| Date | Agency | PIID | NAICS | Description | Amount |
|---|---|---|---|---|---|
| May 21, 2018 | Department of DefenseW6QK ACC-RSA | 0683 | 336413 | IGF::OT::IGF THE CONTRACTOR SHALL PERFORM SCHEDULED MAINTENANCE, SERVICE BULLETINS, AND AIRWORTHINESS DIRECTIVES ON TWENTY-FOUR (24) UH-72A AIRCRAFT PER MASTER SERVICE MANUAL 05-11-00 AND 05-12-00 WHEN AUTHORIZED IN WRITING BY THE PIF COR. THE CONTRACTOR SHALL NOTIFY THE PROTOTYPE INTEGRATION FACILITY (PIF) CONTRACTING OFFICERS REPRESENTATIVE (COR) OF ALL SCHEDULED AND UNSCHEDULED MAINTENANCE, SERVICE BULLETINS, AND AIRWORTHINESS DIRECTIVES REQUIRED DURING AIRCRAFT MODIFICATION. THE CONTRACTOR SHALL SUBMIT A WORK REQUEST TO THE PIF COR OF ALL UNSCHEDULED MAINTENANCE REQUIRED DURING AIRCRAFT MODIFICATION IAW DI-MISC-80508/T. FOR WORK REQUESTS LESS THAN OR EQUAL TO $3,500, THE CONTRACTOR SHALL PERFORM UNSCHEDULED MAINTENANCE FOLLOWING SUBMISSION OF THE WORK REQUEST TO THE PIF COR. FOR WORK REQUESTS GREATER THAN $3,500, THE CONTRACTOR SHALL PERFORM UNSCHEDULED MAINTENANCE UPON WRITTEN APPROVAL OF THE PIF COR. THE GOVERNMENT ANTICIPATES OVERTIME WILL BE REQUIRED TO SUPPORT MAINTENANCE ACTIVITIES. THE GOVERNMENT ANTICIPATES UP TO 2200 HOURS WILL BE REQUIRED DURING THE EXECUTION OF UNSCHEDULED MAINTENANCE EVENTS. | $264K |
| May 21, 2018 | Department of DefenseW6QK ACC-RSA | 0750 | 336413 | THE PURPOSE OF THIS STATEMENT OF WORK (SOW) IS TO DEFINE THE EFFORT REQUIRED TO PROVIDE 16 BLUE FORCE TRACKING (BFT) ELECTROMAGNETIC INTERFERENCE (EMI) ENCLOSURE ASSEMBLIES FOR THE CH47F HELICOPTER IN SUPPORT OF FOREIGN MILITARY SALES (FMS) CASE: NE-B-WGR. | $233K |
| May 18, 2018 | Department of DefenseW6QK ACC-RSA | 0498 | 336413 | IGF::CL::IGF:: COMMON AVIATION TOOL SYSTEM PLUS (CATS+) | $62K |
| May 18, 2018 | Department of DefenseW6QK ACC-RSA | 0693 | 336413 | IGF::OT::IGF THE CONTRACTOR SHALL: REDESIGN THE RIFLE MOUNT TO ACCOMMODATE M-4 RIFLES WITHOUT REQUIRING FULL EXTENSION OF THE BUTTSTOCK AND M-16 RIFLES AND INTEGRATE THE DESIGN. DESIGN A MEANS OF INSTALLATION/REMOVAL OF EITHER THE CURRENT UNINTERRUPTABLE POWER SUPPLY (UPS) OR A REPLACEMENT UPS THAT CONFORMS TO AR 602-2, IAW MIL-STD-1472 AS WELL AS, DESIGN AND INSTALL ANY MOUNTING, CABLING AND INTERFACING TO THE CURRENT TOCNET CONFIGURATION AND USER INTERFACE. REMOVE THE NON-DIRECTIONAL BEACON MONITOR. RESEARCH AND INSTALL A SOLUTION FOR THE REDESIGN OF CURRENT MOTS SKIDS TO ALLOW FOR LIFTING BY STANDARD LENGTH FORKLIFT FORKS AND ELIMINATE THE POTENTIAL FOR SHELTER DAMAGE IN MATING/UN-MATING OF SHELTER FROM PRIME MOVER. DESIGN AND INSTALL AN ALTERNATIVE REPLACEMENT RJ21 CONNECTOR FOR THE 90 DEGREE CABLE CONNECTOR CURRENTLY USED ON THE ADTRAN CABLE FOR MOTS. PROVIDE LOGISTICS DATA SUPPORT TO INCLUDE ONE FIELD LEVEL MODIFICATION WORK ORDER TO REMOVE THE