Federal Contracts
Showing contracts 1–50 of 621 total. Sorted by action date, most recent first. Excludes $0 modifications.
| Date | Agency | PIID | NAICS | Description | Amount |
|---|---|---|---|---|---|
| Aug 1, 2024 | Department of DefenseW6QK ACC-RSA | 0092 | 336413 | TASK ORDER 0092, $886,486, "NAVO N9 OPS." | $2K |
| Jun 18, 2024 | Department of DefenseW6QK ACC-RSA | 0728 | 336413 | BASE EFFORT THE CONTRACTOR SHALL DE-MODIFY THE FOLLOWING EQUIPMENT FROM FOUR EACH HH-60L AIRCRAFT IN ACCORDANCE WITH THE APPLICABLE TECHNICAL MANUALS OR DRAWINGS. THE CONTRACTOR SHALL PROVIDE ONE EACH A-KIT FOR EACH OF THE FOUR AIRCRAFT IN THE TABLE LISTED BELOW. THE CONTRACTOR SHALL INSTALL THE FOLLOWING MODIFICATIONS ON THE FOUR EACH HH-60L AIRCRAFT IN ORDER TO BRING THEM INTO A MODIFIED HH-60L CONFIGURATION. THE GOVERNMENT ANTICIPATES OVERTIME WILL BE REQUIRED TO SUPPORT INTEGRATION ACTIVITIES. MODIFICATIONS SHALL BE PERFORMED IAW THE APPLICABLE TECHNICAL MANUALS OR DRAWINGS. THE CONTRACTOR SHALL MAKE ANY NECESSARY DESIGN CHANGES TO THE A-KITS PROVIDED AS GOVERNMENT FURNISHED EQUIPMENT IN ORDER TO ACHIEVE FORM, FIT, AND FUNCTION ON THE FOUR AIRCRAFT. THE CONTRACTOR SHALL PROVIDE OR REWORK THE NECESSARY A-KIT PARTS IAW THE REDLINED OR MODIFIED DRAWINGS AND INSTALL A-KIT PARTS IAW THE REDLINED OR MODIFIED INSTALLATION DRAWINGS. OPTION 1 THE CONTRACTOR SHALL DE-MODIFY THE FOLLOWING EQUIPMENT FROM TWO EACH HH-60L AIRCRAFT IN ACCORDANCE WITH THE APPLICABLE TECHNICAL MANUALS OR DRAWINGS LISTED. THE CONTRACTOR SHALL PROVIDE ONE EACH A-KIT FOR EACH OF THE TWO AIRCRAFT IN THE TABLE LISTED BELOW. THE CONTRACTOR SHALL INSTALL THE FOLLOWING MODIFICATIONS ON THE TWO EACH HH-60L AIRCRAFT IN ORDER TO BRING THEM INTO A MODIFIED HH-60L CONFIGURATION IAW THE APPLICABLE TECHNICAL MANUALS OR DRAWINGS. OPTION 2 THE CONTRACTOR SHALL DE-MODIFY THE FOLLOWING EQUIPMENT FROM TWO EACH HH-60L AIRCRAFT IN ACCORDANCE WITH THE APPLICABLE TECHNICAL MANUALS OR DRAWINGS LISTED. THE CONTRACTOR SHALL PROVIDE ONE EACH A-KIT FOR EACH OF THE TWO AIRCRAFT IN THE TABLE LISTED BELOW. THE CONTRACTOR SHALL INSTALL THE FOLLOWING MODIFICATIONS ON THE TWO EACH HH-60L AIRCRAFT IN ORDER TO BRING THEM INTO A MODIFIED HH-60L CONFIGURATION IAW THE APPLICABLE TECHNICAL MANUALS OR DRAWINGS. | $3K |
| Jan 17, 2024 | Department of DefenseW6QK ACC-RSA | 0645 | 336413 | PIF CONTRACT | $1 |
| Jul 31, 2023 | Department of DefenseW6QK ACC-RSA | 0136 | 336413 | OEP 14746 | $6K |
| May 8, 2023 | Department of DefenseW6QK ACC-RSA | 0727 | 336413 | THIS SOW DEFINES THE EFFORT REQUIRED FOR THE NON-RECURRING ENGINEERING (NRE), FABRICATION, ASSEMBLY, AND KITTING OF 225 CH-47F AN/AVR-2B A-KITS | $144K |
| Jun 15, 2022 | Department of DefenseW6QK ACC-RSA | 0655 | 336413 | DEVELOPMENT OF THE A-KIT NECESSARY FOR ADAPTING THE COMMON INFRARED COUNTERMEASURE SYSTEM ONTO THE CH-47F ROTARY WING AIRCRAFT WHICH HAVE HAD THE Q-24 SYSTEM INSTALLED AS PART OF A JOINT OPERATIONAL NEEDS STATEMENT (JUONS) EFFORT AND TO ACHIEVE A SAFETY OF FLIGHT (SOF) AIRWORTHINESS RELEASE (AWR) FOR A LIMITED NUMBER OF AIRCRAFT TO BE FIELDED. THE COMMON INFRARED COUNTERMEASURE (CIRCM) SYSTEM WILL REPLACE THE GUARDIAN LASER TRACKER ASSEMBLY (GLTA) FROM THE JUONS MODIFIED AIRCRAFT. IGF::OT::IGF | $28K |
| Sep 22, 2021 | Department of DefenseW6QK ACC-RSA | 0722 | 336413 | IGF::OT::IGF THIS SOW DEFINES THE EFFORT REQUIRED TO PROVIDE THIRTY (30) PATRIOT DUAL TELEMETRY KITS. | $464K |
