Home/Contractors/Granite Construction Company/contracts

Federal Contractor Profile

Granite Construction Company

$1.6B obligated·100 awards·4 agencies·8 NAICS

Federal Contracts

Showing contracts 150 of 277 total. Sorted by action date, most recent first. Excludes $0 modifications.

DateAgencyPIIDNAICSDescriptionAmount
Apr 8, 2026Department of Transportation690567 WESTERN FEDERAL LANDS DIV69056726F00059N237310FUNDS CONSTRUCTION PROJECT ID BOR SRAO TCROWN(1), CROWN POINT TRAIL AND PARKING AREA. WORK INCLUDES TRAIL CONSTRUCTION, TRAIL RESURFACING, SLOPE REPAIR, AND PAVING. TOTAL LENGTH IS 2.7 MILES. LOCATED IN VALLEY COUNTY, IDAHO.$1.5M
Mar 31, 2026Department of Homeland SecurityADMINISTRATION FACILITIES TRAINING CONTRACTING DIVISION70B01C25F00000194236220BORDER INFRASTRUCTURE-BARRIER GAPS DESIGN BUILD CONSTRUCTION$9.5M
Mar 16, 2026Department of Transportation690567 WESTERN FEDERAL LANDS DIV69056723C000008237310THE PROJECT CONSISTS OF TWO PHASES: 1) PRE-CONSTRUCTION SERVICES CONTAINED IN THE BASE CONTRACT; AND 2) CONSTRUCTION SERVICES CONTAINED IN TWO OPTIONS. THE PROJECT WILL CONSIST OF SPANNING THE ACTIVE PRETTY ROCKS LANDSLIDE WITH AN APPROXIMATELY 475-F$950K
Mar 9, 2026Department of Homeland SecurityADMINISTRATION FACILITIES TRAINING CONTRACTING DIVISION70B01C26F00000165236220BORDER WALL CONSTRUCTION- VERTICAL BARRIER, LAREDO TEXAS SECTOR, LRT-4$512M
Jan 21, 2026Department of Transportation690567 WESTERN FEDERAL LANDS DIV69056726F00019N237310CONSTRUCTION SERVICES FOR PROJECT ID BOUNDARY 5806 (3)B, RIVERSIDE ROAD IMPROVEMENTS B. THE WORK CONSISTS OF GRADING, DRAINAGE, BASE, SUBEXCAVATION, CULVERTS AND PAVING.$8.0M
Dec 4, 2025Department of DefenseW076 ENDIST FT WORTHW9126G25C0003237990ALL WORK FOR THE NOBLES BRANCH SUMP. DALLAS FLOODWAY (DF) NOBLES BRANCH SUMP IMPROVEMENTS$123K
Dec 3, 2025Department of DefenseW076 ENDIST FT WORTHW9126G25C0003237990ALL WORK FOR THE NOBLES BRANCH SUMP. DALLAS FLOODWAY (DF) NOBLES BRANCH SUMP IMPROVEMENTS$82K
Nov 25, 2025Department of DefenseW075 ENDIST SACRAMENTOW9123823C0014237990THE SACRAMENTO WEIR WIDENING WILL REDUCE WATER SURFACE ELEVATION IN SACRAMENTO RIVER AND ALLOW WATER TO FLOW INTO THE YOLO BYPASS SYSTEM. PROJECT CONSISTS OF CONSTRUCTION OF A PASSIVE WEIR, LEVEE SETBACK, FISH PASSAGE CONTROL AMONG OTHERS.$299K
Nov 17, 2025Department of DefenseW075 ENDIST SACRAMENTOW9123823C0014237990THE SACRAMENTO WEIR WIDENING WILL REDUCE WATER SURFACE ELEVATION IN SACRAMENTO RIVER AND ALLOW WATER TO FLOW INTO THE YOLO BYPASS SYSTEM. PROJECT CONSISTS OF CONSTRUCTION OF A PASSIVE WEIR, LEVEE SETBACK, FISH PASSAGE CONTROL AMONG OTHERS.$54K
