Home/Contractors/I & L Fms/contracts

Federal Contractor Profile

I & L Fms

$38M obligated·139 awards·3 agencies·3 NAICS

Federal Contracts

Showing contracts 150 of 212 total. Sorted by action date, most recent first. Excludes $0 modifications.

DateAgencyPIIDNAICSDescriptionAmount
Jun 27, 2024General Services AdministrationPBS R6 SMALL PROJECTS ACQUISITION ST. LOUIS EAST47PG0324F0016561210THE CONTRACTOR SHALL PROVIDE ALL LABOR, SUPERVISION, MATERIALS, AND EQUIPMENT NECESSARY TO OPERATE AIR HANDLING UNITS NEEDED AT THE THOMAS F. EAGLETON U.S. COURTHOUSE, 111 S. 10TH STREET, ST. LOUIS, MO 63102.$12K
Jun 26, 2024General Services AdministrationPBS R6 SMALL PROJECTS ACQUISITION ST. LOUIS EAST47PG0324F0027561210REPLACE SHRUBBERY, ADJUST MULCH, PURCHASE AND INSTALL 8 NEW SPIRAEA BUSHES, TRIM ROUGHLY 30 TREES, AND REMOVE 4 TREES AND REPLACE WITH BLACK GUM TREES AT THE THOMAS F. EAGLETON U.S. COURTHOUSE 111 SOUTH 10TH ST, ST LOUIS MO 63102.$48K
Jun 21, 2024General Services AdministrationPBS R6 SMALL PROJECTS ACQUISITION ST. LOUIS EAST47PG0324F0019561210MANAGE FLOOD DAMAGE FROM A BROKEN SPRINKLER HEAD ON FLOORS: FOUR, THREE, TWO AND ONE MEZZANINE AT THE THOMAS EAGLETON COURTHOUSE, 111 S. 10TH STREET, ST. LOUIS, MO 63102-1125 AS WELL AS MOLD TESTING.$4K
Jun 18, 2024General Services AdministrationPBS R6 SMALL PROJECTS ACQUISITION ST. LOUIS EAST47PG0324F0019561210MANAGE FLOOD DAMAGE FROM A BROKEN SPRINKLER HEAD ON FLOORS: FOUR, THREE, TWO AND ONE MEZZANINE AT THE THOMAS EAGLETON COURTHOUSE, 111 S. 10TH STREET, ST. LOUIS, MO 63102-1125 AS WELL AS MOLD TESTING.$111K
Jun 17, 2024General Services AdministrationPBS R6 SMALL PROJECTS ACQUISITION ST. LOUIS EAST47PG0324F0024561210THE CONTRACTOR SHALL FURNISH ALL NECESSARY LABOR, MATERIAL, EQUIPMENT, AND SUPERVISION TO REPLACE, THE 2 OVERHEAD GARAGE DOORS AT THE THOMAS F. EAGLETON U.S. COURTHOUSE 111 SOUTH 10TH ST, ST LOUIS MO 63102.$109K
Jun 6, 2024General Services AdministrationPBS R6 SMALL PROJECTS ACQUISITION ST. LOUIS EAST47PG0324F0019561210MANAGE FLOOD DAMAGE FROM A BROKEN SPRINKLER HEAD ON FLOORS: FOUR, THREE, TWO AND ONE MEZZANINE AT THE THOMAS EAGLETON COURTHOUSE, 111 S. 10TH STREET, ST. LOUIS, MO 63102-1125 AS WELL AS MOLD TESTING.$27K
Jun 4, 2024General Services AdministrationPBS R6 SMALL PROJECTS ACQUISITION ST. LOUIS EAST47PG0324F0020561210PROVIDE LABOR & MATERIAL TO REPAIR DAMAGE CAUSED BY AMEREN IN A-SIDE PRIMARY SWITCHGEAR AT THE THOMAS F. EAGLETON U.S. COURTHOUSE, 111 S. 10TH STREET, ST. LOUIS, MO 63102-1125.$150K
