRCRAFT IS REQUIRED EVERY 1,740 HOURS TO COMPLETELY INSPECT FOR THE STRUCTURE, MECHANICAL/DRIVETRAIN AND AVIONIC DAMAGES. THE WORKS INCLUDE V-22 AIRCRAFT INDUCTION, PLANNED MAINTENANCE INTERVAL (PMI) INSPECTION, DISCREPANCY CORRECTION, SCHEDULED MAINTENANCE AND TECHNICAL DIRECTIVE COMPLIANCE. INCLUDED ARE THE ASSOCIATED PROGRAM MANAGEMENT AND LOGISTICS SUPPORT PLANNING REQUIREMENTS. | $1.5M |
| Feb 25, 2021 | Department of DefenseW6QK ACC-RSA | W58RGZ20F0215 | 336413 | EFFORT REQUIRED FOR THE REPAIR OF AH-64 APACHE TAIL ROTOR BLADES (TRB) FOR THE UNITED KINGDOM (UK). | $557K |
| Feb 16, 2021 | Department of DefenseW6QK ACC-RSA | W58RGZ20F0565 | 336413 | TO PROCURE, MANUFACTURE, INTEGRATE, KIT, DELIVER AND INSTALL MULTIPLE APACHE MISSION ESSENTIAL PACKAGES (MEPS), MODIFICATION KITS, AND APACHE PARTS. | $126K |
| Feb 12, 2021 | Department of DefenseW6QK ACC-RSA | W58RGZ20F0276 | 336413 | THE NAVY IS DEVELOPING A PROTOTYPE HAMMERHEAD LAUNCH SYSTEM FOR UNDERWATER NAVAL MINES AND HAS ASKED THE PIF TO PROVIDE PROTOTYPE COMPONENTS | $67K |
| Feb 11, 2021 | Department of DefenseW6QK ACC-RSA | W58RGZ20F0516 | 336413 | REQUIRED TO PROVIDE AVIATION GROUND SUPPORT EQUIPMENT (AGSE) IN SUPPORT OF FOREIGN MILITARY SALES CASES: SAUDI ARABIAN NATIONAL GUARD (CASES SI-B-WXY, SI-B-WYB, SI-B-WXP), SAUDI ARABIA SR-B-ZAD, TURKEY TK-B-VCQ, GREECE GR-B-XOP, AND LATVIA LG-B-UDM. | $858K |
| Feb 5, 2021 | Department of DefenseW6QK ACC ANAD | W911KF19F0031 | 336992 | VARIOUS SUPPORT SERVICES - 1ST OPT PERIO | $1.4M |
| Feb 4, 2021 | Department of DefenseW6QK ACC-RSA | W58RGZ20F0562 | 336413 | THIS STATEMENT OF WORK (SOW) DEFINES THE EFFORT REQUIRED FOR TRAVEL, REPAIR, FABRICATION, AND PROCUREMENT OF SPARE PARTS AND EQUIPMENT, PART AND AIRCRAFT MAINTENANCE SUPPORT, FIELDED SYSTEMS SUPPORT, | $296K |
| Feb 3, 2021 | Department of DefenseW6QK ACC-RSA | W58RGZ19F0671 | 336413 | TASK ORDER FOR "RAZORBACK [LBS-AUV(S)]MAINTENANCE AND SHIPPING VAN" | $1.1M |
| Jan 26, 2021 | Department of DefenseW6QK ACC-RSA | W58RGZ21F0102 | 336413 | H-60 CUSTOMS AND BOARDER PROTECTION (CBP) SPARES | $779K |
| Jan 22, 2021 | Department of DefenseW6QK ACC-RSA | W58RGZ21F0180 | 336413 | PROVIDE OPERATIONS, TRAINING, MAINTENANCE AND LOGISTICS SUPPORT FOR THE GROUND BASED SENSE AND AVOID (GBSAA) SYSTEMS AT SELECT ARMY AND AIR FORCE AIR NATIONAL GUARD (AF ANG) SITES. | $15K |
| Jan 21, 2021 | Department of DefenseW6QK ACC-RSA | W58RGZ21F0206 | 336413 | EFFORT REQUIRED FOR THE AFGHANISTAN MODIFICATIONS ON UH-60A HELICOPTERS. | $12M |
| Jan 19, 2021 | Department of DefenseW6QK ACC-RSA | W58RGZ19F0187 | 336413 | THE PURPOSE OF THIS STATEMENT OF WORK (SOW) IS TO DEFINE THE EFFORT TO PROVIDE TWO (2) EACH HH-60L MODIFICATION KITS IAW DRAWING PACKAGE 1063667, AND PROVIDE INSTALLATION OF PROVIDED KITS ON TWO (2) EACH HH-60L AIRCRAFT. | $596K |
| Jan 5, 2021 | Department of DefenseW6QK ACC-RSA | W58RGZ21F0189 | 336413 | PROVIDE TECHNICAL SUPPLY PACKAGE (TSP) SUPPORT TO UH-60M FOREIGN MILITARY SALES (FMS) CUSTOMERS | $4.3M |
