Home/Contractors/Julius Kaaz Construction CO INC/contracts

Federal Contractor Profile

Julius Kaaz Construction CO INC

$55M obligated·297 awards·2 agencies·5 NAICS

Federal Contracts

Showing contracts 201250 of 352 total. Sorted by action date, most recent first. Excludes $0 modifications.

DateAgencyPIIDNAICSDescriptionAmount
Feb 25, 2021Department of DefenseW071 ENDIST KANSAS CITYW912DQ20C4015236220BUILDING 50 RENOVATION AT FORT LEAVENWORTH KANSAS TO INCLUDE WHOLE BUILDING RENOVATIONS INCLUDING ARCHITECTURAL, MECHANICAL, ELECTRICAL, LIFE SAFETY, COMMUNICATIONS, ADDING WINDOWS, SMALL ADDITION AT ENTRY, ETC. FURNITURE, FIXTURES, AND EQUIPMENT$15K
Feb 18, 2021Department of DefenseW071 ENDIST KANSAS CITYW912DQ20C4015236220BUILDING 50 RENOVATION AT FORT LEAVENWORTH KANSAS TO INCLUDE WHOLE BUILDING RENOVATIONS INCLUDING ARCHITECTURAL, MECHANICAL, ELECTRICAL, LIFE SAFETY, COMMUNICATIONS, ADDING WINDOWS, SMALL ADDITION AT ENTRY, ETC. FURNITURE, FIXTURES, AND EQUIPMENT$58K
Sep 22, 2020Department of DefenseW071 ENDIST KANSAS CITYW912DQ20C4015236220BUILDING 50 RENOVATION AT FORT LEAVENWORTH KANSAS TO INCLUDE WHOLE BUILDING RENOVATIONS INCLUDING ARCHITECTURAL, MECHANICAL, ELECTRICAL, LIFE SAFETY, COMMUNICATIONS, ADDING WINDOWS, SMALL ADDITION AT ENTRY, ETC. FURNITURE, FIXTURES, AND EQUIPMENT$8.9M
Aug 26, 2020Department of DefenseW6QM MICC-FT LEAVENWORTHW91QF420F0064238110EXTEND AND REPAIR KINDLE RANGE WALL&BULLET TRAP - THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IAW STRICT PLANS AND SPECIFICATIONS TO EXTEND AND REPAIR KINDLE RANGE WALL&BULLET TRAP.$1.1M
Jun 23, 2020Department of DefenseW6QM MICC-FT LEAVENWORTHW91QF420F0075238110REPAIR BLUNTVILLE SEWER, B#56 STAIRWELL&WALK AND B#325 ROADWAY REPAIR ON WESTSIDE - THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IAW STRICT PLANS&SPECIFICATIONS.$24K
Apr 9, 2020Department of DefenseW6QM MICC-FT LEAVENWORTHW91QF420F0096238110REPAIR ADA RAMP&CHIMNEY AT BLDG.#425 - THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS.$91K
Apr 8, 2020Department of DefenseW6QM MICC-FT LEAVENWORTHW91QF419F0277238110REPAIR PARKING LOT AT BELL HALL - THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS TO REPAIR PARKING LOT.$16K
Apr 2, 2020Department of DefenseW6QM MICC-FT LEAVENWORTHW91QF420F0091238110REPAIR DUMPSTER ENCLOSURE AT BLDG.#427&REPAIR SIDEWALK AT BLDG.#2400 - THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IAW STRICT SPECIFICATIONS TO REPAIR DUMPSTER ENCLOSURE AND REPAIR SIDEWALK.$14K
Apr 1, 2020Department of DefenseW6QM MICC-FT LEAVENWORTHW91QF420F0084238110THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS TO REPAIR RAMP AT B# 700 AND SECURITY GATE AT B# 136.$27K
Apr 1, 2020Department of DefenseW6QM MICC-FT LEAVENWORTHW91QF420F0087238110REPAIR BUILDING TUCKPOINT AT BLDG.86 REPAIR CONCRETE STAIRS AT BLDG.73 - THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IAW STRICT SPECIFICATIONS TO REPAIR TUCKPOINT&CONCRETE STAIRS.$110K
Mar 31, 2020Department of DefenseW6QM MICC-FT LEAVENWORTHW91QF420F0086238110REPAIR SIDEWALK AT BLDG.#285&REPAIR STORM SEWER INLET GRATES AT BULLARD AVE - THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IAW STRICT SPECIFICATIONS TO REPAIR SIDEWALK AND STORM SEWER INLET GRATES.$32K
Mar 26, 2020Department of DefenseW6QM MICC-FT LEAVENWORTHW91QF420F0076238110REPAIR SIDEWALK&HANDICAP CURB B.197. THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS TO REPAIR THE SIDEWALK AND HANDICAP CURB.$22K