| May 21, 2021 | Department of DefenseW6QK ACC-RSA | 0625 | 336413 | IGF::OT::IGF V-22 OSPREY MISSION COMPUTER OBSOLESCENCE THIS EFFORT IS REQUIRED TO SUPPORT PMA-275 FOR THE PROCUREMENT, MANUFACTURING, INTEGRATION, KITTING, DELIVERY, AND INSTALLATION OF MISSION COMPUTER OBSOLESCENCE INITIATIVE (MCOI) RETROFIT KITS AND COMMON AIRCRAFT PORTABLE REPROGRAMMING EQUIPMENT (CAPRE) GBE FILLPORT KITS. INCLUDED ARE THE ASSOCIATED PROGRAM MANAGEMENT AND LOGISTICS SUPPORT PLANNING REQUIREMENTS. | $1.6M |
| May 5, 2021 | Department of DefenseW6QK ACC-RSA | 0652 | 336413 | US ARMY UC31 CURRENT UTILIZE THE UNIVERSITY UNS-1ESPEW WHITE MANAGEMENT SYSTEM AND MULTIPLE AVA COMPONTS THROUGH THE AIRSPACE TO MEET ARMY TRANSPORT REQUIREMENTS. PURPOSE OF THE EFFECT IS TO ADSB OUT OPERATIONS | $689K |
| Feb 3, 2021 | Department of DefenseW6QK ACC-RSA | 0593 | 336413 | IGF::OT::IGF CUSTOMS AND BORDER PROTECTION HH-60L AIRCRAFT 2&3 MODIFICATION | $241K |
| Jan 13, 2021 | Department of DefenseW6QK ACC-RSA | 0728 | 336413 | BASE EFFORT THE CONTRACTOR SHALL DE-MODIFY THE FOLLOWING EQUIPMENT FROM FOUR EACH HH-60L AIRCRAFT IN ACCORDANCE WITH THE APPLICABLE TECHNICAL MANUALS OR DRAWINGS. THE CONTRACTOR SHALL PROVIDE ONE EACH A-KIT FOR EACH OF THE FOUR AIRCRAFT IN THE TABLE LISTED BELOW. THE CONTRACTOR SHALL INSTALL THE FOLLOWING MODIFICATIONS ON THE FOUR EACH HH-60L AIRCRAFT IN ORDER TO BRING THEM INTO A MODIFIED HH-60L CONFIGURATION. THE GOVERNMENT ANTICIPATES OVERTIME WILL BE REQUIRED TO SUPPORT INTEGRATION ACTIVITIES. MODIFICATIONS SHALL BE PERFORMED IAW THE APPLICABLE TECHNICAL MANUALS OR DRAWINGS. THE CONTRACTOR SHALL MAKE ANY NECESSARY DESIGN CHANGES TO THE A-KITS PROVIDED AS GOVERNMENT FURNISHED EQUIPMENT IN ORDER TO ACHIEVE FORM, FIT, AND FUNCTION ON THE FOUR AIRCRAFT. THE CONTRACTOR SHALL PROVIDE OR REWORK THE NECESSARY A-KIT PARTS IAW THE REDLINED OR MODIFIED DRAWINGS AND INSTALL A-KIT PARTS IAW THE REDLINED OR MODIFIED INSTALLATION DRAWINGS. OPTION 1 THE CONTRACTOR SHALL DE-MODIFY THE FOLLOWING EQUIPMENT FROM TWO EACH HH-60L AIRCRAFT IN ACCORDANCE WITH THE APPLICABLE TECHNICAL MANUALS OR DRAWINGS LISTED. THE CONTRACTOR SHALL PROVIDE ONE EACH A-KIT FOR EACH OF THE TWO AIRCRAFT IN THE TABLE LISTED BELOW. THE CONTRACTOR SHALL INSTALL THE FOLLOWING MODIFICATIONS ON THE TWO EACH HH-60L AIRCRAFT IN ORDER TO BRING THEM INTO A MODIFIED HH-60L CONFIGURATION IAW THE APPLICABLE TECHNICAL MANUALS OR DRAWINGS. OPTION 2 THE CONTRACTOR SHALL DE-MODIFY THE FOLLOWING EQUIPMENT FROM TWO EACH HH-60L AIRCRAFT IN ACCORDANCE WITH THE APPLICABLE TECHNICAL MANUALS OR DRAWINGS LISTED. THE CONTRACTOR SHALL PROVIDE ONE EACH A-KIT FOR EACH OF THE TWO AIRCRAFT IN THE TABLE LISTED BELOW. THE CONTRACTOR SHALL INSTALL THE FOLLOWING MODIFICATIONS ON THE TWO EACH HH-60L AIRCRAFT IN ORDER TO BRING THEM INTO A MODIFIED HH-60L CONFIGURATION IAW THE APPLICABLE TECHNICAL MANUALS OR DRAWINGS. | $608K |
| Dec 29, 2020 | Department of DefenseW6QK ACC-RSA | W58RGZ18F0003 | 336413 | PROVIDE TECHNICAL SUPPORT TO THE PRECISION FIRES ROCKET AND MISSILE SYSTEMS (PFRMS) PROJECT OFFICE (PO) TO UPGRADE UNITED ARAB EMIRATES (UAE) HIGH MOBILITY ARTILLERY ROCKET SYSTEMS (HIMARS) LAUNCHERS WITH DRIVERS VISION ENHANCER (DVE), CREW CHIEF RESTRAINT SYSTEM (CCRS), AND SAPPHIRE GLASS / TRANSPARENT ARMOR RETROFIT KIT. | $110K |
| Dec 11, 2020 | Department of DefenseW6QK ACC-RSA | W58RGZ18F0051 | 336413 | THIS STATEMENT OF WORK (SOW) DEFINES THE EFFORT REQUIRED TO PROVIDE TEST ASSETS FOR AMRDEC SECURITY INITIATIVES. | $39K |
