| Date | Agency | PIID | NAICS | Description | Amount |
|---|---|---|---|---|---|
| Sep 14, 2018 | Department of DefenseW6QM MICC-FT LEAVENWORTH | W91QF418F0203 | 238110 | REPAIR SHERMAN EROSION AT AREA 5&7 - THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS TO REPAIR SHERMAN EROSION. ALL WORK PERFORMED BY THE CONTRACTOR SHALL RESULT IN A COMPLETE, FUNCTIONAL STORM DRAIN. | $19K |
| Sep 14, 2018 | Department of DefenseW6QM MICC-FT LEAVENWORTH | W91QF418F0204 | 238110 | REPAIR SHERMAN EROSION AT AREA 6 - THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS TO REPAIR SHERMAN EROSION. ALL WORK PERFORMED BY THE CONTRACTOR SHALL RESULT IN A COMPLETE, FUNCTIONAL STORM DRAIN. WORK WILL INCLUDE DEBRIS REMOVAL AND MINOR REPAIRS. | $26K |
| Sep 13, 2018 | Department of DefenseW6QM MICC-FT LEAVENWORTH | W91QF418F0200 | 238110 | REPAIR SHERMAN EROSION AT AREA 4 - THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS TO REPAIR SHERMAN EROSION. ALL WORK PERFORMED BY THE CONTRACTOR SHALL RESULT IN A COMPLETE, FUNCTIONAL STORM DRAIN. | $40K |
| Sep 11, 2018 | Department of DefenseW6QM MICC-FT LEAVENWORTH | W91QF418F0195 | 238110 | BLDG.#112 REPAIR EXTENDED DRIVEWAY AND BLDG.#127 REPAIR ADA RAMP - THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS TO REPAIR EXTENDED DRIVEWAY&REPAIR ADA RAMP. ALL WORK PERFORMED BY THE CONTRACTOR SHALL RESULT IN A COMPLETE, FUNCTIONAL DRIVEWAY AND RAMP. | $26K |
| Sep 11, 2018 | Department of DefenseW6QM MICC-FT LEAVENWORTH | W91QF418F0196 | 238110 | REPAIR STORM DRAIN&EROSION IN AREA 1-2-3 NEAR SHERMAN&BLDG.#245 - THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS TO REPAIR STORM DRAIN&EROSION IN AREAS 1-2-3. ALL WORK PERFORMED BY THE CONTRACTOR SHALL RESULT IN A COMPLETE, FUNCTIONAL STORM DRAIN. WORK WILL INCLUDE DEBRIS REMOVAL AND MINOR REPAIRS. | $30K |
| Sep 10, 2018 | Department of DefenseW6QM MICC-FT LEAVENWORTH | W91QF418F0188 | 238110 | REPAIR TUCKPOINT AT BLDG.#238, 304&320 - THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS TO REPAIR TUCKPOINT. ALL WORK PERFORMED BY THE CONTRACTOR SHALL RESULT IN A COMPLETE, FUNCTIONAL BUILDING WALLS. | $190K |
| Sep 10, 2018 | Department of DefenseW6QM MICC-FT LEAVENWORTH | W91QF418F0189 | 238110 | REPAIR BUILDING/CHIMNEY TUCKPOINT AT BLDGS.#277, 336&424 - THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS TO REPAIR BUILDING/CHIMNEY TUCKPOINT . ALL WORK PERFORMED BY THE CONTRACTOR SHALL RESULT IN A COMPLETE, FUNCTIONAL BUILDING&CHIMNEY WALLS. | $254K |
| Sep 10, 2018 | Department of DefenseW6QM MICC-FT LEAVENWORTH | W91QF418F0190 | 238110 | INSTALL SIDEWALK&STAIRS AT BLDG.#225 - THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS TO INSTALL SIDEWALK&STAIRS. ALL WORK PERFORMED BY THE CONTRACTOR SHALL RESULT IN A COMPLETE, FUNCTIONAL SIDEWALK AND STAIRS. | $85K |
