Federal Contractor Profile
Sierra Lobo INC
$678M obligated·49 awards·3 agencies·8 NAICS
Federal Contracts
Showing contracts 201–250 of 324 total. Sorted by action date, most recent first. Excludes $0 modifications.
| Date | Agency | PIID | NAICS | Description | Amount |
|---|---|---|---|---|---|
| Mar 6, 2019 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | NNG14CR62C | 541330 | IGF::OT::IGF ENVIRONMENTAL TESTING AND INTEGRATION SERVICES (ETIS) II THIS STATEMENT OF WORK (SOW) SPECIFIES THE REQUIREMENTS FOR ON SITE CONTRACTOR SUPPLIED ENVIRONMENTAL TEST AND INTEGRATION AND OTHER LABORATORY OPERATIONS SERVICES TO THE GODDARD SPACE FLIGHT CENTER (GSFC). THE SCOPE OF THESE SERVICES INCLUDES THE FOLLOWING: OPERATION, MAINTENANCE, AND UPGRADE OF ENVIRONMENTAL TEST EQUIPMENT AND FACILITIES LOCATED IN THE GSFC BUILDING 7/10/15/29 COMPLEX, AREA 300 MAGNETIC TEST SITE AND OTHER TECHNICAL FACILITIES LOCATED AT VARIOUS LOCATIONS WITHIN GSFC INCLUDING THE MANUFACTURING AND ELECTROPLATING EQUIPMENT AND FACILITIES PRIMARILY LOCATED IN GSFC BUILDING 5/10/21 SHOPS MECHANICAL AND OPTICAL INTEGRATION OF SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, FABRICATE, AND MANUFACTURE CUSTOM SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, MANUFACTURE, AND OPERATION OF GROUND HANDLING EQUIPMENT AND FIXTURES DESIGN, MANUFACTURE, AND OPERATION OF OPTICAL ALIGNMENT AND CALIBRATION SYSTEMS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT THERMAL BLANKETS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT AND GROUND SUPPORT SYSTEM CABLE HARNESSES DESIGN, MANUFACTURE, AND INSTALLATION OF TECHNICAL FACILITIES INCLUDING BUILDINGS, BUILDING ELEMENTS, UTILITY SYSTEMS, AND TECHNICAL EQUIPMENT AND SYSTEMS DEFINE, ANALYZE, AND RESOLVE ELECTROMAGNETIC RADIATION ISSUES RELATING TO FACILITY AND SATELLITE GROUND SUPPORT EQUIPMENT OPERATION WITHIN THE TEST COMPLEX. SUPPORT SPECTRUM SIGNATURE ANALYSIS TO INSURE INTERFERENCE-FREE AND SAFE OPERATION OF ALL FACILITY-LOCATED NEAR ELECTROMAGNETIC WAVE SENSING DEVICES. TEST AND INTEGRATION ENGINEERING AND ENGINEERING ANALYSIS CLEANROOM OPERATION AND MAINTENANCE CONTAMINATION CONTROL SERVICES USING QUALIFIED AND EXPERIENCED PERSONNEL MAINTENANCE AND OPERATION OF CERTAIN PHYSICAL PLANT SYSTEMS SUCH AS PROCESSED WATER, EMERGENCY POWER, LN2/GN2 STORAGE SYSTEMS, CONDITIONED CLEANROOM AIR HVAC AND HUMIDITY SYSTEMS RECERTIFICATION (TESTING AND INSPECTION) OF LIFTING DEVICES AND EQUIPMENT (LDE), AND (INSPECTION) OF PRESSURE VESSELS AND PRESSURIZED SYSTEMS (PVS) AT GSFC, GREENBELT, WALLOPS, AND OTHER OFFSITE LOCATIONS. MAINTENANCE OF LDE AT GREENBELT SITE ONLY, NOT AT OTHER SITES; NON-DESTRUCTIVE EXAMINATION TESTING OF LDE AND PVS FACILITY AND OPERATIONS SAFETY DATA ACQUISITION AND ANALYSIS SYSTEM DEVELOPMENT AND MANAGEMENT. | $2.3M |
| Feb 15, 2019 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | NNG14CR62C | 541330 | IGF::OT::IGF ENVIRONMENTAL TESTING AND INTEGRATION SERVICES (ETIS) II THIS STATEMENT OF WORK (SOW) SPECIFIES THE REQUIREMENTS FOR ON SITE CONTRACTOR SUPPLIED ENVIRONMENTAL TEST AND INTEGRATION AND OTHER LABORATORY OPERATIONS SERVICES TO THE GODDARD SPACE FLIGHT CENTER (GSFC). THE SCOPE OF THESE SERVICES INCLUDES THE FOLLOWING: OPERATION, MAINTENANCE, AND UPGRADE OF ENVIRONMENTAL TEST EQUIPMENT AND FACILITIES LOCATED IN THE GSFC BUILDING 7/10/15/29 COMPLEX, AREA 300 MAGNETIC TEST SITE AND OTHER TECHNICAL FACILITIES LOCATED AT VARIOUS LOCATIONS WITHIN GSFC INCLUDING THE MANUFACTURING AND ELECTROPLATING EQUIPMENT AND FACILITIES PRIMARILY LOCATED IN GSFC BUILDING 5/10/21 SHOPS MECHANICAL AND OPTICAL INTEGRATION OF SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, FABRICATE, AND MANUFACTURE CUSTOM SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, MANUFACTURE, AND OPERATION OF GROUND HANDLING EQUIPMENT AND FIXTURES DESIGN, MANUFACTURE, AND OPERATION OF OPTICAL ALIGNMENT AND CALIBRATION SYSTEMS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT THERMAL BLANKETS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT AND GROUND SUPPORT SYSTEM CABLE HARNESSES DESIGN, MANUFACTURE, AND INSTALLATION OF TECHNICAL FACILITIES INCLUDING BUILDINGS, BUILDING ELEMENTS, UTILITY SYSTEMS, AND TECHNICAL EQUIPMENT AND SYSTEMS DEFINE, ANALYZE, AND RESOLVE ELECTROMAGNETIC RADIATION ISSUES RELATING TO FACILITY AND SATELLITE GROUND SUPPORT EQUIPMENT OPERATION WITHIN THE TEST COMPLEX. SUPPORT SPECTRUM SIGNATURE ANALYSIS TO INSURE INTERFERENCE-FREE AND SAFE OPERATION OF ALL FACILITY-LOCATED NEAR ELECTROMAGNETIC WAVE SENSING DEVICES. TEST AND INTEGRATION ENGINEERING AND ENGINEERING ANALYSIS CLEANROOM OPERATION AND MAINTENANCE CONTAMINATION CONTROL SERVICES USING QUALIFIED AND EXPERIENCED PERSONNEL MAINTENANCE AND OPERATION OF CERTAIN PHYSICAL PLANT SYSTEMS SUCH AS PROCESSED WATER, EMERGENCY POWER, LN2/GN2 STORAGE SYSTEMS, CONDITIONED CLEANROOM AIR HVAC AND HUMIDITY SYSTEMS RECERTIFICATION (TESTING AND INSPECTION) OF LIFTING DEVICES AND EQUIPMENT (LDE), AND (INSPECTION) OF PRESSURE VESSELS AND PRESSURIZED SYSTEMS (PVS) AT GSFC, GREENBELT, WALLOPS, AND OTHER OFFSITE LOCATIONS. MAINTENANCE OF LDE AT GREENBELT SITE ONLY, NOT AT OTHER SITES; NON-DESTRUCTIVE EXAMINATION TESTING OF LDE AND PVS FACILITY AND OPERATIONS SAFETY DATA ACQUISITION AND ANALYSIS SYSTEM DEVELOPMENT AND MANAGEMENT. | $4.0M |
| Feb 11, 2019 | Department of DefenseFA9300 AFTC PZR | FA930018F9000 | 541712 | IGF::OT::IGF ROCKET TECHNOLOGY ENGINEERING SUPPORT ADVICE AND ASSISTANCE SERVICE | $983K |
| Feb 11, 2019 | Department of DefenseFA9300 AFTC PZR | FA930018F9000 | 541712 | IGF::OT::IGF ROCKET TECHNOLOGY ENGINEERING SUPPORT ADVICE AND ASSISTANCE SERVICE | $983 |
| Feb 6, 2019 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | NNG14CR62C | 541330 | IGF::OT::IGF ENVIRONMENTAL TESTING AND INTEGRATION SERVICES (ETIS) II THIS STATEMENT OF WORK (SOW) SPECIFIES THE REQUIREMENTS FOR ON SITE CONTRACTOR SUPPLIED ENVIRONMENTAL TEST AND INTEGRATION AND OTHER LABORATORY OPERATIONS SERVICES TO THE GODDARD SPACE FLIGHT CENTER (GSFC). THE SCOPE OF THESE SERVICES INCLUDES THE FOLLOWING: OPERATION, MAINTENANCE, AND UPGRADE OF ENVIRONMENTAL TEST EQUIPMENT AND FACILITIES LOCATED IN THE GSFC BUILDING 7/10/15/29 COMPLEX, AREA 300 MAGNETIC TEST SITE AND OTHER TECHNICAL FACILITIES LOCATED AT VARIOUS LOCATIONS WITHIN GSFC INCLUDING THE MANUFACTURING AND ELECTROPLATING EQUIPMENT AND FACILITIES PRIMARILY LOCATED IN GSFC BUILDING 5/10/21 SHOPS MECHANICAL AND OPTICAL INTEGRATION OF SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, FABRICATE, AND MANUFACTURE CUSTOM SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, MANUFACTURE, AND OPERATION OF GROUND HANDLING