May 29, 2024General Services AdministrationPBS R6 SMALL PROJECTS ACQUISITION ST. LOUIS EAST47PG0324F0019561210MANAGE FLOOD DAMAGE FROM A BROKEN SPRINKLER HEAD ON FLOORS: FOUR, THREE, TWO AND ONE MEZZANINE AT THE THOMAS EAGLETON COURTHOUSE, 111 S. 10TH STREET, ST. LOUIS, MO 63102-1125 AS WELL AS MOLD TESTING.$25K
Feb 21, 2024General Services AdministrationPBS R6 CONSTRUCTION ACQUISITION BRANCH47PG0224F0024561210THIS IS A GENERAL SERVICE ADMINISTRATION REQUIREMENT TO REPLACE GARAGE BARRIERS AT THE THOMAS F EAGLETON UNITED STATES COURTHOUSE AT 111 S 10TH STREET, ST. LOUIS, MISSOURI 63102.$317K
Feb 15, 2024General Services AdministrationPBS R6 SMALL PROJECTS ACQUISITION ST. LOUIS EAST47PG0324F0016561210THE CONTRACTOR SHALL PROVIDE ALL LABOR, SUPERVISION, MATERIALS, AND EQUIPMENT NECESSARY TO OPERATE AIR HANDLING UNITS NEEDED AT THE THOMAS F. EAGLETON U.S. COURTHOUSE, 111 S. 10TH STREET, ST. LOUIS, MO 63102.$7K
Jan 22, 2024General Services AdministrationPBS R6 SMALL PROJECTS ACQUISITION ST. LOUIS EAST47PG0324F0013561210REPLACE MAN DOOR AT GARAGE ENTRANCE, PUBLIC DRINKING FOUNTAINS WITH FOUNTAIN/BOTTLE FILLER ON THE 5TH FLOOR, AND INSTALL CARBON STEEL STAIRS WHERE EXISTING LADDER IS AT THE THOMAS F. EAGLETON U.S. COURTHOUSE 111 SOUTH 10TH ST, ST LOUIS MO 63102.$35K
Oct 25, 2023General Services AdministrationPBS R6 SMALL PROJECTS ACQUISITION ST. LOUIS EAST47PG0323F0067561210THE CONTRACTOR SHALL FURNISH ALL NECESSARY LABOR, MATERIAL, EQUIPMENT, AND SUPERVISION TO REBUILD CONDENSER WATER PUMP 3 AT THE THOMAS F. EAGLETON U.S. COURTHOUSE.$13K
Sep 22, 2023General Services AdministrationPBS R6 SMALL PROJECTS ACQUISITION ST. LOUIS EAST47PG0323F0074561210THE CONTRACTOR SHALL FURNISH ALL NECESSARY LABOR, MATERIAL, EQUIPMENT, AND SUPERVISION TO FURNISH AND REPLACE THE CONTROLLER FOR THE EMERGENCY GENERATORS AT THE THOMAS F. EAGLETON U.S. COURTHOUSE 111 SOUTH 10TH ST, ST LOUIS MO 63102.$100K
Sep 21, 2023General Services AdministrationPBS R6 SMALL PROJECTS ACQUISITION ST. LOUIS EAST47PG0323F0073561210THE CONTRACTOR SHALL FURNISH ALL NECESSARY LABOR, MATERIAL, EQUIPMENT, AND SUPERVISION TO REPLACE TWO 2 DUCT DETECTORS AND ONE FIRE ALARM SYSTEM RELAY AT THE THOMAS F. EAGLETON U.S. COURTHOUSE ,111 S. 10TH STREET, ST. LOUIS, MO 63102-1125.$4K
Sep 12, 2023General Services AdministrationPBS R6 SMALL PROJECTS ACQUISITION ST. LOUIS EAST47PG0323F0070561210THE CONTRACTOR SHALL FURNISH ALL NECESSARY LABOR, MATERIAL, EQUIPMENT, AND SUPERVISION TO REMOVE WALL COVERING AND PAINT WALLS IN EMPLOYEE HEALTH UNIT AT THE THOMAS F. EAGLETON U.S. COURTHOUSE , 111 S. 10TH STREET ST. LOUIS, MO 63102-1125.$6K