| Sep 10, 2018 | Department of DefenseW6QM MICC-FT LEAVENWORTH | W91QF418F0192 | 238110 | REPAIR PAVEMENT CRACKS&STRIPING AT BLDG.#664 - THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS TO REPAIR PAVEMENT CRACKS&STRIPING. ALL WORK PERFORMED BY THE CONTRACTOR SHALL RESULT IN A COMPLETE, FUNCTIONAL PARKING LOT&ROAD. | $27K |
| Sep 10, 2018 | Department of DefenseW6QM MICC-FT LEAVENWORTH | W91QF418F0193 | 238110 | REPAIR SIDEWALK NEAR VISITOR CONTROL CENTER (VCC)&MERRITT LAKE - THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS TO REPAIR SIDEWALK NEAR VCC&MERRITT LAKE. ALL WORK PERFORMED BY THE CONTRACTOR SHALL RESULT IN A COMPLETE, FUNCTIONAL SIDEWALKS. | $18K |
| Sep 7, 2018 | Department of DefenseW6QM MICC-FT LEAVENWORTH | W91QF418F0187 | 238110 | REPAIR REFUELING PAD AT BLDG.#132&REPAIR DRAINAGE DITCH NEAR FCC ACCESS RD - THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS TO REPAIR REFUELING PAD AND REPAIR DRAINAGE DITCH NEAR FCC ACCESS RD. ALL WORK PERFORMED BY THE CONTRACTOR SHALL RESULT IN A COMPLETE, FUNCTIONAL FUELING PAD AND DRAINAGE DITCH. | $154K |
| Sep 6, 2018 | Department of DefenseW6QM MICC-FT LEAVENWORTH | W91QF418F0181 | 238110 | REPAIR LOW WATER CROSSING DRAINAGE DITCH AT FCC - THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS TO REPAIR LOW WATER CROSSING DRAINAGE DITCH. ALL WORK PERFORMED BY THE CONTRACTOR SHALL RESULT IN A COMPLETE, FUNCTIONAL DRAINAGE DITCH. | $26K |
| Sep 6, 2018 | Department of DefenseW6QM MICC-FT LEAVENWORTH | W91QF418F0182 | 238110 | REPAIR ADA RAMP (MUIR HALL) AT BLDG.#285 - THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS TO REPAIR ADA RAMP. ALL WORK PERFORMED BY THE CONTRACTOR SHALL RESULT IN A COMPLETE, FUNCTIONAL SIDEWALK RAMP. | $22K |
| Sep 6, 2018 | Department of DefenseW6QM MICC-FT LEAVENWORTH | W91QF418F0185 | 238110 | REPAIR ADA RAMP (MUIR HALL) AT BLDG.#285 - THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS TO REPAIR ADA RAMP. ALL WORK PERFORMED BY THE CONTRACTOR SHALL RESULT IN A COMPLETE, FUNCTIONAL SIDEWALK RAMP. | $35K |
| Aug 30, 2018 | Department of DefenseW6QM MICC-FT LEAVENWORTH | W91QF418F0172 | 238110 | REPAIR TUCKPOINT AT BLDG.#268 - THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS TO REPAIR TUCKPOINT. ALL WORK PERFORMED BY THE CONTRACTOR SHALL RESULT IN A COMPLETE, FUNCTIONAL WALLS. WORK WILL INCLUDE DEBRIS REMOVAL AND MINOR REPAIRS. | $34K |
| Aug 14, 2018 | Department of DefenseW071 ENDIST KANSAS CITY | W912DQ17C4012 | 237310 | IGF::OT::IGF IOWA AVENUE EXTENSION. THE PURPOSE OF THIS CONTRACT IS TO PERFORM ROAD REPAIRS FOR THE IOWA AVENUE EXTENSION PROJECT AT FORT LEAVENWORTH, KANSAS | $20K |