EQUIPMENT AND FIXTURES DESIGN, MANUFACTURE, AND OPERATION OF OPTICAL ALIGNMENT AND CALIBRATION SYSTEMS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT THERMAL BLANKETS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT AND GROUND SUPPORT SYSTEM CABLE HARNESSES DESIGN, MANUFACTURE, AND INSTALLATION OF TECHNICAL FACILITIES INCLUDING BUILDINGS, BUILDING ELEMENTS, UTILITY SYSTEMS, AND TECHNICAL EQUIPMENT AND SYSTEMS DEFINE, ANALYZE, AND RESOLVE ELECTROMAGNETIC RADIATION ISSUES RELATING TO FACILITY AND SATELLITE GROUND SUPPORT EQUIPMENT OPERATION WITHIN THE TEST COMPLEX. SUPPORT SPECTRUM SIGNATURE ANALYSIS TO INSURE INTERFERENCE-FREE AND SAFE OPERATION OF ALL FACILITY-LOCATED NEAR ELECTROMAGNETIC WAVE SENSING DEVICES. TEST AND INTEGRATION ENGINEERING AND ENGINEERING ANALYSIS CLEANROOM OPERATION AND MAINTENANCE CONTAMINATION CONTROL SERVICES USING QUALIFIED AND EXPERIENCED PERSONNEL MAINTENANCE AND OPERATION OF CERTAIN PHYSICAL PLANT SYSTEMS SUCH AS PROCESSED WATER, EMERGENCY POWER, LN2/GN2 STORAGE SYSTEMS, CONDITIONED CLEANROOM AIR HVAC AND HUMIDITY SYSTEMS RECERTIFICATION (TESTING AND INSPECTION) OF LIFTING DEVICES AND EQUIPMENT (LDE), AND (INSPECTION) OF PRESSURE VESSELS AND PRESSURIZED SYSTEMS (PVS) AT GSFC, GREENBELT, WALLOPS, AND OTHER OFFSITE LOCATIONS. MAINTENANCE OF LDE AT GREENBELT SITE ONLY, NOT AT OTHER SITES; NON-DESTRUCTIVE EXAMINATION TESTING OF LDE AND PVS FACILITY AND OPERATIONS SAFETY DATA ACQUISITION AND ANALYSIS SYSTEM DEVELOPMENT AND MANAGEMENT. | $5.0M |
| Jan 9, 2019 | Department of DefenseFA9300 AFTC PZR | FA930018F9000 | 541712 | IGF::OT::IGF ROCKET TECHNOLOGY ENGINEERING SUPPORT ADVICE AND ASSISTANCE SERVICE | $785 |
| Jan 9, 2019 | Department of DefenseFA9300 AFTC PZR | FA930018F9000 | 541712 | IGF::OT::IGF ROCKET TECHNOLOGY ENGINEERING SUPPORT ADVICE AND ASSISTANCE SERVICE | $784K |
| Dec 20, 2018 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | NNG14CR62C | 541330 | IGF::OT::IGF ENVIRONMENTAL TESTING AND INTEGRATION SERVICES (ETIS) II THIS STATEMENT OF WORK (SOW) SPECIFIES THE REQUIREMENTS FOR ON SITE CONTRACTOR SUPPLIED ENVIRONMENTAL TEST AND INTEGRATION AND OTHER LABORATORY OPERATIONS SERVICES TO THE GODDARD SPACE FLIGHT CENTER (GSFC). THE SCOPE OF THESE SERVICES INCLUDES THE FOLLOWING: OPERATION, MAINTENANCE, AND UPGRADE OF ENVIRONMENTAL TEST EQUIPMENT AND FACILITIES LOCATED IN THE GSFC BUILDING 7/10/15/29 COMPLEX, AREA 300 MAGNETIC TEST SITE AND OTHER TECHNICAL FACILITIES LOCATED AT VARIOUS LOCATIONS WITHIN GSFC INCLUDING THE MANUFACTURING AND ELECTROPLATING EQUIPMENT AND FACILITIES PRIMARILY LOCATED IN GSFC BUILDING 5/10/21 SHOPS MECHANICAL AND OPTICAL INTEGRATION OF SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, FABRICATE, AND MANUFACTURE CUSTOM SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, MANUFACTURE, AND OPERATION OF GROUND HANDLING EQUIPMENT AND FIXTURES DESIGN, MANUFACTURE, AND OPERATION OF OPTICAL ALIGNMENT AND CALIBRATION SYSTEMS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT THERMAL BLANKETS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT AND GROUND SUPPORT SYSTEM CABLE HARNESSES DESIGN, MANUFACTURE, AND INSTALLATION OF TECHNICAL FACILITIES INCLUDING BUILDINGS, BUILDING ELEMENTS, UTILITY SYSTEMS, AND TECHNICAL EQUIPMENT AND SYSTEMS DEFINE, ANALYZE, AND RESOLVE ELECTROMAGNETIC RADIATION ISSUES RELATING TO FACILITY AND SATELLITE GROUND SUPPORT EQUIPMENT OPERATION WITHIN THE TEST COMPLEX. SUPPORT SPECTRUM SIGNATURE ANALYSIS TO INSURE INTERFERENCE-FREE AND SAFE OPERATION OF ALL FACILITY-LOCATED NEAR ELECTROMAGNETIC WAVE SENSING DEVICES. TEST AND INTEGRATION ENGINEERING AND ENGINEERING ANALYSIS CLEANROOM OPERATION AND MAINTENANCE CONTAMINATION CONTROL SERVICES USING QUALIFIED AND EXPERIENCED PERSONNEL MAINTENANCE AND OPERATION OF CERTAIN PHYSICAL PLANT SYSTEMS SUCH AS PROCESSED WATER, EMERGENCY POWER, LN2/GN2 STORAGE SYSTEMS, CONDITIONED CLEANROOM AIR HVAC AND HUMIDITY SYSTEMS RECERTIFICATION (TESTING AND INSPECTION) OF LIFTING DEVICES AND EQUIPMENT (LDE), AND (INSPECTION) OF PRESSURE VESSELS AND PRESSURIZED SYSTEMS (PVS) AT GSFC, GREENBELT, WALLOPS, AND OTHER OFFSITE LOCATIONS. MAINTENANCE OF LDE AT GREENBELT SITE ONLY, NOT AT OTHER SITES; NON-DESTRUCTIVE EXAMINATION TESTING OF LDE AND PVS FACILITY AND OPERATIONS SAFETY DATA ACQUISITION AND ANALYSIS SYSTEM DEVELOPMENT AND MANAGEMENT. | $2.0M |
| Dec 13, 2018 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | NNG14CR62C | 541330 | IGF::OT::IGF ENVIRONMENTAL TESTING AND INTEGRATION SERVICES (ETIS) II THIS STATEMENT OF WORK (SOW) SPECIFIES THE REQUIREMENTS FOR ON SITE CONTRACTOR SUPPLIED ENVIRONMENTAL TEST AND INTEGRATION AND OTHER LABORATORY OPERATIONS SERVICES TO THE GODDARD SPACE FLIGHT CENTER (GSFC). THE SCOPE OF THESE SERVICES INCLUDES THE FOLLOWING: OPERATION, MAINTENANCE, AND UPGRADE OF ENVIRONMENTAL TEST EQUIPMENT AND FACILITIES LOCATED IN THE GSFC BUILDING 7/10/15/29 COMPLEX, AREA 300 MAGNETIC TEST SITE AND OTHER TECHNICAL FACILITIES LOCATED AT VARIOUS LOCATIONS WITHIN GSFC INCLUDING THE MANUFACTURING AND ELECTROPLATING EQUIPMENT AND FACILITIES PRIMARILY LOCATED IN GSFC BUILDING 5/10/21 SHOPS MECHANICAL AND OPTICAL INTEGRATION OF SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, FABRICATE, AND MANUFACTURE CUSTOM SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, MANUFACTURE, AND OPERATION OF GROUND HANDLING EQUIPMENT AND FIXTURES DESIGN, MANUFACTURE, AND OPERATION OF OPTICAL ALIGNMENT AND CALIBRATION SYSTEMS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT THERMAL BLANKETS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT AND GROUND SUPPORT SYSTEM CABLE HARNESSES DESIGN, MANUFACTURE, AND INSTALLATION OF TECHNICAL FACILITIES INCLUDING BUILDINGS, BUILDING ELEMENTS, UTILITY SYSTEMS, AND TECHNICAL EQUIPMENT AND SYSTEMS DEFINE, ANALYZE, AND RESOLVE ELECTROMAGNETIC RADIATION ISSUES RELATING TO FACILITY AND SATELLITE GROUND SUPPORT EQUIPMENT OPERATION WITHIN THE TEST COMPLEX. SUPPORT SPECTRUM SIGNATURE ANALYSIS TO INSURE INTERFERENCE-FREE AND SAFE OPERATION OF ALL FACILITY-LOCATED NEAR ELECTROMAGNETIC WAVE SENSING DEVICES. TEST AND INTEGRATION ENGINEERING AND ENGINEERING ANALYSIS CLEANROOM OPERATION AND MAINTENANCE CONTAMINATION CONTROL SERVICES USING QUALIFIED AND EXPERIENCED PERSONNEL MAINTENANCE AND OPERATION OF CERTAIN PHYSICAL PLANT SYSTEMS SUCH AS PROCESSED WATER, EMERGENCY POWER, LN2/GN2 STORAGE SYSTEMS, CONDITIONED CLEANROOM AIR HVAC AND HUMIDITY SYSTEMS RECERTIFICATION (TESTING AND INSPECTION) OF LIFTING DEVICES AND EQUIPMENT (LDE), AND (INSPECTION) OF PRESSURE VESSELS AND PRESSURIZED SYSTEMS (PVS) AT GSFC, GREENBELT, WALLOPS, AND OTHER OFFSITE LOCATIONS. MAINTENANCE OF LDE AT GREENBELT SITE ONLY, NOT AT OTHER SITES; NON-DESTRUCTIVE EXAMINATION TESTING OF LDE AND PVS FACILITY AND OPERATIONS SAFETY DATA ACQUISITION AND ANALYSIS SYSTEM DEVELOPMENT AND MANAGEMENT. | $2.0M |