V200 COMPUTER TABLET, APPLICABLE HARDWARE AND MOUNTING BRACKET AND TO INSTALL THE V110 COMPUTER TABLET, APPLICABLE HARDWARE AND MOUNTING BRACKET; ALONG WITH, A DEPOT LEVEL MWO TO INCORPORATE ALL OTHER CHANGES RESULTING FROM THIS EFFORT. MODIFY GOVERNMENT FURNISHED MOTS ACCEPTANCE TEST PLAN TO INCORPORATE CHANGES TO THE SYSTEM IAW DI-MISC-80508. RECOMMEND CHANGES TO TM 11-5895-1880-10HR, TM 11-5895-1880-10 AND TM 11-5895-1880-23&P AND EXISTING TRAINING MATERIAL. | $517K |
| May 18, 2018 | Department of DefenseW6QK ACC-RSA | 0674 | 336413 | THIS STATEMENT OF WORK (SOW) DEFINES THE EFFORT REQUIRED TO PROVIDE 30 MANNED UN-MANNED TEAMING (MUMT) APACHE CONFIGURATION MAINTENANCE EQUIPMENT (ACME) KITS. THIS EFFORT WILL REQUIRE MODIFICATION OF EXISTING MUMT PECULIAR GROUND SUPPORT EQUIPMENT (PGSE) KITS BY THE REMOVAL AND ADDITION OF CERTAIN KIT CONTENTS, REPLACEMENT OF MISSING PIECE PARTS, AS WELL AS MODIFICATION OF THE FOAM INSERTS TO ACCOMMODATE THE UPDATED KIT CONTENTS. THE MODIFIED KIT, KNOWN AS THE MUMT ACME KIT, WILL BE USED FOR TRAINING PURPOSES TO PROVIDE INTERACTIVE UNMANNED AERIAL VEHICLE (UAV) VIDEO AND METADATA CONSISTENT WITH THE GREY EAGLE AND SHADOW LIVE SYSTEM INTERFACES TO MANNED PLATFORMS. ADDITIONALLY, THE REQUIREMENT INCLUDES AN OPTION FOR AN ADDITIONAL 45 MUMT ACME KITS | $5.4M |
| May 18, 2018 | Department of DefenseW6QK ACC-RSA | 0605 | 336413 | IGF::OT::IGF ORDER 0605 HE EFFORT FOR THE CONTRACTOR TO PROVIDE PATRIOT AIR MISSILE DEFENSE SYSTEM HARDWARE FOR THE FOREIGN MILITARY SALES CUSTOMER OF QATAR. THE GOVERNMENT REQUIRES MANUFACTURING OF PATRIOT HARDWARE FOR THE PATRIOT ENGAGEMENT CONTROL STATION (ECS) AND LAUNCHER STATION (LS). THE PRIMARY GOAL IS TO SUPPORT ARMY AVIATION, MISSILE, DOD AND TECHNOLOGY ACTIVITIES THROUGH THE DEVELOPMENT, FABRICATION, INTEGRATION, TEST AND QUALIFICATION OF TACTICAL AND GROUND SUPPORT SYSTEMS, SUBSYSTEMS AND COMPONENTS. | $186K |
| May 18, 2018 | Department of DefenseW6QK ACC-RSA | 0701 | 336413 | THIS SOW DEFINES THE EFFORT REQUIRED TO PROVIDE 100 AVENGER W303 CABLES ASSEMBLIES. | $535K |
| May 18, 2018 | Department of DefenseW6QK ACC-RSA | 0710 | 336413 | IGF::OT::IGF ORDER 0710 (NEW ORDER UNDER BASE IDIQ CONTRACT) THIS STATEMENT OF WORK (SOW) DEFINES THE EFFORT REQUIRED TO CLEAN, REPAIR, TOUCH UP, AND PAINT THE EXTERIOR SURFACE OF ONE (1) AH-1F COBRA AIRCRAFT FOR THE EXISTING PEO AVIATION STATIC DISPLAY. ADDITIONALLY, THIS STATEMENT OF WORK CONTAINS REQUIREMENTS FOR PROGRAM MANAGEMENT AND LOGISTICS SUPPORT. | $121K |
| May 18, 2018 | Department of DefenseW6QK ACC-RSA | 0732 | 336413 | THIS STATEMENT OF WORK (SOW) DEFINES THE EFFORT REQUIRED FOR THE PROCUREMENT, MANUFACTURING, DESIGN, ENGINEERING, KITTING, AND SHIPPING OF THE 12TH CAB INITIAL FIELDING PACKAGE. INCLUDED ARE THE ASSOCIATED PROGRAM MANAGEMENT AND LOGISTICS SUPPORT PLANNING REQUIREMENTS. | $1.1M |