Mar 25, 2020Department of DefenseW6QM MICC-FT LEAVENWORTHW91QF420F0075238110REPAIR BLUNTVILLE SEWER, B#56 STAIRWELL&WALK AND B#325 ROADWAY REPAIR ON WESTSIDE - THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IAW STRICT PLANS&SPECIFICATIONS.$298K
Mar 25, 2020Department of DefenseW6QM MICC-FT LEAVENWORTHW91QF420F0077238110POSTWIDE ROAD STRIPING - THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT,&MATERIALS TO PERFORM ALL WORK IAW SPECIFICATIONS FOR POSTWIDE ROAD STRIPPING. ALL WORK PERFORMED BY THE CONTRACTOR SHALL RESULT IN A COMPLETE, FUNCTIONAL ROADWAY$100K
Mar 25, 2020Department of DefenseW6QM MICC-FT LEAVENWORTHW91QF420F0078238110REPLACE LOADING DOCK AT BLDG.#499 - THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS.$70K
Mar 23, 2020Department of DefenseW6QM MICC-FT LEAVENWORTHW91QF420F0072238110REPLACE CONCRETE&ASPHALT PARKING AT BLDG.#429 - THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS TO REPLACE CONCRETE&ASPHALT PARKING.$58K
Mar 18, 2020Department of DefenseW6QM MICC-FT LEAVENWORTHW91QF420F0064238110EXTEND AND REPAIR KINDLE RANGE WALL&BULLET TRAP - THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IAW STRICT PLANS AND SPECIFICATIONS TO EXTEND AND REPAIR KINDLE RANGE WALL&BULLET TRAP.$1.5M
Sep 30, 2019Department of DefenseW6QM MICC-FT LEAVENWORTHW91QF419F0276238110POST-WIDE PAVEMENT STRIPING - THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS TO POST-WIDE PAVEMENT STRIPING.$75K
Sep 28, 2019Department of DefenseW6QM MICC-FT LEAVENWORTHW91QF419F0277238110REPAIR PARKING LOT AT BELL HALL - THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS TO REPAIR PARKING LOT.$276K
Sep 26, 2019Department of DefenseW6QM MICC-FT LEAVENWORTHW91QF419F0267238110REPAIR SIDEWALK AT BLDG.#136-THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS TO REPAIR SIDEWALK.$4K
Sep 26, 2019Department of DefenseW6QM MICC-FT LEAVENWORTHW91QF419F0269238110REPAIR TUCKPOINTING AND BRICKS AT B.79 AND INSTALL MASONRY WALL AND FOOTINGS AT B.132. ALL WORK PERFORMED BY THE CONTRACTOR SHALL RESULT IN A COMPLETE AND FUNCTIONAL BUILDING.$83K
Sep 24, 2019Department of DefenseW6QM MICC-FT LEAVENWORTHW91QF419F0257238110REPAIR PAVERS&CAULK SIDEWALK AT BLDG.#127 - THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS TO REPAIR PAVERS&CAULK SIDEWALK.$65K
Sep 16, 2019Department of DefenseW6QM MICC-FT LEAVENWORTHW91QF419F0248238110INSTALL CONCRETE SLAB AT BLDG.#112. THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT AND MATERIALS TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS TO INSTALL CONCRETE SLAB.$4K
Sep 5, 2019Department of DefenseW6QM MICC-FT LEAVENWORTHW91QF419F0066238110REPAIR GOLF COURSE CULVERT BOX - THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS TO REPAIR GOLF COURSE CULVERT. ALL WORK PERFORMED BY THE CONTRACTOR SHALL RESULT IN A COMPLETE, FUNCTIONAL CULVERT BOX. WORK WILL INCLUDE DEBRIS REMOVAL AND MINOR REPAIRS.$13K
Sep 3, 2019Department of DefenseW6QM MICC-FT LEAVENWORTHW91QF419F0230238110REPAIR&CAULK FRONT STEPS AT BLDG.#345-THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS TO REPAIR&CAULK FRONT STEPS.$4K
Aug 26, 2019Department of DefenseW6QM MICC-FT LEAVENWORTHW91QF419F0216238110RPLCE SIDEWALK AT B#52&STORM DRAIN CAMERA INSPEC-THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS TO RPLCE SIDEWALK&STORM DRAIN CAMERA INSPEC$10K
Aug 22, 2019Department of DefenseW6QM MICC-FT LEAVENWORTHW91QF419F0213238110REPAIR MASONRY AT BLDG.#345&BLDG.#664 - THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS TO REPAIR MASONRY.$18K