| Nov 26, 2018 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | NNG14CR62C | 541330 | IGF::OT::IGF ENVIRONMENTAL TESTING AND INTEGRATION SERVICES (ETIS) II THIS STATEMENT OF WORK (SOW) SPECIFIES THE REQUIREMENTS FOR ON SITE CONTRACTOR SUPPLIED ENVIRONMENTAL TEST AND INTEGRATION AND OTHER LABORATORY OPERATIONS SERVICES TO THE GODDARD SPACE FLIGHT CENTER (GSFC). THE SCOPE OF THESE SERVICES INCLUDES THE FOLLOWING: OPERATION, MAINTENANCE, AND UPGRADE OF ENVIRONMENTAL TEST EQUIPMENT AND FACILITIES LOCATED IN THE GSFC BUILDING 7/10/15/29 COMPLEX, AREA 300 MAGNETIC TEST SITE AND OTHER TECHNICAL FACILITIES LOCATED AT VARIOUS LOCATIONS WITHIN GSFC INCLUDING THE MANUFACTURING AND ELECTROPLATING EQUIPMENT AND FACILITIES PRIMARILY LOCATED IN GSFC BUILDING 5/10/21 SHOPS MECHANICAL AND OPTICAL INTEGRATION OF SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, FABRICATE, AND MANUFACTURE CUSTOM SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, MANUFACTURE, AND OPERATION OF GROUND HANDLING EQUIPMENT AND FIXTURES DESIGN, MANUFACTURE, AND OPERATION OF OPTICAL ALIGNMENT AND CALIBRATION SYSTEMS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT THERMAL BLANKETS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT AND GROUND SUPPORT SYSTEM CABLE HARNESSES DESIGN, MANUFACTURE, AND INSTALLATION OF TECHNICAL FACILITIES INCLUDING BUILDINGS, BUILDING ELEMENTS, UTILITY SYSTEMS, AND TECHNICAL EQUIPMENT AND SYSTEMS DEFINE, ANALYZE, AND RESOLVE ELECTROMAGNETIC RADIATION ISSUES RELATING TO FACILITY AND SATELLITE GROUND SUPPORT EQUIPMENT OPERATION WITHIN THE TEST COMPLEX. SUPPORT SPECTRUM SIGNATURE ANALYSIS TO INSURE INTERFERENCE-FREE AND SAFE OPERATION OF ALL FACILITY-LOCATED NEAR ELECTROMAGNETIC WAVE SENSING DEVICES. TEST AND INTEGRATION ENGINEERING AND ENGINEERING ANALYSIS CLEANROOM OPERATION AND MAINTENANCE CONTAMINATION CONTROL SERVICES USING QUALIFIED AND EXPERIENCED PERSONNEL MAINTENANCE AND OPERATION OF CERTAIN PHYSICAL PLANT SYSTEMS SUCH AS PROCESSED WATER, EMERGENCY POWER, LN2/GN2 STORAGE SYSTEMS, CONDITIONED CLEANROOM AIR HVAC AND HUMIDITY SYSTEMS RECERTIFICATION (TESTING AND INSPECTION) OF LIFTING DEVICES AND EQUIPMENT (LDE), AND (INSPECTION) OF PRESSURE VESSELS AND PRESSURIZED SYSTEMS (PVS) AT GSFC, GREENBELT, WALLOPS, AND OTHER OFFSITE LOCATIONS. MAINTENANCE OF LDE AT GREENBELT SITE ONLY, NOT AT OTHER SITES; NON-DESTRUCTIVE EXAMINATION TESTING OF LDE AND PVS FACILITY AND OPERATIONS SAFETY DATA ACQUISITION AND ANALYSIS SYSTEM DEVELOPMENT AND MANAGEMENT. | $3.0M |
| Nov 19, 2018 | Department of DefenseFA9300 AFTC PZR | FA930018F9000 | 541712 | IGF::OT::IGF ROCKET TECHNOLOGY ENGINEERING SUPPORT ADVICE AND ASSISTANCE SERVICE | $7K |
| Nov 19, 2018 | Department of DefenseFA9300 AFTC PZR | FA930018F9000 | 541712 | IGF::OT::IGF ROCKET TECHNOLOGY ENGINEERING SUPPORT ADVICE AND ASSISTANCE SERVICE | $163K |
| Oct 29, 2018 | Department of DefenseFA9300 AFTC PZR | FA930018F9000 | 541712 | IGF::OT::IGF ROCKET TECHNOLOGY ENGINEERING SUPPORT ADVICE AND ASSISTANCE SERVICE | $25K |
| Oct 29, 2018 | Department of DefenseFA9300 AFTC PZR | FA930018F9000 | 541712 | IGF::OT::IGF ROCKET TECHNOLOGY ENGINEERING SUPPORT ADVICE AND ASSISTANCE SERVICE | $881K |
| Oct 25, 2018 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | NNG14CR62C | 541330 | IGF::OT::IGF ENVIRONMENTAL TESTING AND INTEGRATION SERVICES (ETIS) II THIS STATEMENT OF WORK (SOW) SPECIFIES THE REQUIREMENTS FOR ON SITE CONTRACTOR SUPPLIED ENVIRONMENTAL TEST AND INTEGRATION AND OTHER LABORATORY OPERATIONS SERVICES TO THE GODDARD SPACE FLIGHT CENTER (GSFC). THE SCOPE OF THESE SERVICES INCLUDES THE FOLLOWING: OPERATION, MAINTENANCE, AND UPGRADE OF ENVIRONMENTAL TEST EQUIPMENT AND FACILITIES LOCATED IN THE GSFC BUILDING 7/10/15/29 COMPLEX, AREA 300 MAGNETIC TEST SITE AND OTHER TECHNICAL FACILITIES LOCATED AT VARIOUS LOCATIONS WITHIN GSFC INCLUDING THE MANUFACTURING AND ELECTROPLATING EQUIPMENT AND FACILITIES PRIMARILY LOCATED IN GSFC BUILDING 5/10/21 SHOPS MECHANICAL AND OPTICAL INTEGRATION OF SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, FABRICATE, AND MANUFACTURE CUSTOM SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, MANUFACTURE, AND OPERATION OF GROUND HANDLING EQUIPMENT AND FIXTURES DESIGN, MANUFACTURE, AND OPERATION OF OPTICAL ALIGNMENT AND CALIBRATION SYSTEMS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT THERMAL BLANKETS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT AND GROUND SUPPORT SYSTEM CABLE HARNESSES DESIGN, MANUFACTURE, AND INSTALLATION OF TECHNICAL FACILITIES INCLUDING BUILDINGS, BUILDING ELEMENTS, UTILITY SYSTEMS, AND TECHNICAL EQUIPMENT AND SYSTEMS DEFINE, ANALYZE, AND RESOLVE ELECTROMAGNETIC RADIATION ISSUES RELATING TO FACILITY AND SATELLITE GROUND SUPPORT EQUIPMENT OPERATION WITHIN THE TEST COMPLEX. SUPPORT SPECTRUM SIGNATURE ANALYSIS TO INSURE INTERFERENCE-FREE AND SAFE OPERATION OF ALL FACILITY-LOCATED NEAR ELECTROMAGNETIC WAVE SENSING DEVICES. TEST AND INTEGRATION ENGINEERING AND ENGINEERING ANALYSIS CLEANROOM OPERATION AND MAINTENANCE CONTAMINATION CONTROL SERVICES USING QUALIFIED AND EXPERIENCED PERSONNEL MAINTENANCE AND OPERATION OF CERTAIN PHYSICAL PLANT SYSTEMS SUCH AS PROCESSED WATER, EMERGENCY POWER, LN2/GN2 STORAGE SYSTEMS, CONDITIONED CLEANROOM AIR HVAC AND HUMIDITY SYSTEMS RECERTIFICATION (TESTING AND INSPECTION) OF LIFTING DEVICES AND EQUIPMENT (LDE), AND (INSPECTION) OF PRESSURE VESSELS AND PRESSURIZED SYSTEMS (PVS) AT GSFC, GREENBELT, WALLOPS, AND OTHER OFFSITE LOCATIONS. MAINTENANCE OF LDE AT GREENBELT SITE ONLY, NOT AT OTHER SITES; NON-DESTRUCTIVE EXAMINATION TESTING OF LDE AND PVS FACILITY AND OPERATIONS SAFETY DATA ACQUISITION AND ANALYSIS SYSTEM DEVELOPMENT AND MANAGEMENT. | $2.5M |