| Dec 9, 2020 | Department of DefenseW6QK ACC-RSA | 0655 | 336413 | DEVELOPMENT OF THE A-KIT NECESSARY FOR ADAPTING THE COMMON INFRARED COUNTERMEASURE SYSTEM ONTO THE CH-47F ROTARY WING AIRCRAFT WHICH HAVE HAD THE Q-24 SYSTEM INSTALLED AS PART OF A JOINT OPERATIONAL NEEDS STATEMENT (JUONS) EFFORT AND TO ACHIEVE A SAFETY OF FLIGHT (SOF) AIRWORTHINESS RELEASE (AWR) FOR A LIMITED NUMBER OF AIRCRAFT TO BE FIELDED. THE COMMON INFRARED COUNTERMEASURE (CIRCM) SYSTEM WILL REPLACE THE GUARDIAN LASER TRACKER ASSEMBLY (GLTA) FROM THE JUONS MODIFIED AIRCRAFT. IGF::OT::IGF | $227K |
| Nov 16, 2020 | Department of DefenseW6QK ACC-RSA | 0728 | 336413 | BASE EFFORT THE CONTRACTOR SHALL DE-MODIFY THE FOLLOWING EQUIPMENT FROM FOUR EACH HH-60L AIRCRAFT IN ACCORDANCE WITH THE APPLICABLE TECHNICAL MANUALS OR DRAWINGS. THE CONTRACTOR SHALL PROVIDE ONE EACH A-KIT FOR EACH OF THE FOUR AIRCRAFT IN THE TABLE LISTED BELOW. THE CONTRACTOR SHALL INSTALL THE FOLLOWING MODIFICATIONS ON THE FOUR EACH HH-60L AIRCRAFT IN ORDER TO BRING THEM INTO A MODIFIED HH-60L CONFIGURATION. THE GOVERNMENT ANTICIPATES OVERTIME WILL BE REQUIRED TO SUPPORT INTEGRATION ACTIVITIES. MODIFICATIONS SHALL BE PERFORMED IAW THE APPLICABLE TECHNICAL MANUALS OR DRAWINGS. THE CONTRACTOR SHALL MAKE ANY NECESSARY DESIGN CHANGES TO THE A-KITS PROVIDED AS GOVERNMENT FURNISHED EQUIPMENT IN ORDER TO ACHIEVE FORM, FIT, AND FUNCTION ON THE FOUR AIRCRAFT. THE CONTRACTOR SHALL PROVIDE OR REWORK THE NECESSARY A-KIT PARTS IAW THE REDLINED OR MODIFIED DRAWINGS AND INSTALL A-KIT PARTS IAW THE REDLINED OR MODIFIED INSTALLATION DRAWINGS. OPTION 1 THE CONTRACTOR SHALL DE-MODIFY THE FOLLOWING EQUIPMENT FROM TWO EACH HH-60L AIRCRAFT IN ACCORDANCE WITH THE APPLICABLE TECHNICAL MANUALS OR DRAWINGS LISTED. THE CONTRACTOR SHALL PROVIDE ONE EACH A-KIT FOR EACH OF THE TWO AIRCRAFT IN THE TABLE LISTED BELOW. THE CONTRACTOR SHALL INSTALL THE FOLLOWING MODIFICATIONS ON THE TWO EACH HH-60L AIRCRAFT IN ORDER TO BRING THEM INTO A MODIFIED HH-60L CONFIGURATION IAW THE APPLICABLE TECHNICAL MANUALS OR DRAWINGS. OPTION 2 THE CONTRACTOR SHALL DE-MODIFY THE FOLLOWING EQUIPMENT FROM TWO EACH HH-60L AIRCRAFT IN ACCORDANCE WITH THE APPLICABLE TECHNICAL MANUALS OR DRAWINGS LISTED. THE CONTRACTOR SHALL PROVIDE ONE EACH A-KIT FOR EACH OF THE TWO AIRCRAFT IN THE TABLE LISTED BELOW. THE CONTRACTOR SHALL INSTALL THE FOLLOWING MODIFICATIONS ON THE TWO EACH HH-60L AIRCRAFT IN ORDER TO BRING THEM INTO A MODIFIED HH-60L CONFIGURATION IAW THE APPLICABLE TECHNICAL MANUALS OR DRAWINGS. | $334K |
| Aug 5, 2020 | Department of DefenseW6QK ACC-RSA | 0423 | 336413 | IGF::OT::IGF ORDER 0423 SUPPORTING H-1 LIGHTING KITS. | $1.4M |
| Jul 28, 2020 | Department of DefenseW6QK ACC-RSA | 0728 | 336413 | BASE EFFORT THE CONTRACTOR SHALL DE-MODIFY THE FOLLOWING EQUIPMENT FROM FOUR EACH HH-60L AIRCRAFT IN ACCORDANCE WITH THE APPLICABLE TECHNICAL MANUALS OR DRAWINGS. THE CONTRACTOR SHALL PROVIDE ONE EACH A-KIT FOR EACH OF THE FOUR AIRCRAFT IN THE TABLE LISTED BELOW. THE CONTRACTOR SHALL INSTALL THE FOLLOWING MODIFICATIONS ON THE FOUR EACH HH-60L AIRCRAFT IN ORDER TO BRING THEM INTO A MODIFIED HH-60L CONFIGURATION. THE GOVERNMENT ANTICIPATES OVERTIME WILL BE REQUIRED TO SUPPORT INTEGRATION ACTIVITIES. MODIFICATIONS SHALL BE PERFORMED IAW THE APPLICABLE TECHNICAL MANUALS OR DRAWINGS. THE CONTRACTOR SHALL MAKE ANY NECESSARY DESIGN CHANGES TO THE A-KITS PROVIDED AS GOVERNMENT FURNISHED EQUIPMENT IN ORDER TO ACHIEVE FORM, FIT, AND FUNCTION ON THE FOUR AIRCRAFT. THE CONTRACTOR SHALL PROVIDE OR REWORK THE NECESSARY A-KIT PARTS IAW THE REDLINED OR MODIFIED DRAWINGS AND INSTALL A-KIT PARTS