| Dec 30, 2020 | Department of DefenseW6QK ACC-RSA | W58RGZ19F0162 | 336413 | UH-60V A-KITS FOR LOW RATE INITIAL PRODUCTION FOR DIGITAL COCKPITS. | $19M |
| Dec 23, 2020 | Department of DefenseW6QK ACC-RSA | W58RGZ21F0180 | 336413 | PROVIDE OPERATIONS, TRAINING, MAINTENANCE AND LOGISTICS SUPPORT FOR THE GROUND BASED SENSE AND AVOID (GBSAA) SYSTEMS AT SELECT ARMY AND AIR FORCE AIR NATIONAL GUARD (AF ANG) SITES. | $3.5M |
| Dec 23, 2020 | Department of DefenseW6QK ACC-RSA | W58RGZ19F0669 | 336413 | THE EFFORT IS TO INTEGRATE AUTOMATIC DEPENDENT SURVEILLANCE-BROADCAST (ADS-B) OUT ON A TOTAL OF FIVE (5) EACH CBP DASH-8 FIXED WING AIRCRAFT. THE FIVE (5) AIRCRAFT CONSIST OF THREE (3) EACH DHC-8-200 AIRCRAFT AND TWO (2) EACH DHC-8-300 AIRCRAFT. | $30K |
| Dec 21, 2020 | Department of DefenseW6QK ACC-RSA | W58RGZ20F0098 | 336413 | AVIATION SYSTEMS PRECISION APPROACH RADAR (PAR) 2020 SYSTEM INTEGRATION | $12K |
| Dec 17, 2020 | Department of DefenseW6QK ACC-RSA | W58RGZ20F0349 | 336413 | ARMY PALLETIZED FIELD ARTILLERY LAUNCHER (PFAL) SUPPORT | $100K |
| Dec 16, 2020 | Department of DefenseW6QK ACC-RSA | W58RGZ19F0163 | 336413 | THIS EFFORT IS TO PROVIDE PRODUCTION-REPRESENTATIVE HARDWARE KITS AND CORRESPONDING PRODUCTION SUPPORT FOR THE UH-60V PROGRAM. | $19M |
| Dec 16, 2020 | Department of DefenseW6QK ACC-RSA | W58RGZ19F0674 | 336413 | SUPPORT OF THE LITTORAL COMBAT SHIP PROGRAM EXECUTE OFFICE PMS 505 AND THE MISSION PACKAGE SUPPORT FACILITY IN DEPLOYMENT OF HIGH QUALITY HARDWARE ON TIME AND ON BUDGET, ALLOWING INTEGRATION OF THIS HARDWARE INTO A JOINT OPERATIONAL ENVIRONMENT. | $666K |
| Dec 8, 2020 | Department of DefenseW6QK ACC ANAD | W911KF21F0028 | 336992 | VARIOUS SUPPORT SERVICES FOR THE JAB CABLES, JAB PLATE EXTERIOR AND JAB PLATE INTERIOR - 3RD OPTION YEAR. | $352K |
| Dec 1, 2020 | Department of DefenseW6QK ACC-RSA | W58RGZ21F0127 | 336413 | A REQUIREMENT FOR 100 60KVA GENERATOR A-KITS. THIS STATEMENT OF WORK INCLUDES A BASE EFFORT FOR 100 60 KVA GENERATOR A-KITS, AND SIX (6) OPTIONS, EACH FOR AN ADDITIONAL 100 60KVA GENERATOR A-KITS. | $766K |
| Nov 5, 2020 | Department of DefenseW6QK ACC-RSA | W58RGZ21F0112 | 336413 | PROCUREMENT, FABRICATION AND DELIVERY OF 20 MK112 ALL UP ROUND SIMULATOR (AURS) MK112 MOD3 UNITS, 20 DYNAMIC LOAD BANK CONTROLLERS (DLBC), AND 20 DLBC CABLES TO SUPPORT THE DESIGN AND MANUFACTURING OF THE TOMAHAWK MISSILE OPERATIONAL TEST EQUIPMENT. | $1.8M |
| Oct 29, 2020 | Department of DefenseW6QK ACC-RSA | W58RGZ20F0293 | 336413 | H-53 MODIFICATIONS/INSTALLS | $336K |
| Oct 23, 2020 | Department of DefenseW6QK ACC-RSA | W58RGZ20F0276 | 336413 | THE NAVY IS DEVELOPING A PROTOTYPE HAMMERHEAD LAUNCH SYSTEM FOR UNDERWATER NAVAL MINES AND HAS ASKED THE PIF TO PROVIDE PROTOTYPE COMPONENTS | $259K |
| Oct 7, 2020 | Department of DefenseW6QK ACC-RSA | W58RGZ21F0089 | 336413 | TO PROVIDE TEST FIXTURES AND PERSONNEL SUPPORT FOR THE HYPERSONIC MISSILE FIRST STAGE MOTOR INSENSITIVE MUNITIONS TESTING PROGRAM. | $583K |