| Sep 28, 2018 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | NNG14CR62C | 541330 | IGF::OT::IGF ENVIRONMENTAL TESTING AND INTEGRATION SERVICES (ETIS) II THIS STATEMENT OF WORK (SOW) SPECIFIES THE REQUIREMENTS FOR ON SITE CONTRACTOR SUPPLIED ENVIRONMENTAL TEST AND INTEGRATION AND OTHER LABORATORY OPERATIONS SERVICES TO THE GODDARD SPACE FLIGHT CENTER (GSFC). THE SCOPE OF THESE SERVICES INCLUDES THE FOLLOWING: OPERATION, MAINTENANCE, AND UPGRADE OF ENVIRONMENTAL TEST EQUIPMENT AND FACILITIES LOCATED IN THE GSFC BUILDING 7/10/15/29 COMPLEX, AREA 300 MAGNETIC TEST SITE AND OTHER TECHNICAL FACILITIES LOCATED AT VARIOUS LOCATIONS WITHIN GSFC INCLUDING THE MANUFACTURING AND ELECTROPLATING EQUIPMENT AND FACILITIES PRIMARILY LOCATED IN GSFC BUILDING 5/10/21 SHOPS MECHANICAL AND OPTICAL INTEGRATION OF SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, FABRICATE, AND MANUFACTURE CUSTOM SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, MANUFACTURE, AND OPERATION OF GROUND HANDLING EQUIPMENT AND FIXTURES DESIGN, MANUFACTURE, AND OPERATION OF OPTICAL ALIGNMENT AND CALIBRATION SYSTEMS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT THERMAL BLANKETS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT AND GROUND SUPPORT SYSTEM CABLE HARNESSES DESIGN, MANUFACTURE, AND INSTALLATION OF TECHNICAL FACILITIES INCLUDING BUILDINGS, BUILDING ELEMENTS, UTILITY SYSTEMS, AND TECHNICAL EQUIPMENT AND SYSTEMS DEFINE, ANALYZE, AND RESOLVE ELECTROMAGNETIC RADIATION ISSUES RELATING TO FACILITY AND SATELLITE GROUND SUPPORT EQUIPMENT OPERATION WITHIN THE TEST COMPLEX. SUPPORT SPECTRUM SIGNATURE ANALYSIS TO INSURE INTERFERENCE-FREE AND SAFE OPERATION OF ALL FACILITY-LOCATED NEAR ELECTROMAGNETIC WAVE SENSING DEVICES. TEST AND INTEGRATION ENGINEERING AND ENGINEERING ANALYSIS CLEANROOM OPERATION AND MAINTENANCE CONTAMINATION CONTROL SERVICES USING QUALIFIED AND EXPERIENCED PERSONNEL MAINTENANCE AND OPERATION OF CERTAIN PHYSICAL PLANT SYSTEMS SUCH AS PROCESSED WATER, EMERGENCY POWER, LN2/GN2 STORAGE SYSTEMS, CONDITIONED CLEANROOM AIR HVAC AND HUMIDITY SYSTEMS RECERTIFICATION (TESTING AND INSPECTION) OF LIFTING DEVICES AND EQUIPMENT (LDE), AND (INSPECTION) OF PRESSURE VESSELS AND PRESSURIZED SYSTEMS (PVS) AT GSFC, GREENBELT, WALLOPS, AND OTHER OFFSITE LOCATIONS. MAINTENANCE OF LDE AT GREENBELT SITE ONLY, NOT AT OTHER SITES; NON-DESTRUCTIVE EXAMINATION TESTING OF LDE AND PVS FACILITY AND OPERATIONS SAFETY DATA ACQUISITION AND ANALYSIS SYSTEM DEVELOPMENT AND MANAGEMENT. | $300K |
| Sep 27, 2018 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | NNG14CR62C | 541330 | IGF::OT::IGF ENVIRONMENTAL TESTING AND INTEGRATION SERVICES (ETIS) II THIS STATEMENT OF WORK (SOW) SPECIFIES THE REQUIREMENTS FOR ON SITE CONTRACTOR SUPPLIED ENVIRONMENTAL TEST AND INTEGRATION AND OTHER LABORATORY OPERATIONS SERVICES TO THE GODDARD SPACE FLIGHT CENTER (GSFC). THE SCOPE OF THESE SERVICES INCLUDES THE FOLLOWING: OPERATION, MAINTENANCE, AND UPGRADE OF ENVIRONMENTAL TEST EQUIPMENT AND FACILITIES LOCATED IN THE GSFC BUILDING 7/10/15/29 COMPLEX, AREA 300 MAGNETIC TEST SITE AND OTHER TECHNICAL FACILITIES LOCATED AT VARIOUS LOCATIONS WITHIN GSFC INCLUDING THE MANUFACTURING AND ELECTROPLATING EQUIPMENT AND FACILITIES PRIMARILY LOCATED IN GSFC BUILDING 5/10/21 SHOPS MECHANICAL AND OPTICAL INTEGRATION OF SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, FABRICATE, AND MANUFACTURE CUSTOM SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, MANUFACTURE, AND OPERATION OF GROUND HANDLING EQUIPMENT AND FIXTURES DESIGN, MANUFACTURE, AND OPERATION OF OPTICAL ALIGNMENT AND CALIBRATION SYSTEMS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT THERMAL BLANKETS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT AND GROUND SUPPORT SYSTEM CABLE HARNESSES DESIGN, MANUFACTURE, AND INSTALLATION OF TECHNICAL FACILITIES INCLUDING BUILDINGS, BUILDING ELEMENTS, UTILITY SYSTEMS, AND TECHNICAL EQUIPMENT AND SYSTEMS DEFINE, ANALYZE, AND RESOLVE ELECTROMAGNETIC RADIATION ISSUES RELATING TO FACILITY AND SATELLITE GROUND SUPPORT EQUIPMENT OPERATION WITHIN THE TEST COMPLEX. SUPPORT SPECTRUM SIGNATURE ANALYSIS TO INSURE INTERFERENCE-FREE AND SAFE OPERATION OF ALL FACILITY-LOCATED NEAR ELECTROMAGNETIC WAVE SENSING DEVICES. TEST AND INTEGRATION ENGINEERING AND ENGINEERING ANALYSIS CLEANROOM OPERATION AND MAINTENANCE CONTAMINATION CONTROL SERVICES USING QUALIFIED AND EXPERIENCED PERSONNEL MAINTENANCE AND OPERATION OF CERTAIN PHYSICAL PLANT SYSTEMS SUCH AS PROCESSED WATER, EMERGENCY POWER, LN2/GN2 STORAGE SYSTEMS, CONDITIONED CLEANROOM AIR HVAC AND HUMIDITY SYSTEMS RECERTIFICATION (TESTING AND INSPECTION) OF LIFTING DEVICES AND EQUIPMENT (LDE), AND (INSPECTION) OF PRESSURE VESSELS AND PRESSURIZED SYSTEMS (PVS) AT GSFC, GREENBELT, WALLOPS, AND OTHER OFFSITE LOCATIONS. MAINTENANCE OF LDE AT GREENBELT SITE ONLY, NOT AT OTHER SITES; NON-DESTRUCTIVE EXAMINATION TESTING OF LDE AND PVS FACILITY AND OPERATIONS SAFETY DATA ACQUISITION AND ANALYSIS SYSTEM DEVELOPMENT AND MANAGEMENT. | $4.3M |
| Sep 17, 2018 | Department of DefenseOFFICE OF NAVAL RESEARCH | N0001418C2060 | 541715 | LONG RANGE BROAD AGENCY ANNOUNCEMENT (BAA) FOR NAVY AND MARINE CORPS SCIENCE&TECHNOLOGY | $88K |
| Sep 12, 2018 | Department of DefenseFA9300 AFTC PZR | FA930018F9000 | 541712 | IGF::OT::IGF ROCKET TECHNOLOGY ENGINEERING SUPPORT ADVICE AND ASSISTANCE SERVICE | $113K |
| Sep 12, 2018 | Department of DefenseFA9300 AFTC PZR | FA930018F9000 | 541712 | IGF::OT::IGF ROCKET TECHNOLOGY ENGINEERING SUPPORT ADVICE AND ASSISTANCE SERVICE | $579K |
| Sep 10, 2018 | Department of DefenseFA9300 AFTC PZR | FA930012C0002 | 541712 | ARES 3 BASIC CONTRACT | $95K |
| Sep 10, 2018 | Department of DefenseFA9300 AFTC PZR | FA930018F9000 | 541712 | IGF::OT::IGF ROCKET TECHNOLOGY ENGINEERING SUPPORT ADVICE AND ASSISTANCE SERVICE | $200K |
| Sep 10, 2018 | Department of DefenseFA9300 AFTC PZR | FA930018F9000 | 541712 | IGF::OT::IGF ROCKET TECHNOLOGY ENGINEERING SUPPORT ADVICE AND ASSISTANCE SERVICE | $160K |
| Sep 7, 2018 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | NNG14CR62C | 541330 | IGF::OT::IGF ENVIRONMENTAL TESTING AND INTEGRATION SERVICES (ETIS) II THIS STATEMENT OF WORK (SOW) SPECIFIES THE REQUIREMENTS FOR ON SITE CONTRACTOR SUPPLIED ENVIRONMENTAL TEST AND INTEGRATION AND OTHER LABORATORY OPERATIONS SERVICES TO THE GODDARD SPACE FLIGHT CENTER (GSFC). THE SCOPE OF THESE SERVICES INCLUDES THE FOLLOWING: OPERATION, MAINTENANCE, AND UPGRADE OF ENVIRONMENTAL TEST EQUIPMENT AND FACILITIES LOCATED IN THE GSFC BUILDING 7/10/15/29 COMPLEX, AREA 300 MAGNETIC TEST SITE AND OTHER TECHNICAL FACILITIES LOCATED AT VARIOUS LOCATIONS WITHIN GSFC INCLUDING THE MANUFACTURING AND ELECTROPLATING EQUIPMENT AND FACILITIES PRIMARILY LOCATED IN GSFC BUILDING 5/10/21 SHOPS MECHANICAL AND OPTICAL INTEGRATION OF SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, FABRICATE, AND MANUFACTURE CUSTOM SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, MANUFACTURE, AND OPERATION OF GROUND HANDLING EQUIPMENT AND FIXTURES DESIGN, MANUFACTURE, AND OPERATION OF OPTICAL ALIGNMENT AND CALIBRATION SYSTEMS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT THERMAL BLANKETS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT AND GROUND SUPPORT SYSTEM CABLE HARNESSES DESIGN, MANUFACTURE, AND INSTALLATION OF TECHNICAL FACILITIES INCLUDING BUILDINGS, BUILDING ELEMENTS, UTILITY SYSTEMS, AND TECHNICAL