Nov 13, 2025Department of DefenseW075 ENDIST SACRAMENTOW9123823C0014237990THE SACRAMENTO WEIR WIDENING WILL REDUCE WATER SURFACE ELEVATION IN SACRAMENTO RIVER AND ALLOW WATER TO FLOW INTO THE YOLO BYPASS SYSTEM. PROJECT CONSISTS OF CONSTRUCTION OF A PASSIVE WEIR, LEVEE SETBACK, FISH PASSAGE CONTROL AMONG OTHERS.$150K
Nov 6, 2025Department of DefenseW076 ENDIST FT WORTHW9126G24C0032237990DESIGN BID BUILD CONSTRUCTION FOR RAIL YARD IMPROVEMENTS AT FORT BLISS, TEXAS$83K
Nov 5, 2025Department of DefenseW075 ENDIST SACRAMENTOW9123823C0014237990THE SACRAMENTO WEIR WIDENING WILL REDUCE WATER SURFACE ELEVATION IN SACRAMENTO RIVER AND ALLOW WATER TO FLOW INTO THE YOLO BYPASS SYSTEM. PROJECT CONSISTS OF CONSTRUCTION OF A PASSIVE WEIR, LEVEE SETBACK, FISH PASSAGE CONTROL AMONG OTHERS.$600K
Oct 10, 2025Department of DefenseW076 ENDIST FT WORTHW9126G25C0003237990ALL WORK FOR THE NOBLES BRANCH SUMP. DALLAS FLOODWAY (DF) NOBLES BRANCH SUMP IMPROVEMENTS$14K
Oct 9, 2025Department of DefenseW076 ENDIST FT WORTHW9126G24C0032237990DESIGN BID BUILD CONSTRUCTION FOR RAIL YARD IMPROVEMENTS AT FORT BLISS, TEXAS$1.6M
Sep 18, 2025Department of Homeland SecurityADMINISTRATION FACILITIES TRAINING CONTRACTING DIVISION70B01C25F00000194236220BORDER INFRASTRUCTURE-BARRIER GAPS DESIGN BUILD CONSTRUCTION$908K
Sep 15, 2025Department of Transportation690567 WESTERN FEDERAL LANDS DIV69056725C000008237310FUND CONSTRUCTION PROJECT OR FLAP UMATILLA 582(1), MILL CREEK ROAD. WORK INCLUDES CHIP SEAL, CRUSHED AGGREGATE, GRADING, REPAIR OF SOLDIER PILE WALLS WITH ANCHORED WIRE MESH, SIGNING, TRAFFIC CONTROL, AND EROSION CONTROL.$300K
Sep 12, 2025Department of DefenseFA8201 AFSC OL H PZIOFA820125FG163324121MISCELLANEOUS CONSTRUCTION MATERIALS$18K
Sep 5, 2025Department of DefenseW075 ENDIST SAN FRANW912P725CA018237990PROJECT DESCRIPTION: THIS PROJECT IS FOR THE REACH 6 LEVEE AND FLOODWALL CONSTRUCTION ALONG THE CORRALITOS CREEK, A TRIBUTARY OF THE PAJARO RIVER LEVEE SYSTEM IN THE CITY OF WATSONVILLE, COUNTY OF SANTA CRUZ.$39M
Sep 3, 2025Department of DefenseW075 ENDIST SACRAMENTOW9123823C0014237990THE SACRAMENTO WEIR WIDENING WILL REDUCE WATER SURFACE ELEVATION IN SACRAMENTO RIVER AND ALLOW WATER TO FLOW INTO THE YOLO BYPASS SYSTEM. PROJECT CONSISTS OF CONSTRUCTION OF A PASSIVE WEIR, LEVEE SETBACK, FISH PASSAGE CONTROL AMONG OTHERS.$51K
Sep 3, 2025Department of DefenseW075 ENDIST SACRAMENTOW9123823C0014237990THE SACRAMENTO WEIR WIDENING WILL REDUCE WATER SURFACE ELEVATION IN SACRAMENTO RIVER AND ALLOW WATER TO FLOW INTO THE YOLO BYPASS SYSTEM. PROJECT CONSISTS OF CONSTRUCTION OF A PASSIVE WEIR, LEVEE SETBACK, FISH PASSAGE CONTROL AMONG OTHERS.$51K