IAW THE REDLINED OR MODIFIED INSTALLATION DRAWINGS. OPTION 1 THE CONTRACTOR SHALL DE-MODIFY THE FOLLOWING EQUIPMENT FROM TWO EACH HH-60L AIRCRAFT IN ACCORDANCE WITH THE APPLICABLE TECHNICAL MANUALS OR DRAWINGS LISTED. THE CONTRACTOR SHALL PROVIDE ONE EACH A-KIT FOR EACH OF THE TWO AIRCRAFT IN THE TABLE LISTED BELOW. THE CONTRACTOR SHALL INSTALL THE FOLLOWING MODIFICATIONS ON THE TWO EACH HH-60L AIRCRAFT IN ORDER TO BRING THEM INTO A MODIFIED HH-60L CONFIGURATION IAW THE APPLICABLE TECHNICAL MANUALS OR DRAWINGS. OPTION 2 THE CONTRACTOR SHALL DE-MODIFY THE FOLLOWING EQUIPMENT FROM TWO EACH HH-60L AIRCRAFT IN ACCORDANCE WITH THE APPLICABLE TECHNICAL MANUALS OR DRAWINGS LISTED. THE CONTRACTOR SHALL PROVIDE ONE EACH A-KIT FOR EACH OF THE TWO AIRCRAFT IN THE TABLE LISTED BELOW. THE CONTRACTOR SHALL INSTALL THE FOLLOWING MODIFICATIONS ON THE TWO EACH HH-60L AIRCRAFT IN ORDER TO BRING THEM INTO A MODIFIED HH-60L CONFIGURATION IAW THE APPLICABLE TECHNICAL MANUALS OR DRAWINGS. | $538K |
| Jul 16, 2020 | Department of DefenseW6QK ACC-RSA | 0722 | 336413 | IGF::OT::IGF THIS SOW DEFINES THE EFFORT REQUIRED TO PROVIDE THIRTY (30) PATRIOT DUAL TELEMETRY KITS. | $73K |
| Jun 11, 2020 | Department of DefenseW6QK ACC-RSA | 0593 | 336413 | IGF::OT::IGF CUSTOMS AND BORDER PROTECTION HH-60L AIRCRAFT 2&3 MODIFICATION | $183K |
| May 7, 2020 | Department of DefenseW6QK ACC-RSA | 0771 | 336413 | THIS STATEMENT OF WORK (SOW) DEFINES THE EFFORT REQUIRED TO PROVIDE AIRCRAFT WIRE HARNESSES FOR THE MH-65 DOLPHIN IMPROVEMENT PROGRAM. THE U.S. COAST GUARD (USCG) AVIATION LOGISTICS CENTER (ALC) HAS A REQUIREMENT TO FABRICATE AIRCRAFT WIRE HARNESSES FOR THE MH-65 DOLPHIN SHORT RANGE RECOVERY AIRCRAFT. THE REQUIREMENT WILL BE TO PROVIDE ENGINEERING, DESIGN, AND FABRICATION SUPPORT FOR THE ALC MH-65 IMPROVEMENT AND MODERNIZATION EFFORTS | $342K |
| May 4, 2020 | Department of DefenseW6QK ACC-RSA | 0741 | 336413 | THIS SOW DEFINES THE EFFORT REQUIRED TO PROVIDE 60 KVA GENERATOR KITS IAW DRAWING NUMBER 1071704. | $307K |
| Mar 30, 2020 | Department of DefenseW6QK ACC-RSA | 0728 | 336413 | BASE EFFORT THE CONTRACTOR SHALL DE-MODIFY THE FOLLOWING EQUIPMENT FROM FOUR EACH HH-60L AIRCRAFT IN ACCORDANCE WITH THE APPLICABLE TECHNICAL MANUALS OR DRAWINGS. THE CONTRACTOR SHALL PROVIDE ONE EACH A-KIT FOR EACH OF THE FOUR AIRCRAFT IN THE TABLE LISTED BELOW. THE CONTRACTOR SHALL INSTALL THE FOLLOWING MODIFICATIONS ON THE FOUR EACH HH-60L AIRCRAFT IN ORDER TO BRING THEM INTO A MODIFIED HH-60L CONFIGURATION. THE GOVERNMENT ANTICIPATES OVERTIME WILL BE REQUIRED TO SUPPORT INTEGRATION ACTIVITIES. MODIFICATIONS SHALL BE PERFORMED IAW THE APPLICABLE TECHNICAL MANUALS OR DRAWINGS. THE CONTRACTOR SHALL MAKE ANY NECESSARY DESIGN CHANGES TO THE A-KITS PROVIDED AS GOVERNMENT FURNISHED EQUIPMENT IN ORDER TO ACHIEVE FORM, FIT, AND FUNCTION ON THE FOUR AIRCRAFT. THE CONTRACTOR SHALL PROVIDE OR REWORK THE NECESSARY A-KIT PARTS IAW THE REDLINED OR MODIFIED DRAWINGS AND INSTALL A-KIT PARTS IAW THE REDLINED OR MODIFIED INSTALLATION DRAWINGS. OPTION 1 THE CONTRACTOR SHALL DE-MODIFY THE FOLLOWING EQUIPMENT FROM TWO EACH HH-60L AIRCRAFT IN ACCORDANCE WITH THE APPLICABLE TECHNICAL MANUALS OR DRAWINGS LISTED. THE CONTRACTOR SHALL PROVIDE ONE EACH A-KIT FOR EACH OF THE TWO AIRCRAFT IN THE TABLE LISTED BELOW. THE CONTRACTOR SHALL INSTALL THE FOLLOWING MODIFICATIONS ON THE TWO EACH HH-60L AIRCRAFT IN ORDER TO BRING THEM INTO A MODIFIED HH-60L CONFIGURATION IAW THE APPLICABLE TECHNICAL MANUALS OR DRAWINGS. OPTION 2 THE CONTRACTOR SHALL DE-MODIFY THE FOLLOWING EQUIPMENT FROM TWO EACH HH-60L AIRCRAFT IN ACCORDANCE WITH THE APPLICABLE TECHNICAL MANUALS OR DRAWINGS LISTED. THE CONTRACTOR SHALL PROVIDE ONE EACH A-KIT FOR EACH OF THE TWO AIRCRAFT IN THE TABLE LISTED BELOW. THE CONTRACTOR SHALL INSTALL THE FOLLOWING MODIFICATIONS ON THE TWO EACH HH-60L AIRCRAFT IN ORDER TO BRING THEM INTO A MODIFIED HH-60L CONFIGURATION IAW THE APPLICABLE TECHNICAL MANUALS OR DRAWINGS. | $799K |
