Federal Contractor Profile
Estes Bros. Const. INC.
Federal contracting record: $330M obligated across 68 awards from 4 agencies, FY 2016–2026.
Company Profile
UEI (Unique Entity Identifier)
YKVNGM329N76
CAGE Code
1TXC5
Parent Organization
Estes Bros. Const. INC.
Address
153 FLEENORTOWN RD, JONESVILLE, VA, 242637564
First Federal Award
Dec 21, 2015
Most Recent Award
Apr 10, 2026
Federal Sales Analytics
Toggle between trend, agency drilldown, and treemap. Use the period selector to focus the time window.
Hover any bar for YoY change + award count. Current fiscal year shown at reduced opacity (partial year).
Top Federal Agencies
- $309M
Department of Transportation
55 awards · 93.5% of total
- $22M
Department of the Interior
10 awards · 6.5% of total
- $3K
Department of Justice
1 awards · 0.0% of total
- $3K
Department of Agriculture
2 awards · 0.0% of total
Top NAICS Activity
- $329M
237310
HIGHWAY, STREET, AND BRIDGE CONSTRUCTION
65 awards
- $1.8M
237110
WATER AND SEWER LINE AND RELATED STRUCTURES CONSTRUCTION
3 awards
Recent Federal Awards
| Date | Agency | NAICS | Description | Amount |
|---|---|---|---|---|
| Feb 3, 2026 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 237310 | PROJECT VA NP BLRI 1K1: THE PROJECT CONSISTS OF PAVEMENT REHABILITATION FROM MP 86 TO MP 89 ON THE BLUE RIDGE PARKWAY. THE WORK INCLUDES FULL DEPTH RECLAMATION, DRAINAGE IMPROVEMENT, SIGNAGE, AND OTHER MISCELLANEOUS WORK. | $5.7M |
| Nov 25, 2025 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 237310 | PROJECT NC NP BLRI 2M30: THE PROJECT CONSISTS OF HURRICANE DAMAGE REPAIRS AT MP 342.7, 343.7 AND 343.8. THE WORK INCLUDES SLIDE REPAIRS, CULVERT REPLACEMENT AND CLEANING, STONE MASONRY HEADWALL INSTALLATION, RIPRAP PLACEMENT, CURB AND GUARDRAIL IN | $13M |
| Oct 30, 2025 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 237310 | TN NP GRSM 11(6): THE PROJECT CONSISTS OF REPAIRING PAVEMENT EDGE DROP-OFFS, REMOVING OR PAVING GRAVEL PULL-OFF AREAS AND REPLACING TIMBER GUARDRAIL. THE WORK INCLUDES SHOULDER HARDENING, WHICH CONSISTS OF CONSTRUCTING A 2-FOOT WIDE ASPHALT PAVED SH | $3.1M |
| Sep 16, 2025 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 237310 | PROJECT MS NP NATR 3P27: THE PROJECT CONSISTS OF MILLING AND OVERLAY OF MULTI-USE TRAILS, ASPHALT CONCRETE REHABILITATION, AGGREGATE SURFACING, MINOR TRAIL PROFILE ADJUSTMENTS, AND OTHER MISCELLANEOUS WORK. | $900K |
| Sep 15, 2025 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 237310 | PROJECT NP NATR 3N17, 3H26, ETC. - THE PROJECT CONSISTS OF THE DRAINAGE IMPROVEMENTS OF THE NATCHEZ TRACE PARKWAY (NATR) FROM MILEPOST (MP) 121 TO MP 204 INCLUDING SOME PARKING AREAS. THE WORK CONSISTS OF DESIGN AND INSTALLATION OF DESIGNATED INLETS | $1.4M |
| Aug 26, 2025 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 237310 | PROJECT TN ERFO FS 2019-1(2): THE PROJECT CONSISTS OF RECONSTRUCTING SINK MOUNTAIN LAUNCH ROAD AND CONSTRUCTING A NEW PARKING AREA. THE WORK INCLUDES CLEARING AND GRUBBING, EMBANKMENT CONSTRUCTION, ASPHALT PAVEMENT, REINFORCED CONCRETE BOX CULVERT I | $440K |