Aug 29, 2023General Services AdministrationPBS R6 SMALL PROJECTS ACQUISITION ST. LOUIS EAST47PG0323F0067561210THE CONTRACTOR SHALL FURNISH ALL NECESSARY LABOR, MATERIAL, EQUIPMENT, AND SUPERVISION TO REBUILD CONDENSER WATER PUMP 3 AT THE THOMAS F. EAGLETON U.S. COURTHOUSE.$8K
Aug 9, 2023General Services AdministrationPBS R6 SMALL PROJECTS ACQUISITION ST. LOUIS EAST47PG0323F0057561210THE CONTRACTOR SHALL FURNISH ALL NECESSARY LABOR, MATERIAL, EQUIPMENT, AND SUPERVISION TO PERFORM REPAIRS TO THE EAST MAIN LOBBY ENTRANCE ROTATING DOOR AT THE THOMAS F. EAGLETON U.S. COURTHOUSE, 111 S. 10TH STREET, ST. LOUIS, MO 63102-1125.$41K
Jul 31, 2023General Services AdministrationPBS R6 SMALL PROJECTS ACQUISITION ST. LOUIS EAST47PG0323F0054561210REPACK SEALS ON FIRE PUMP 3, REPLACE THE BACKFLOW PREVENTER, REPAIR DAMAGED FENCING, AND REPAIR LEAKING HEAT EXCHANGER AT THE THOMAS F. EAGLETON U.S. COURTHOUSE, 111 S. 10TH STREET, ST. LOUIS, MO 63102-1125.$39K
Jul 30, 2023General Services AdministrationPBS R6 SMALL PROJECTS ACQUISITION ST. LOUIS EAST47PG0323F0053561210THE CONTRACTOR SHALL FURNISH ALL NECESSARY LABOR, MATERIAL, EQUIPMENT, AND SUPERVISION TO REMOVE AND REPLACE SHRUBBERY ON THE EAST SIDE AND ADJUST MULCH, AT THE THOMAS F. EAGLETON U.S. COURTHOUSE 111 SOUTH 10TH ST, ST LOUIS MO 63102.$23K
Jul 24, 2023General Services AdministrationPBS R6 SMALL PROJECTS ACQUISITION ST. LOUIS EAST47PG0323F0052561210THE CONTRACTOR SHALL FURNISH ALL NECESSARY LABOR, MATERIAL, EQUIPMENT, AND SUPERVISION TO REPAIR AND REPLACE MULTIPLE GARAGE LIGHTS AT THE THOMAS F. EAGLETON U.S. COURTHOUSE.$34K
Jul 14, 2023General Services AdministrationPBS R6 SMALL PROJECTS ACQUISITION ST. LOUIS EAST47PG0323F0049561210REPLACE, THE PUBLIC DRINKING FOUNTAINS WITH COMBINATION DRINKING FOUNTAIN/BOTTLE FILLER ON THE 15TH FLOOR LOBBY AREA AND OPTION FOR 5TH FLOOR LOBBY AT THE THOMAS F. EAGLETON U.S. COURTHOUSE 111 SOUTH 10TH ST, ST LOUIS MO 63102.$8K
Jul 12, 2023General Services AdministrationPBS R6 SMALL PROJECTS ACQUISITION ST. LOUIS EAST47PG0323F0048561210THE CONTRACTOR SHALL FURNISH ALL NECESSARY LABOR, MATERIAL, EQUIPMENT, AND SUPERVISION TO REPLACE, REPLACE CHILLED WATER PUMP 3, AT THE THOMAS F. EAGLETON U.S. COURTHOUSE 111 SOUTH 10TH ST, ST LOUIS MO 63102.$74K