EQUIPMENT AND SYSTEMS DEFINE, ANALYZE, AND RESOLVE ELECTROMAGNETIC RADIATION ISSUES RELATING TO FACILITY AND SATELLITE GROUND SUPPORT EQUIPMENT OPERATION WITHIN THE TEST COMPLEX. SUPPORT SPECTRUM SIGNATURE ANALYSIS TO INSURE INTERFERENCE-FREE AND SAFE OPERATION OF ALL FACILITY-LOCATED NEAR ELECTROMAGNETIC WAVE SENSING DEVICES. TEST AND INTEGRATION ENGINEERING AND ENGINEERING ANALYSIS CLEANROOM OPERATION AND MAINTENANCE CONTAMINATION CONTROL SERVICES USING QUALIFIED AND EXPERIENCED PERSONNEL MAINTENANCE AND OPERATION OF CERTAIN PHYSICAL PLANT SYSTEMS SUCH AS PROCESSED WATER, EMERGENCY POWER, LN2/GN2 STORAGE SYSTEMS, CONDITIONED CLEANROOM AIR HVAC AND HUMIDITY SYSTEMS RECERTIFICATION (TESTING AND INSPECTION) OF LIFTING DEVICES AND EQUIPMENT (LDE), AND (INSPECTION) OF PRESSURE VESSELS AND PRESSURIZED SYSTEMS (PVS) AT GSFC, GREENBELT, WALLOPS, AND OTHER OFFSITE LOCATIONS. MAINTENANCE OF LDE AT GREENBELT SITE ONLY, NOT AT OTHER SITES; NON-DESTRUCTIVE EXAMINATION TESTING OF LDE AND PVS FACILITY AND OPERATIONS SAFETY DATA ACQUISITION AND ANALYSIS SYSTEM DEVELOPMENT AND MANAGEMENT. | $3.0M |
| Aug 16, 2018 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | NNG14CR62C | 541330 | IGF::OT::IGF ENVIRONMENTAL TESTING AND INTEGRATION SERVICES (ETIS) II THIS STATEMENT OF WORK (SOW) SPECIFIES THE REQUIREMENTS FOR ON SITE CONTRACTOR SUPPLIED ENVIRONMENTAL TEST AND INTEGRATION AND OTHER LABORATORY OPERATIONS SERVICES TO THE GODDARD SPACE FLIGHT CENTER (GSFC). THE SCOPE OF THESE SERVICES INCLUDES THE FOLLOWING: OPERATION, MAINTENANCE, AND UPGRADE OF ENVIRONMENTAL TEST EQUIPMENT AND FACILITIES LOCATED IN THE GSFC BUILDING 7/10/15/29 COMPLEX, AREA 300 MAGNETIC TEST SITE AND OTHER TECHNICAL FACILITIES LOCATED AT VARIOUS LOCATIONS WITHIN GSFC INCLUDING THE MANUFACTURING AND ELECTROPLATING EQUIPMENT AND FACILITIES PRIMARILY LOCATED IN GSFC BUILDING 5/10/21 SHOPS MECHANICAL AND OPTICAL INTEGRATION OF SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, FABRICATE, AND MANUFACTURE CUSTOM SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, MANUFACTURE, AND OPERATION OF GROUND HANDLING EQUIPMENT AND FIXTURES DESIGN, MANUFACTURE, AND OPERATION OF OPTICAL ALIGNMENT AND CALIBRATION SYSTEMS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT THERMAL BLANKETS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT AND GROUND SUPPORT SYSTEM CABLE HARNESSES DESIGN, MANUFACTURE, AND INSTALLATION OF TECHNICAL FACILITIES INCLUDING BUILDINGS, BUILDING ELEMENTS, UTILITY SYSTEMS, AND TECHNICAL EQUIPMENT AND SYSTEMS DEFINE, ANALYZE, AND RESOLVE ELECTROMAGNETIC RADIATION ISSUES RELATING TO FACILITY AND SATELLITE GROUND SUPPORT EQUIPMENT OPERATION WITHIN THE TEST COMPLEX. SUPPORT SPECTRUM SIGNATURE ANALYSIS TO INSURE INTERFERENCE-FREE AND SAFE OPERATION OF ALL FACILITY-LOCATED NEAR ELECTROMAGNETIC WAVE SENSING DEVICES. TEST AND INTEGRATION ENGINEERING AND ENGINEERING ANALYSIS CLEANROOM OPERATION AND MAINTENANCE CONTAMINATION CONTROL SERVICES USING QUALIFIED AND EXPERIENCED PERSONNEL MAINTENANCE AND OPERATION OF CERTAIN PHYSICAL PLANT SYSTEMS SUCH AS PROCESSED WATER, EMERGENCY POWER, LN2/GN2 STORAGE SYSTEMS, CONDITIONED CLEANROOM AIR HVAC AND HUMIDITY SYSTEMS RECERTIFICATION (TESTING AND INSPECTION) OF LIFTING DEVICES AND EQUIPMENT (LDE), AND (INSPECTION) OF PRESSURE VESSELS AND PRESSURIZED SYSTEMS (PVS) AT GSFC, GREENBELT, WALLOPS, AND OTHER OFFSITE LOCATIONS. MAINTENANCE OF LDE AT GREENBELT SITE ONLY, NOT AT OTHER SITES; NON-DESTRUCTIVE EXAMINATION TESTING OF LDE AND PVS FACILITY AND OPERATIONS SAFETY DATA ACQUISITION AND ANALYSIS SYSTEM DEVELOPMENT AND MANAGEMENT. | $2.5M |
| Aug 14, 2018 | Department of DefenseOFFICE OF NAVAL RESEARCH | N0001418C2060 | 541715 | LONG RANGE BROAD AGENCY ANNOUNCEMENT (BAA) FOR NAVY AND MARINE CORPS SCIENCE&TECHNOLOGY | $201K |
| Jul 18, 2018 | Department of DefenseFA9300 AFTC PZR | FA930018F9000 | 541712 | IGF::OT::IGF ROCKET TECHNOLOGY ENGINEERING SUPPORT ADVICE AND ASSISTANCE SERVICE | $842K |
| Jul 18, 2018 | Department of DefenseFA9300 AFTC PZR | FA930018F9000 | 541712 | IGF::OT::IGF ROCKET TECHNOLOGY ENGINEERING SUPPORT ADVICE AND ASSISTANCE SERVICE | $21K |
| Jul 13, 2018 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | NNG14CR62C | 541330 | IGF::OT::IGF ENVIRONMENTAL TESTING AND INTEGRATION SERVICES (ETIS) II THIS STATEMENT OF WORK (SOW) SPECIFIES THE REQUIREMENTS FOR ON SITE CONTRACTOR SUPPLIED ENVIRONMENTAL TEST AND INTEGRATION AND OTHER LABORATORY OPERATIONS SERVICES TO THE GODDARD SPACE FLIGHT CENTER (GSFC). THE SCOPE OF THESE SERVICES INCLUDES THE FOLLOWING: OPERATION, MAINTENANCE, AND UPGRADE OF ENVIRONMENTAL TEST EQUIPMENT AND FACILITIES LOCATED IN THE GSFC BUILDING 7/10/15/29 COMPLEX, AREA 300 MAGNETIC TEST SITE AND OTHER TECHNICAL FACILITIES LOCATED AT VARIOUS LOCATIONS WITHIN GSFC INCLUDING THE MANUFACTURING AND ELECTROPLATING EQUIPMENT AND FACILITIES PRIMARILY LOCATED IN GSFC BUILDING 5/10/21 SHOPS MECHANICAL AND OPTICAL INTEGRATION OF SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, FABRICATE, AND MANUFACTURE CUSTOM SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, MANUFACTURE, AND OPERATION OF GROUND HANDLING EQUIPMENT AND FIXTURES DESIGN, MANUFACTURE, AND OPERATION OF OPTICAL ALIGNMENT AND CALIBRATION SYSTEMS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT THERMAL BLANKETS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT AND GROUND SUPPORT SYSTEM CABLE HARNESSES DESIGN, MANUFACTURE, AND INSTALLATION OF TECHNICAL FACILITIES INCLUDING BUILDINGS, BUILDING ELEMENTS, UTILITY SYSTEMS, AND TECHNICAL EQUIPMENT AND SYSTEMS DEFINE, ANALYZE, AND RESOLVE ELECTROMAGNETIC RADIATION ISSUES RELATING TO FACILITY AND SATELLITE GROUND SUPPORT EQUIPMENT OPERATION WITHIN THE TEST COMPLEX. SUPPORT SPECTRUM SIGNATURE ANALYSIS TO INSURE INTERFERENCE-FREE AND SAFE OPERATION OF ALL FACILITY-LOCATED NEAR ELECTROMAGNETIC WAVE SENSING DEVICES. TEST AND INTEGRATION ENGINEERING AND ENGINEERING ANALYSIS CLEANROOM OPERATION AND MAINTENANCE CONTAMINATION CONTROL SERVICES USING QUALIFIED AND EXPERIENCED PERSONNEL MAINTENANCE AND OPERATION OF CERTAIN PHYSICAL PLANT SYSTEMS SUCH AS PROCESSED WATER, EMERGENCY POWER, LN2/GN2 STORAGE SYSTEMS, CONDITIONED CLEANROOM AIR HVAC AND HUMIDITY SYSTEMS RECERTIFICATION (TESTING AND INSPECTION) OF LIFTING DEVICES AND EQUIPMENT (LDE), AND (INSPECTION) OF PRESSURE VESSELS AND PRESSURIZED SYSTEMS (PVS) AT GSFC, GREENBELT, WALLOPS, AND OTHER OFFSITE LOCATIONS. MAINTENANCE OF LDE AT GREENBELT SITE ONLY, NOT AT OTHER SITES; NON-DESTRUCTIVE EXAMINATION TESTING OF LDE AND PVS FACILITY AND OPERATIONS SAFETY DATA ACQUISITION AND ANALYSIS SYSTEM DEVELOPMENT AND MANAGEMENT. | $5.5M |