| Jun 23, 2025 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 237310 | PROJECT NP NATR 3N17, 3H26, ETC. - THE PROJECT CONSISTS OF THE DRAINAGE IMPROVEMENTS OF THE NATCHEZ TRACE PARKWAY (NATR) FROM MILEPOST (MP) 121 TO MP 204 INCLUDING SOME PARKING AREAS. THE WORK CONSISTS OF DESIGN AND INSTALLATION OF DESIGNATED INLETS | $1.5M |
| Apr 28, 2025 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 237310 | PROJECT TN ERFO FS 2019-1(2): THE PROJECT CONSISTS OF RECONSTRUCTING SINK MOUNTAIN LAUNCH ROAD AND CONSTRUCTING A NEW PARKING AREA. THE WORK INCLUDES CLEARING AND GRUBBING, EMBANKMENT CONSTRUCTION, ASPHALT PAVEMENT, REINFORCED CONCRETE BOX CULVERT I | $647K |
| Mar 26, 2025 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 237310 | NP NATR 3N18, 3H27, ETC - GEOTECHNICAL, PAVEMENT REHABILITATION, AND STRUCTURAL REPAIRS BETWEEN MP 121 AND MP 204 (PHASE 2), PROJECT MS NP NATR 3N18 3H27 ETC, SOLICITATION NUMBER 693C73-25-B-000003, LOCATED IN ATTALA, CHOCTAW, LEAKE, MADISON, AND WEB | $33M |
| Jan 6, 2025 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 237310 | PROJECT NP NATR 3N17, 3H26, ETC. - THE PROJECT CONSISTS OF THE DRAINAGE IMPROVEMENTS OF THE NATCHEZ TRACE PARKWAY (NATR) FROM MILEPOST (MP) 121 TO MP 204 INCLUDING SOME PARKING AREAS. THE WORK CONSISTS OF DESIGN AND INSTALLATION OF DESIGNATED INLETS | $137K |
| Dec 5, 2024 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 237310 | PROJECT TN ERFO FS 2019-1(2): THE PROJECT CONSISTS OF RECONSTRUCTING SINK MOUNTAIN LAUNCH ROAD AND CONSTRUCTING A NEW PARKING AREA. THE WORK INCLUDES CLEARING AND GRUBBING, EMBANKMENT CONSTRUCTION, ASPHALT PAVEMENT, REINFORCED CONCRETE BOX CULVERT I | $2.1M |
| Nov 29, 2024 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 237310 | PROJECT VA NP BLRI BMS FY23(1): THE PROJECT CONSISTS OF PERFORMING PREVENTATIVE BRIDGE REPAIRS TO 18 BRIDGES ALONG THE BLUE RIDGE PARKWAY. THE WORK INCLUDES REPOINTING STONE MASONRY JOINTS, CLEANING AND COATING EXPOSED REBAR, CLEANING AND RESEALING | $150K |
| Nov 21, 2024 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 237310 | PROJECT MS NP NATR 3P27: THE PROJECT CONSISTS OF MILLING AND OVERLAY OF MULTI-USE TRAILS, ASPHALT CONCRETE REHABILITATION, AGGREGATE SURFACING, MINOR TRAIL PROFILE ADJUSTMENTS, AND OTHER MISCELLANEOUS WORK. | $1.8M |
| Sep 5, 2024 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 237310 | PROJECT NP BLRI PVT PRES FY24(1): THE PROJECT CONSISTS OF PAVEMENT PRESERVATION ON THE BLUE RIDGE PARKWAY MAINLINE FROM MILEPOST 121 TO MILEPOST 143. THE WORK INCLUDES PLACEMENT OF CHIP SEAL AND FOG SEAL, PATCHING, CRACK CLEANING AND SEALING, PAVEME | $2.6M |