| May 18, 2018 | Department of DefenseW6QK ACC-RSA | 0678 | 336413 | IGF::OT::IGF THE CONTRACTOR SHALL PROVIDE TWO (2) AIRFIELD PROTECTION TEST ASSETS IAW THE GOVERNMENT FURNISHED PRELIMINARY TDP. | $71K |
| May 18, 2018 | Department of DefenseW6QK ACC-RSA | 0707 | 336413 | PROVIDE SAUDI AIR NATIONAL GUARD (SANG) WITH A UH-60 FIELDING SUPPORT PACKAGE IN SUPPORT OF CASES SI-B-WXZ AND SI-B-WAY. | $2.4M |
| May 18, 2018 | Department of DefenseW6QK ACC-RSA | 0751 | 336413 | CONTRACTOR LOGISTICS SUPPORT (CLS) TASKS NECESSARY FOR OPERATIONAL FIELD SUPPORT AND OTHER SUSTAINMENT SUPPORT ACTIVITIES FOR THE AAQ-24 LARGE AIRCRAFT INFRARED COUNTERMEASURES (LAIRCM) SYSTEM WITH ADVANCED THREAT WARNING (ATW) SENSORS, HEREINAFTER REFERRED AS THE AAQ-24 ATW LAIRCM. THE AAQ-24 ATW LAIRCM WILL BE INTEGRATED FOR USE ON MULTIPLE US ARMY AIRCRAFT TO INCLUDE THE AH-64E, CH-47F, UH/HH-60L/M PLATFORMS. | $4.8M |
| May 17, 2018 | Department of DefenseW6QK ACC-RSA | 0748 | 336413 | THE CONTRACTOR SHALL PROVIDE (25) DETECTOR SHIELD ASSEMBLIES IAW WITH DRAWING 151094 AND (20) AN/APR-39 (V)2 ETHERNET CABLE ASSEMBLIES IAW DRAWING L100624. | $94K |
| May 16, 2018 | Department of DefenseW6QK ACC-RSA | 0342 | 336413 | IGF::OT::IGF MULTI MISSION LAUNCHER ORDER 0342/OEP 16413 | $5.1M |
| May 16, 2018 | Department of DefenseW6QK ACC-RSA | 0551 | 336413 | IGF::OT::IGF UH-60M TROOP SEAT IMPROVEMENT | $550K |
| May 16, 2018 | Department of DefenseW6QK ACC-RSA | 0734 | 336413 | THE CONTRACTOR SHALL PROVIDE FIFTY (50) UK APACHE SUPPORT KITS. EACH KIT SHALL INCLUDE THE FOLLOWING ITEMS (THE KIT PARTS LIST IS PROVIDED IN APPENDIX C) : ONE (1) AH-64E APACHE AVR-2A KIT ONE (1) AH-64E CMWS A-KIT ONE (1) AH-64E M48 BRACKET ONE (1) AIRCRAFT SET OF INTERMEDIATES (NACELLE ASSEMBLIES) WITH ATTACHMENT HARDWARE ONE (1) AIRCRAFT SET OF STRAP AND BUCKLE ASSEMBLIES IN ADDITION, THE CONTRACTOR SHALL PROVIDE THREE (3) AH-64E M48 BRACKETS. | $2.0M |
| May 15, 2018 | Department of DefenseW6QK ACC-RSA | 0643 | 336413 | IGF::OT::IGF NEW ORDER. MODIFICATION OF H-60M AIRCRAFT INFRARED SEARCH LIGHT SYSTEM INTENSITY DECREASED/INCREASED FUNCTION ON THE PILOT AND CO-PILOT COLLECTIVE STICK FOR THE UH-60M AND HH-60M, HEREIN REFERRED TO AS THE H-60M, IR SEARCHLIGHT TO BE DIMMED TO A DESIRED LEVEL OF LUMINESCENCE IN 10% INCREMENTS. THE IR SEARCH LIGHT SYSTEMS INCLUDES ALL HARDWARE FROM THE PILOT AND COPILOT COLLECTIVE SWITCH, ALL ASSOCIATED WIRING. THESE EFFORTS WILL RESULT IN AN ENGINEERING CHANGE PROPOSAL (ECP) AND A MODIFICATION WORK ORDER (MWO) FOR BOTH THE HH/UH-60M AIRCRAFT. | $176K |