| Aug 9, 2018 | Department of DefenseW6QM MICC-FT LEAVENWORTH | W91QF418F0148 | 238110 | REPAIR SIDEWALK AT 5TH ARTILLERY&IOWA - THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS TO REPAIR SIDEWALK AT 5TH ARTILLERY&IOWA. ALL WORK PERFORMED BY THE CONTRACTOR SHALL RESULT IN A COMPLETE, FUNCTIONAL STORM SEWER. WORK WILL INCLUDE DEBRIS REMOVAL AND MINOR REPAIRS. POP: 6 DAYS AFTER NTP. | $30K |
| Jul 26, 2018 | Department of DefenseW6QM MICC-FT LEAVENWORTH | W91QF418F0088 | 238110 | REPAIR RETAINING WALL AT BLDG #73 - THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS TO REPAIR RETAINING WALL. ALL WORK PERFORMED BY THE CONTRACTOR SHALL RESULT IN A COMPLETE, FUNCTIONAL RETAINING WALL. WORK WILL INCLUDE DEBRIS REMOVAL AND MINOR REPAIRS. | $38K |
| Jul 17, 2018 | Department of DefenseW071 ENDIST KANSAS CITY | W912DQ16C4011 | 236220 | IGF::OT::IGF WHOLE BUILDING RENOVATION OF BLDG 47 - AT FORT LEAVENWORTH, KANSAS | $6K |
| Jul 5, 2018 | Department of DefenseW6QM MICC-FT LEAVENWORTH | W91QF418F0121 | 238110 | REPAIR HANDRAIL&CONCRETE AT BLDG.470 - THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS TO REPAIR HANDRAIL AND CONCRETE AT BLDG. #470. WORK WILL INCLUDE DEBRIS REMOVAL AND MINOR REPAIRS. | $7K |
| Jun 7, 2018 | Department of DefenseW6QM MICC-FT LEAVENWORTH | W91QF418F0086 | 238110 | REPAIR SIDEWALK RAMP AT BLDG #268 - THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS TO REPAIR SIDEWALK RAMP. ALL WORK PERFORMED BY THE CONTRACTOR SHALL RESULT IN A COMPLETE, FUNCTIONAL SIDEWALK RAMP WORK WILL INCLUDE DEBRIS REMOVAL AND MINOR REPAIRS. | $14K |
| Jun 7, 2018 | Department of DefenseW6QM MICC-FT LEAVENWORTH | W91QF418F0087 | 238110 | REPAIR STONE PILLAR&LOADING DECK B.120 - THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS TO REPAIR STONE PILLAR AND LOADING DECK. ALL WORK PERFORMED BY THE CONTRACTOR SHALL RESULT IN A COMPLETE, FUNCTIONAL PILLARS AND LOADING DECK. WORK WILL INCLUDE DEBRIS REMOVAL AND MINOR REPAIRS. | $21K |
| Jun 7, 2018 | Department of DefenseW6QM MICC-FT LEAVENWORTH | W91QF418F0088 | 238110 | REPAIR RETAINING WALL AT BLDG #73 - THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS TO REPAIR RETAINING WALL. ALL WORK PERFORMED BY THE CONTRACTOR SHALL RESULT IN A COMPLETE, FUNCTIONAL RETAINING WALL. WORK WILL INCLUDE DEBRIS REMOVAL AND MINOR REPAIRS. | $53K |
| Jun 7, 2018 | Department of DefenseW6QM MICC-FT LEAVENWORTH | W91QF418F0091 | 238110 | REPAIR SIDEWALK, CURB AND RAMP AT BLDG #1147&INSTALL SIDEWALK AND DUMPSTER PAD AT BLDG #1149&1150 - THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS TO REPAIR SIDEWALK, CURB, RAMP AND INSTALL SIDEWALK&DUMPSTER PAD. ALL WORK PERFORMED BY THE CONTRACTOR SHALL RESULT IN A COMPLETE, FUNCTIONAL APPROACH SIDEWALKS AND DUMPSTER PAD. WORK WILL INCLUDE DEBRIS REMOVAL AND MINOR REPAIRS. | $73K |