| Feb 27, 2020 | Department of DefenseW6QK ACC-RSA | 0593 | 336413 | IGF::OT::IGF CUSTOMS AND BORDER PROTECTION HH-60L AIRCRAFT 2&3 MODIFICATION | $776K |
| Feb 27, 2020 | Department of DefenseW6QK ACC-RSA | W58RGZ18F0051 | 336413 | THIS STATEMENT OF WORK (SOW) DEFINES THE EFFORT REQUIRED TO PROVIDE TEST ASSETS FOR AMRDEC SECURITY INITIATIVES. | $138K |
| Feb 14, 2020 | Department of DefenseW6QK ACC-RSA | W58RGZ18F0188 | 336413 | CH-47F SAUDI SPECIAL TOOLS AND TEST EQUIPMENT SUPPORT. | $415K |
| Jan 29, 2020 | Department of DefenseW6QK ACC-RSA | 0655 | 336413 | DEVELOPMENT OF THE A-KIT NECESSARY FOR ADAPTING THE COMMON INFRARED COUNTERMEASURE SYSTEM ONTO THE CH-47F ROTARY WING AIRCRAFT WHICH HAVE HAD THE Q-24 SYSTEM INSTALLED AS PART OF A JOINT OPERATIONAL NEEDS STATEMENT (JUONS) EFFORT AND TO ACHIEVE A SAFETY OF FLIGHT (SOF) AIRWORTHINESS RELEASE (AWR) FOR A LIMITED NUMBER OF AIRCRAFT TO BE FIELDED. THE COMMON INFRARED COUNTERMEASURE (CIRCM) SYSTEM WILL REPLACE THE GUARDIAN LASER TRACKER ASSEMBLY (GLTA) FROM THE JUONS MODIFIED AIRCRAFT. IGF::OT::IGF | $375K |
| Oct 29, 2019 | Department of DefenseW6QK ACC-RSA | 0625 | 336413 | IGF::OT::IGF V-22 OSPREY MISSION COMPUTER OBSOLESCENCE THIS EFFORT IS REQUIRED TO SUPPORT PMA-275 FOR THE PROCUREMENT, MANUFACTURING, INTEGRATION, KITTING, DELIVERY, AND INSTALLATION OF MISSION COMPUTER OBSOLESCENCE INITIATIVE (MCOI) RETROFIT KITS AND COMMON AIRCRAFT PORTABLE REPROGRAMMING EQUIPMENT (CAPRE) GBE FILLPORT KITS. INCLUDED ARE THE ASSOCIATED PROGRAM MANAGEMENT AND LOGISTICS SUPPORT PLANNING REQUIREMENTS. | $721K |
| Sep 26, 2019 | Department of DefenseW6QK ACC-RSA | 0593 | 336413 | IGF::OT::IGF CUSTOMS AND BORDER PROTECTION HH-60L AIRCRAFT 2&3 MODIFICATION | $1.5M |
| Sep 4, 2019 | Department of DefenseW6QK ACC-RSA | 0659 | 336413 | IGF::OT::IGF ORDER 0659 THIS STATEMENT OF WORK (SOW) DEFINES THE EFFORT REQUIRED FOR THE MANAGEMENT, PROCUREMENT, TESTING AND INTEGRATION OF THE AERIAL RECONNAISSANCE WEATHER OFFICER (ARWO) COMPUTER ON WC-130J AIRCRAFT AND AT FIXED GROUND BASED STATIONS (GBS). INCLUDED ARE THE ASSOCIATED PROGRAM MANAGEMENT AND AIRCRAFT INTEGRATION SUPPORT PLANNING REQUIREMENTS. | $159K |
| Aug 22, 2019 | Department of DefenseW6QK ACC-RSA | 0315 | 336413 | IGF::OT::IGF INTEGRATION/QUALIFICATION FOR THE H-60L DIGITAL COCKPIT UPGRADE KIT, W58RGZ-12-D-0089, TASK ORDER 0315 (ORDER EXECUTION PLAN 16231) . | $1.3M |
| Aug 21, 2019 | Department of DefenseW6QK ACC-RSA | 0620 | 336413 | IGF::OT::IGF THE NAVAIR V-22 PROGRAM MANAGEMENT OFFICE (PMO) REQUIRES A REPLACEMENT 6X8 ADVANCED MULTI-FUNCTION DISPLAY (AMFD) FOR INTEGRATION INTO THE V-22 OSPREY AIR VEHICLE TO REPLACE THE OBSOLETE 6X6 MULTI-FUNCTION DISPLAY. | $1.2M |
| Jul 16, 2019 | Department of DefenseW6QK ACC-RSA | 0691 | 336413 | IGF::OT::IGF THE PURPOSE OF THIS STATEMENT OF WORK (SOW) IS TO DEFINE THE EFFORTS REQUIRED TO INTEGRATE THE DE-ICE CONTROL INDICATING UNIT (DCIU) ONTO THE HH/UH-60M. THE DCIU IS A SINGLE LINE REPLACEMENT UNIT (LRU) THAT REPLACES THE THREE LEGACY LRUS (CONTROL PANEL, ICE RATE METER, AND TEST PANEL). THIS EFFORTS WILL RESULT IN AN ENGINEERING CHANGE PROPOSAL (ECP) AND TECHNICAL MANUAL UPDATES FOR BOTH THE HH/UH-60M AIRCRAFT. | $37K |
