Federal Contractor Profile
Granite Construction Company
Federal contracting record: $1.6B obligated across 100 awards from 4 agencies, FY 2016–2026.
Company Profile
UEI (Unique Entity Identifier)
VAYJNMM2KBE5
CAGE Code
1X910
Parent Organization
Granite Construction Incorporated
Address
585 W BEACH ST, WATSONVILLE, CA, 950765123
First Federal Award
Oct 16, 2015
Most Recent Award
Apr 8, 2026
Federal Sales Analytics
Toggle between trend, agency drilldown, and treemap. Use the period selector to focus the time window.
Hover any bar for YoY change + award count. Current fiscal year shown at reduced opacity (partial year).
Top Federal Agencies
- $691M
Department of Homeland Security
6 awards · 43.2% of total
- $642M
Department of Defense
80 awards · 40.2% of total
- $265M
Department of Transportation
11 awards · 16.6% of total
- $36K
Department of Agriculture
3 awards · 0.0% of total
Top NAICS Activity
- $691M
236220
COMMERCIAL AND INSTITUTIONAL BUILDING CONSTRUCTION
5 awards
- $516M
237990
OTHER HEAVY AND CIVIL ENGINEERING CONSTRUCTION
24 awards
- $388M
237310
HIGHWAY, STREET, AND BRIDGE CONSTRUCTION
38 awards
- $3.5M
324121
ASPHALT PAVING MIXTURE AND BLOCK MANUFACTURING
28 awards
- $154K
238990
ALL OTHER SPECIALTY TRADE CONTRACTORS
1 awards
- $25K
115310
SUPPORT ACTIVITIES FOR FORESTRY
2 awards
- $23K
212321
CONSTRUCTION SAND AND GRAVEL MINING
1 awards
- $11K
212319
OTHER CRUSHED AND BROKEN STONE MINING AND QUARRYING
1 awards
Recent Federal Awards
| Date | Agency | NAICS | Description | Amount |
|---|---|---|---|---|
| Apr 8, 2026 | Department of Transportation690567 WESTERN FEDERAL LANDS DIV | 237310 | FUNDS CONSTRUCTION PROJECT ID BOR SRAO TCROWN(1), CROWN POINT TRAIL AND PARKING AREA. WORK INCLUDES TRAIL CONSTRUCTION, TRAIL RESURFACING, SLOPE REPAIR, AND PAVING. TOTAL LENGTH IS 2.7 MILES. LOCATED IN VALLEY COUNTY, IDAHO. | $1.5M |
| Mar 31, 2026 | Department of Homeland SecurityADMINISTRATION FACILITIES TRAINING CONTRACTING DIVISION | 236220 | BORDER INFRASTRUCTURE-BARRIER GAPS DESIGN BUILD CONSTRUCTION | $9.5M |
| Mar 16, 2026 | Department of Transportation690567 WESTERN FEDERAL LANDS DIV | 237310 | THE PROJECT CONSISTS OF TWO PHASES: 1) PRE-CONSTRUCTION SERVICES CONTAINED IN THE BASE CONTRACT; AND 2) CONSTRUCTION SERVICES CONTAINED IN TWO OPTIONS. THE PROJECT WILL CONSIST OF SPANNING THE ACTIVE PRETTY ROCKS LANDSLIDE WITH AN APPROXIMATELY 475-F | $950K |
| Mar 9, 2026 | Department of Homeland SecurityADMINISTRATION FACILITIES TRAINING CONTRACTING DIVISION | 236220 | BORDER WALL CONSTRUCTION- VERTICAL BARRIER, LAREDO TEXAS SECTOR, LRT-4 | $512M |
| Jan 21, 2026 | Department of Transportation690567 WESTERN FEDERAL LANDS DIV | 237310 | CONSTRUCTION SERVICES FOR PROJECT ID BOUNDARY 5806 (3)B, RIVERSIDE ROAD IMPROVEMENTS B. THE WORK CONSISTS OF GRADING, DRAINAGE, BASE, SUBEXCAVATION, CULVERTS AND PAVING. | $8.0M |