Sep 2, 2025Department of Homeland SecurityADMINISTRATION FACILITIES TRAINING CONTRACTING DIVISION70B01C25F00000194236220BORDER INFRASTRUCTURE-BARRIER GAPS DESIGN BUILD CONSTRUCTION$20M
Aug 27, 2025Department of Transportation690567 WESTERN FEDERAL LANDS DIV69056723C000008237310THE PROJECT CONSISTS OF TWO PHASES: 1) PRE-CONSTRUCTION SERVICES CONTAINED IN THE BASE CONTRACT; AND 2) CONSTRUCTION SERVICES CONTAINED IN TWO OPTIONS. THE PROJECT WILL CONSIST OF SPANNING THE ACTIVE PRETTY ROCKS LANDSLIDE WITH AN APPROXIMATELY 475-F$5.6M
Aug 19, 2025Department of DefenseW075 ENDIST SACRAMENTOW9123823C0014237990THE SACRAMENTO WEIR WIDENING WILL REDUCE WATER SURFACE ELEVATION IN SACRAMENTO RIVER AND ALLOW WATER TO FLOW INTO THE YOLO BYPASS SYSTEM. PROJECT CONSISTS OF CONSTRUCTION OF A PASSIVE WEIR, LEVEE SETBACK, FISH PASSAGE CONTROL AMONG OTHERS.$244K
Aug 12, 2025Department of DefenseW075 ENDIST SACRAMENTOW9123823C0014237990THE SACRAMENTO WEIR WIDENING WILL REDUCE WATER SURFACE ELEVATION IN SACRAMENTO RIVER AND ALLOW WATER TO FLOW INTO THE YOLO BYPASS SYSTEM. PROJECT CONSISTS OF CONSTRUCTION OF A PASSIVE WEIR, LEVEE SETBACK, FISH PASSAGE CONTROL AMONG OTHERS.$10K
Jul 28, 2025Department of DefenseW075 ENDIST SACRAMENTOW9123823C0014237990THE SACRAMENTO WEIR WIDENING WILL REDUCE WATER SURFACE ELEVATION IN SACRAMENTO RIVER AND ALLOW WATER TO FLOW INTO THE YOLO BYPASS SYSTEM. PROJECT CONSISTS OF CONSTRUCTION OF A PASSIVE WEIR, LEVEE SETBACK, FISH PASSAGE CONTROL AMONG OTHERS.$379K
Jul 8, 2025Department of DefenseW075 ENDIST SACRAMENTOW9123823C0014237990THE SACRAMENTO WEIR WIDENING WILL REDUCE WATER SURFACE ELEVATION IN SACRAMENTO RIVER AND ALLOW WATER TO FLOW INTO THE YOLO BYPASS SYSTEM. PROJECT CONSISTS OF CONSTRUCTION OF A PASSIVE WEIR, LEVEE SETBACK, FISH PASSAGE CONTROL AMONG OTHERS.$197K
Jul 3, 2025Department of Homeland SecurityADMINISTRATION FACILITIES TRAINING CONTRACTING DIVISION70B01C25F00000194236220BORDER INFRASTRUCTURE-BARRIER GAPS DESIGN BUILD CONSTRUCTION$54M
Jun 2, 2025Department of DefenseW076 ENDIST FT WORTHW9126G24C0032237990DESIGN BID BUILD CONSTRUCTION FOR RAIL YARD IMPROVEMENTS AT FORT BLISS, TEXAS$5.7M
May 20, 2025Department of DefenseW075 ENDIST SACRAMENTOW9123823C0014237990THE SACRAMENTO WEIR WIDENING WILL REDUCE WATER SURFACE ELEVATION IN SACRAMENTO RIVER AND ALLOW WATER TO FLOW INTO THE YOLO BYPASS SYSTEM. PROJECT CONSISTS OF CONSTRUCTION OF A PASSIVE WEIR, LEVEE SETBACK, FISH PASSAGE CONTROL AMONG OTHERS.$175K
May 13, 2025Department of Homeland SecurityADMINISTRATION FACILITIES TRAINING CONTRACTING DIVISION70B01C25F00000194236220BORDER INFRASTRUCTURE-BARRIER GAPS DESIGN BUILD CONSTRUCTION$1.6M
