Federal Contractor Profile
Jpi Construction LLC
Federal contracting record: $34M obligated across 16 awards from 3 agencies, FY 2021–2026.
Company Profile
Parent UEI (Unique Entity Identifier)
JHBNCGNQS367
CAGE Code
8FNM4
Address
1513 LAS MARAS ST STE 1A, SAN JUAN, PR, 009111675
First Federal Award
Jul 28, 2021
Most Recent Award
Mar 6, 2026
Federal Sales Analytics
Toggle between trend, agency drilldown, and treemap. Use the period selector to focus the time window.
Hover any bar for YoY change + award count. Current fiscal year shown at reduced opacity (partial year).
Top Federal Agencies
- $21M
Department of Agriculture
60.1% of total obligations
- $12M
Department of Transportation
36.1% of total obligations
- $1.3M
Department of Defense
3.8% of total obligations
Top NAICS Activity
- $26M
237310
HIGHWAY, STREET, AND BRIDGE CONSTRUCTION
6 awards
- $4.9M
237990
OTHER HEAVY AND CIVIL ENGINEERING CONSTRUCTION
1 awards
- $3.7M
236220
COMMERCIAL AND INSTITUTIONAL BUILDING CONSTRUCTION
9 awards
Recent Federal Awards
| Date | Agency | NAICS | Description | Amount |
|---|---|---|---|---|
| Nov 19, 2025 | Department of AgricultureUSDA-FS, CSA EAST 12 | 236220 | EMERGENCY IITF & SFRS HVAC SYSTEMS REPLACEMENT | $16K |
| Sep 30, 2025 | Department of AgricultureUSDA-FS, CSA EAST 12 | 237310 | LA MINA TRAIL RECONSTRUCTION DB PROJECT | $12M |
| Sep 30, 2025 | Department of AgricultureUSDA-FS, CSA EAST 12 | 236220 | EMERGENCY IITF & SFRS HVAC SYSTEMS REPLACEMENT | $111K |
| Sep 25, 2025 | Department of DefenseW6QM MICC-FORT BUCHANAN (RC) | 237310 | TORO CREEK GATE REPAIR | $1.3M |
| Sep 23, 2025 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 237310 | THE WORK INCLUDES EMBANKMENT RECONSTRUCTION, GABION WALLS, DRAINAGE SYSTEMS INSTALLATION, AND SOLDIER PILE RETAINING WALL WITH CONCRETE LAGGING, MILLING AND OVERLAY, PAVEMENT RECONSTRUCTION, PAVEMENT MARKINGS, REMOVAL AND REPLACEMENT OF GUARDRAILS, S | $1.4M |
| Sep 11, 2025 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 237310 | THE WORK INCLUDES EMBANKMENT RECONSTRUCTION, GABION WALLS, DRAINAGE SYSTEMS INSTALLATION, AND SOLDIER PILE RETAINING WALL WITH CONCRETE LAGGING, MILLING AND OVERLAY, PAVEMENT RECONSTRUCTION, PAVEMENT MARKINGS, REMOVAL AND REPLACEMENT OF GUARDRAILS, S | $234K |
| Sep 9, 2025 | Department of AgricultureUSDA-FS, CSA EAST 12 | 236220 | PHASE 1 WATER WELL DRILLING COMPREHENSIVE WATER QUALITY ASSESSMENT & EXISTING SURFACE WATER SYSTEM MAINTENANCE | $433K |
| Apr 22, 2025 | Department of AgricultureUSDA-FS, CSA EAST 12 | 236220 | BISLEY ROAD ACCESS IS BLOCKED BY A BIG LANDSLIDE THAT PREVENT THE GATE TO OPEN AND BLOCK THE PASS FOR ANY VEHICLE. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CLEANING THE EXISTING LANDSLIDE MATERIAL AND DISPOSING LEGALLY TO A LANDFILL AND RE-ESTABLISHIN | $70K |
| Apr 7, 2025 | Department of AgricultureUSDA-FS, CSA EAST 12 | 236220 | MORATORIUM EXCEPTION NEW CELL PHONE BOOSTERS. EXCEPTION REQUEST FORM IS UPLOADED IN SUPPORTING DOCUMENTS SECTION. THANKS. | $32K |
| Mar 26, 2025 | Department of Transportation697DCK REGIONAL ACQUISITIONS SVCS | 237310 | EMBANKMENT STABILIZATION AND RIPRAP INSTALLATION FOR QJQ ARSR ACCESS ROAD | $80K |
| Feb 24, 2025 | Department of AgricultureUSDA-FS, CSA EAST 12 | 237990 | REPAIRS TO THIRTEEN (13) DAMAGED TRAIL SITES. THE GOVT. FURNISHED A DESIGN-BID-BUILD TO A TOTAL OF NINE (9) OF THE DAMAGED SITES, MISCELLANEOUS TRAIL SPOT SURFACING TO APPROX. TWO (2) SITES, AND THE REMAINING LAST TWO (2) SITES WILL REQUIRE A CONTRAC | $545K |
| Feb 19, 2025 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 237310 | THE WORK INCLUDES EMBANKMENT RECONSTRUCTION, GABION WALLS, DRAINAGE SYSTEMS INSTALLATION, AND SOLDIER PILE RETAINING WALL WITH CONCRETE LAGGING, MILLING AND OVERLAY, PAVEMENT RECONSTRUCTION, PAVEMENT MARKINGS, REMOVAL AND REPLACEMENT OF GUARDRAILS, S | $28K |