| Jun 13, 2018 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | NNG14CR62C | 541330 | IGF::OT::IGF ENVIRONMENTAL TESTING AND INTEGRATION SERVICES (ETIS) II THIS STATEMENT OF WORK (SOW) SPECIFIES THE REQUIREMENTS FOR ON SITE CONTRACTOR SUPPLIED ENVIRONMENTAL TEST AND INTEGRATION AND OTHER LABORATORY OPERATIONS SERVICES TO THE GODDARD SPACE FLIGHT CENTER (GSFC). THE SCOPE OF THESE SERVICES INCLUDES THE FOLLOWING: OPERATION, MAINTENANCE, AND UPGRADE OF ENVIRONMENTAL TEST EQUIPMENT AND FACILITIES LOCATED IN THE GSFC BUILDING 7/10/15/29 COMPLEX, AREA 300 MAGNETIC TEST SITE AND OTHER TECHNICAL FACILITIES LOCATED AT VARIOUS LOCATIONS WITHIN GSFC INCLUDING THE MANUFACTURING AND ELECTROPLATING EQUIPMENT AND FACILITIES PRIMARILY LOCATED IN GSFC BUILDING 5/10/21 SHOPS MECHANICAL AND OPTICAL INTEGRATION OF SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, FABRICATE, AND MANUFACTURE CUSTOM SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, MANUFACTURE, AND OPERATION OF GROUND HANDLING EQUIPMENT AND FIXTURES DESIGN, MANUFACTURE, AND OPERATION OF OPTICAL ALIGNMENT AND CALIBRATION SYSTEMS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT THERMAL BLANKETS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT AND GROUND SUPPORT SYSTEM CABLE HARNESSES DESIGN, MANUFACTURE, AND INSTALLATION OF TECHNICAL FACILITIES INCLUDING BUILDINGS, BUILDING ELEMENTS, UTILITY SYSTEMS, AND TECHNICAL EQUIPMENT AND SYSTEMS DEFINE, ANALYZE, AND RESOLVE ELECTROMAGNETIC RADIATION ISSUES RELATING TO FACILITY AND SATELLITE GROUND SUPPORT EQUIPMENT OPERATION WITHIN THE TEST COMPLEX. SUPPORT SPECTRUM SIGNATURE ANALYSIS TO INSURE INTERFERENCE-FREE AND SAFE OPERATION OF ALL FACILITY-LOCATED NEAR ELECTROMAGNETIC WAVE SENSING DEVICES. TEST AND INTEGRATION ENGINEERING AND ENGINEERING ANALYSIS CLEANROOM OPERATION AND MAINTENANCE CONTAMINATION CONTROL SERVICES USING QUALIFIED AND EXPERIENCED PERSONNEL MAINTENANCE AND OPERATION OF CERTAIN PHYSICAL PLANT SYSTEMS SUCH AS PROCESSED WATER, EMERGENCY POWER, LN2/GN2 STORAGE SYSTEMS, CONDITIONED CLEANROOM AIR HVAC AND HUMIDITY SYSTEMS RECERTIFICATION (TESTING AND INSPECTION) OF LIFTING DEVICES AND EQUIPMENT (LDE), AND (INSPECTION) OF PRESSURE VESSELS AND PRESSURIZED SYSTEMS (PVS) AT GSFC, GREENBELT, WALLOPS, AND OTHER OFFSITE LOCATIONS. MAINTENANCE OF LDE AT GREENBELT SITE ONLY, NOT AT OTHER SITES; NON-DESTRUCTIVE EXAMINATION TESTING OF LDE AND PVS FACILITY AND OPERATIONS SAFETY DATA ACQUISITION AND ANALYSIS SYSTEM DEVELOPMENT AND MANAGEMENT. | $5.0M |
| May 30, 2018 | Department of DefenseFA9300 AFTC PZR | FA930018F9000 | 541712 | IGF::OT::IGF ROCKET TECHNOLOGY ENGINEERING SUPPORT ADVICE AND ASSISTANCE SERVICE | $7K |
| May 30, 2018 | Department of DefenseFA9300 AFTC PZR | FA930018F9000 | 541712 | IGF::OT::IGF ROCKET TECHNOLOGY ENGINEERING SUPPORT ADVICE AND ASSISTANCE SERVICE | $181K |
| May 10, 2018 | Department of DefenseFA9300 AFTC PZR | FA930018F9000 | 541712 | IGF::OT::IGF ROCKET TECHNOLOGY ENGINEERING SUPPORT ADVICE AND ASSISTANCE SERVICE | $3K |
| May 10, 2018 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | NNG14CR62C | 541330 | IGF::OT::IGF ENVIRONMENTAL TESTING AND INTEGRATION SERVICES (ETIS) II THIS STATEMENT OF WORK (SOW) SPECIFIES THE REQUIREMENTS FOR ON SITE CONTRACTOR SUPPLIED ENVIRONMENTAL TEST AND INTEGRATION AND OTHER LABORATORY OPERATIONS SERVICES TO THE GODDARD SPACE FLIGHT CENTER (GSFC). THE SCOPE OF THESE SERVICES INCLUDES THE FOLLOWING: OPERATION, MAINTENANCE, AND UPGRADE OF ENVIRONMENTAL TEST EQUIPMENT AND FACILITIES LOCATED IN THE GSFC BUILDING 7/10/15/29 COMPLEX, AREA 300 MAGNETIC TEST SITE AND OTHER TECHNICAL FACILITIES LOCATED AT VARIOUS LOCATIONS WITHIN GSFC INCLUDING THE MANUFACTURING AND ELECTROPLATING EQUIPMENT AND FACILITIES PRIMARILY LOCATED IN GSFC BUILDING 5/10/21 SHOPS MECHANICAL AND OPTICAL INTEGRATION OF SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, FABRICATE, AND MANUFACTURE CUSTOM SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, MANUFACTURE, AND OPERATION OF GROUND HANDLING EQUIPMENT AND FIXTURES DESIGN, MANUFACTURE, AND OPERATION OF OPTICAL ALIGNMENT AND CALIBRATION SYSTEMS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT THERMAL BLANKETS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT AND GROUND SUPPORT SYSTEM CABLE HARNESSES DESIGN, MANUFACTURE, AND INSTALLATION OF TECHNICAL FACILITIES INCLUDING BUILDINGS, BUILDING ELEMENTS, UTILITY SYSTEMS, AND TECHNICAL EQUIPMENT AND SYSTEMS DEFINE, ANALYZE, AND RESOLVE ELECTROMAGNETIC RADIATION ISSUES RELATING TO FACILITY AND SATELLITE GROUND SUPPORT EQUIPMENT OPERATION WITHIN THE TEST COMPLEX. SUPPORT SPECTRUM SIGNATURE ANALYSIS TO INSURE INTERFERENCE-FREE AND SAFE OPERATION OF ALL FACILITY-LOCATED NEAR ELECTROMAGNETIC WAVE SENSING DEVICES. TEST AND INTEGRATION ENGINEERING AND ENGINEERING ANALYSIS CLEANROOM OPERATION AND MAINTENANCE CONTAMINATION CONTROL SERVICES USING QUALIFIED AND EXPERIENCED PERSONNEL MAINTENANCE AND OPERATION OF CERTAIN PHYSICAL PLANT SYSTEMS SUCH AS PROCESSED WATER, EMERGENCY POWER, LN2/GN2 STORAGE SYSTEMS, CONDITIONED CLEANROOM AIR HVAC AND HUMIDITY SYSTEMS RECERTIFICATION (TESTING AND INSPECTION) OF LIFTING DEVICES AND EQUIPMENT (LDE), AND (INSPECTION) OF PRESSURE VESSELS AND PRESSURIZED SYSTEMS (PVS) AT GSFC, GREENBELT, WALLOPS, AND OTHER OFFSITE LOCATIONS. MAINTENANCE OF LDE AT GREENBELT SITE ONLY, NOT AT OTHER SITES; NON-DESTRUCTIVE EXAMINATION TESTING OF LDE AND PVS FACILITY AND OPERATIONS SAFETY DATA ACQUISITION AND ANALYSIS SYSTEM DEVELOPMENT AND MANAGEMENT. | $1.9M |
| May 10, 2018 | Department of DefenseFA9300 AFTC PZR | FA930018F9000 | 541712 | IGF::OT::IGF ROCKET TECHNOLOGY ENGINEERING SUPPORT ADVICE AND ASSISTANCE SERVICE | $328K |
| Apr 20, 2018 | Department of DefenseFA9300 AFTC PZR | FA930018F9000 | 541712 | IGF::OT::IGF ROCKET TECHNOLOGY ENGINEERING SUPPORT ADVICE AND ASSISTANCE SERVICE | $134K |
| Apr 20, 2018 | Department of DefenseFA9300 AFTC PZR | FA930018F9000 | 541712 | IGF::OT::IGF ROCKET TECHNOLOGY ENGINEERING SUPPORT ADVICE AND ASSISTANCE SERVICE | $6K |