Jul 11, 2023General Services AdministrationPBS R6 SMALL PROJECTS ACQUISITION ST. LOUIS EAST47PG0323F0047561210THE CONTRACTOR SHALL FURNISH ALL NECESSARY LABOR, MATERIAL, EQUIPMENT, AND SUPERVISION TO REPAIR THE FIRE ALARM SYSTEM AT THE THOMAS F. EAGLETON U.S. COURTHOUSE, 111 S. 10TH STREET, ST. LOUIS, MO 63102-1125.$4K
Jun 27, 2023General Services AdministrationPBS R6 SERVICES ACQUISITION BRANCHGS06P14GXD0011561210IGF::OT::IGF FOR OTHER FUNCTIONS OPERATIONS AND MAINTENANCE SERVICES FOR THE THOMAS F. EAGLETON COURTHOUSE AND PARK/PLAZA, 111/112 S. 10TH STREET., ST. LOUIS, MO$1.6M
Jun 7, 2023General Services AdministrationPBS R6 SMALL PROJECTS ACQUISITION ST. LOUIS EAST47PG0323F0042561210THE CONTRACTOR SHALL FURNISH ALL NECESSARY LABOR, MATERIAL, EQUIPMENT, AND SUPERVISION TO PROVIDE AN LED LIGHTING UPGRADE IN PUBLIC CORRIDORS AT THE THOMAS F. EAGLETON U.S. COURTHOUSE.$44K
Jun 5, 2023General Services AdministrationPBS R6 SMALL PROJECTS ACQUISITION ST. LOUIS EAST47PG0323F0041561210INSTALL AUDIO/VISUAL SYSTEM IN THE 24TH FLOOR GENERAL SERVICES ADMINISTRATION CONFERENCE ROOM AT THE THOMAS F. EAGLETON U.S. COURTHOUSE111 S. 10TH STREET, ST. LOUIS, MO 63102-1125.$16K
May 16, 2023General Services AdministrationPBS R6 SMALL PROJECTS ACQUISITION ST. LOUIS EAST47PG0323F0038561210PROVIDE OVERTIME MECHANIC FOR CHILLER OPERATION AND MAINTENANCE AT THE THOMAS F. EAGLETON U.S. COURTHOUSE, 111 S. 10TH STREET, ST. LOUIS, MO 63102-1125.$17K
May 12, 2023General Services AdministrationPBS R6 SMALL PROJECTS ACQUISITION ST. LOUIS EAST47PG0323F0037561210REPLACE SINKS IN THE FIRST FLOOR RESTROOMS AT THE THOMAS F. EAGLETON U.S. COURTHOUSE, 111 S. 10TH STREET, ST. LOUIS, MO 63102-1125.$8K
May 2, 2023General Services AdministrationPBS R6 SMALL PROJECTS ACQUISITION ST. LOUIS EAST47PG0323F0032561210THE CONTRACTOR SHALL FURNISH ALL NECESSARY LABOR, MATERIAL, EQUIPMENT, AND SUPERVISION TO REPLACE, REPLACE CHILLED WATER PUMP, AT THE THOMAS F. EAGLETON U.S. COURTHOUSE 111 SOUTH 10TH ST, ST LOUIS MO 63102.$20K
Apr 12, 2023General Services AdministrationPBS R6 SMALL PROJECTS ACQUISITION ST. LOUIS EAST47PG0322F0061561210THE CONTRACTOR SHALL FURNISH ALL NECESSARY LABOR, MATERIAL, EQUIPMENT, AND SUPERVISION TO REPLACE THE SALLY PORT OVERSIZED MAN DOOR AT THE THOMAS F. EAGLETON U.S. COURTHOUSE 111 SOUTH 10TH ST, ST LOUIS MO 63102.$10K
Apr 11, 2023General Services AdministrationPBS R6 SMALL PROJECTS ACQUISITION ST. LOUIS EAST47PG0323F0027561210THE CONTRACTOR SHALL FURNISH ALL NECESSARY LABOR, MATERIAL, EQUIPMENT, AND SUPERVISION TO PROGRAM NEW PHONE LINES AT THE THOMAS F. EAGLETON U.S. COURTHOUSE 111 S. 10TH STREET, ST. LOUIS, MO 63102-1125.$4K
