Home/Contractors/Sierra Lobo INC/contracts

Federal Contractor Profile

Sierra Lobo INC

$678M obligated·49 awards·3 agencies·8 NAICS

Federal Contracts

Showing contracts 201250 of 324 total. Sorted by action date, most recent first. Excludes $0 modifications.

DateAgencyPIIDNAICSDescriptionAmount
Mar 6, 2019National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNG14CR62C541330IGF::OT::IGF ENVIRONMENTAL TESTING AND INTEGRATION SERVICES (ETIS) II THIS STATEMENT OF WORK (SOW) SPECIFIES THE REQUIREMENTS FOR ON SITE CONTRACTOR SUPPLIED ENVIRONMENTAL TEST AND INTEGRATION AND OTHER LABORATORY OPERATIONS SERVICES TO THE GODDARD SPACE FLIGHT CENTER (GSFC). THE SCOPE OF THESE SERVICES INCLUDES THE FOLLOWING: OPERATION, MAINTENANCE, AND UPGRADE OF ENVIRONMENTAL TEST EQUIPMENT AND FACILITIES LOCATED IN THE GSFC BUILDING 7/10/15/29 COMPLEX, AREA 300 MAGNETIC TEST SITE AND OTHER TECHNICAL FACILITIES LOCATED AT VARIOUS LOCATIONS WITHIN GSFC INCLUDING THE MANUFACTURING AND ELECTROPLATING EQUIPMENT AND FACILITIES PRIMARILY LOCATED IN GSFC BUILDING 5/10/21 SHOPS MECHANICAL AND OPTICAL INTEGRATION OF SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, FABRICATE, AND MANUFACTURE CUSTOM SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, MANUFACTURE, AND OPERATION OF GROUND HANDLING EQUIPMENT AND FIXTURES DESIGN, MANUFACTURE, AND OPERATION OF OPTICAL ALIGNMENT AND CALIBRATION SYSTEMS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT THERMAL BLANKETS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT AND GROUND SUPPORT SYSTEM CABLE HARNESSES DESIGN, MANUFACTURE, AND INSTALLATION OF TECHNICAL FACILITIES INCLUDING BUILDINGS, BUILDING ELEMENTS, UTILITY SYSTEMS, AND TECHNICAL EQUIPMENT AND SYSTEMS DEFINE, ANALYZE, AND RESOLVE ELECTROMAGNETIC RADIATION ISSUES RELATING TO FACILITY AND SATELLITE GROUND SUPPORT EQUIPMENT OPERATION WITHIN THE TEST COMPLEX. SUPPORT SPECTRUM SIGNATURE ANALYSIS TO INSURE INTERFERENCE-FREE AND SAFE OPERATION OF ALL FACILITY-LOCATED NEAR ELECTROMAGNETIC WAVE SENSING DEVICES. TEST AND INTEGRATION ENGINEERING AND ENGINEERING ANALYSIS CLEANROOM OPERATION AND MAINTENANCE CONTAMINATION CONTROL SERVICES USING QUALIFIED AND EXPERIENCED PERSONNEL MAINTENANCE AND OPERATION OF CERTAIN PHYSICAL PLANT SYSTEMS SUCH AS PROCESSED WATER, EMERGENCY POWER, LN2/GN2 STORAGE SYSTEMS, CONDITIONED CLEANROOM AIR HVAC AND HUMIDITY SYSTEMS RECERTIFICATION (TESTING AND INSPECTION) OF LIFTING DEVICES AND EQUIPMENT (LDE), AND (INSPECTION) OF PRESSURE VESSELS AND PRESSURIZED SYSTEMS (PVS) AT GSFC, GREENBELT, WALLOPS, AND OTHER OFFSITE LOCATIONS. MAINTENANCE OF LDE AT GREENBELT SITE ONLY, NOT AT OTHER SITES; NON-DESTRUCTIVE EXAMINATION TESTING OF LDE AND PVS FACILITY AND OPERATIONS SAFETY DATA ACQUISITION AND ANALYSIS SYSTEM DEVELOPMENT AND MANAGEMENT.$2.3M