| May 30, 2018 | Department of DefenseW6QM MICC-FT LEAVENWORTH | W91QF418F0090 | 238110 | REPAIR STORM SEWER AT BLDG.#72 - THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS TO REPAIR STORM SEWER AT BLDG.#72. WORK WILL INCLUDE DEBRIS REMOVAL AND MINOR REPAIRS. | $16K |
| May 22, 2018 | Department of DefenseW6QM MICC-FT LEAVENWORTH | W91QF418F0078 | 238110 | REPAIR OVERHEAD DOOR APPROACH SLAB AND WATER DIVERTER AT BLDG #341 - THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS TO REPAIR OVERHEAD DOOR APPROACH SLAB AND WATER DIVERTER . ALL WORK PERFORMED BY THE CONTRACTOR SHALL RESULT IN A COMPLETE, FUNCTIONAL APPROACH SLAB AND WATER DIVERTER. WORK WILL INCLUDE DEBRIS REMOVAL AND MINOR REPAIRS. | $17K |
| May 22, 2018 | Department of DefenseW071 ENDIST KANSAS CITY | W912DQ16C4011 | 236220 | IGF::OT::IGF WHOLE BUILDING RENOVATION OF BLDG 47 - AT FORT LEAVENWORTH, KANSAS | $9K |
| May 11, 2018 | Department of DefenseW6QM MICC-FT LEAVENWORTH | W91QF418F0070 | 238110 | REPAIR HANCOCK POOL FILTRATION STEPS&PAD AT BLDG #646 - THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS TO REPAIR HANCOCK POOL FILTRATION STEPS&PAD. ALL WORK PERFORMED BY THE CONTRACTOR SHALL RESULT IN A COMPLETE, FUNCTIONAL STEPS AND PAD. WORK WILL INCLUDE DEBRIS REMOVAL AND MINOR REPAIRS. | $23K |
| May 11, 2018 | Department of DefenseW6QM MICC-FT LEAVENWORTH | W91QF418F0076 | 238110 | INSTALL SLAB, RETAINING WALL AND TRENCH DRAIN AT BLDG #73 - THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS TO INSTALL SLAB, RETAINING WALL AND TRENCH DRAIN. ALL WORK PERFORMED BY THE CONTRACTOR SHALL RESULT IN A COMPLETE, FUNCTIONAL SLAB, WALL AND DRAIN. | $22K |
| May 11, 2018 | Department of DefenseW6QM MICC-FT LEAVENWORTH | W91QF418F0077 | 238110 | CONNECT DOWNSPOUT TO STORM SYSTEM AT BLDG #73 - THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS TO CONNECT DOWNSPOUT TO STORM SYSTEM. ALL WORK PERFORMED BY THE CONTRACTOR SHALL RESULT IN A COMPLETE, FUNCTIONAL DOWNSPOUT AND STORM SYSTEM. | $64K |
| May 1, 2018 | Department of DefenseW6QM MICC-FT LEAVENWORTH | W91QF418F0061 | 238110 | REPAIR AND INSTALL DOWNSPOUT&STORM DRAIN AT BLDG #61 - THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS TO REPAIR AND INSTALL DOWNSPOUT&STORM DRAIN. ALL WORK PERFORMED BY THE CONTRACTOR SHALL RESULT IN A COMPLETE, FUNCTIONAL STORM DRAIN. WORK WILL INCLUDE DEBRIS REMOVAL AND MINOR REPAIRS. | $29K |
| Apr 23, 2018 | Department of DefenseW6QM MICC-FT LEAVENWORTH | 0008 | 238110 | IGF::OT::IGF REPAIR MASONRY AT BLDG. 52 - THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS FOR REPAIR MASONRY. ALL WORK PERFORMED BY THE CONTRACTOR SHALL RESULT IN A COMPLETE, FUNCTIONAL MASONRY. WORK WILL INCLUDE DEBRIS REMOVAL AND MINOR REPAIRS. | $25K |