Aug 22, 2019Department of DefenseW6QM MICC-FT LEAVENWORTHW91QF419F0214238110REPAIR WATER INTRUSION - BLDG.#198 - THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS TO REPAIR WATER INTRUSION.$27K
Aug 21, 2019Department of DefenseW6QM MICC-FT LEAVENWORTHW91QF419F0209238110SAW CUT, REMOVE AND REPLACE CONCRETE - B.1140 - THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS TO SAW CUT, REMOVE AND REPLACE CONCRETE.$52K
Aug 6, 2019Department of DefenseW6QM MICC-FT LEAVENWORTHW91QF419F0195238110REPLACE CONCRETE PAVED PARKING LOT&SEAL COAT ASPHALT AT BLDG.#343 - THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS.$342K
Aug 1, 2019General Services AdministrationPBS R6 ACQUISITION MANAGEMENT DIVISION47PG0019D0020236220AWARD OF THE REGION 6 INDEFINITE DELIVERY/INDEFINITE QUANTITY (IDIQ), MULTIPLE AWARD TASK ORDER CONTRACTS (MATOC), FOR CONSTRUCTION SERVICES IN THE STATES OF MISSOURI, KANSAS, NEBRASKA AND IOWA.$1K
Jul 30, 2019Department of DefenseW6QM MICC-FT LEAVENWORTHW91QF419F0185238110REPAIR SIDEWALK, CURB&STREET AT BLDG.#284 - THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS TO RPR SIDEWALK&CURB.$6K
Jul 30, 2019Department of DefenseW6QM MICC-FT LEAVENWORTHW91QF419F0186238110REPAIR PARKING, SIDEWALK&CURB FOR ADA COMPLIANCE AT BLDG.#27 - THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS TO RPR PARKING, SIDEWALK&CURB.$38K
Jul 15, 2019Department of DefenseW6QM MICC-FT LEAVENWORTHW91QF419F0172238110REPLACE CONCRETE SLAB -BLDG.#73-THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS TO REPLACE CONCRETE SLAB.$2K
Jun 21, 2019Department of DefenseW071 ENDIST KANSAS CITYW912DQ17C4012237310IGF::OT::IGF IOWA AVENUE EXTENSION. THE PURPOSE OF THIS CONTRACT IS TO PERFORM ROAD REPAIRS FOR THE IOWA AVENUE EXTENSION PROJECT AT FORT LEAVENWORTH, KANSAS$19K
May 30, 2019Department of DefenseW6QM MICC-FT LEAVENWORTHW91QF419F0135238110REPAIR CONCRETE AT GRANT GATE- THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS TO REPAIR CONCRETE AT GRANT GATE. ALL WORK PERFORMED BY THE CONTRACTOR SHALL RESULT IN A COMPLETE AND FUNCTIONAL CONCRETE. WORK WILL INCLUDE DEBRIS REMOVAL AND MINOR REPAIRS.$332K
May 15, 2019Department of DefenseW6QM MICC-FT LEAVENWORTHW91QF419F0120238110REPAIR CONCRETE FOOTING AT B#399 - THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS TO REPAIR CONCRETE FOOTING. ALL WORK PERFORMED BY THE CONTRACTOR SHALL RESULT IN COMPLETE AND FUNCTIONAL CONCRETE FOOTING. WORK WILL INCLUDE DEBRIS REMOVAL AND MINOR REPAIRS.$15K
May 9, 2019Department of DefenseW6QM MICC-FT LEAVENWORTHW91QF419F0118238110REPAIR DRAINAGE AND GRADING AT B#664 - THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS TO REPAIR DRAINAGE AND GRADING. ALL WORK PERFORMED BY THE CONTRACTOR SHALL RESULT IN COMPLETE AND FUNCTIONAL DRAINAGE AND GRADING. WORK WILL INCLUDE DEBRIS REMOVAL AND MINOR REPAIRS.$23K
Apr 18, 2019Department of DefenseW6QM MICC-FT LEAVENWORTHW91QF419F0100238110INSTALL CONCRETE DRIVE AT USDB CEMETERY - THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS TO INSTALL CONCRETE DRIVE AT USDB CEMETERY. WORK WILL INCLUDE DEBRIS REMOVAL AND MINOR REPAIRS.$17K
Apr 15, 2019Department of DefenseW6QM MICC-FT LEAVENWORTHW91QF419F0094238110B#1140 EMERGENCY PIPE REPAIR - USDB - THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS TO REMOVE AND REPLACE CONCRETE FOR PIPE REPAIR. ALL WORK PERFORMED BY THE CONTRACTOR SHALL RESULT IN A COMPLETE AND FUNCTIONAL CONCRETE AREA. WORK WILL INCLUDE DEBRIS REMOVAL AND MINOR REPAIRS.$9K