| Jul 2, 2019 | Department of DefenseW6QK ACC-RSA | 0426 | 336413 | IGF::OT::IGF: OEP 17124 UNMANNED AIRCRAFT SYSTEMS (UAS) LIGHTWEIGHT SURVEILLANCE TARGET ACQUISITION RADAR (LSTAR) GROUND-BASE SENSE AND AVOID (GBSAA) RADAR INTEGRATION | $65K |
| May 29, 2019 | Department of DefenseW6QK ACC-RSA | 0719 | 336413 | IGF::OT::IGF NEW TO THE CONTRACTOR SHALL NOTIFY THE IPT OF ALL PMI-1 MAINTENANCE, SERVICE BULLETINS, AND TECHNICAL DIRECTIVES REQUIRED DURING AIRCRAFT MAINTENANCE/MODIFICATION. THE CONTRACTOR SHALL PERFORM AIRCRAFT MODERNIZATION AND ANY NEW TECHNICAL DIRECTIVE AS CALLED OUT IN PLANNED MAINTENANCE INTERVAL (PMI) REQUIREMENTS SPECIFICATION, DATED 15 JUNE 2016, WHEN AUTHORIZED IN WRITING BY THE PIF COR. THE CONTRACTOR SHALL NOTIFY THE PIF COR OF ALL REPAIRS, UPGRADE, TEST AND MAINTENANCE FLIGHTS REQUIRED BY MAINTENANCE PROCEDURES, SERVICE BULLETINS, OR AIRWORTHINESS DIRECTIVES. THE GOVERNMENT WILL PROVIDE PILOTS FOR FLIGHTS AS NEEDED. THE CONTRACTOR SHALL PROVIDE GROUND SUPPORT FOR ALL FLIGHTS. FUNDING FOR SCHEDULED MAINTENANCE, SERVICE BULLETINS, AIRWORTHINESS DIRECTIVES, AND GROUND FLIGHT SUPPORT SHALL BE TRACKED AS A SEPARATE WBS ON THE COST REPORT. AIRCRAFT DISCREPANCIES, DEFECTS, AND AIRCRAFT SYSTEM FAILURES DISCOVERED DURING THE PMI EVENT (BUT NOT PART OF A SPECIFIC PMI INSPECTION REQUIREMENT) SHALL BE IDENTIFIED BY THE CONTRACTOR AND REPORTED AS AN EXAMINER AND EVALUATOR DISCREPANCY REPORT IAW DI-MISC-80508B-2. THE CONTRACTOR SHALL PREPARE THIS REPORT FOR DISCREPANCY CLASSIFICATION (IN-SERVICE REPAIR, O-LEVEL, OR UNSCHEDULED COMPONENT REPAIR), DEFECT CLASSIFICATION (CRITICAL, MAJOR, MINOR, AND NOTED BUT NOT CORRECTED [NBNC]), AND TASK RESOLUTION. THE CONTRACTOR SHALL NOTIFY THE GOVERNMENT UPON BECOMING AWARE OF ANY ISSUE WITH THE TYPE, AREA, AND NATURE OF DISCREPANCY AND DEFECT. THE CONTRACTOR SHALL PROVIDE A PROPOSED RESOLUTION TO THE GOVERNMENT, BUT SHALL NOT EXECUTE ANY REPAIRS, MAINTENANCE, OR CHANGES UNTIL RECEIPT OF THE WRITTEN APPROVAL OF THE PIF COR. THE CONTRACTOR SHALL NOTIFY THE PIF COR OF ALL TEST AND MAINTENANCE FLIGHTS REQUIRED BY MAINTENANCE PROCEDURES. THE GOVERNMENT WILL PROVIDE PILOTS FOR FLIGHTS AS NEEDED. THE CONTRACTOR SHALL PROVIDE GROUND SUPPORT FOR ALL FLIGHTS. FUNDING FOR UNSCHEDULED MAINTENANCE SHALL BE TRACKED AS A SEPARATE WBS ON THE COST REPORT. | $26K |
| May 3, 2019 | Department of DefenseW6QK ACC-RSA | 0731 | 336413 | THE CONTRACTOR SHALL PROVIDE A REVISED UH-60 A/L BLADE FOLD KIT TDP FOR DRAWINGS 1043419 AND 1043731 IN ACCORDANCE WITH (IAW) DI-ADMN-80925. THE CONTRACTOR SHALL PROVIDE, ASSEMBLE AND KIT A QUANTITY OF 100 UH-60 A/L BLADE FOLD KIT ASSEMBLIES (PN:1043413). THE CONTRACTOR SHALL PROVIDE A QUANTITY OF 100 AIR TRANSPORT CASES, (P/N: 21044). THE CONTRACTOR SHALL PROVIDE A QUANTITY OF 100 STAR PLATE KITS, (P/N: 1006779). | $34K |
| Apr 25, 2019 | Department of DefenseW6QK ACC-RSA | 0615 | 336413 | IGF::OT::IGF PROGRAM MANAGEMENT, AND INTEGRATION OF THE AIRBUS HELICOPTERS INC. COCKPIT VOICE AND FLIGHT DATA RECORDER (CV/FDR) SERVICE BULLETIN MBB-BK117 C-2-31-046 INTO TWENTY-ONE (21) US ARMY UH-72A LAKOTA. | $59K |
| Mar 1, 2019 | Department of DefenseW6QK ACC-RSA | 0492 | 336413 | IGF::OT::IGF NEW TASK ORDER FOR "INTEGRATION AND QUALIFICATION FOR THE H-60 L/M FEDERATED ADVANCE NAVIGATION SYSTEM (FANS)" | $56K |
