| Date | Agency | PIID | NAICS | Description | Amount |
|---|---|---|---|---|---|
| Aug 31, 2017 | Department of DefenseW6QM MICC-FT LEAVENWORTH | 0008 | 238110 | IGF::OT::IGF REPAIR MASONRY AT BLDG. 52 - THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS FOR REPAIR MASONRY. ALL WORK PERFORMED BY THE CONTRACTOR SHALL RESULT IN A COMPLETE, FUNCTIONAL MASONRY. WORK WILL INCLUDE DEBRIS REMOVAL AND MINOR REPAIRS. | $237K |
| Jul 25, 2017 | Department of DefenseW6QM MICC-FT LEAVENWORTH | 0006 | 238110 | IGF::OT::IGF REPAIR TUCK-POINT AND REGRADE AT BLDG. #116 - THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS FOR REPAIR TUCK-POINT AND RE-GRADE. ALL WORK PERFORMED BY THE CONTRACTOR SHALL RESULT IN A COMPLETE, FUNCTIONAL WALLS. WORK WILL INCLUDE DEBRIS REMOVAL AND MINOR REPAIRS. | $10K |
| Jul 25, 2017 | Department of DefenseW6QM MICC-FT LEAVENWORTH | 0007 | 238110 | IGF::OT::IGF CRACK SEALING POST WIDE - THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS FOR POST WIDE CRACK SEALING. ALL WORK PERFORMED BY THE CONTRACTOR SHALL RESULT IN A COMPLETE, FUNCTIONAL ROADS AND SIDEWALKS. WORK WILL INCLUDE DEBRIS REMOVAL AND MINOR REPAIRS. | $100K |
| Jul 12, 2017 | Department of DefenseW6QM MICC-FT LEAVENWORTH | 0003 | 238110 | IGF::OT::IGF REPLACE CURB SIDEWALK AND STEPS AT BLDG. 27 - THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS FOR REPLACING CURB SIDEWALK AND STEPS. ALL WORK PERFORMED BY THE CONTRACTOR SHALL RESULT IN A COMPLETE, FUNCTIONAL CURB SIDEWALK AND STEPS. WORK WILL INCLUDE DEBRIS REMOVAL AND MINOR REPAIRS. | $14K |
| Jul 12, 2017 | Department of DefenseW6QM MICC-FT LEAVENWORTH | 0004 | 238110 | IGF::OT::IGF REPAIR SIDEWALK AT BLDG. 198 - THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS FOR REPAIRING SIDEWALK. ALL WORK PERFORMED BY THE CONTRACTOR SHALL RESULT IN A COMPLETE, FUNCTIONAL SIDEWALK. WORK WILL INCLUDE DEBRIS REMOVAL AND MINOR REPAIRS. | $24K |
| Jul 11, 2017 | Department of DefenseW6QM MICC-FT LEAVENWORTH | 0005 | 238110 | IGF::OT::IGF REPAIR STORM SEWER DUCT NEAR RSC - THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS FOR REPAIRING STORM SEWER CONCRETE DUCT. ALL WORK PERFORMED BY THE CONTRACTOR SHALL RESULT IN A COMPLETE, FUNCTIONAL SEWER DUCT. WORK WILL INCLUDE DEBRIS REMOVAL AND MINOR REPAIRS. | $50K |
| Jun 29, 2017 | Department of DefenseW071 ENDIST KANSAS CITY | W912DQ16C4011 | 236220 | IGF::OT::IGF WHOLE BUILDING RENOVATION OF BLDG 47 - AT FORT LEAVENWORTH, KANSAS | $1K |
| Jun 22, 2017 | Department of DefenseW071 ENDIST KANSAS CITY | W912DQ16C4011 | 236220 | IGF::OT::IGF WHOLE BUILDING RENOVATION OF BLDG 47 - AT FORT LEAVENWORTH, KANSAS | $49K |
| Jun 20, 2017 | Department of DefenseW071 ENDIST KANSAS CITY | W912DQ16C4011 | 236220 | IGF::OT::IGF WHOLE BUILDING RENOVATION OF BLDG 47 - AT FORT LEAVENWORTH, KANSAS | $8K |