| May 14, 2018 | Department of DefenseW6QK ACC-RSA | 0747 | 336413 | IGF::OT::IGF SOW: PATRIOT ELECTRICAL POWER PLANT JUNCTION BOX HIS STATEMENT OF WORK (SOW) DEFINES THE EFFORT REQUIRED TO SUPPORT THE LOWER TIER PROJECT OFFICE (LTPO) MANUFACTURE, INTEGRATE, TEST, AND DELIVERY OF TWO (2) PATRIOT LOAD BANK JUNCTION BOX, WHICH INCLUDES FOUR (4) LOAD BANK UNITS. THE PATRIOT LOAD BANK JUNCTION BOX WILL BE USED TO ACCOMMODATE COMMERCIAL 15KW, 30KW AND 150KW POWER CONVERTERS AND TACTICAL POWER GENERATORS | $407K |
| May 14, 2018 | Department of DefenseW6QK ACC-RSA | 0752 | 336413 | THE CONTRACTOR SHALL DEVELOP REPAIR CERTIFICATION INSTALLATION PROCESSES FOR YEH-60B LANDING GEAR STRUTS FROM THREE GOVERNMENT FURNISHED PROTOTYPE STRUTS PROVIDED FOR FAMILIARIZATION AND TEARDOWN ANALYSIS. THE CONTRACTOR SHALL DEVELOP A REPORT DOCUMENTING REPAIR/CERTIFICATION/INSTALLATION PROCESS FOR THE YEH-60B AIRCRAFT STRUT INCORPORATING DETAILS PROPER AND SAFE FUNCTIONING LEVELS FOR FLIGHT IAW DI-CMAN-80792. THE PROTOTYPE INTEGRATION FACILITY (PIF) CONTRACTING OFFICERS REPRESENTATIVE (COR) WILL OBTAIN AIRWORTHINESS ENGINEERING DIRECTORATE (AED) APPROVAL | $80K |
| May 7, 2018 | Department of DefenseW6QK ACC-RSA | 0653 | 336413 | IGF::OT::IGF NEW ORDER 0653 (INCREMENTALLY FUNDED) THIS STATEMENT OF WORK (SOW) DEFINES THE REQUIREMENTS FOR THE DEVELOPMENT OF THE A-KIT NECESSARY FOR ADAPTING THE COMMON INFRARED COUNTERMEASURE SYSTEM ONTO THE H-60 ROTARY WING AIRCRAFT WHICH HAVE HAD THE Q-24 SYSTEM INSTALLED AS PART OF A JOINT OPERATIONAL NEEDS STATEMENT (JUONS) EFFORT AND TO ACHIEVE A SAFETY OF FLIGHT (SOF) AIRWORTHINESS RELEASE (AWR) FOR A LIMITED NUMBER OF AIRCRAFT TO BE FIELDED. THE COMMON INFRARED COUNTERMEASURE (CIRCM) SYSTEM WILL REPLACE THE GUARDIAN LASER TRACKER ASSEMBLY (GLTA) FROM THE JUONS MODIFIED AIRCRAFT. | $4.4M |
| May 4, 2018 | Department of DefenseW6QK ACC-RSA | 0696 | 336413 | IGF::OT::IGF THIS SOW DEFINES THE EFFORT REQUIRED FOR THE MANUFACTURING AND DELIVERY OF 156 EELS KITS: 93 PERSONNEL (P) KITS IAW 7013100-1; 39 COMMAND (C) KITS IAW 7013100-2; 24 RECOVERY (R) KITS IAW 7013100-3; 100 SETS OF FLEX TRACK; AND FINAL INITIAL ISSUE PROVISIONING (IIP) COMPONENTS, TO INCLUDE 15 WATER SENSORS AND 2 EELS TEST SETS. INCLUDED ARE THE ASSOCIATED PROGRAM MANAGEMENT AND LOGISTICS SUPPORT PLANNING REQUIREMENTS. | $1.5M |
| May 4, 2018 | Department of DefenseW6QK ACC ANAD | 0016 | 336992 | IGF::OT::IGF VARIOUS SUPPORT SERVICES MPTB | $104K |
| May 3, 2018 | Department of DefenseW6QK ACC-RSA | 0718 | 336413 | IGF::OT::IGF, THE UH-60 PROJECT MANAGEMENT OFFICE HAS A REQUIREMENT TO COMPLETE THE NON-RECURRING EFFORT NECESSARY TO INCORPORATE THE IMPROVED ENGINE STARTER, P/N 3505300-10, INTO THE H-60 FLEET AS A SPARE. THIS EFFORT WILL INCLUDE DEVELOPMENT OF TECHNICAL MANUAL (TM) UPDATES, REPAIR PARTS AND SPECIAL TOOLS LIST (RPSTL) UPDATES, PROVISIONING UPDATES, DRAWINGS, AND COMPONENT AND AIRFRAME ENGINEERING CHANGE PROPOSALS (ECP). | $5K |