| Sep 30, 2020 | Department of DefenseW6QK ACC-RSA | W58RGZ19F0163 | 336413 | THIS EFFORT IS TO PROVIDE PRODUCTION-REPRESENTATIVE HARDWARE KITS AND CORRESPONDING PRODUCTION SUPPORT FOR THE UH-60V PROGRAM. | $21M |
| Sep 29, 2020 | Department of DefenseW6QK ACC-RSA | W58RGZ20F0558 | 336413 | MI-17 SECURE COMMUNICATIONS HARRIS RADIO INSTALLATION | $3.0M |
| Sep 28, 2020 | Department of DefenseW6QK ACC-RSA | W58RGZ19F0484 | 336413 | THIS STATEMENT OF WORK (SOW) DEFINES THE EFFORT REQUIRED FOR THE INTEGRATION OF VERSION IV AH-64E (IMPROVED) MODIFICATION KITS, AIRCRAFT COMPONENTS/HARDWARE, AND INSPECTION/REPAIR OF AIRCRAFT PARTS. | $8.5M |
| Sep 28, 2020 | Department of DefenseW6QK ACC-RSA | W58RGZ20F0495 | 336413 | MAST MOUNTED ASSEMBLY CONTAINERS FOR LONG TERM STORAGE AND DAMAGE FREE SHIPPING OF THE APACHE FIRE CONTROL RADAR. TECHNICAL DATA PACKAGE AND SPECIFIC LOGISTICS DOCUMENTATION. OPTION FOR ADDITIONAL MMA CONTAINERS FOR USG. | $15K |
| Sep 28, 2020 | Department of DefenseW6QK ACC-RSA | W58RGZ20F0495 | 336413 | MAST MOUNTED ASSEMBLY CONTAINERS FOR LONG TERM STORAGE AND DAMAGE FREE SHIPPING OF THE APACHE FIRE CONTROL RADAR. TECHNICAL DATA PACKAGE AND SPECIFIC LOGISTICS DOCUMENTATION. OPTION FOR ADDITIONAL MMA CONTAINERS FOR USG. | $3.3M |
| Sep 26, 2020 | Department of DefenseW6QK ACC-RSA | W58RGZ20F0536 | 336413 | SHALL DESIGN A NEW AVIONICS SUITE CAPABLE OF ISR OPERATIONS WITH THE RECORDING AND DOWNLINK CAPABILITY ON LINE OF SIGHT (LOS) (VHF) RADIO) AND (BLOS) (SATCOM) EQUIPMENT (IAW) THE PC-12 MODERNIZATION SYSTEMS REQUIREMENTS DOCUMENT (SRD). | $41M |
| Sep 24, 2020 | Department of DefenseW6QK ACC-RSA | W58RGZ20F0250 | 336413 | PROVIDE BLUE FORCE TRACKING (BFT) ELECTROMAGNETIC INTERFERENCE (EMI) ENCLOSURE ASSEMBLIES FOR THE CH47F HELICOPTER IN SUPPORT OF FOREIGN MILITARY SALES (FMS) CASE: NE-B-WGR. | $170K |
| Sep 24, 2020 | Department of DefenseW6QK ACC-RSA | W58RGZ20F0493 | 336413 | (SOW) IDENTIFIES REQUIREMENTS TO BE ACCOMPLISHED BY THE CONTRACTOR IN SUPPORT OF THE PROTOTYPE INTEGRATION FACILITY (PIF) EXTENDED RANGE CANNON ARTILLERY (ERCA) PROGRAM. | $8.5M |
| Sep 23, 2020 | Department of DefenseW6QK ACC-RSA | W58RGZ19F0247 | 336413 | COMNAVAIRSYSCOM PROGRAM MANAGER AIR (PMA) -275 HAS A REQUIREMENT FOR THE PROTOTYPE INTEGRATION FACILITY (PIF) TO DEVELOP A V-22 COMMERCIAL MAINTENANCE CAPABILITY TO HELP SOLVE THE UNDER REQUIREMENT NEEDS FOR THE V-22 FLEET READINESS. UNDER THE PLANNED MAINTENANCE INTERVAL (PMI) SPECIFICATION THE AIRCRAFT IS REQUIRED EVERY 1,740 HOURS TO COMPLETELY INSPECT FOR THE STRUCTURE, MECHANICAL/DRIVETRAIN AND AVIONIC DAMAGES. THE WORKS INCLUDE V-22 AIRCRAFT INDUCTION, PLANNED MAINTENANCE INTERVAL (PMI) INSPECTION, DISCREPANCY CORRECTION, SCHEDULED MAINTENANCE AND TECHNICAL DIRECTIVE COMPLIANCE. INCLUDED ARE THE ASSOCIATED PROGRAM MANAGEMENT AND LOGISTICS SUPPORT PLANNING REQUIREMENTS. | $1.8M |
Get Alerted Before Defense Systems And Solutions's Next Recompete
Mindy monitors active contracts and flags recompetes 12 months out so you can position to compete.
Start Free