| Jun 19, 2017 | Department of DefenseW6QM MICC-FT LEAVENWORTH | 0002 | 238110 | IGF::OT::IGF REPAIR CAULKING AND TUCK POINT AT BLDG. 2400 - THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS FOR REPAIR CAULKING AND TUCK POINT. ALL WORK PERFORMED BY THE CONTRACTOR SHALL RESULT IN A COMPLETE, FUNCTIONAL CAULKING AND TUCK POINT. WORK WILL INCLUDE DEBRIS REMOVAL AND MINOR REPAIRS. | $9K |
| Jun 13, 2017 | Department of DefenseW6QM MICC-FT LEAVENWORTH | 0001 | 238110 | IGF::OT::IGF THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS FOR POST WIDE ROAD&PARKING LOT STRIPING. ALL WORK PERFORMED BY THE CONTRACTOR SHALL RESULT IN A COMPLETE, FUNCTIONAL ROAD AND PARKING LOT STRIPING. WORK WILL INCLUDE DEBRIS REMOVAL AND MINOR REPAIRS. POST WIDE ROAD&PARKING LOT STRIPING - | $100K |
| Apr 11, 2017 | Department of DefenseW071 ENDIST KANSAS CITY | W912DQ16C4011 | 236220 | IGF::OT::IGF WHOLE BUILDING RENOVATION OF BLDG 47 - AT FORT LEAVENWORTH, KANSAS | $125K |
| Apr 6, 2017 | Department of DefenseW6QM MICC-FT LEAVENWORTH | 0107 | 238110 | IGF::OT::IGF TUCK POINT AND REPAIR RETAINING WALL NEAR BLDG. #427 - THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS FOR TUCK POINT AND REPAIR RETAINING WALL. ALL WORK PERFORMED BY THE CONTRACTOR SHALL RESULT IN A COMPLETE, FUNCTIONAL WALL. WORK WILL INCLUDE DEBRIS REMOVAL AND MINOR REPAIRS. | $286K |
| Mar 31, 2017 | Department of DefenseW7M9 USPFO ACTIVITY KS ARNG | 0002 | 236220 | IGF::OT::IGF INSTALL NEW SECURITY FENCE | $6K |
| Mar 29, 2017 | Department of DefenseW6QM MICC-FT LEAVENWORTH | 0105 | 238110 | IGF::OT::IGF THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS FOR TUCK POINT REPAIR. ALL WORK PERFORMED BY THE CONTRACTOR SHALL RESULT IN A COMPLETE, FUNCTIONAL BUILDING. WORK WILL INCLUDE DEBRIS REMOVAL AND MINOR REPAIRS | $31K |
| Mar 29, 2017 | Department of DefenseW6QM MICC-FT LEAVENWORTH | 0106 | 238110 | IGF::OT::IGF THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS FOR TUCKPOINT AND STONE REPAIR. ALL WORK PERFORMED BY THE CONTRACTOR SHALL RESULT IN A COMPLETE, FUNCTIONAL BUILDING. WORK WILL INCLUDE DEBRIS REMOVAL AND MINOR REPAIRS. | $132K |
| Mar 27, 2017 | Department of DefenseW6QM MICC-FT LEAVENWORTH | 0103 | 238110 | IGF::OT::IGF THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS FOR REPAIR RAMP, HAND RAIL, SEAL CRACKS AT LOADING DOCK. ALL WORK PERFORMED BY THE CONTRACTOR SHALL RESULT IN A COMPLETE, FUNCTIONAL RAMP, HAND RAIL AND SEALED CRACKS. WORK WILL INCLUDE DEBRIS REMOVAL AND MINOR REPAIRS | $66K |
| Mar 27, 2017 | Department of DefenseW6QM MICC-FT LEAVENWORTH | 0104 | 238110 | IGF::OT::IGF TUCK POINT CHIMNEY REPAIR AT BLDG #227 - THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS FOR TUCK POINT CHIMNEY REPAIR. ALL WORK PERFORMED BY THE CONTRACTOR SHALL RESULT IN A COMPLETE, FUNCTIONAL CHIMNEY. WORK WILL INCLUDE DEBRIS REMOVAL AND MINOR REPAIRS. | $9K |