| May 2, 2018 | Department of DefenseW6QK ACC-RSA | 0584 | 336413 | IGF::OT::IGF , "AH-1W PLATFORM SUPPORT" OEP 18522 | $1.7M |
| May 2, 2018 | Department of DefenseW6QK ACC-RSA | 0740 | 336413 | THIS STATEMENT OF WORK (SOW) DEFINES THE EFFORT REQUIRED TO SUPPORT NAVAIR PMA-275 FOR THE WRITING AND DELIVERY OF A V-22 IRIDIUM ANTENNA INSTALLATION, REMOVAL, AND TROUBLESHOOTING PROCEDURE. INCLUDED ARE THE ASSOCIATED PROGRAM MANAGEMENT AND LOGISTICS SUPPORT PLANNING REQUIREMENTS. | $86K |
| May 2, 2018 | Department of DefenseW6QK ACC-RSA | 0731 | 336413 | THE CONTRACTOR SHALL PROVIDE A REVISED UH-60 A/L BLADE FOLD KIT TDP FOR DRAWINGS 1043419 AND 1043731 IN ACCORDANCE WITH (IAW) DI-ADMN-80925. THE CONTRACTOR SHALL PROVIDE, ASSEMBLE AND KIT A QUANTITY OF 100 UH-60 A/L BLADE FOLD KIT ASSEMBLIES (PN:1043413). THE CONTRACTOR SHALL PROVIDE A QUANTITY OF 100 AIR TRANSPORT CASES, (P/N: 21044). THE CONTRACTOR SHALL PROVIDE A QUANTITY OF 100 STAR PLATE KITS, (P/N: 1006779). | $923K |
| May 2, 2018 | Department of DefenseW6QK ACC-RSA | 0627 | 336413 | IGF::OT::IGF, TO 727, OEP 18841, "PROVIDE SUPPORT EQUIPMENT (SE) REQUIRED TO SUPPORT V-22 PLANNED MAINTENANCE INTERVAL (PMI) EFFORTS. INCLUDED ARE THE ASSOCIATED PROGRAM MANAGEMENT, SYSTEM ENGINEERING, AND LOGISTICS REQUIREMENTS. | $309K |
| May 2, 2018 | Department of DefenseW6QK ACC-RSA | 0645 | 336413 | PIF CONTRACT | $6.9M |
| May 1, 2018 | Department of DefenseW6QK ACC-RSA | 0733 | 336413 | SOW: FUTURE LAUNCHER DEMONSTRATION UNITS THIS STATEMENT OF WORK (SOW) IDENTIFIES REQUIREMENTS TO BE ACCOMPLISHED BY THE CONTRACTOR IN SUPPORT OF THE PROTOTYPE INTEGRATION FACILITY (PIF) FUTURE LAUNCHER DEMONSTRATION UNITS DEVELOPMENT. THE FUTURE LAUNCHER IS A PALLETIZED LAUNCHER CAPABLE OF FIRING THE MULTIPLE LAUNCH ROCKET SYSTEM (MLRS) FAMILY OF MUNITIONS (MFOM), TWO (2) PODS LOAD OUT, WITH AZIMUTH AND ELEVATION CAPABILITY. THE DRAWING PACKAGE FOR THE FUTURE LAUNCHER DEMONSTRATION UNITS IS UNDER DEVELOPMENT BY THE GOVERNMENT AND WILL BE PROVIDED TO THE CONTRACTOR. THE LAUNCHER DESIGN WILL BE BASED ON THE FUTURE LAUNCHER INTEGRATION TEST UNITS DESIGN, TWO OF WHICH WERE FABRICATED UNDER TASK ORDER 0649 OF THIS CONTRACT, BUT WILL HAVE SIGNIFICANT DIFFERENCES IN FORM, FIT, AND FUNCTION. TWO M270 TURRET GEAR BEARINGS WILL BE PROVIDED TO THE CONTRACTOR FOR RE-UTILIZATION IN ORDER TO REDUCE COST AND SCHEDULE RISK. ACTIVITIES INCLUDE DESIGN, DEVELOPMENT, FABRICATION, INTEGRATION, TEST, AND CHECKOUT OF MECHANICAL AND ELECTRICAL COMPONENTS ASSOCIATED WITH THE DEVELOPMENT OF TWO FUTURE LAUNCHER DEMONSTRATION UNITS WHICH WILL FACILITATE TESTING OF FUTURE LAUNCHER FUNCTIONALITY | $400K |