| Feb 26, 2019 | Department of DefenseW6QK ACC-RSA | 0625 | 336413 | IGF::OT::IGF V-22 OSPREY MISSION COMPUTER OBSOLESCENCE THIS EFFORT IS REQUIRED TO SUPPORT PMA-275 FOR THE PROCUREMENT, MANUFACTURING, INTEGRATION, KITTING, DELIVERY, AND INSTALLATION OF MISSION COMPUTER OBSOLESCENCE INITIATIVE (MCOI) RETROFIT KITS AND COMMON AIRCRAFT PORTABLE REPROGRAMMING EQUIPMENT (CAPRE) GBE FILLPORT KITS. INCLUDED ARE THE ASSOCIATED PROGRAM MANAGEMENT AND LOGISTICS SUPPORT PLANNING REQUIREMENTS. | $224K |
| Feb 21, 2019 | Department of DefenseW6QK ACC-RSA | 0733 | 336413 | SOW: FUTURE LAUNCHER DEMONSTRATION UNITS THIS STATEMENT OF WORK (SOW) IDENTIFIES REQUIREMENTS TO BE ACCOMPLISHED BY THE CONTRACTOR IN SUPPORT OF THE PROTOTYPE INTEGRATION FACILITY (PIF) FUTURE LAUNCHER DEMONSTRATION UNITS DEVELOPMENT. THE FUTURE LAUNCHER IS A PALLETIZED LAUNCHER CAPABLE OF FIRING THE MULTIPLE LAUNCH ROCKET SYSTEM (MLRS) FAMILY OF MUNITIONS (MFOM), TWO (2) PODS LOAD OUT, WITH AZIMUTH AND ELEVATION CAPABILITY. THE DRAWING PACKAGE FOR THE FUTURE LAUNCHER DEMONSTRATION UNITS IS UNDER DEVELOPMENT BY THE GOVERNMENT AND WILL BE PROVIDED TO THE CONTRACTOR. THE LAUNCHER DESIGN WILL BE BASED ON THE FUTURE LAUNCHER INTEGRATION TEST UNITS DESIGN, TWO OF WHICH WERE FABRICATED UNDER TASK ORDER 0649 OF THIS CONTRACT, BUT WILL HAVE SIGNIFICANT DIFFERENCES IN FORM, FIT, AND FUNCTION. TWO M270 TURRET GEAR BEARINGS WILL BE PROVIDED TO THE CONTRACTOR FOR RE-UTILIZATION IN ORDER TO REDUCE COST AND SCHEDULE RISK. ACTIVITIES INCLUDE DESIGN, DEVELOPMENT, FABRICATION, INTEGRATION, TEST, AND CHECKOUT OF MECHANICAL AND ELECTRICAL COMPONENTS ASSOCIATED WITH THE DEVELOPMENT OF TWO FUTURE LAUNCHER DEMONSTRATION UNITS WHICH WILL FACILITATE TESTING OF FUTURE LAUNCHER FUNCTIONALITY | $420K |
| Feb 1, 2019 | Department of DefenseW6QK ACC-RSA | 0719 | 336413 | IGF::OT::IGF NEW TO THE CONTRACTOR SHALL NOTIFY THE IPT OF ALL PMI-1 MAINTENANCE, SERVICE BULLETINS, AND TECHNICAL DIRECTIVES REQUIRED DURING AIRCRAFT MAINTENANCE/MODIFICATION. THE CONTRACTOR SHALL PERFORM AIRCRAFT MODERNIZATION AND ANY NEW TECHNICAL DIRECTIVE AS CALLED OUT IN PLANNED MAINTENANCE INTERVAL (PMI) REQUIREMENTS SPECIFICATION, DATED 15 JUNE 2016, WHEN AUTHORIZED IN WRITING BY THE PIF COR. THE CONTRACTOR SHALL NOTIFY THE PIF COR OF ALL REPAIRS, UPGRADE, TEST AND MAINTENANCE FLIGHTS REQUIRED BY MAINTENANCE PROCEDURES, SERVICE BULLETINS, OR AIRWORTHINESS DIRECTIVES. THE GOVERNMENT WILL PROVIDE PILOTS FOR FLIGHTS AS NEEDED. THE CONTRACTOR SHALL PROVIDE GROUND SUPPORT FOR ALL FLIGHTS. FUNDING FOR SCHEDULED MAINTENANCE, SERVICE BULLETINS, AIRWORTHINESS DIRECTIVES, AND GROUND FLIGHT SUPPORT SHALL BE TRACKED AS A SEPARATE WBS ON THE COST REPORT. AIRCRAFT DISCREPANCIES, DEFECTS, AND AIRCRAFT SYSTEM FAILURES DISCOVERED DURING THE PMI EVENT (BUT NOT PART OF A SPECIFIC PMI INSPECTION REQUIREMENT) SHALL BE IDENTIFIED BY THE CONTRACTOR AND REPORTED AS AN EXAMINER AND EVALUATOR DISCREPANCY REPORT IAW DI-MISC-80508B-2. THE CONTRACTOR SHALL PREPARE THIS REPORT FOR DISCREPANCY CLASSIFICATION (IN-SERVICE REPAIR, O-LEVEL, OR UNSCHEDULED COMPONENT REPAIR), DEFECT CLASSIFICATION (CRITICAL, MAJOR, MINOR, AND NOTED BUT NOT CORRECTED [NBNC]), AND TASK RESOLUTION. THE CONTRACTOR SHALL NOTIFY THE GOVERNMENT UPON BECOMING AWARE OF ANY ISSUE WITH THE TYPE, AREA, AND NATURE OF DISCREPANCY AND DEFECT. THE CONTRACTOR SHALL PROVIDE A PROPOSED RESOLUTION TO THE GOVERNMENT, BUT SHALL NOT EXECUTE ANY REPAIRS, MAINTENANCE, OR CHANGES UNTIL RECEIPT OF THE WRITTEN APPROVAL OF THE PIF COR. THE CONTRACTOR SHALL NOTIFY THE PIF COR OF ALL TEST AND MAINTENANCE FLIGHTS REQUIRED BY MAINTENANCE PROCEDURES. THE GOVERNMENT WILL PROVIDE PILOTS FOR FLIGHTS AS NEEDED. THE CONTRACTOR SHALL PROVIDE GROUND SUPPORT FOR ALL FLIGHTS. FUNDING FOR UNSCHEDULED MAINTENANCE SHALL BE TRACKED AS A SEPARATE WBS ON THE COST REPORT. | $506K |