Feb 15, 2019National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNG14CR62C541330IGF::OT::IGF ENVIRONMENTAL TESTING AND INTEGRATION SERVICES (ETIS) II THIS STATEMENT OF WORK (SOW) SPECIFIES THE REQUIREMENTS FOR ON SITE CONTRACTOR SUPPLIED ENVIRONMENTAL TEST AND INTEGRATION AND OTHER LABORATORY OPERATIONS SERVICES TO THE GODDARD SPACE FLIGHT CENTER (GSFC). THE SCOPE OF THESE SERVICES INCLUDES THE FOLLOWING: OPERATION, MAINTENANCE, AND UPGRADE OF ENVIRONMENTAL TEST EQUIPMENT AND FACILITIES LOCATED IN THE GSFC BUILDING 7/10/15/29 COMPLEX, AREA 300 MAGNETIC TEST SITE AND OTHER TECHNICAL FACILITIES LOCATED AT VARIOUS LOCATIONS WITHIN GSFC INCLUDING THE MANUFACTURING AND ELECTROPLATING EQUIPMENT AND FACILITIES PRIMARILY LOCATED IN GSFC BUILDING 5/10/21 SHOPS MECHANICAL AND OPTICAL INTEGRATION OF SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, FABRICATE, AND MANUFACTURE CUSTOM SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, MANUFACTURE, AND OPERATION OF GROUND HANDLING EQUIPMENT AND FIXTURES DESIGN, MANUFACTURE, AND OPERATION OF OPTICAL ALIGNMENT AND CALIBRATION SYSTEMS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT THERMAL BLANKETS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT AND GROUND SUPPORT SYSTEM CABLE HARNESSES DESIGN, MANUFACTURE, AND INSTALLATION OF TECHNICAL FACILITIES INCLUDING BUILDINGS, BUILDING ELEMENTS, UTILITY SYSTEMS, AND TECHNICAL EQUIPMENT AND SYSTEMS DEFINE, ANALYZE, AND RESOLVE ELECTROMAGNETIC RADIATION ISSUES RELATING TO FACILITY AND SATELLITE GROUND SUPPORT EQUIPMENT OPERATION WITHIN THE TEST COMPLEX. SUPPORT SPECTRUM SIGNATURE ANALYSIS TO INSURE INTERFERENCE-FREE AND SAFE OPERATION OF ALL FACILITY-LOCATED NEAR ELECTROMAGNETIC WAVE SENSING DEVICES. TEST AND INTEGRATION ENGINEERING AND ENGINEERING ANALYSIS CLEANROOM OPERATION AND MAINTENANCE CONTAMINATION CONTROL SERVICES USING QUALIFIED AND EXPERIENCED PERSONNEL MAINTENANCE AND OPERATION OF CERTAIN PHYSICAL PLANT SYSTEMS SUCH AS PROCESSED WATER, EMERGENCY POWER, LN2/GN2 STORAGE SYSTEMS, CONDITIONED CLEANROOM AIR HVAC AND HUMIDITY SYSTEMS RECERTIFICATION (TESTING AND INSPECTION) OF LIFTING DEVICES AND EQUIPMENT (LDE), AND (INSPECTION) OF PRESSURE VESSELS AND PRESSURIZED SYSTEMS (PVS) AT GSFC, GREENBELT, WALLOPS, AND OTHER OFFSITE LOCATIONS. MAINTENANCE OF LDE AT GREENBELT SITE ONLY, NOT AT OTHER SITES; NON-DESTRUCTIVE EXAMINATION TESTING OF LDE AND PVS FACILITY AND OPERATIONS SAFETY DATA ACQUISITION AND ANALYSIS SYSTEM DEVELOPMENT AND MANAGEMENT.$4.0M
Feb 11, 2019Department of DefenseFA9300 AFTC PZRFA930018F9000541712IGF::OT::IGF ROCKET TECHNOLOGY ENGINEERING SUPPORT ADVICE AND ASSISTANCE SERVICE$983K