| Apr 17, 2018 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | NNG14CR62C | 541330 | IGF::OT::IGF ENVIRONMENTAL TESTING AND INTEGRATION SERVICES (ETIS) II THIS STATEMENT OF WORK (SOW) SPECIFIES THE REQUIREMENTS FOR ON SITE CONTRACTOR SUPPLIED ENVIRONMENTAL TEST AND INTEGRATION AND OTHER LABORATORY OPERATIONS SERVICES TO THE GODDARD SPACE FLIGHT CENTER (GSFC). THE SCOPE OF THESE SERVICES INCLUDES THE FOLLOWING: OPERATION, MAINTENANCE, AND UPGRADE OF ENVIRONMENTAL TEST EQUIPMENT AND FACILITIES LOCATED IN THE GSFC BUILDING 7/10/15/29 COMPLEX, AREA 300 MAGNETIC TEST SITE AND OTHER TECHNICAL FACILITIES LOCATED AT VARIOUS LOCATIONS WITHIN GSFC INCLUDING THE MANUFACTURING AND ELECTROPLATING EQUIPMENT AND FACILITIES PRIMARILY LOCATED IN GSFC BUILDING 5/10/21 SHOPS MECHANICAL AND OPTICAL INTEGRATION OF SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, FABRICATE, AND MANUFACTURE CUSTOM SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, MANUFACTURE, AND OPERATION OF GROUND HANDLING EQUIPMENT AND FIXTURES DESIGN, MANUFACTURE, AND OPERATION OF OPTICAL ALIGNMENT AND CALIBRATION SYSTEMS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT THERMAL BLANKETS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT AND GROUND SUPPORT SYSTEM CABLE HARNESSES DESIGN, MANUFACTURE, AND INSTALLATION OF TECHNICAL FACILITIES INCLUDING BUILDINGS, BUILDING ELEMENTS, UTILITY SYSTEMS, AND TECHNICAL EQUIPMENT AND SYSTEMS DEFINE, ANALYZE, AND RESOLVE ELECTROMAGNETIC RADIATION ISSUES RELATING TO FACILITY AND SATELLITE GROUND SUPPORT EQUIPMENT OPERATION WITHIN THE TEST COMPLEX. SUPPORT SPECTRUM SIGNATURE ANALYSIS TO INSURE INTERFERENCE-FREE AND SAFE OPERATION OF ALL FACILITY-LOCATED NEAR ELECTROMAGNETIC WAVE SENSING DEVICES. TEST AND INTEGRATION ENGINEERING AND ENGINEERING ANALYSIS CLEANROOM OPERATION AND MAINTENANCE CONTAMINATION CONTROL SERVICES USING QUALIFIED AND EXPERIENCED PERSONNEL MAINTENANCE AND OPERATION OF CERTAIN PHYSICAL PLANT SYSTEMS SUCH AS PROCESSED WATER, EMERGENCY POWER, LN2/GN2 STORAGE SYSTEMS, CONDITIONED CLEANROOM AIR HVAC AND HUMIDITY SYSTEMS RECERTIFICATION (TESTING AND INSPECTION) OF LIFTING DEVICES AND EQUIPMENT (LDE), AND (INSPECTION) OF PRESSURE VESSELS AND PRESSURIZED SYSTEMS (PVS) AT GSFC, GREENBELT, WALLOPS, AND OTHER OFFSITE LOCATIONS. MAINTENANCE OF LDE AT GREENBELT SITE ONLY, NOT AT OTHER SITES; NON-DESTRUCTIVE EXAMINATION TESTING OF LDE AND PVS FACILITY AND OPERATIONS SAFETY DATA ACQUISITION AND ANALYSIS SYSTEM DEVELOPMENT AND MANAGEMENT. | $4.0M |
| Mar 16, 2018 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | NNG14CR62C | 541330 | IGF::OT::IGF ENVIRONMENTAL TESTING AND INTEGRATION SERVICES (ETIS) II THIS STATEMENT OF WORK (SOW) SPECIFIES THE REQUIREMENTS FOR ON SITE CONTRACTOR SUPPLIED ENVIRONMENTAL TEST AND INTEGRATION AND OTHER LABORATORY OPERATIONS SERVICES TO THE GODDARD SPACE FLIGHT CENTER (GSFC). THE SCOPE OF THESE SERVICES INCLUDES THE FOLLOWING: OPERATION, MAINTENANCE, AND UPGRADE OF ENVIRONMENTAL TEST EQUIPMENT AND FACILITIES LOCATED IN THE GSFC BUILDING 7/10/15/29 COMPLEX, AREA 300 MAGNETIC TEST SITE AND OTHER TECHNICAL FACILITIES LOCATED AT VARIOUS LOCATIONS WITHIN GSFC INCLUDING THE MANUFACTURING AND ELECTROPLATING EQUIPMENT AND FACILITIES PRIMARILY LOCATED IN GSFC BUILDING 5/10/21 SHOPS MECHANICAL AND OPTICAL INTEGRATION OF SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, FABRICATE, AND MANUFACTURE CUSTOM SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, MANUFACTURE, AND OPERATION OF GROUND HANDLING EQUIPMENT AND FIXTURES DESIGN, MANUFACTURE, AND OPERATION OF OPTICAL ALIGNMENT AND CALIBRATION SYSTEMS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT THERMAL BLANKETS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT AND GROUND SUPPORT SYSTEM CABLE HARNESSES DESIGN, MANUFACTURE, AND INSTALLATION OF TECHNICAL FACILITIES INCLUDING BUILDINGS, BUILDING ELEMENTS, UTILITY SYSTEMS, AND TECHNICAL EQUIPMENT AND SYSTEMS DEFINE, ANALYZE, AND RESOLVE ELECTROMAGNETIC RADIATION ISSUES RELATING TO FACILITY AND SATELLITE GROUND SUPPORT EQUIPMENT OPERATION WITHIN THE TEST COMPLEX. SUPPORT SPECTRUM SIGNATURE ANALYSIS TO INSURE INTERFERENCE-FREE AND SAFE OPERATION OF ALL FACILITY-LOCATED NEAR ELECTROMAGNETIC WAVE SENSING DEVICES. TEST AND INTEGRATION ENGINEERING AND ENGINEERING ANALYSIS CLEANROOM OPERATION AND MAINTENANCE CONTAMINATION CONTROL SERVICES USING QUALIFIED AND EXPERIENCED PERSONNEL MAINTENANCE AND OPERATION OF CERTAIN PHYSICAL PLANT SYSTEMS SUCH AS PROCESSED WATER, EMERGENCY POWER, LN2/GN2 STORAGE SYSTEMS, CONDITIONED CLEANROOM AIR HVAC AND HUMIDITY SYSTEMS RECERTIFICATION (TESTING AND INSPECTION) OF LIFTING DEVICES AND EQUIPMENT (LDE), AND (INSPECTION) OF PRESSURE VESSELS AND PRESSURIZED SYSTEMS (PVS) AT GSFC, GREENBELT, WALLOPS, AND OTHER OFFSITE LOCATIONS. MAINTENANCE OF LDE AT GREENBELT SITE ONLY, NOT AT OTHER SITES; NON-DESTRUCTIVE EXAMINATION TESTING OF LDE AND PVS FACILITY AND OPERATIONS SAFETY DATA ACQUISITION AND ANALYSIS SYSTEM DEVELOPMENT AND MANAGEMENT. | $4.0M |
| Mar 6, 2018 | Department of DefenseW6QK ACC-APG | 0001 | 541712 | INCREMENTAL FUNDING | $545 |
| Feb 16, 2018 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | NNG14CR62C | 541330 | IGF::OT::IGF ENVIRONMENTAL TESTING AND INTEGRATION SERVICES (ETIS) II THIS STATEMENT OF WORK (SOW) SPECIFIES THE REQUIREMENTS FOR ON SITE CONTRACTOR SUPPLIED ENVIRONMENTAL TEST AND INTEGRATION AND OTHER LABORATORY OPERATIONS SERVICES TO THE GODDARD SPACE FLIGHT CENTER (GSFC). THE SCOPE OF THESE SERVICES INCLUDES THE FOLLOWING: OPERATION, MAINTENANCE, AND UPGRADE OF ENVIRONMENTAL TEST EQUIPMENT AND FACILITIES LOCATED IN THE GSFC BUILDING 7/10/15/29 COMPLEX, AREA 300 MAGNETIC TEST SITE AND OTHER TECHNICAL FACILITIES LOCATED AT VARIOUS LOCATIONS WITHIN GSFC INCLUDING THE MANUFACTURING AND ELECTROPLATING EQUIPMENT AND FACILITIES PRIMARILY LOCATED IN GSFC BUILDING 5/10/21 SHOPS MECHANICAL AND OPTICAL INTEGRATION OF SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, FABRICATE, AND MANUFACTURE CUSTOM SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, MANUFACTURE, AND OPERATION OF GROUND HANDLING EQUIPMENT AND FIXTURES DESIGN, MANUFACTURE, AND OPERATION OF OPTICAL ALIGNMENT AND CALIBRATION SYSTEMS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT THERMAL BLANKETS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT AND GROUND SUPPORT SYSTEM CABLE HARNESSES DESIGN, MANUFACTURE, AND INSTALLATION OF TECHNICAL FACILITIES INCLUDING BUILDINGS, BUILDING ELEMENTS, UTILITY SYSTEMS, AND TECHNICAL EQUIPMENT AND SYSTEMS DEFINE, ANALYZE, AND RESOLVE ELECTROMAGNETIC RADIATION ISSUES RELATING TO FACILITY AND SATELLITE GROUND SUPPORT EQUIPMENT OPERATION WITHIN THE TEST COMPLEX. SUPPORT SPECTRUM SIGNATURE ANALYSIS TO INSURE INTERFERENCE-FREE AND SAFE OPERATION OF ALL FACILITY-LOCATED NEAR ELECTROMAGNETIC WAVE SENSING DEVICES. TEST AND INTEGRATION ENGINEERING AND ENGINEERING ANALYSIS CLEANROOM OPERATION AND MAINTENANCE CONTAMINATION CONTROL SERVICES USING QUALIFIED AND EXPERIENCED PERSONNEL MAINTENANCE AND OPERATION OF CERTAIN PHYSICAL PLANT SYSTEMS SUCH AS PROCESSED WATER, EMERGENCY POWER, LN2/GN2 STORAGE SYSTEMS, CONDITIONED CLEANROOM AIR HVAC AND HUMIDITY SYSTEMS RECERTIFICATION (TESTING AND INSPECTION) OF LIFTING DEVICES AND EQUIPMENT (LDE), AND (INSPECTION) OF PRESSURE VESSELS AND PRESSURIZED SYSTEMS (PVS) AT GSFC, GREENBELT, WALLOPS, AND OTHER OFFSITE LOCATIONS. MAINTENANCE OF LDE AT GREENBELT SITE ONLY, NOT AT OTHER SITES; NON-DESTRUCTIVE EXAMINATION TESTING OF LDE AND PVS FACILITY AND OPERATIONS SAFETY DATA ACQUISITION AND ANALYSIS SYSTEM DEVELOPMENT AND MANAGEMENT. | $5.0M |