Mar 24, 2023General Services AdministrationPBS R6 SMALL PROJECTS ACQUISITION ST. LOUIS EAST47PG0323F0022561210THE CONTRACTOR SHALL FURNISH ALL NECESSARY LABOR, MATERIAL, EQUIPMENT, AND SUPERVISION TO REPLACE, ALL THE LIGHTS IN THE CONFERENCE ROOM ON THE 24TH FLOOR AND 2 DIMMING SWITCHES AT THE THOMAS F. EAGLETON U.S. COURTHOUSE.$5K
Mar 21, 2023Department of Homeland SecurityFLETC GLYNCO PROCUREMENT OFFICEHSFLGL16C00003485113IGF::OT::IGF TRANSPORTATION SERVICES$860K
Mar 9, 2023General Services AdministrationPBS R6 SMALL PROJECTS ACQUISITION ST. LOUIS EAST47PG0323F0018561210THE CONTRACTOR SHALL FURNISH ALL NECESSARY LABOR, MATERIAL, EQUIPMENT, AND SUPERVISION TO REMOVE AND REPLACE 1 WINDOWPANE ON THE 24TH FLOOR, AT THE THOMAS F. EAGLETON U.S. COURTHOUSE 111 SOUTH 10TH ST, ST LOUIS MO 63102.$3K
Feb 24, 2023General Services AdministrationPBS R6 SMALL PROJECTS ACQUISITION ST. LOUIS EAST47PG0323F0016561210THE CONTRACTOR SHALL FURNISH ALL NECESSARY LABOR, MATERIAL, EQUIPMENT, AND SUPERVISION TO MAKE REPAIRS TO INSTALL CANE SENSORS, VARIABLE FREQUENCY DRIVERS, DOME LIGHTS AND REPAIR FLOOR DRAINS AT THE THOMAS F. EAGLETON U.S. COURTHOUSE, 111 S. 10TH ST.$60K
Jan 4, 2023General Services AdministrationPBS R6 SMALL PROJECTS ACQUISITION ST. LOUIS EAST47PG0323F0010561210THE CONTRACTOR SHALL FURNISH ALL NECESSARY LABOR, MATERIAL, EQUIPMENT, AND SUPERVISION TO PROVIDE AND REPLACE SIX (6) TREE RINGS AT THE THOMAS F. EAGLETON U.S. COURTHOUSE.$17K
Dec 13, 2022Department of Homeland SecurityFLETC GLYNCO PROCUREMENT OFFICEHSFLGL16C00003485113IGF::OT::IGF TRANSPORTATION SERVICES$102K
Nov 21, 2022Department of Homeland SecurityFLETC GLYNCO PROCUREMENT OFFICEHSFLGL16C00003485113IGF::OT::IGF TRANSPORTATION SERVICES$571K
Sep 29, 2022General Services AdministrationPBS R6 SMALL PROJECTS ACQUISITION ST. LOUIS EAST47PG0322F0063561210THE CONTRACTOR SHALL FURNISH ALL NECESSARY LABOR, MATERIAL, EQUIPMENT, AND SUPERVISION TO PROVIDING THE CLEANING, PREVENTIVE MAINTENANCE AND TESTING SERVICES OF THE TFE INDOOR FIRE RANGE.$51K
Sep 21, 2022General Services AdministrationPBS R6 SMALL PROJECTS ACQUISITION ST. LOUIS EAST47PG0322F0061561210THE CONTRACTOR SHALL FURNISH ALL NECESSARY LABOR, MATERIAL, EQUIPMENT, AND SUPERVISION TO REPLACE THE SALLY PORT OVERSIZED MAN DOOR AT THE THOMAS F. EAGLETON U.S. COURTHOUSE 111 SOUTH 10TH ST, ST LOUIS MO 63102.$10K