Feb 11, 2019Department of DefenseFA9300 AFTC PZRFA930018F9000541712IGF::OT::IGF ROCKET TECHNOLOGY ENGINEERING SUPPORT ADVICE AND ASSISTANCE SERVICE$983
Feb 6, 2019National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNG14CR62C541330IGF::OT::IGF ENVIRONMENTAL TESTING AND INTEGRATION SERVICES (ETIS) II THIS STATEMENT OF WORK (SOW) SPECIFIES THE REQUIREMENTS FOR ON SITE CONTRACTOR SUPPLIED ENVIRONMENTAL TEST AND INTEGRATION AND OTHER LABORATORY OPERATIONS SERVICES TO THE GODDARD SPACE FLIGHT CENTER (GSFC). THE SCOPE OF THESE SERVICES INCLUDES THE FOLLOWING: OPERATION, MAINTENANCE, AND UPGRADE OF ENVIRONMENTAL TEST EQUIPMENT AND FACILITIES LOCATED IN THE GSFC BUILDING 7/10/15/29 COMPLEX, AREA 300 MAGNETIC TEST SITE AND OTHER TECHNICAL FACILITIES LOCATED AT VARIOUS LOCATIONS WITHIN GSFC INCLUDING THE MANUFACTURING AND ELECTROPLATING EQUIPMENT AND FACILITIES PRIMARILY LOCATED IN GSFC BUILDING 5/10/21 SHOPS MECHANICAL AND OPTICAL INTEGRATION OF SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, FABRICATE, AND MANUFACTURE CUSTOM SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, MANUFACTURE, AND OPERATION OF GROUND HANDLING EQUIPMENT AND FIXTURES DESIGN, MANUFACTURE, AND OPERATION OF OPTICAL ALIGNMENT AND CALIBRATION SYSTEMS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT THERMAL BLANKETS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT AND GROUND SUPPORT SYSTEM CABLE HARNESSES DESIGN, MANUFACTURE, AND INSTALLATION OF TECHNICAL FACILITIES INCLUDING BUILDINGS, BUILDING ELEMENTS, UTILITY SYSTEMS, AND TECHNICAL EQUIPMENT AND SYSTEMS DEFINE, ANALYZE, AND RESOLVE ELECTROMAGNETIC RADIATION ISSUES RELATING TO FACILITY AND SATELLITE GROUND SUPPORT EQUIPMENT OPERATION WITHIN THE TEST COMPLEX. SUPPORT SPECTRUM SIGNATURE ANALYSIS TO INSURE INTERFERENCE-FREE AND SAFE OPERATION OF ALL FACILITY-LOCATED NEAR ELECTROMAGNETIC WAVE SENSING DEVICES. TEST AND INTEGRATION ENGINEERING AND ENGINEERING ANALYSIS CLEANROOM OPERATION AND MAINTENANCE CONTAMINATION CONTROL SERVICES USING QUALIFIED AND EXPERIENCED PERSONNEL MAINTENANCE AND OPERATION OF CERTAIN PHYSICAL PLANT SYSTEMS SUCH AS PROCESSED WATER, EMERGENCY POWER, LN2/GN2 STORAGE SYSTEMS, CONDITIONED CLEANROOM AIR HVAC AND HUMIDITY SYSTEMS RECERTIFICATION (TESTING AND INSPECTION) OF LIFTING DEVICES AND EQUIPMENT (LDE), AND (INSPECTION) OF PRESSURE VESSELS AND PRESSURIZED SYSTEMS (PVS) AT GSFC, GREENBELT, WALLOPS, AND OTHER OFFSITE LOCATIONS. MAINTENANCE OF LDE AT GREENBELT SITE ONLY, NOT AT OTHER SITES; NON-DESTRUCTIVE EXAMINATION TESTING OF LDE AND PVS FACILITY AND OPERATIONS SAFETY DATA ACQUISITION AND ANALYSIS SYSTEM DEVELOPMENT AND MANAGEMENT.$5.0M
Jan 9, 2019Department of DefenseFA9300 AFTC PZRFA930018F9000541712IGF::OT::IGF ROCKET TECHNOLOGY ENGINEERING SUPPORT ADVICE AND ASSISTANCE SERVICE$785