| May 21, 2024 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 237310 | PROJECT VA NP BLRI BMS FY23(1): THE PROJECT CONSISTS OF PERFORMING PREVENTATIVE BRIDGE REPAIRS TO 18 BRIDGES ALONG THE BLUE RIDGE PARKWAY. THE WORK INCLUDES REPOINTING STONE MASONRY JOINTS, CLEANING AND COATING EXPOSED REBAR, CLEANING AND RESEALING | $645K |
| May 20, 2024 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 237310 | PROJECT NP NATR 3N17, 3H26, ETC. - THE PROJECT CONSISTS OF THE DRAINAGE IMPROVEMENTS OF THE NATCHEZ TRACE PARKWAY (NATR) FROM MILEPOST (MP) 121 TO MP 204 INCLUDING SOME PARKING AREAS. THE WORK CONSISTS OF DESIGN AND INSTALLATION OF DESIGNATED INLETS | $20M |
| Apr 26, 2024 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 237310 | PROJECT: NP NP BLRI 1L9, 1M22, ETC - THE PROJECT CONSISTS OF THE REHABILITATION OF APPROXIMATELY 24 MILES OF THE BLUE RIDGE PARKWAY (BLRI) BETWEEN MILEPOST (MP) 97 AND 121 IN BEDFORD, BOTETOURT, AND ROANOKE COUNTIES, VIRGINIA. THE WORK CONSISTS OF RE | $29M |
| Apr 17, 2024 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 237310 | PROJECT FL NP DESO 900(1): THE PROJECT CONSISTS OF RESURFACING THE VISITOR ENTRANCE ROAD AND PARKING AREAS. THE WORK INCLUDES MILLING AND OVERLAY, FULL DEPTH PATCH, AND OTHER MISCELLANEOUS WORK. | $322K |
| Mar 19, 2024 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 237310 | TO SOLICIT PROJECT: NP-NATR 2A18,B7,C6,D11,3A17,B9. | $2.1M |
| Dec 13, 2023 | Department of the InteriorSER NORTH MABO (53000) | 237110 | GREAT SMOKY MOUNTAINS NP REHAB BALSAM/HEINTOOGA WASTEWATER | $48K |
| Sep 11, 2023 | Department of the InteriorSER NORTH MABO (53000) | 237110 | GREAT SMOKY MOUNTAINS NP REHAB BALSAM/HEINTOOGA WATER TANK REHAB SYSTEM | $857K |
| Sep 7, 2023 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 237310 | PROJECT NP-BISC 10(2): THE PROJECT CONSISTS OF DESIGNING AND REHABILITATION/RECONSTRUCTION OF THE ROADWAY AND PARKING AREAS, PAVEMENT MARKING, DEVELOPMENT AND IMPLEMENTATION OF A TRAFFIC CONTROL PLAN, INSTALLATION OF EROSION AND SEDIMENT CONTROL MEA | $376K |
| Sep 6, 2023 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 237310 | PROJECT: NP NP BLRI 1L9, 1M22, ETC - THE PROJECT CONSISTS OF THE REHABILITATION OF APPROXIMATELY 24 MILES OF THE BLUE RIDGE PARKWAY (BLRI) BETWEEN MILEPOST (MP) 97 AND 121 IN BEDFORD, BOTETOURT, AND ROANOKE COUNTIES, VIRGINIA. THE WORK CONSISTS OF RE | $35M |
| Aug 30, 2023 | Department of Transportation693C73 EASTERN FED LANDS DIVISION | 237310 | TO SOLICIT PROJECT: NP-NATR 2A18,B7,C6,D11,3A17,B9. | $277K |
| Aug 16, 2023 | Department of the InteriorSER NORTH MABO (53000) | 237110 | GREAT SMOKY MOUNTAINS NP REHAB BALSAM/HEINTOOGA WASTEWATER | $488K |
Related Contractors
Other companies active in NAICS 237310 — HIGHWAY, STREET, AND BRIDGE CONSTRUCTION.
Track Estes Bros. Const. INC. Recompetes Before They Post
Mindy monitors Estes Bros. Const. INC.'s active contracts and alerts you 12 months before they expire — so you can position to compete on recompete.
Get Free Recompete Alerts