| Feb 28, 2017 | Department of DefenseW6QM MICC-FT LEAVENWORTH | 0100 | 238110 | IGF::OT::IGF REPAIR WASHOUT AND INSTALL CURB&GUTTER NEAR SHERIDAN DRIVE - THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS FOR REPAIR WASHOUT AND INSTALL CURB&GUTTER NEAR SHERIDAN DRIVE. ALL WORK PERFORMED BY THE CONTRACTOR SHALL RESULT IN A COMPLETE, FUNCTIONAL CURB&GUTTER. WORK WILL INCLUDE DEBRIS REMOVAL AND MINOR REPAIRS. | $25K |
| Feb 28, 2017 | Department of DefenseW6QM MICC-FT LEAVENWORTH | 0102 | 238110 | IGF::OT::IGF REPAIR MINOR SECTION OF HANCOCK ROAD - THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS FOR REPAIRING MINOR SECTION OF HANCOCK ROAD. ALL WORK PERFORMED BY THE CONTRACTOR SHALL RESULT IN A COMPLETE, FUNCTIONAL ROAD SECTION. WORK WILL INCLUDE DEBRIS REMOVAL AND MINOR REPAIRS. | $8K |
| Feb 14, 2017 | Department of DefenseW6QM MICC-FT LEAVENWORTH | 0101 | 238110 | IGF::OT::IGF PARKING LOT PAVING PATCH AT BLDG. 77 - THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS FOR PARKING LOT PAVING PATCH. ALL WORK PERFORMED BY THE CONTRACTOR SHALL RESULT IN A COMPLETE, FUNCTIONAL PARKING LOT. WORK WILL INCLUDE DEBRIS REMOVAL AND MINOR REPAIRS. | $6K |
| Feb 10, 2017 | Department of DefenseW071 ENDIST KANSAS CITY | W912DQ16C4011 | 236220 | IGF::OT::IGF WHOLE BUILDING RENOVATION OF BLDG 47 - AT FORT LEAVENWORTH, KANSAS | $404K |
| Jan 23, 2017 | Department of DefenseW6QM MICC-FT LEAVENWORTH | 0099 | 238110 | IGF::OT::IGF REPLACE HANDICAP RAMP TO ADA STANDARDS AT BLDG 87 - THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS FOR REPLACING ADA RAMP. ALL WORK PERFORMED BY THE CONTRACTOR SHALL RESULT IN A COMPLETE, FUNCTIONAL ADA RAMP. WORK WILL INCLUDE DEBRIS REMOVAL AND MINOR REPAIRS. | $77K |
| Dec 12, 2016 | Department of DefenseW6QM MICC-FT LEAVENWORTH | 0098 | 238110 | IGF::OT::IGF REPAIR SIDEWALK BETWEEN HARRY BELL AND BIDDLE- THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS FOR REPAIR SIDEWALK. ALL WORK PERFORMED BY THE CONTRACTOR SHALL RESULT IN A COMPLETE, FUNCTIONAL SIDEWALK. WORK WILL INCLUDE DEBRIS REMOVAL AND MINOR REPAIRS. | $20K |
| Nov 8, 2016 | Department of DefenseW6QM MICC-FT LEAVENWORTH | 0097 | 238110 | IGF::OT::IGF REPLACE WELL PIT AND PIPE - THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS FOR REPLACE WELL PIT AND PIPES. ALL WORK PERFORMED BY THE CONTRACTOR SHALL RESULT IN A COMPLETE, FUNCTIONAL WELL AND PIPES. WORK WILL INCLUDE DEBRIS REMOVAL AND MINOR REPAIRS. | $50K |
| Sep 29, 2016 | Department of DefenseW6QM MICC-FT LEAVENWORTH | 0096 | 238110 | IGF::OT::IGF ROAD STRIPING AND CRACK SEALING - THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS FOR CRACK SEALING AND ROAD STRIPING. ALL WORK PERFORMED BY THE CONTRACTOR SHALL RESULT IN A COMPLETE, FUNCTIONAL ROADS. WORK WILL INCLUDE DEBRIS REMOVAL AND MINOR REPAIRS. | $137K |
| Sep 27, 2016 | Department of DefenseW6QM MICC-FT LEAVENWORTH | 0095 | 238110 | IGF::OT::IGF TUCK POINTING AT BLDG.472&275 - THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS FOR TUCK POINTING. ALL WORK PERFORMED BY THE CONTRACTOR SHALL RESULT IN A COMPLETE, FUNCTIONAL BUILDING STRUCTURE. WORK WILL INCLUDE DEBRIS REMOVAL AND MINOR REPAIRS. | $124K |