Jan 9, 2019Department of DefenseFA9300 AFTC PZRFA930018F9000541712IGF::OT::IGF ROCKET TECHNOLOGY ENGINEERING SUPPORT ADVICE AND ASSISTANCE SERVICE$784K
Dec 20, 2018National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNG14CR62C541330IGF::OT::IGF ENVIRONMENTAL TESTING AND INTEGRATION SERVICES (ETIS) II THIS STATEMENT OF WORK (SOW) SPECIFIES THE REQUIREMENTS FOR ON SITE CONTRACTOR SUPPLIED ENVIRONMENTAL TEST AND INTEGRATION AND OTHER LABORATORY OPERATIONS SERVICES TO THE GODDARD SPACE FLIGHT CENTER (GSFC). THE SCOPE OF THESE SERVICES INCLUDES THE FOLLOWING: OPERATION, MAINTENANCE, AND UPGRADE OF ENVIRONMENTAL TEST EQUIPMENT AND FACILITIES LOCATED IN THE GSFC BUILDING 7/10/15/29 COMPLEX, AREA 300 MAGNETIC TEST SITE AND OTHER TECHNICAL FACILITIES LOCATED AT VARIOUS LOCATIONS WITHIN GSFC INCLUDING THE MANUFACTURING AND ELECTROPLATING EQUIPMENT AND FACILITIES PRIMARILY LOCATED IN GSFC BUILDING 5/10/21 SHOPS MECHANICAL AND OPTICAL INTEGRATION OF SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, FABRICATE, AND MANUFACTURE CUSTOM SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, MANUFACTURE, AND OPERATION OF GROUND HANDLING EQUIPMENT AND FIXTURES DESIGN, MANUFACTURE, AND OPERATION OF OPTICAL ALIGNMENT AND CALIBRATION SYSTEMS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT THERMAL BLANKETS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT AND GROUND SUPPORT SYSTEM CABLE HARNESSES DESIGN, MANUFACTURE, AND INSTALLATION OF TECHNICAL FACILITIES INCLUDING BUILDINGS, BUILDING ELEMENTS, UTILITY SYSTEMS, AND TECHNICAL EQUIPMENT AND SYSTEMS DEFINE, ANALYZE, AND RESOLVE ELECTROMAGNETIC RADIATION ISSUES RELATING TO FACILITY AND SATELLITE GROUND SUPPORT EQUIPMENT OPERATION WITHIN THE TEST COMPLEX. SUPPORT SPECTRUM SIGNATURE ANALYSIS TO INSURE INTERFERENCE-FREE AND SAFE OPERATION OF ALL FACILITY-LOCATED NEAR ELECTROMAGNETIC WAVE SENSING DEVICES. TEST AND INTEGRATION ENGINEERING AND ENGINEERING ANALYSIS CLEANROOM OPERATION AND MAINTENANCE CONTAMINATION CONTROL SERVICES USING QUALIFIED AND EXPERIENCED PERSONNEL MAINTENANCE AND OPERATION OF CERTAIN PHYSICAL PLANT SYSTEMS SUCH AS PROCESSED WATER, EMERGENCY POWER, LN2/GN2 STORAGE SYSTEMS, CONDITIONED CLEANROOM AIR HVAC AND HUMIDITY SYSTEMS RECERTIFICATION (TESTING AND INSPECTION) OF LIFTING DEVICES AND EQUIPMENT (LDE), AND (INSPECTION) OF PRESSURE VESSELS AND PRESSURIZED SYSTEMS (PVS) AT GSFC, GREENBELT, WALLOPS, AND OTHER OFFSITE LOCATIONS. MAINTENANCE OF LDE AT GREENBELT SITE ONLY, NOT AT OTHER SITES; NON-DESTRUCTIVE EXAMINATION TESTING OF LDE AND PVS FACILITY AND OPERATIONS SAFETY DATA ACQUISITION AND ANALYSIS SYSTEM DEVELOPMENT AND MANAGEMENT.$2.0M