| Apr 20, 2018 | Department of DefenseW6QK ACC-RSA | 0679 | 336413 | IGF::OT::IGF THIS REQUIREMENT WILL MODIFY 1 APACHE AH-64E BY INSTALLING 1 EACH OF THE KITS LISTED IN THE ATTACHMENT 1 OF THE SOW. THE CONTRACTOR SHALL ENSURE 100% KIT ACCURACY AND REMEDY ANY DEFICIENCIES. THE CONTRACTOR SHALL REDLINE CHANGES TO THE TECHNICAL DATA PACKAGE. THE CONTRACTOR SHALL FABRICATE AND DELIVER 1 EACH OF THE ITEMS LISTED AS TOOLING. | $110K |
| Apr 19, 2018 | Department of DefenseW6QK ACC-RSA | 0743 | 336413 | TO 0743, RBA 20352, "PROVIDE BLUE FORCE TRACKING (BFT) ELECTROMAGNETIC INTERFERENCE (EMI) ENCLOSURE ASSEMBLIES FOR THE CH47F HELICOPTER IN SUPPORT OF FOREIGN MILITARY SALES (FMS) CASES: AT-B-UDK AND AT-B-VAF" | $85K |
| Apr 18, 2018 | Department of DefenseW6QK ACC-RSA | 0058 | 336413 | NOT TO EXCEED ORDER FOR RECOVERY OF AIRBASE DENIED BY ORDNANCE IN SUPPORT OF THE AIR FORCE | $347K |
| Apr 18, 2018 | Department of DefenseW6QK ACC-RSA | 0746 | 336413 | THE PURPOSE OF THIS STATEMENT OF WORK (SOW) IS TO DEFINE THE EFFORT REQUIRED TO INCORPORATE INTO THE UH-60M AIRCRAFT THE NEW FLEXIBLE NON-BALLISTIC FUEL HOSE, P/N HM026-048-TBD. THIS INCLUDES REVISIONS TO THE COMPLETE TECHNICAL DATA PACKAGE (TDP), INCLUDING VALIDATION/VERIFICATION MODIFICATION WORK ORDER (MWO), PUBLICATIONS, AND DRAWING(S). | $428K |
| Apr 18, 2018 | Department of DefenseW6QK ACC-RSA | 0565 | 336413 | IGF::OT::IGF NEW TASK ORDER FOR INTERROGATION ARM INSTALLATION AND COMMON REMOTELY OPERATED WEAPON SYSTEM TESTING | $85K |
| Apr 5, 2018 | Department of DefenseW6QK ACC ANAD | 0037 | 336992 | IGF::OT::IGF OTHER DIRECT COST | $11K |
| Apr 5, 2018 | Department of DefenseW6QK ACC-RSA | 0736 | 336413 | THIS STATEMENT OF WORK (SOW) DEFINES THE EFFORT REQUIRED FOR THE PROCUREMENT, MANUFACTURING, DESIGN, ENGINEERING, KITTING, AND SHIPPING OF THE NATIONAL GUARD BUREAU (NGB) SUPPLEMENTAL FIELDING PACKAGE. INCLUDED ARE THE ASSOCIATED PROGRAM MANAGEMENT AND LOGISTICS SUPPORT PLANNING REQUIREMENTS. | $1.4M |
| Apr 5, 2018 | Department of DefenseW6QK ACC-RSA | 0294 | 336413 | IGF::OT::IGF ORDER 0294. | $41K |
| Apr 5, 2018 | Department of DefenseW6QK ACC-RSA | 0663 | 336413 | IGF::OT::IGF, THIS STATEMENT OF WORK (SOW) DEFINES THE EFFORT REQUIRED TO PROVIDE RADBO PRODUCT LEVEL DRAWINGS AND ENGINEERING SUPPORT TO THE DIRECTED ENERGY WEAPONS (DEW) BOARD AND CYBERSECURITY IPT. | $747K |
| Apr 4, 2018 | Department of DefenseW6QK ACC-RSA | 0654 | 336413 | IGF::OT::IGF THIS STATEMENT OF WORK (SOW) DEFINES THE EFFORT REQUIRED TO PROVIDE AH-64E APR-39 DV2 A-KITS. THE APR-39 DV2 RADAR WARNING RECEIVER (RWR)/ELECTRONIC WARFARE MANAGEMENT SYSTEM (EWMS) IS BEING DESIGNED TO MAXIMIZE SURVIVABILITY BY IMPROVING AIRCREW SITUATIONAL AWARENESS VIA INTERACTIVE MANAGEMENT OF ALL ONBOARD SENSORS AND COUNTERMEASURES. INCLUDED ARE THE ASSOCIATED PROGRAM MANAGEMENT AND LOGISTICS SUPPORT PLANNING REQUIREMENTS. THE APR-39 DV2 IS CURRENTLY IN THE DEVELOPMENT PHASE. THE CONTRACTOR SHALL PROVIDE, KIT AND SHIP TWENTY-EIGHT (28) AH-64E APR-39 DV2 A-KITS IN ACCORDANCE WITH (IAW) THE GOVERNMENT FURNISHED PRELIMINARY TDP. THE CONTRACTOR SHALL PROVIDE TWENTY-EIGHT (28) COCKPIT UTILITY RELAY BOXES (PN 7-611B25001-107). THE CONTRACTOR SHALL PROVIDE FIVE (5) TOOL SETS IAW THE GOVERNMENT FURNISHED PRELIMINARY TDP. | $3.5M |