| Sep 26, 2016 | Department of DefenseW6QM MICC-FT LEAVENWORTH | 0094 | 238110 | IGF::OT::IGF REPAIR LOADING DOCK AT BLDG.341 - THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS TO REPAIR LOADING DOCK. ALL WORK PERFORMED BY THE CONTRACTOR SHALL RESULT IN A COMPLETE, FUNCTIONAL LOADING DECK. WORK WILL INCLUDE DEBRIS REMOVAL AND MINOR REPAIRS. | $23K |
| Sep 19, 2016 | Department of DefenseW6QM MICC-FT LEAVENWORTH | 0093 | 238110 | IGF::OT::IGF REPAIR POST OFFICE STEPS AND LANDING - THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS TO REPAIR POST OFFICE STEPS AND LANDING. ALL WORK PERFORMED BY THE CONTRACTOR SHALL RESULT IN A COMPLETE, FUNCTIONAL STEPS AND LANDING. WORK WILL INCLUDE DEBRIS REMOVAL AND MINOR REPAIRS. | $64K |
| Sep 16, 2016 | Department of DefenseW071 ENDIST KANSAS CITY | W912DQ16C4011 | 236220 | IGF::OT::IGF WHOLE BUILDING RENOVATION OF BLDG 47 - AT FORT LEAVENWORTH, KANSAS | $4.5M |
| Sep 15, 2016 | Department of DefenseW6QM MICC-FT LEAVENWORTH | 0091 | 238110 | IGF::OT::IGF REPAIR GOLF CART PATH -THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS TO REPAIR GOLF CART PATH. ALL WORK PERFORMED BY THE CONTRACTOR SHALL RESULT IN A COMPLETE, FUNCTIONAL GOLF CART PATH. WORK WILL INCLUDE DEBRIS REMOVAL AND MINOR REPAIRS. | $9K |
| Sep 15, 2016 | Department of DefenseW6QM MICC-FT LEAVENWORTH | 0092 | 238110 | IGF::OT::IGF REPAIR DOG RUN AND CONSTRUCT BOWLING PAD - THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS TO REPAIR DOG RUN AND CONSTRUCT BOWLING PAD ALL WORK PERFORMED BY THE CONTRACTOR SHALL RESULT IN A COMPLETE, FUNCTIONAL DOG RUN AND BOWLING PAD. WORK WILL INCLUDE DEBRIS REMOVAL AND MINOR REPAIRS. | $18K |
| Sep 13, 2016 | Department of DefenseW6QM MICC-FT LEAVENWORTH | 0090 | 238110 | IGF::OT::IGF REPAIR MASONRY AT BLDG.193 - THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS TO REPLACE CURB, MASONRY AND CROSSWALK. ALL WORK PERFORMED BY THE CONTRACTOR SHALL RESULT IN A COMPLETE, FUNCTIONAL CURB. WORK WILL INCLUDE DEBRIS REMOVAL AND MINOR REPAIRS. | $17K |
| Sep 13, 2016 | Department of DefenseW6QM MICC-FT LEAVENWORTH | 0089 | 238110 | IGF::OT::IGF REPAIR BIDDLE STORM SEWER DRAIN AND REPLACE HANDICAP RAMP&CURB - THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS TO REPAIR BIDDLE STORM SEWER DRAIN AND REPLACE HANDICAP RAMP&CURB. ALL WORK PERFORMED BY THE CONTRACTOR SHALL RESULT IN A COMPLETE, FUNCTIONAL STORM SEWER DRAIN, HANDICAP RAMP AND CURB. WORK WILL INCLUDE DEBRIS REMOVAL AND MINOR REPAIRS. | $84K |
| Sep 7, 2016 | Department of DefenseW7M9 USPFO ACTIVITY KS ARNG | 0002 | 236220 | IGF::OT::IGF INSTALL NEW SECURITY FENCE | $123K |