Dec 13, 2018National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNG14CR62C541330IGF::OT::IGF ENVIRONMENTAL TESTING AND INTEGRATION SERVICES (ETIS) II THIS STATEMENT OF WORK (SOW) SPECIFIES THE REQUIREMENTS FOR ON SITE CONTRACTOR SUPPLIED ENVIRONMENTAL TEST AND INTEGRATION AND OTHER LABORATORY OPERATIONS SERVICES TO THE GODDARD SPACE FLIGHT CENTER (GSFC). THE SCOPE OF THESE SERVICES INCLUDES THE FOLLOWING: OPERATION, MAINTENANCE, AND UPGRADE OF ENVIRONMENTAL TEST EQUIPMENT AND FACILITIES LOCATED IN THE GSFC BUILDING 7/10/15/29 COMPLEX, AREA 300 MAGNETIC TEST SITE AND OTHER TECHNICAL FACILITIES LOCATED AT VARIOUS LOCATIONS WITHIN GSFC INCLUDING THE MANUFACTURING AND ELECTROPLATING EQUIPMENT AND FACILITIES PRIMARILY LOCATED IN GSFC BUILDING 5/10/21 SHOPS MECHANICAL AND OPTICAL INTEGRATION OF SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, FABRICATE, AND MANUFACTURE CUSTOM SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, MANUFACTURE, AND OPERATION OF GROUND HANDLING EQUIPMENT AND FIXTURES DESIGN, MANUFACTURE, AND OPERATION OF OPTICAL ALIGNMENT AND CALIBRATION SYSTEMS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT THERMAL BLANKETS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT AND GROUND SUPPORT SYSTEM CABLE HARNESSES DESIGN, MANUFACTURE, AND INSTALLATION OF TECHNICAL FACILITIES INCLUDING BUILDINGS, BUILDING ELEMENTS, UTILITY SYSTEMS, AND TECHNICAL EQUIPMENT AND SYSTEMS DEFINE, ANALYZE, AND RESOLVE ELECTROMAGNETIC RADIATION ISSUES RELATING TO FACILITY AND SATELLITE GROUND SUPPORT EQUIPMENT OPERATION WITHIN THE TEST COMPLEX. SUPPORT SPECTRUM SIGNATURE ANALYSIS TO INSURE INTERFERENCE-FREE AND SAFE OPERATION OF ALL FACILITY-LOCATED NEAR ELECTROMAGNETIC WAVE SENSING DEVICES. TEST AND INTEGRATION ENGINEERING AND ENGINEERING ANALYSIS CLEANROOM OPERATION AND MAINTENANCE CONTAMINATION CONTROL SERVICES USING QUALIFIED AND EXPERIENCED PERSONNEL MAINTENANCE AND OPERATION OF CERTAIN PHYSICAL PLANT SYSTEMS SUCH AS PROCESSED WATER, EMERGENCY POWER, LN2/GN2 STORAGE SYSTEMS, CONDITIONED CLEANROOM AIR HVAC AND HUMIDITY SYSTEMS RECERTIFICATION (TESTING AND INSPECTION) OF LIFTING DEVICES AND EQUIPMENT (LDE), AND (INSPECTION) OF PRESSURE VESSELS AND PRESSURIZED SYSTEMS (PVS) AT GSFC, GREENBELT, WALLOPS, AND OTHER OFFSITE LOCATIONS. MAINTENANCE OF LDE AT GREENBELT SITE ONLY, NOT AT OTHER SITES; NON-DESTRUCTIVE EXAMINATION TESTING OF LDE AND PVS FACILITY AND OPERATIONS SAFETY DATA ACQUISITION AND ANALYSIS SYSTEM DEVELOPMENT AND MANAGEMENT.$2.0M