| Dec 19, 2018 | Department of DefenseW6QK ACC-RSA | 0315 | 336413 | IGF::OT::IGF INTEGRATION/QUALIFICATION FOR THE H-60L DIGITAL COCKPIT UPGRADE KIT, W58RGZ-12-D-0089, TASK ORDER 0315 (ORDER EXECUTION PLAN 16231) . | $2.3M |
| Nov 30, 2018 | Department of DefenseW6QK ACC-RSA | 0591 | 336413 | IGF::OT::IGF NEW ORDER TO W58RGZ12D0089 | $8.4M |
| Nov 30, 2018 | Department of DefenseW6QK ACC-RSA | 0645 | 336413 | PIF CONTRACT | $3.9M |
| Nov 30, 2018 | Department of DefenseW6QK ACC-RSA | W58RGZ19F0070 | 336413 | PERFORM DESIGN, ENGINEERING, FABRICATION, PRE-SHIPMENT INTEGRATION AND PREPARATION FOR SHIPMENT NECESSARY TO EQUIP THE SAUDI ARABIAN MINISTRY OF NATIONAL GUARD (MNG) AVIATION MAINTENANCE, SUPPLY SUPPORT, AND AIRCRAFT SIMULATOR FACILITIES AT THE MNG DIRECTED LOCATION FOR THE 2ND BRIGADE FIELDING EFFORT IN THE KINGDOM OF SAUDI ARABIA (KSA). | $6.4M |
| Nov 30, 2018 | Department of DefenseW6QK ACC-RSA | W58RGZ19F0117 | 336413 | UPPORT THE THAAD PROJECT OFFICE (TPO) IN THE DESIGN AND DEVELOPMENT OF THE THAAD ASSURED POSITION, NAVIGATION, AND TIMING (PNT). THE THAAD PNT INCLUDES 1PPS ELECTROMAGNETIC INTERFERENCE (EMI) FILTER, 1RIGB 127 EMI FILTER, +28VDC EMI FILTER, ANTI-JAM (AJ) ANTENNA ENCLOSURE, NETWORK TIME SERVERS AND CABLES. | $1.7M |
| Nov 30, 2018 | Department of DefenseW6QK ACC-RSA | W58RGZ19F0130 | 336413 | ORDER FOR STATEMENT OF WORK RECOVERY OF AIRBASE DENIED ORDNANCE PHASE 2. | $1.8M |
| Nov 30, 2018 | Department of DefenseW6QK ACC-RSA | W58RGZ19F0131 | 336413 | THIS STATEMENT OF WORK DEFINES THE EFFORT REQUIRED TO SUPPORT THE PROTOTYPE INTEGRATION FACILITY QUALITY MANAGEMENT SYSTEM. IN ORDER TO CONTINUE TO EFFECTIVELY PROVIDE BEST VALUE PRODUCTS TO OUR CUSTOMERS, A SYSTEMATIC APPROACH THAT ADDRESSES BEST PRACTICES FOR DAILY QUALITY, AUDIT AND TEST RELATED OPERATIONS IS NEEDED. THIS STATEMENT OF WORK IDENTIFIES THE QUALITY, AUDIT AND TEST AREAS AND THE PROCESS NEEDED TO PROVIDE THE BEST SUPPORT OF THE QUALITY MANAGEMENT SYSTEM. | $312K |
| Nov 29, 2018 | Department of DefenseW6QK ACC-RSA | 0725 | 336413 | IGF::OT::IGF NEW ORDER 0725 IN ACCORDANCE WITH THE SOW, DATED 19 SEPTEMBER 2017, THE PROTOTYPE INTEGRATION FACILITY (PIF) DEFINES THE REQUIREMENT TO PROVIDE FORTY-FIVE (45) AURS MK112 MOD2S IN ACCORDANCE WITH (IAW) DRAWING NUMBER 8242774 AND FORTY-FIVE (45) AURS MK112 MOD2S CA 717 CABLE ASSEMBLIES IAW DRAWING NUMBER 5408717. THE CONTRACTOR SHALL PROVIDE AN ADDITIONAL THIRTY-SIX (36) AURS MK112 MOD2S IN ACCORDANCE WITH (IAW) DRAWING NUMBER 8242774. THE CONTRACTOR SHALL PROVIDE EIGHT (8) DLBCS IN ACCORDANCE WITH (IAW) DRAWING NUMBER 7615651 AND THREE (3) VPT CABLES IAW DRAWING NUMBER 8242800. THE CONTRACTOR SHALL PERFORM PRODUCT VERIFICATION INSPECTIONS AND PREPARE PRODUCT VERIFICATION INSPECTION REPORTS FOR ALL CONFIGURATION ITEMS IAW DI-MISC-80508/T. | $2.2M |
| Nov 28, 2018 | Department of DefenseW6QK ACC-RSA | W58RGZ19F0124 | 336413 | THE PROTOTYPE INTEGRATION FACILITY (PIF) REQUIRES SUPPORT TO CONDUCT OPERATIONS IN THE PIF AIRCRAFT HANGER LOCATED AT BUILDING 4803, REDSTONE ARMY AIRFIELD. | $165K |
| Nov 28, 2018 | Department of DefenseW6QK ACC ANAD | 0037 | 336992 | IGF::OT::IGF OTHER DIRECT COST | $5K |
Get Alerted Before Redstone Defense Systems's Next Recompete