Sep 20, 2022General Services AdministrationPBS R6 SMALL PROJECTS ACQUISITION ST. LOUIS EAST47PG0322F0060561210REPLACE BROKEN MAIN IRRIGATION PIPE AT THE THOMAS F. EAGLETON U.S. COURTHOUSE, 111 S. 10TH STREET, ST. LOUIS, MO 63102.$16K
Sep 1, 2022General Services AdministrationPBS R6 SMALL PROJECTS ACQUISITION ST. LOUIS EAST47PG0322F0052561210THE CONTRACTOR SHALL FURNISH ALL MATERIAL TO SUPPLY 159 LED LIGHTS TO THE THOMAS F. EAGLETON U.S. COURTHOUSE AT 111 S. 10TH STREET, ST. LOUIS, MO 63102.$2K
Aug 31, 2022General Services AdministrationPBS R6 SMALL PROJECTS ACQUISITION ST. LOUIS EAST47PG0322F0056561210THE CONTRACTOR SHALL FURNISH 3 VARIABLE FREQUENCY DRIVE UNITS FOR THE THOMAS F. EAGLETON U.S. COURTHOUSE.$7K
Aug 25, 2022General Services AdministrationPBS R6 SMALL PROJECTS ACQUISITION ST. LOUIS EAST47PG0322F0054561210PERFORM CRACK SEAL AND RECOAT TWO PARKING SPACES AT THE THOMAS F. EAGLETON U.S. COURTHOUSE, 111 S. 10TH STREET, ST. LOUIS, MO 63102.$4K
Aug 3, 2022General Services AdministrationPBS R6 SMALL PROJECTS ACQUISITION ST. LOUIS EAST47PG0322F0052561210THE CONTRACTOR SHALL FURNISH ALL MATERIAL TO SUPPLY 159 LED LIGHTS TO THE THOMAS F. EAGLETON U.S. COURTHOUSE AT 111 S. 10TH STREET, ST. LOUIS, MO 63102.$25K
Jul 29, 2022General Services AdministrationPBS R6 SMALL PROJECTS ACQUISITION ST. LOUIS EAST47PG0322F0050561210PERFORM RESTORATION OF USDC COMBINED CHAMBERS DUE TO A RUPTURED SPRINKLER PIPE AT THOMAS F. EAGLETON U.S. COURTHOUSE, 111 S. 10TH STREET, ST. LOUIS, MO.$41K
Jul 29, 2022General Services AdministrationPBS R6 SMALL PROJECTS ACQUISITION ST. LOUIS EAST47PG0322F0051561210REPLACE 10 STEAM VALVES AT THOMAS F EAGLETON COURTHOUSE 111 S. 10TH STREET, ST. LOUIS, MO.$36K
Jul 28, 2022General Services AdministrationPBS R6 SMALL PROJECTS ACQUISITION ST. LOUIS EAST47PG0322F0048561210PROVIDE AND INSTALL 39 ACCESS PANELS FOR ACCESS TO THE AHU AIRFLOW SENSORS AT THE THOMAS F. EAGLETON U.S. COURTHOUSE, 111 S. 10TH STREET, ST. LOUIS, MO 63102.$7K
Jul 15, 2022General Services AdministrationPBS R6 SMALL PROJECTS ACQUISITION ST. LOUIS EAST47PG0322F0045561210INSTALL GLYCOL ISOLATION VALVES AT THE THOMAS F. EAGLETON U.S. COURTHOUSE, 111 S. 10TH STREET, ST. LOUIS, MO 63102$26K
Jul 12, 2022General Services AdministrationPBS R6 SMALL PROJECTS ACQUISITION ST. LOUIS EAST47PG0322F0044561210REPLACE THE MAIN CHILLED WATER RETURN VALVE AT THE THOMAS F. EAGLETON U.S. COURTHOUSE, 111 S. 10TH STREET, ST. LOUIS, MO 63102.$31K

Get Alerted Before I & L Fms's Next Recompete

Mindy monitors active contracts and flags recompetes 12 months out so you can position to compete.

Start Free