Nov 26, 2018National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNG14CR62C541330IGF::OT::IGF ENVIRONMENTAL TESTING AND INTEGRATION SERVICES (ETIS) II THIS STATEMENT OF WORK (SOW) SPECIFIES THE REQUIREMENTS FOR ON SITE CONTRACTOR SUPPLIED ENVIRONMENTAL TEST AND INTEGRATION AND OTHER LABORATORY OPERATIONS SERVICES TO THE GODDARD SPACE FLIGHT CENTER (GSFC). THE SCOPE OF THESE SERVICES INCLUDES THE FOLLOWING: OPERATION, MAINTENANCE, AND UPGRADE OF ENVIRONMENTAL TEST EQUIPMENT AND FACILITIES LOCATED IN THE GSFC BUILDING 7/10/15/29 COMPLEX, AREA 300 MAGNETIC TEST SITE AND OTHER TECHNICAL FACILITIES LOCATED AT VARIOUS LOCATIONS WITHIN GSFC INCLUDING THE MANUFACTURING AND ELECTROPLATING EQUIPMENT AND FACILITIES PRIMARILY LOCATED IN GSFC BUILDING 5/10/21 SHOPS MECHANICAL AND OPTICAL INTEGRATION OF SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, FABRICATE, AND MANUFACTURE CUSTOM SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, MANUFACTURE, AND OPERATION OF GROUND HANDLING EQUIPMENT AND FIXTURES DESIGN, MANUFACTURE, AND OPERATION OF OPTICAL ALIGNMENT AND CALIBRATION SYSTEMS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT THERMAL BLANKETS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT AND GROUND SUPPORT SYSTEM CABLE HARNESSES DESIGN, MANUFACTURE, AND INSTALLATION OF TECHNICAL FACILITIES INCLUDING BUILDINGS, BUILDING ELEMENTS, UTILITY SYSTEMS, AND TECHNICAL EQUIPMENT AND SYSTEMS DEFINE, ANALYZE, AND RESOLVE ELECTROMAGNETIC RADIATION ISSUES RELATING TO FACILITY AND SATELLITE GROUND SUPPORT EQUIPMENT OPERATION WITHIN THE TEST COMPLEX. SUPPORT SPECTRUM SIGNATURE ANALYSIS TO INSURE INTERFERENCE-FREE AND SAFE OPERATION OF ALL FACILITY-LOCATED NEAR ELECTROMAGNETIC WAVE SENSING DEVICES. TEST AND INTEGRATION ENGINEERING AND ENGINEERING ANALYSIS CLEANROOM OPERATION AND MAINTENANCE CONTAMINATION CONTROL SERVICES USING QUALIFIED AND EXPERIENCED PERSONNEL MAINTENANCE AND OPERATION OF CERTAIN PHYSICAL PLANT SYSTEMS SUCH AS PROCESSED WATER, EMERGENCY POWER, LN2/GN2 STORAGE SYSTEMS, CONDITIONED CLEANROOM AIR HVAC AND HUMIDITY SYSTEMS RECERTIFICATION (TESTING AND INSPECTION) OF LIFTING DEVICES AND EQUIPMENT (LDE), AND (INSPECTION) OF PRESSURE VESSELS AND PRESSURIZED SYSTEMS (PVS) AT GSFC, GREENBELT, WALLOPS, AND OTHER OFFSITE LOCATIONS. MAINTENANCE OF LDE AT GREENBELT SITE ONLY, NOT AT OTHER SITES; NON-DESTRUCTIVE EXAMINATION TESTING OF LDE AND PVS FACILITY AND OPERATIONS SAFETY DATA ACQUISITION AND ANALYSIS SYSTEM DEVELOPMENT AND MANAGEMENT.$3.0M
Nov 19, 2018Department of DefenseFA9300 AFTC PZRFA930018F9000541712IGF::OT::IGF ROCKET TECHNOLOGY ENGINEERING SUPPORT ADVICE AND ASSISTANCE SERVICE$7K
Nov 19, 2018Department of DefenseFA9300 AFTC PZRFA930018F9000541712IGF::OT::IGF ROCKET TECHNOLOGY ENGINEERING SUPPORT ADVICE AND ASSISTANCE SERVICE$163K
Oct 29, 2018Department of DefenseFA9300 AFTC PZRFA930018F9000541712IGF::OT::IGF ROCKET TECHNOLOGY ENGINEERING SUPPORT ADVICE AND ASSISTANCE SERVICE$25K
Oct 29, 2018Department of DefenseFA9300 AFTC PZRFA930018F9000541712IGF::OT::IGF ROCKET TECHNOLOGY ENGINEERING SUPPORT ADVICE AND ASSISTANCE SERVICE$881K