| Apr 6, 2018 | Department of DefenseW6QM MICC-FT LEAVENWORTH | W91QF418F0035 | 238110 | IGF::OT::IGF POST-WIDE CRACK SEALING&ROAD STRIPPING - THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS FOR POST-WIDE CRACK SEALING&ROAD STRIPPING. ALL WORK PERFORMED BY THE CONTRACTOR SHALL RESULT IN A COMPLETE, FUNCTIONAL ROADS. | $200K |
| Apr 6, 2018 | Department of DefenseW6QM MICC-FT LEAVENWORTH | W91QF418F0036 | 238110 | IGF::OT::IGF REPAIR SIDEWALKS NEAR BLDG. #62&1098 - THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS TO REPAIR SIDEWALKS NEAR BLDG. #62&1098. ALL WORK PERFORMED BY THE CONTRACTOR SHALL RESULT IN A COMPLETE, FUNCTIONAL SIDEWALKS. | $10K |
| Apr 3, 2018 | Department of DefenseW6QM MICC-FT LEAVENWORTH | W91QF418F0034 | 238110 | IGF::OT::IGF POST-WIDE STORM PIPE CLEANING - THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS FOR POST-WIDE STORM PIPE CLEANING. ALL WORK PERFORMED BY THE CONTRACTOR SHALL RESULT IN A COMPLETE, FUNCTIONAL POST-WIDE STORM PIPES. WORK WILL INCLUDE DEBRIS REMOVAL AND MINOR REPAIRS. | $10K |
| Mar 21, 2018 | Department of DefenseW6QM MICC-FT LEAVENWORTH | W91QF418F0024 | 238110 | IGF::OT::IGF PRACTICE TEE EXPANSION AT BLDG.#75042 - THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS TO PRACTICE TEE EXPANSION. ALL WORK PERFORMED BY THE CONTRACTOR SHALL RESULT IN A COMPLETE, FUNCTIONAL PRACTICE TEE EXPANSION. WORK WILL INCLUDE DEBRIS REMOVAL AND MINOR REPAIRS. | $65K |
| Mar 8, 2018 | Department of DefenseW6QM MICC-FT LEAVENWORTH | W91QF418F0016 | 238110 | IGF::OT::IGF EPAIR CHIMNEY AND TUCKPOINT AT BLDG.234 - THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS TO REPAIR CHIMNEY AND TUCKPOINT. ALL WORK PERFORMED BY THE CONTRACTOR SHALL RESULT IN A COMPLETE, FUNCTIONAL CHIMNEY AND WALLS. | $32K |
| Feb 28, 2018 | Department of DefenseW6QM MICC-FT LEAVENWORTH | W91QF418F0008 | 238110 | IGF::OT::IGF REPAIR CONCRETE AND REPLACE CAULK AT BLDG.166 - THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS TO REPAIR CONCRETE AND REPLACE CAULKING AT BLDG.#166, GRANT POOL. WORK WILL INCLUDE DEBRIS REMOVAL AND MINOR REPAIRS. | $25K |
| Jan 10, 2018 | Department of DefenseW071 ENDIST KANSAS CITY | W912DQ16C4011 | 236220 | IGF::OT::IGF WHOLE BUILDING RENOVATION OF BLDG 47 - AT FORT LEAVENWORTH, KANSAS | $13K |
| Dec 28, 2017 | Department of DefenseW071 ENDIST KANSAS CITY | W912DQ18C1012 | 237990 | FED-LEVEE, OTTAWA, FRANKLIN COUNTY KS | $214K |
| Dec 21, 2017 | Department of DefenseW6QM MICC-FT LEAVENWORTH | 0013 | 238110 | IGF::OT::IGF INSTALL ADA ACCESS FOR SIDEWALK AND PARKING LOT NEAR BLDG.1049 - THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS TO INSTALL ADA ACCESS FOR SIDEWALK AND PARKING LOT. ALL WORK PERFORMED BY THE CONTRACTOR SHALL RESULT IN A COMPLETE, FUNCTIONAL SIDEWALK AND PARKING LOT ACCESS. WORK WILL INCLUDE DEBRIS REMOVAL AND MINOR REPAIRS. | $8K |