| Dec 4, 2025 | Department of DefenseW076 ENDIST FT WORTH | 237990 | ALL WORK FOR THE NOBLES BRANCH SUMP. DALLAS FLOODWAY (DF) NOBLES BRANCH SUMP IMPROVEMENTS | $123K |
| Dec 3, 2025 | Department of DefenseW076 ENDIST FT WORTH | 237990 | ALL WORK FOR THE NOBLES BRANCH SUMP. DALLAS FLOODWAY (DF) NOBLES BRANCH SUMP IMPROVEMENTS | $82K |
| Nov 25, 2025 | Department of DefenseW075 ENDIST SACRAMENTO | 237990 | THE SACRAMENTO WEIR WIDENING WILL REDUCE WATER SURFACE ELEVATION IN SACRAMENTO RIVER AND ALLOW WATER TO FLOW INTO THE YOLO BYPASS SYSTEM. PROJECT CONSISTS OF CONSTRUCTION OF A PASSIVE WEIR, LEVEE SETBACK, FISH PASSAGE CONTROL AMONG OTHERS. | $299K |
| Nov 17, 2025 | Department of DefenseW075 ENDIST SACRAMENTO | 237990 | THE SACRAMENTO WEIR WIDENING WILL REDUCE WATER SURFACE ELEVATION IN SACRAMENTO RIVER AND ALLOW WATER TO FLOW INTO THE YOLO BYPASS SYSTEM. PROJECT CONSISTS OF CONSTRUCTION OF A PASSIVE WEIR, LEVEE SETBACK, FISH PASSAGE CONTROL AMONG OTHERS. | $54K |
| Nov 13, 2025 | Department of DefenseW075 ENDIST SACRAMENTO | 237990 | THE SACRAMENTO WEIR WIDENING WILL REDUCE WATER SURFACE ELEVATION IN SACRAMENTO RIVER AND ALLOW WATER TO FLOW INTO THE YOLO BYPASS SYSTEM. PROJECT CONSISTS OF CONSTRUCTION OF A PASSIVE WEIR, LEVEE SETBACK, FISH PASSAGE CONTROL AMONG OTHERS. | $150K |
| Nov 6, 2025 | Department of DefenseW076 ENDIST FT WORTH | 237990 | DESIGN BID BUILD CONSTRUCTION FOR RAIL YARD IMPROVEMENTS AT FORT BLISS, TEXAS | $83K |
| Nov 5, 2025 | Department of DefenseW075 ENDIST SACRAMENTO | 237990 | THE SACRAMENTO WEIR WIDENING WILL REDUCE WATER SURFACE ELEVATION IN SACRAMENTO RIVER AND ALLOW WATER TO FLOW INTO THE YOLO BYPASS SYSTEM. PROJECT CONSISTS OF CONSTRUCTION OF A PASSIVE WEIR, LEVEE SETBACK, FISH PASSAGE CONTROL AMONG OTHERS. | $600K |
| Oct 10, 2025 | Department of DefenseW076 ENDIST FT WORTH | 237990 | ALL WORK FOR THE NOBLES BRANCH SUMP. DALLAS FLOODWAY (DF) NOBLES BRANCH SUMP IMPROVEMENTS | $14K |
| Oct 9, 2025 | Department of DefenseW076 ENDIST FT WORTH | 237990 | DESIGN BID BUILD CONSTRUCTION FOR RAIL YARD IMPROVEMENTS AT FORT BLISS, TEXAS | $1.6M |
| Sep 18, 2025 | Department of Homeland SecurityADMINISTRATION FACILITIES TRAINING CONTRACTING DIVISION | 236220 | BORDER INFRASTRUCTURE-BARRIER GAPS DESIGN BUILD CONSTRUCTION | $908K |
| Sep 15, 2025 | Department of Transportation690567 WESTERN FEDERAL LANDS DIV | 237310 | FUND CONSTRUCTION PROJECT OR FLAP UMATILLA 582(1), MILL CREEK ROAD. WORK INCLUDES CHIP SEAL, CRUSHED AGGREGATE, GRADING, REPAIR OF SOLDIER PILE WALLS WITH ANCHORED WIRE MESH, SIGNING, TRAFFIC CONTROL, AND EROSION CONTROL. | $300K |
| Sep 12, 2025 | Department of DefenseFA8201 AFSC OL H PZIO | 324121 | MISCELLANEOUS CONSTRUCTION MATERIALS | $18K |