| Aug 1, 2016 | Department of DefenseW6QM MICC-FT LEAVENWORTH | 0088 | 238110 | IGF::OT::IGF INSTALL CROSSWALK, SIDEWALK AND HANDICAP RAMP AT MCCARTHER SCHOOL - THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS TO INSTALL CROSSWALK, SIDEWALK AND HANDICAP RAMP. ALL WORK PERFORMED BY THE CONTRACTOR SHALL RESULT IN A COMPLETE, FUNCTIONAL CROSSWALK, SIDEWALK AND HANDICAP RAMP. | $11K |
| Jul 26, 2016 | Department of DefenseW6QM MICC-FT LEAVENWORTH | 0088 | 238110 | IGF::OT::IGF INSTALL CROSSWALK, SIDEWALK AND HANDICAP RAMP AT MCCARTHER SCHOOL - THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS TO INSTALL CROSSWALK, SIDEWALK AND HANDICAP RAMP. ALL WORK PERFORMED BY THE CONTRACTOR SHALL RESULT IN A COMPLETE, FUNCTIONAL CROSSWALK, SIDEWALK AND HANDICAP RAMP. | $65K |
| Jul 25, 2016 | Department of DefenseW6QM MICC-FT LEAVENWORTH | 0087 | 238110 | IGF::OT::IGF REPAIR STORM SEWER INLET - POPE&MUNSON | $85K |
| Jun 16, 2016 | Department of DefenseW6QM MICC-FT LEAVENWORTH | 0086 | 238110 | IGF::OT::IGF INSTALL 3 DUMPSTER PADS AT BLDG. 120 - THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS TO INSTALL 3 DUMPSTER PADS. ALL WORK PERFORMED BY THE CONTRACTOR SHALL RESULT IN A COMPLETE, FUNCTIONAL CONCRETE PADS. WORK WILL INCLUDE DEBRIS REMOVAL AND MINOR REPAIRS. | $10K |
| Jun 10, 2016 | Department of DefenseW6QM MICC-FT LEAVENWORTH | 0085 | 238110 | IGF::OT::IGF REPAIR TUCKPOINT PARAPIT WALL AT BLDG. 86 - THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS TO REPAIR TUCKPOINT PARAPIT WALL. ALL WORK PERFORMED BY THE CONTRACTOR SHALL RESULT IN A COMPLETE, FUNCTIONAL WALLS. WORK WILL INCLUDE DEBRIS REMOVAL AND MINOR REPAIRS. POP: 30 DAYS AFTER NTP. | $15K |
| Jun 7, 2016 | Department of DefenseW6QM MICC-FT LEAVENWORTH | 0084 | 238110 | IGF::OT::IGF REPAIR SIDEWALK NEAR HANCOCK POOL, ROSE LOOP STORM DRAIN AND GOLF COURSE PAD - THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS TO REPAIR SIDEWALK NEAR HANCOCK POOL, ROSE LOOP STORM DRAIN AND GOLF COURSE PAD . ALL WORK PERFORMED BY THE CONTRACTOR SHALL RESULT IN A COMPLETE, FUNCTIONAL SIDEWALK, STORM DRAIN AND CONCRETE PAD. WORK WILL INCLUDE DEBRIS REMOVAL AND MINOR REPAIRS. | $6K |
| Apr 21, 2016 | Department of DefenseW6QM MICC-FT LEAVENWORTH | 0076 | 238110 | IGF::OT::IGF STORM SEWER REPAIR NEAR LOWE DRIVE - THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS TO REPAIR STORM SEWER. ALL WORK PERFORMED BY THE CONTRACTOR SHALL RESULT IN A COMPLETE, FUNCTIONAL STORM SEWER. WORK WILL INCLUDE DEBRIS REMOVAL AND MINOR REPAIRS. | $47K |
| Apr 5, 2016 | Department of DefenseW6QM MICC-FT LEAVENWORTH | 0070 | 238110 | IGF::OT::IGF REPAIR STORM DRAINS NEAR MCPHERSON AND WAREHOUSE ROAD - THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS TO PERFORM REPAIR STORM DRAINS AT MCPHERSON&WAREHOUSE ROAD. ALL WORK PERFORMED BY THE CONTRACTOR SHALL RESULT IN A COMPLETE, FUNCTIONAL STORM DRAINS. WORK WILL INCLUDE DEBRIS REMOVAL AND MINOR REPAIRS. | $31K |