May 9, 2025Department of DefenseNAVFACSYSCOM SOUTHWESTN6247325F5234237310MINIMUM GUARANTEE - GRANITE CONSTRUCTION$5K
May 1, 2025Department of DefenseW075 ENDIST SACRAMENTOW9123823C0014237990THE SACRAMENTO WEIR WIDENING WILL REDUCE WATER SURFACE ELEVATION IN SACRAMENTO RIVER AND ALLOW WATER TO FLOW INTO THE YOLO BYPASS SYSTEM. PROJECT CONSISTS OF CONSTRUCTION OF A PASSIVE WEIR, LEVEE SETBACK, FISH PASSAGE CONTROL AMONG OTHERS.$163K
Apr 30, 2025Department of Homeland SecurityADMINISTRATION FACILITIES TRAINING CONTRACTING DIVISION70B01C25F00000194236220BORDER INFRASTRUCTURE-BARRIER GAPS DESIGN BUILD CONSTRUCTION$23M
Apr 30, 2025Department of Transportation690567 WESTERN FEDERAL LANDS DIV69056725D000003237310IDAHO, MONTANA, AND SURROUNDING AREAS INDEFINITE DELIVERY/ INDEFINITE QUANTITY (IDIQ) MULTIPLE AWARD TASK ORDER CONTRACT (MATOC)$10K
Apr 15, 2025Department of DefenseW075 ENDIST SACRAMENTOW9123823C0014237990THE SACRAMENTO WEIR WIDENING WILL REDUCE WATER SURFACE ELEVATION IN SACRAMENTO RIVER AND ALLOW WATER TO FLOW INTO THE YOLO BYPASS SYSTEM. PROJECT CONSISTS OF CONSTRUCTION OF A PASSIVE WEIR, LEVEE SETBACK, FISH PASSAGE CONTROL AMONG OTHERS.$244K
Apr 1, 2025Department of DefenseW075 ENDIST SACRAMENTOW9123823C0014237990THE SACRAMENTO WEIR WIDENING WILL REDUCE WATER SURFACE ELEVATION IN SACRAMENTO RIVER AND ALLOW WATER TO FLOW INTO THE YOLO BYPASS SYSTEM. PROJECT CONSISTS OF CONSTRUCTION OF A PASSIVE WEIR, LEVEE SETBACK, FISH PASSAGE CONTROL AMONG OTHERS.$263K
Mar 28, 2025Department of DefenseW075 ENDIST SACRAMENTOW9123823C0014237990THE SACRAMENTO WEIR WIDENING WILL REDUCE WATER SURFACE ELEVATION IN SACRAMENTO RIVER AND ALLOW WATER TO FLOW INTO THE YOLO BYPASS SYSTEM. PROJECT CONSISTS OF CONSTRUCTION OF A PASSIVE WEIR, LEVEE SETBACK, FISH PASSAGE CONTROL AMONG OTHERS.$33K
Mar 24, 2025Department of Transportation690567 WESTERN FEDERAL LANDS DIV69056723C000008237310THE PROJECT CONSISTS OF TWO PHASES: 1) PRE-CONSTRUCTION SERVICES CONTAINED IN THE BASE CONTRACT; AND 2) CONSTRUCTION SERVICES CONTAINED IN TWO OPTIONS. THE PROJECT WILL CONSIST OF SPANNING THE ACTIVE PRETTY ROCKS LANDSLIDE WITH AN APPROXIMATELY 475-F$45K
Mar 14, 2025Department of Homeland SecurityADMINISTRATION FACILITIES TRAINING CONTRACTING DIVISION70B01C25F00000194236220BORDER INFRASTRUCTURE-BARRIER GAPS DESIGN BUILD CONSTRUCTION$70M
Feb 26, 2025Department of DefenseW075 ENDIST SACRAMENTOW9123823C0014237990THE SACRAMENTO WEIR WIDENING WILL REDUCE WATER SURFACE ELEVATION IN SACRAMENTO RIVER AND ALLOW WATER TO FLOW INTO THE YOLO BYPASS SYSTEM. PROJECT CONSISTS OF CONSTRUCTION OF A PASSIVE WEIR, LEVEE SETBACK, FISH PASSAGE CONTROL AMONG OTHERS.$41K