| Sep 5, 2025 | Department of DefenseW075 ENDIST SAN FRAN | 237990 | PROJECT DESCRIPTION: THIS PROJECT IS FOR THE REACH 6 LEVEE AND FLOODWALL CONSTRUCTION ALONG THE CORRALITOS CREEK, A TRIBUTARY OF THE PAJARO RIVER LEVEE SYSTEM IN THE CITY OF WATSONVILLE, COUNTY OF SANTA CRUZ. | $39M |
| Sep 3, 2025 | Department of DefenseW075 ENDIST SACRAMENTO | 237990 | THE SACRAMENTO WEIR WIDENING WILL REDUCE WATER SURFACE ELEVATION IN SACRAMENTO RIVER AND ALLOW WATER TO FLOW INTO THE YOLO BYPASS SYSTEM. PROJECT CONSISTS OF CONSTRUCTION OF A PASSIVE WEIR, LEVEE SETBACK, FISH PASSAGE CONTROL AMONG OTHERS. | $51K |
| Sep 3, 2025 | Department of DefenseW075 ENDIST SACRAMENTO | 237990 | THE SACRAMENTO WEIR WIDENING WILL REDUCE WATER SURFACE ELEVATION IN SACRAMENTO RIVER AND ALLOW WATER TO FLOW INTO THE YOLO BYPASS SYSTEM. PROJECT CONSISTS OF CONSTRUCTION OF A PASSIVE WEIR, LEVEE SETBACK, FISH PASSAGE CONTROL AMONG OTHERS. | $51K |
| Sep 2, 2025 | Department of Homeland SecurityADMINISTRATION FACILITIES TRAINING CONTRACTING DIVISION | 236220 | BORDER INFRASTRUCTURE-BARRIER GAPS DESIGN BUILD CONSTRUCTION | $20M |
| Aug 27, 2025 | Department of Transportation690567 WESTERN FEDERAL LANDS DIV | 237310 | THE PROJECT CONSISTS OF TWO PHASES: 1) PRE-CONSTRUCTION SERVICES CONTAINED IN THE BASE CONTRACT; AND 2) CONSTRUCTION SERVICES CONTAINED IN TWO OPTIONS. THE PROJECT WILL CONSIST OF SPANNING THE ACTIVE PRETTY ROCKS LANDSLIDE WITH AN APPROXIMATELY 475-F | $5.6M |
| Aug 19, 2025 | Department of DefenseW075 ENDIST SACRAMENTO | 237990 | THE SACRAMENTO WEIR WIDENING WILL REDUCE WATER SURFACE ELEVATION IN SACRAMENTO RIVER AND ALLOW WATER TO FLOW INTO THE YOLO BYPASS SYSTEM. PROJECT CONSISTS OF CONSTRUCTION OF A PASSIVE WEIR, LEVEE SETBACK, FISH PASSAGE CONTROL AMONG OTHERS. | $244K |
| Aug 12, 2025 | Department of DefenseW075 ENDIST SACRAMENTO | 237990 | THE SACRAMENTO WEIR WIDENING WILL REDUCE WATER SURFACE ELEVATION IN SACRAMENTO RIVER AND ALLOW WATER TO FLOW INTO THE YOLO BYPASS SYSTEM. PROJECT CONSISTS OF CONSTRUCTION OF A PASSIVE WEIR, LEVEE SETBACK, FISH PASSAGE CONTROL AMONG OTHERS. | $10K |
| Jul 28, 2025 | Department of DefenseW075 ENDIST SACRAMENTO | 237990 | THE SACRAMENTO WEIR WIDENING WILL REDUCE WATER SURFACE ELEVATION IN SACRAMENTO RIVER AND ALLOW WATER TO FLOW INTO THE YOLO BYPASS SYSTEM. PROJECT CONSISTS OF CONSTRUCTION OF A PASSIVE WEIR, LEVEE SETBACK, FISH PASSAGE CONTROL AMONG OTHERS. | $379K |
Related Contractors
Other companies active in NAICS 236220 — COMMERCIAL AND INSTITUTIONAL BUILDING CONSTRUCTION.
Track Granite Construction Company Recompetes Before They Post
Mindy monitors Granite Construction Company's active contracts and alerts you 12 months before they expire — so you can position to compete on recompete.
Get Free Recompete Alerts