| Jan 6, 2025 | Department of AgricultureUSDA-FS, CSA EAST 12 | 236220 | THE USFS EL YUNQUE NATIONAL FOREST (EYNF) PROPOSES TO RECONSTRUCT THE LA COCA FALLS ENTRANCE STATION LOCATED ON THE EYNF PER PR-191 K.M. 8.3. | $455K |
| Nov 21, 2024 | Department of Transportation697DCK REGIONAL ACQUISITIONS SVCS | 237310 | EMBANKMENT STABILIZATION AND RIPRAP INSTALLATION FOR QJQ ARSR ACCESS ROAD | $98K |
| Oct 20, 2024 | Department of AgricultureUSDA-FS, CSA EAST 12 | 237990 | REPAIRS TO THIRTEEN (13) DAMAGED TRAIL SITES. THE GOVT. FURNISHED A DESIGN-BID-BUILD TO A TOTAL OF NINE (9) OF THE DAMAGED SITES, MISCELLANEOUS TRAIL SPOT SURFACING TO APPROX. TWO (2) SITES, AND THE REMAINING LAST TWO (2) SITES WILL REQUIRE A CONTRAC | $146K |
| Sep 5, 2024 | Department of AgricultureUSDA-FS, CSA EAST 10 | 236220 | EMERGENCY TROPICAL STORM ERNESTO DEBRIS CLEARING EQUIPMENT AND SERVICES | $286K |
| Sep 4, 2024 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 237310 | PR ER DOT PRMNT RPR(20) THE PROJECT CONSISTS OF REPAIRING ROADWAYS DAMAGED BY LANDSLIDES DURING HURRICANES IRMA AND MARIA IN THE MUNICIPALITY OF ANASCO, PUERTO RICO. THE PROJECT CONSISTS OF REPAIRING DAMAGE CAUSED BY HURRICANES IRMA AND MARIA ON PR- | $115K |
| Aug 7, 2024 | Department of AgricultureUSDA-FS, CSA EAST 12 | 237990 | REPAIRS TO THIRTEEN (13) DAMAGED TRAIL SITES. THE GOVT. FURNISHED A DESIGN-BID-BUILD TO A TOTAL OF NINE (9) OF THE DAMAGED SITES, MISCELLANEOUS TRAIL SPOT SURFACING TO APPROX. TWO (2) SITES, AND THE REMAINING LAST TWO (2) SITES WILL REQUIRE A CONTRAC | $248K |
| Aug 7, 2024 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 237310 | THE WORK INCLUDES EMBANKMENT RECONSTRUCTION, GABION WALLS, DRAINAGE SYSTEMS INSTALLATION, AND SOLDIER PILE RETAINING WALL WITH CONCRETE LAGGING, MILLING AND OVERLAY, PAVEMENT RECONSTRUCTION, PAVEMENT MARKINGS, REMOVAL AND REPLACEMENT OF GUARDRAILS, S | $47K |
| Jun 28, 2024 | Department of AgricultureUSDA-FS, CSA EAST 12 | 237990 | REPAIRS TO THIRTEEN (13) DAMAGED TRAIL SITES. THE GOVT. FURNISHED A DESIGN-BID-BUILD TO A TOTAL OF NINE (9) OF THE DAMAGED SITES, MISCELLANEOUS TRAIL SPOT SURFACING TO APPROX. TWO (2) SITES, AND THE REMAINING LAST TWO (2) SITES WILL REQUIRE A CONTRAC | $4.0M |
| Jun 20, 2024 | Department of AgricultureUSDA-FS, CSA EAST 12 | 236220 | PALO COLORADO WATER WELL PERFORMANCE TESTING AND PUMP REPLACEMENT. | $17K |
| Apr 16, 2024 | Department of AgricultureUSDA-FS, CSA EAST 12 | 236220 | PALO COLORADO WATER WELL PERFORMANCE TESTING AND PUMP REPLACEMENT. | $88K |
| Jan 17, 2024 | Department of AgricultureUSDA-FS, CSA EAST 12 | 236220 | CATALINA ENTRANCE ACCESSIBILITY PROJECT | $66K |
| Aug 17, 2023 | Department of AgricultureUSDA-FS, CSA EAST 12 | 236220 | THE USFS EL YUNQUE NATIONAL FOREST (EYNF) PROPOSES TO RECONSTRUCT THE LA COCA FALLS ENTRANCE STATION LOCATED ON THE EYNF PER PR-191 K.M. 8.3. | $2.1M |
| Jul 21, 2023 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 237310 | THE WORK INCLUDES EMBANKMENT RECONSTRUCTION, GABION WALLS, DRAINAGE SYSTEMS INSTALLATION, AND SOLDIER PILE RETAINING WALL WITH CONCRETE LAGGING, MILLING AND OVERLAY, PAVEMENT RECONSTRUCTION, PAVEMENT MARKINGS, REMOVAL AND REPLACEMENT OF GUARDRAILS, S | $4.4M |
Related Contractors
Other companies active in NAICS 237310 — HIGHWAY, STREET, AND BRIDGE CONSTRUCTION.
Track Jpi Construction LLC Recompetes Before They Post
Mindy monitors Jpi Construction LLC's active contracts and alerts you 12 months before they expire — so you can position to compete on recompete.
Get Free Recompete Alerts