Feb 24, 2025Department of DefenseW075 ENDIST SACRAMENTOW9123823C0006237990HCR RODS REPLACEMENT$24K
Feb 19, 2025Department of DefenseW076 ENDIST FT WORTHW9126G23C00132379903 LEVEE REACH2/VINYARD & HARRISON SUMPS$6K
Feb 18, 2025Department of DefenseW075 ENDIST SACRAMENTOW9123823C0014237990THE SACRAMENTO WEIR WIDENING WILL REDUCE WATER SURFACE ELEVATION IN SACRAMENTO RIVER AND ALLOW WATER TO FLOW INTO THE YOLO BYPASS SYSTEM. PROJECT CONSISTS OF CONSTRUCTION OF A PASSIVE WEIR, LEVEE SETBACK, FISH PASSAGE CONTROL AMONG OTHERS.$370K
Feb 12, 2025Department of DefenseW076 ENDIST FT WORTHW9126G25C0003237990ALL WORK FOR THE NOBLES BRANCH SUMP. DALLAS FLOODWAY (DF) NOBLES BRANCH SUMP IMPROVEMENTS$14M
Feb 4, 2025Department of DefenseW075 ENDIST SACRAMENTOW9123823C0006237990HCR RODS REPLACEMENT$93K
Jan 21, 2025Department of DefenseW075 ENDIST SACRAMENTOW9123823C0014237990THE SACRAMENTO WEIR WIDENING WILL REDUCE WATER SURFACE ELEVATION IN SACRAMENTO RIVER AND ALLOW WATER TO FLOW INTO THE YOLO BYPASS SYSTEM. PROJECT CONSISTS OF CONSTRUCTION OF A PASSIVE WEIR, LEVEE SETBACK, FISH PASSAGE CONTROL AMONG OTHERS.$213K
Jan 7, 2025Department of Transportation690567 WESTERN FEDERAL LANDS DIV69056725C000008237310FUND CONSTRUCTION PROJECT OR FLAP UMATILLA 582(1), MILL CREEK ROAD. WORK INCLUDES CHIP SEAL, CRUSHED AGGREGATE, GRADING, REPAIR OF SOLDIER PILE WALLS WITH ANCHORED WIRE MESH, SIGNING, TRAFFIC CONTROL, AND EROSION CONTROL.$3.2M
Dec 20, 2024Department of DefenseW075 ENDIST SACRAMENTOW9123823C0014237990THE SACRAMENTO WEIR WIDENING WILL REDUCE WATER SURFACE ELEVATION IN SACRAMENTO RIVER AND ALLOW WATER TO FLOW INTO THE YOLO BYPASS SYSTEM. PROJECT CONSISTS OF CONSTRUCTION OF A PASSIVE WEIR, LEVEE SETBACK, FISH PASSAGE CONTROL AMONG OTHERS.$292K
Dec 18, 2024Department of DefenseW075 ENDIST SACRAMENTOW9123823C0014237990THE SACRAMENTO WEIR WIDENING WILL REDUCE WATER SURFACE ELEVATION IN SACRAMENTO RIVER AND ALLOW WATER TO FLOW INTO THE YOLO BYPASS SYSTEM. PROJECT CONSISTS OF CONSTRUCTION OF A PASSIVE WEIR, LEVEE SETBACK, FISH PASSAGE CONTROL AMONG OTHERS.$583K
Nov 21, 2024Department of DefenseW075 ENDIST SACRAMENTOW9123823C0014237990THE SACRAMENTO WEIR WIDENING WILL REDUCE WATER SURFACE ELEVATION IN SACRAMENTO RIVER AND ALLOW WATER TO FLOW INTO THE YOLO BYPASS SYSTEM. PROJECT CONSISTS OF CONSTRUCTION OF A PASSIVE WEIR, LEVEE SETBACK, FISH PASSAGE CONTROL AMONG OTHERS.$53K

Get Alerted Before Granite Construction Company's Next Recompete

Mindy monitors active contracts and flags recompetes 12 months out so you can position to compete.

Start Free