| Mar 31, 2016 | Department of DefenseW6QM MICC-FT LEAVENWORTH | 0083 | 238110 | IGF::OT::IGF REPAIR TUCK POINT, ADA RAMP AND SIDEWALK AT BLDG #268&303 - THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS TO REPAIR TUCK POINT AND ADA RAMP. ALL WORK PERFORMED BY THE CONTRACTOR SHALL RESULT IN A COMPLETE, FUNCTIONAL ADA RAMP, SIDEWALK AND TUCK POINTING. WORK WILL INCLUDE DEBRIS REMOVAL AND MINOR REPAIRS. | $595K |
| Mar 9, 2016 | Department of DefenseW6QM MICC-FT LEAVENWORTH | 0081 | 238110 | IGF::OT::IGF POST-WIDE CRACK SEALING AND PAVEMENT STRIPING - THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS FOR POST-WIDE CRACK SEALING AND PAVEMENT STRIPING. ALL WORK PERFORMED BY THE CONTRACTOR SHALL RESULT IN A COMPLETE, FUNCTIONAL ROADS. WORK WILL INCLUDE DEBRIS REMOVAL AND MINOR REPAIRS. | $100K |
| Mar 9, 2016 | Department of DefenseW6QM MICC-FT LEAVENWORTH | 0082 | 238110 | IGF::OT::IGF REPAIR EAST SIDE FOUNDATION LEAK AT BLDG #341 - THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS TO REPAIR FOUNDATION LEAK . ALL WORK PERFORMED BY THE CONTRACTOR SHALL RESULT IN A COMPLETE, FUNCTIONAL FOUNDATION. WORK WILL INCLUDE DEBRIS REMOVAL AND MINOR REPAIRS. | $5K |
| Mar 8, 2016 | Department of DefenseW6QM MICC-FT LEAVENWORTH | 0080 | 238110 | IGF::OT::IGF PARKING LOR REPAIR AT BLDG 246 - THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS TO REPAIR PARKING LOT. ALL WORK PERFORMED BY THE CONTRACTOR SHALL RESULT IN A COMPLETE, FUNCTIONAL PARKING LOT. WORK WILL INCLUDE DEBRIS REMOVAL AND MINOR REPAIRS. | $23K |
| Mar 7, 2016 | Department of DefenseW6QM MICC-FT LEAVENWORTH | 0079 | 238110 | IGF::OT::IGF TUCKPOINT AND SIDEWALK REPAIR AT BLDG 313 - THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS TO REPAIR TUCKPOINT AND SIDEWALK. ALL WORK PERFORMED BY THE CONTRACTOR SHALL RESULT IN A COMPLETE, FUNCTIONAL TUCKPOINT AND SIDEWALK. WORK WILL INCLUDE DEBRIS REMOVAL AND MINOR REPAIRS. | $12K |
| Mar 4, 2016 | Department of DefenseW6QM MICC-FT LEAVENWORTH | 0078 | 238110 | IGF::OT::IGF TUCKPOINT CHIMNEY AT BLDG #22 - THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS TO REPAIR TUCKPOINT AND CHIMNEYS. ALL WORK PERFORMED BY THE CONTRACTOR SHALL RESULT IN A COMPLETE, FUNCTIONAL TUCKPOINT AND CHIMNEYS. WORK WILL INCLUDE DEBRIS REMOVAL AND MINOR REPAIRS. | $25K |
| Feb 25, 2016 | Department of DefenseW6QM MICC-FT LEAVENWORTH | 0077 | 238110 | IGF::OT::IGF REPAIR SIDEWALK AND STORM SEWER NEAR BLDG 1140 - THE WORK CONSISTS OF FURNISHING ALL PLANT, LABOR, EQUIPMENT, AND MATERIALS TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE PLANS AND SPECIFICATIONS TO REPAIR SIDEWALK AND STORM SEWER. ALL WORK PERFORMED BY THE CONTRACTOR SHALL RESULT IN A COMPLETE, FUNCTIONAL SIDEWALK AND STORM SEWER. WORK WILL INCLUDE DEBRIS REMOVAL AND MINOR REPAIRS. | $24K |
Get Alerted Before Julius Kaaz Construction CO INC's Next Recompete
Mindy monitors active contracts and flags recompetes 12 months out so you can position to compete.
Start Free