| Apr 4, 2018 | Department of DefenseW6QK ACC-RSA | 0618 | 336413 | IGF::OT::IGF THIS STATEMENT OF WORK (SOW) DEFINES THE EFFORT REQUIRED FOR THE PROCUREMENT, MANUFACTURING, INTEGRATION, PROVISIONING, KITTING, AND DELIVERY OF MULTIPLE APACHE MISSION ESSENTIAL PACKAGES (MEPS), MODIFICATION KITS AND APACHE PARTS. THIS INCLUDES APACHE FIELD SUPPORT MATERIAL COMPRISED OF AH-64E (IMPROVED) KITS, AIRCRAFT COMPONENTS/HARDWARE, AND INSPECTION/REPAIR OF AIRCRAFT PARTS. ADDITIONALLY, THE CONTRACTOR WILL VERIFY THE APACHE MODIFICATION KIT CONFIGURATIONS, TECHNICAL DATA PACKAGES, DEVELOPMENT/SUSTAINMENT OF MODIFICATION WORK ORDER (MWO) AND OTHER SUPPORT DOCUMENTS FOR INSTALLATION ACTIVITIES. | $3.5M |
| Apr 3, 2018 | Department of DefenseW6QK ACC-RSA | 0728 | 336413 | BASE EFFORT THE CONTRACTOR SHALL DE-MODIFY THE FOLLOWING EQUIPMENT FROM FOUR EACH HH-60L AIRCRAFT IN ACCORDANCE WITH THE APPLICABLE TECHNICAL MANUALS OR DRAWINGS. THE CONTRACTOR SHALL PROVIDE ONE EACH A-KIT FOR EACH OF THE FOUR AIRCRAFT IN THE TABLE LISTED BELOW. THE CONTRACTOR SHALL INSTALL THE FOLLOWING MODIFICATIONS ON THE FOUR EACH HH-60L AIRCRAFT IN ORDER TO BRING THEM INTO A MODIFIED HH-60L CONFIGURATION. THE GOVERNMENT ANTICIPATES OVERTIME WILL BE REQUIRED TO SUPPORT INTEGRATION ACTIVITIES. MODIFICATIONS SHALL BE PERFORMED IAW THE APPLICABLE TECHNICAL MANUALS OR DRAWINGS. THE CONTRACTOR SHALL MAKE ANY NECESSARY DESIGN CHANGES TO THE A-KITS PROVIDED AS GOVERNMENT FURNISHED EQUIPMENT IN ORDER TO ACHIEVE FORM, FIT, AND FUNCTION ON THE FOUR AIRCRAFT. THE CONTRACTOR SHALL PROVIDE OR REWORK THE NECESSARY A-KIT PARTS IAW THE REDLINED OR MODIFIED DRAWINGS AND INSTALL A-KIT PARTS IAW THE REDLINED OR MODIFIED INSTALLATION DRAWINGS. OPTION 1 THE CONTRACTOR SHALL DE-MODIFY THE FOLLOWING EQUIPMENT FROM TWO EACH HH-60L AIRCRAFT IN ACCORDANCE WITH THE APPLICABLE TECHNICAL MANUALS OR DRAWINGS LISTED. THE CONTRACTOR SHALL PROVIDE ONE EACH A-KIT FOR EACH OF THE TWO AIRCRAFT IN THE TABLE LISTED BELOW. THE CONTRACTOR SHALL INSTALL THE FOLLOWING MODIFICATIONS ON THE TWO EACH HH-60L AIRCRAFT IN ORDER TO BRING THEM INTO A MODIFIED HH-60L CONFIGURATION IAW THE APPLICABLE TECHNICAL MANUALS OR DRAWINGS. OPTION 2 THE CONTRACTOR SHALL DE-MODIFY THE FOLLOWING EQUIPMENT FROM TWO EACH HH-60L AIRCRAFT IN ACCORDANCE WITH THE APPLICABLE TECHNICAL MANUALS OR DRAWINGS LISTED. THE CONTRACTOR SHALL PROVIDE ONE EACH A-KIT FOR EACH OF THE TWO AIRCRAFT IN THE TABLE LISTED BELOW. THE CONTRACTOR SHALL INSTALL THE FOLLOWING MODIFICATIONS ON THE TWO EACH HH-60L AIRCRAFT IN ORDER TO BRING THEM INTO A MODIFIED HH-60L CONFIGURATION IAW THE APPLICABLE TECHNICAL MANUALS OR DRAWINGS. | $1.5M |