| Feb 14, 2018 | Department of DefenseFA9300 AFTC PZR | FA930018F9000 | 541712 | IGF::OT::IGF ROCKET TECHNOLOGY ENGINEERING SUPPORT ADVICE AND ASSISTANCE SERVICE | $721K |
| Feb 14, 2018 | Department of DefenseFA9300 AFTC PZR | FA930018F9000 | 541712 | IGF::OT::IGF ROCKET TECHNOLOGY ENGINEERING SUPPORT ADVICE AND ASSISTANCE SERVICE | $70K |
| Jan 24, 2018 | Department of DefenseFA9300 AFTC PZR | FA930018F9000 | 541712 | IGF::OT::IGF ROCKET TECHNOLOGY ENGINEERING SUPPORT ADVICE AND ASSISTANCE SERVICE | $220K |
| Jan 24, 2018 | Department of DefenseFA9300 AFTC PZR | FA930018F9000 | 541712 | IGF::OT::IGF ROCKET TECHNOLOGY ENGINEERING SUPPORT ADVICE AND ASSISTANCE SERVICE | $15K |
| Jan 18, 2018 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | NNG14CR62C | 541330 | IGF::OT::IGF ENVIRONMENTAL TESTING AND INTEGRATION SERVICES (ETIS) II THIS STATEMENT OF WORK (SOW) SPECIFIES THE REQUIREMENTS FOR ON SITE CONTRACTOR SUPPLIED ENVIRONMENTAL TEST AND INTEGRATION AND OTHER LABORATORY OPERATIONS SERVICES TO THE GODDARD SPACE FLIGHT CENTER (GSFC). THE SCOPE OF THESE SERVICES INCLUDES THE FOLLOWING: OPERATION, MAINTENANCE, AND UPGRADE OF ENVIRONMENTAL TEST EQUIPMENT AND FACILITIES LOCATED IN THE GSFC BUILDING 7/10/15/29 COMPLEX, AREA 300 MAGNETIC TEST SITE AND OTHER TECHNICAL FACILITIES LOCATED AT VARIOUS LOCATIONS WITHIN GSFC INCLUDING THE MANUFACTURING AND ELECTROPLATING EQUIPMENT AND FACILITIES PRIMARILY LOCATED IN GSFC BUILDING 5/10/21 SHOPS MECHANICAL AND OPTICAL INTEGRATION OF SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, FABRICATE, AND MANUFACTURE CUSTOM SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, MANUFACTURE, AND OPERATION OF GROUND HANDLING EQUIPMENT AND FIXTURES DESIGN, MANUFACTURE, AND OPERATION OF OPTICAL ALIGNMENT AND CALIBRATION SYSTEMS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT THERMAL BLANKETS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT AND GROUND SUPPORT SYSTEM CABLE HARNESSES DESIGN, MANUFACTURE, AND INSTALLATION OF TECHNICAL FACILITIES INCLUDING BUILDINGS, BUILDING ELEMENTS, UTILITY SYSTEMS, AND TECHNICAL EQUIPMENT AND SYSTEMS DEFINE, ANALYZE, AND RESOLVE ELECTROMAGNETIC RADIATION ISSUES RELATING TO FACILITY AND SATELLITE GROUND SUPPORT EQUIPMENT OPERATION WITHIN THE TEST COMPLEX. SUPPORT SPECTRUM SIGNATURE ANALYSIS TO INSURE INTERFERENCE-FREE AND SAFE OPERATION OF ALL FACILITY-LOCATED NEAR ELECTROMAGNETIC WAVE SENSING DEVICES. TEST AND INTEGRATION ENGINEERING AND ENGINEERING ANALYSIS CLEANROOM OPERATION AND MAINTENANCE CONTAMINATION CONTROL SERVICES USING QUALIFIED AND EXPERIENCED PERSONNEL MAINTENANCE AND OPERATION OF CERTAIN PHYSICAL PLANT SYSTEMS SUCH AS PROCESSED WATER, EMERGENCY POWER, LN2/GN2 STORAGE SYSTEMS, CONDITIONED CLEANROOM AIR HVAC AND HUMIDITY SYSTEMS RECERTIFICATION (TESTING AND INSPECTION) OF LIFTING DEVICES AND EQUIPMENT (LDE), AND (INSPECTION) OF PRESSURE VESSELS AND PRESSURIZED SYSTEMS (PVS) AT GSFC, GREENBELT, WALLOPS, AND OTHER OFFSITE LOCATIONS. MAINTENANCE OF LDE AT GREENBELT SITE ONLY, NOT AT OTHER SITES; NON-DESTRUCTIVE EXAMINATION TESTING OF LDE AND PVS FACILITY AND OPERATIONS SAFETY DATA ACQUISITION AND ANALYSIS SYSTEM DEVELOPMENT AND MANAGEMENT. | $3.5M |
| Jan 12, 2018 | Department of DefenseFA9300 AFTC PZR | FA930012C0002 | 541712 | ARES 3 BASIC CONTRACT | $8K |
| Dec 14, 2017 | Department of DefenseFA9300 AFTC PZR | FA930018F9000 | 541712 | IGF::OT::IGF ROCKET TECHNOLOGY ENGINEERING SUPPORT ADVICE AND ASSISTANCE SERVICE | $10K |
| Dec 14, 2017 | Department of DefenseFA9300 AFTC PZR | FA930018F9000 | 541712 | IGF::OT::IGF ROCKET TECHNOLOGY ENGINEERING SUPPORT ADVICE AND ASSISTANCE SERVICE | $90K |
| Dec 12, 2017 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | NNG14CR62C | 541330 | IGF::OT::IGF ENVIRONMENTAL TESTING AND INTEGRATION SERVICES (ETIS) II THIS STATEMENT OF WORK (SOW) SPECIFIES THE REQUIREMENTS FOR ON SITE CONTRACTOR SUPPLIED ENVIRONMENTAL TEST AND INTEGRATION AND OTHER LABORATORY OPERATIONS SERVICES TO THE GODDARD SPACE FLIGHT CENTER (GSFC). THE SCOPE OF THESE SERVICES INCLUDES THE FOLLOWING: OPERATION, MAINTENANCE, AND UPGRADE OF ENVIRONMENTAL TEST EQUIPMENT AND FACILITIES LOCATED IN THE GSFC BUILDING 7/10/15/29 COMPLEX, AREA 300 MAGNETIC TEST SITE AND OTHER TECHNICAL FACILITIES LOCATED AT VARIOUS LOCATIONS WITHIN GSFC INCLUDING THE MANUFACTURING AND ELECTROPLATING EQUIPMENT AND FACILITIES PRIMARILY LOCATED IN GSFC BUILDING 5/10/21 SHOPS MECHANICAL AND OPTICAL INTEGRATION OF SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, FABRICATE, AND MANUFACTURE CUSTOM SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, MANUFACTURE, AND OPERATION OF GROUND HANDLING EQUIPMENT AND FIXTURES DESIGN, MANUFACTURE, AND OPERATION OF OPTICAL ALIGNMENT AND CALIBRATION SYSTEMS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT THERMAL BLANKETS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT AND GROUND SUPPORT SYSTEM CABLE HARNESSES DESIGN, MANUFACTURE, AND INSTALLATION OF TECHNICAL FACILITIES INCLUDING BUILDINGS, BUILDING ELEMENTS, UTILITY SYSTEMS, AND TECHNICAL EQUIPMENT AND SYSTEMS DEFINE, ANALYZE, AND RESOLVE ELECTROMAGNETIC RADIATION ISSUES RELATING TO FACILITY AND SATELLITE GROUND SUPPORT EQUIPMENT OPERATION WITHIN THE TEST COMPLEX. SUPPORT SPECTRUM SIGNATURE ANALYSIS TO INSURE INTERFERENCE-FREE AND SAFE OPERATION OF ALL FACILITY-LOCATED NEAR ELECTROMAGNETIC WAVE SENSING DEVICES. TEST AND INTEGRATION ENGINEERING AND ENGINEERING ANALYSIS CLEANROOM OPERATION AND MAINTENANCE CONTAMINATION CONTROL SERVICES USING QUALIFIED AND EXPERIENCED PERSONNEL MAINTENANCE AND OPERATION OF CERTAIN PHYSICAL PLANT SYSTEMS SUCH AS PROCESSED WATER, EMERGENCY POWER, LN2/GN2 STORAGE SYSTEMS, CONDITIONED CLEANROOM AIR HVAC AND HUMIDITY SYSTEMS RECERTIFICATION (TESTING AND INSPECTION) OF LIFTING DEVICES AND EQUIPMENT (LDE), AND (INSPECTION) OF PRESSURE VESSELS AND PRESSURIZED SYSTEMS (PVS) AT GSFC, GREENBELT, WALLOPS, AND OTHER OFFSITE LOCATIONS. MAINTENANCE OF LDE AT GREENBELT SITE ONLY, NOT AT OTHER SITES; NON-DESTRUCTIVE EXAMINATION TESTING OF LDE AND PVS FACILITY AND OPERATIONS SAFETY DATA ACQUISITION AND ANALYSIS SYSTEM DEVELOPMENT AND MANAGEMENT. | $5.0M |
Get Alerted Before Sierra Lobo INC's Next Recompete
Mindy monitors active contracts and flags recompetes 12 months out so you can position to compete.
Start Free