Mar 5, 2019Department of DefenseW6QM MICC-FT LEAVENWORTHW91QF419F0067238110POST-WIDE CRACK SEALING AND STRIPING - THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT,AND MATERIALS TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS TO POST-WIDE CRACK SEALING AND STRIPING. ALL WORK PERFORMED BY THE CONTRACTOR SHALL RESULT IN A COMPLETE,FUNCTIONAL SEALED CRACK AND STRIPE. WORK WILL INCLUDE DEBRIS REMOVAL AND MINOR REPAIRS.$200K
Feb 18, 2019Department of DefenseW6QM MICC-FT LEAVENWORTHW91QF419F0066238110REPAIR GOLF COURSE CULVERT BOX - THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS TO REPAIR GOLF COURSE CULVERT. ALL WORK PERFORMED BY THE CONTRACTOR SHALL RESULT IN A COMPLETE, FUNCTIONAL CULVERT BOX. WORK WILL INCLUDE DEBRIS REMOVAL AND MINOR REPAIRS.$85K
Jan 24, 2019Department of DefenseW6QM MICC-FT LEAVENWORTHW91QF419F0052238110REPAIR SIDEWALK AROUND GRUBER GYM AT BLDG.#302 - THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS TO REPAIR SIDEWALK AROUND GRUBER GYM. ALL WORK PERFORMED BY THE CONTRACTOR SHALL RESULT IN A COMPLETE, FUNCTIONAL SIDEWALK. WORK WILL INCLUDE DEBRIS REMOVAL AND MINOR REPAIRS.$12K
Nov 21, 2018Department of DefenseW6QM MICC-FT LEAVENWORTHW91QF419F0021238110THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS TO REMOVE RAMP AND REPAIR SIDEWALK NEAR POPE&AUGUR. WORK WILL INCLUDE DEBRIS REMOVAL AND MINOR REPAIRS.$6K
Oct 25, 2018Department of DefenseW071 ENDIST KANSAS CITYW912DQ17C4012237310IGF::OT::IGF IOWA AVENUE EXTENSION. THE PURPOSE OF THIS CONTRACT IS TO PERFORM ROAD REPAIRS FOR THE IOWA AVENUE EXTENSION PROJECT AT FORT LEAVENWORTH, KANSAS$27K
Oct 9, 2018Department of DefenseW071 ENDIST KANSAS CITYW912DQ17C4012237310IGF::OT::IGF IOWA AVENUE EXTENSION. THE PURPOSE OF THIS CONTRACT IS TO PERFORM ROAD REPAIRS FOR THE IOWA AVENUE EXTENSION PROJECT AT FORT LEAVENWORTH, KANSAS$54K
Sep 28, 2018Department of DefenseW6QM MICC-FT LEAVENWORTHW91QF418F0267238110REMOVE SIDEWALK AND REPLACE CURB NEAR GRANT&AUGUR - THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS TO REMOVE SIDEWALK AND REPLACE CURB NEAR GRANT&AUGUR. ALL WORK PERFORMED BY THE CONTRACTOR SHALL RESULT IN A COMPLETE, FUNCTIONAL SIDEWALK CURB. WORK WILL INCLUDE DEBRIS REMOVAL AND MINOR REPAIRS.$6K
Sep 28, 2018Department of DefenseW6QM MICC-FT LEAVENWORTHW91QF418F0275238110CRACK SEALING POST WIDE - THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS FOR CRACK SEALING POST WIDE. ALL WORK PERFORMED BY THE CONTRACTOR SHALL RESULT IN A COMPLETE, FUNCTIONAL ROADS AND PARKING LOTS. WORK WILL INCLUDE DEBRIS REMOVAL AND MINOR REPAIRS.$132K
Sep 24, 2018Department of DefenseW6QM MICC-FT LEAVENWORTHW91QF418F0250238110REMOVE AFB CONCRETE STAIRS AND EXTEND RETAINER WALL NEAR B.686 - REMOVE AFB CONCRETE STAIRS AND EXTEND RETAINER WALL NEAR B.686 - THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS TO REMOVE AFB CONCRETE STAIRS AND EXTEND RETAINER WALL. ALL WORK PERFORMED BY THE CONTRACTOR SHALL RESULT IN A COMPLETE, FUNCTIONAL RETAINER WALL. WORK WILL INCLUDE DEBRIS REMOVAL AND MINOR REPAIRS.$12K
Sep 14, 2018Department of DefenseW6QM MICC-FT LEAVENWORTHW91QF418F0204238110REPAIR SHERMAN EROSION AT AREA 6 - THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS TO REPAIR SHERMAN EROSION. ALL WORK PERFORMED BY THE CONTRACTOR SHALL RESULT IN A COMPLETE, FUNCTIONAL STORM DRAIN. WORK WILL INCLUDE DEBRIS REMOVAL AND MINOR REPAIRS.$26K

Get Alerted Before Julius Kaaz Construction CO INC's Next Recompete

Mindy monitors active contracts and flags recompetes 12 months out so you can position to compete.