| Apr 3, 2018 | Department of DefenseW6QK ACC-RSA | 0745 | 336413 | THIS STATEMENT OF WORK (SOW) DEFINES THE REQUIREMENTS FOR PROVIDING (10) 13589523, CIRCUIT CARD ASSEMBLIES (CCA) TO SUPPORT SUSTAINMENT OF THE PATRIOT LAUNCHER STATION TEST SETS (LSTS). INCLUDED ARE THE ASSOCIATED PROGRAM MANAGEMENT AND LOGISTICS SUPPORT PLANNING REQUIREMENTS. | $71K |
| Apr 2, 2018 | Department of DefenseW6QK ACC-RSA | 0493 | 336413 | IGF::OT::IGF: OEP 17750 BLUE FORCE TRACKING-2 (BFT-2) PRODUCTION | $64K |
| Mar 30, 2018 | Department of DefenseW6QK ACC-RSA | 0751 | 336413 | CONTRACTOR LOGISTICS SUPPORT (CLS) TASKS NECESSARY FOR OPERATIONAL FIELD SUPPORT AND OTHER SUSTAINMENT SUPPORT ACTIVITIES FOR THE AAQ-24 LARGE AIRCRAFT INFRARED COUNTERMEASURES (LAIRCM) SYSTEM WITH ADVANCED THREAT WARNING (ATW) SENSORS, HEREINAFTER REFERRED AS THE AAQ-24 ATW LAIRCM. THE AAQ-24 ATW LAIRCM WILL BE INTEGRATED FOR USE ON MULTIPLE US ARMY AIRCRAFT TO INCLUDE THE AH-64E, CH-47F, UH/HH-60L/M PLATFORMS. | $1.1M |
| Mar 29, 2018 | Department of DefenseW6QK ACC-RSA | 0678 | 336413 | IGF::OT::IGF THE CONTRACTOR SHALL PROVIDE TWO (2) AIRFIELD PROTECTION TEST ASSETS IAW THE GOVERNMENT FURNISHED PRELIMINARY TDP. | $2.0M |
| Mar 29, 2018 | Department of DefenseW6QK ACC-RSA | 0596 | 336413 | IGF::OT::IGF PROVIDE FORTY-FIVE (45) AURS MK112 MOD2S, FORTY-FIVE (45) AURS MK112 MOD2S CA 717 CABLE ASSEMBLIES, FIVE (5) DYNAMIC LOAD BACK CONTROLLERS (DLBC), AND TEN (10) VPT CABLES. THIS SOW ALSO DEFINES AN OPTION FOR AN ADDITIONAL FORTY-FIVE (45) AURS MK112 MOD2S AND FORTY-FIVE (45) AURS MK112 MOD2S CA 717 CABLE ASSEMBLIES. | $490K |
| Mar 27, 2018 | Department of DefenseW6QK ACC-RSA | 0682 | 336413 | "PROVIDE FMS TWINAX TOOL KITS. THE KITS WILL BE USED TO SUPPORT CRITICAL GROUND MAINTENANCE TASKS." | $150K |
| Mar 20, 2018 | Department of DefenseW6QK ACC-RSA | 0562 | 336413 | IGF::OT::IGF ENGINEERING SUPPORT INCLUDES DRAWING UPDATES, ENGINEERING CHANGES PROPOSALS (ECPS), ACCEPTANCE TEST SUPPORT, TROUBLESHOOTING/RESOLVING ISSUES THAT ARISE DURING ACCEPTANCE TESTING, BI-WEEKLY MEETING SUPPORT, REQUEST FOR VARIANCE (RFV) REVIEWS, AND UPDATES/INPUT FOR FORM 2028 IN SUPPORT OF LOGISTIC PRODUCT CHANGES. | $199K |
| Mar 5, 2018 | Department of DefenseW6QK ACC-RSA | 0342 | 336413 | IGF::OT::IGF MULTI MISSION LAUNCHER ORDER 0342/OEP 16413 | $1.5M |
| Feb 28, 2018 | Department of DefenseW6QK ACC-RSA | 0704 | 336413 | THE STATEMENT OF WORK IS TO PROVIDE FOREIGN MILITARY SALES (FMS) TWINAX TOOL KITS. THE KITS WILL BE USED TO SUPPORT CRITICAL GROUND MAINTENANCE TASKS." | $43K |