| Dec 6, 2017 | Department of DefenseW6QM MICC-FT LEAVENWORTH | 0008 | 238110 | IGF::OT::IGF REPAIR MASONRY AT BLDG. 52 - THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS FOR REPAIR MASONRY. ALL WORK PERFORMED BY THE CONTRACTOR SHALL RESULT IN A COMPLETE, FUNCTIONAL MASONRY. WORK WILL INCLUDE DEBRIS REMOVAL AND MINOR REPAIRS. | $44K |
| Nov 16, 2017 | Department of DefenseW071 ENDIST KANSAS CITY | W912DQ16C4011 | 236220 | IGF::OT::IGF WHOLE BUILDING RENOVATION OF BLDG 47 - AT FORT LEAVENWORTH, KANSAS | $78K |
| Nov 2, 2017 | Department of DefenseW071 ENDIST KANSAS CITY | W912DQ16C4011 | 236220 | IGF::OT::IGF WHOLE BUILDING RENOVATION OF BLDG 47 - AT FORT LEAVENWORTH, KANSAS | $2K |
| Oct 18, 2017 | Department of DefenseW071 ENDIST KANSAS CITY | W912DQ16C4011 | 236220 | IGF::OT::IGF WHOLE BUILDING RENOVATION OF BLDG 47 - AT FORT LEAVENWORTH, KANSAS | $11K |
| Sep 27, 2017 | Department of DefenseW6QM MICC-FT LEAVENWORTH | 0012 | 238110 | IGF::OT::IGF CRACK SEALING POST WIDE - THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS FOR POST WIDE CRACK SEALING. ALL WORK PERFORMED BY THE CONTRACTOR SHALL RESULT IN A COMPLETE, FUNCTIONAL ROADS AND SIDEWALKS. WORK WILL INCLUDE DEBRIS REMOVAL AND MINOR REPAIRS. | $128K |
| Sep 26, 2017 | Department of DefenseW6QM MICC-FT LEAVENWORTH | 0011 | 238110 | IGF::OT::IGF REPAIR TRAIL NEAR AIR FIELD LEVEE - THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS FOR REPAIR TRAIL NEAR AIR FIELD LEVEE. ALL WORK PERFORMED BY THE CONTRACTOR SHALL RESULT IN A COMPLETE, FUNCTIONAL TRAIL. WORK WILL INCLUDE DEBRIS REMOVAL AND MINOR REPAIRS. | $20K |
| Sep 12, 2017 | Department of DefenseW071 ENDIST KANSAS CITY | W912DQ17C4012 | 237310 | IGF::OT::IGF IOWA AVENUE EXTENSION. THE PURPOSE OF THIS CONTRACT IS TO PERFORM ROAD REPAIRS FOR THE IOWA AVENUE EXTENSION PROJECT AT FORT LEAVENWORTH, KANSAS | $1.0M |
| Sep 8, 2017 | Department of DefenseW6QM MICC-FT LEAVENWORTH | 0010 | 238110 | IGF::OT::IGF REPAIR ASP EXPANSION B ROAD, LOADING DOCK&STORM SEWER - THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS FOR REPAIR ASP EXPANSION B ROAD, LOADING DOCK&STORM SEWER. ALL WORK PERFORMED BY THE CONTRACTOR SHALL RESULT IN A COMPLETE, FUNCTIONAL ROAD, LOADING DOCK AND STORM SEWER. WORK WILL INCLUDE DEBRIS REMOVAL AND MINOR REPAIRS. | $81K |
| Sep 6, 2017 | Department of DefenseW6QM MICC-FT LEAVENWORTH | 0009 | 238110 | IGF::OT::IGF REPAIR CAULKING AT BLDG. 1154 - THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS FOR REPAIR CAULKING. ALL WORK PERFORMED BY THE CONTRACTOR SHALL RESULT IN A COMPLETE, FUNCTIONAL CAULKING. WORK WILL INCLUDE DEBRIS REMOVAL AND MINOR REPAIRS. | $6K |