Oct 25, 2018National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNG14CR62C541330IGF::OT::IGF ENVIRONMENTAL TESTING AND INTEGRATION SERVICES (ETIS) II THIS STATEMENT OF WORK (SOW) SPECIFIES THE REQUIREMENTS FOR ON SITE CONTRACTOR SUPPLIED ENVIRONMENTAL TEST AND INTEGRATION AND OTHER LABORATORY OPERATIONS SERVICES TO THE GODDARD SPACE FLIGHT CENTER (GSFC). THE SCOPE OF THESE SERVICES INCLUDES THE FOLLOWING: OPERATION, MAINTENANCE, AND UPGRADE OF ENVIRONMENTAL TEST EQUIPMENT AND FACILITIES LOCATED IN THE GSFC BUILDING 7/10/15/29 COMPLEX, AREA 300 MAGNETIC TEST SITE AND OTHER TECHNICAL FACILITIES LOCATED AT VARIOUS LOCATIONS WITHIN GSFC INCLUDING THE MANUFACTURING AND ELECTROPLATING EQUIPMENT AND FACILITIES PRIMARILY LOCATED IN GSFC BUILDING 5/10/21 SHOPS MECHANICAL AND OPTICAL INTEGRATION OF SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, FABRICATE, AND MANUFACTURE CUSTOM SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, MANUFACTURE, AND OPERATION OF GROUND HANDLING EQUIPMENT AND FIXTURES DESIGN, MANUFACTURE, AND OPERATION OF OPTICAL ALIGNMENT AND CALIBRATION SYSTEMS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT THERMAL BLANKETS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT AND GROUND SUPPORT SYSTEM CABLE HARNESSES DESIGN, MANUFACTURE, AND INSTALLATION OF TECHNICAL FACILITIES INCLUDING BUILDINGS, BUILDING ELEMENTS, UTILITY SYSTEMS, AND TECHNICAL EQUIPMENT AND SYSTEMS DEFINE, ANALYZE, AND RESOLVE ELECTROMAGNETIC RADIATION ISSUES RELATING TO FACILITY AND SATELLITE GROUND SUPPORT EQUIPMENT OPERATION WITHIN THE TEST COMPLEX. SUPPORT SPECTRUM SIGNATURE ANALYSIS TO INSURE INTERFERENCE-FREE AND SAFE OPERATION OF ALL FACILITY-LOCATED NEAR ELECTROMAGNETIC WAVE SENSING DEVICES. TEST AND INTEGRATION ENGINEERING AND ENGINEERING ANALYSIS CLEANROOM OPERATION AND MAINTENANCE CONTAMINATION CONTROL SERVICES USING QUALIFIED AND EXPERIENCED PERSONNEL MAINTENANCE AND OPERATION OF CERTAIN PHYSICAL PLANT SYSTEMS SUCH AS PROCESSED WATER, EMERGENCY POWER, LN2/GN2 STORAGE SYSTEMS, CONDITIONED CLEANROOM AIR HVAC AND HUMIDITY SYSTEMS RECERTIFICATION (TESTING AND INSPECTION) OF LIFTING DEVICES AND EQUIPMENT (LDE), AND (INSPECTION) OF PRESSURE VESSELS AND PRESSURIZED SYSTEMS (PVS) AT GSFC, GREENBELT, WALLOPS, AND OTHER OFFSITE LOCATIONS. MAINTENANCE OF LDE AT GREENBELT SITE ONLY, NOT AT OTHER SITES; NON-DESTRUCTIVE EXAMINATION TESTING OF LDE AND PVS FACILITY AND OPERATIONS SAFETY DATA ACQUISITION AND ANALYSIS SYSTEM DEVELOPMENT AND MANAGEMENT.$2.5M
Sep 28, 2018National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNG14CR62C541330IGF::OT::IGF ENVIRONMENTAL TESTING AND INTEGRATION SERVICES (ETIS) II THIS STATEMENT OF WORK (SOW) SPECIFIES THE REQUIREMENTS FOR ON SITE CONTRACTOR SUPPLIED ENVIRONMENTAL TEST AND INTEGRATION AND OTHER LABORATORY OPERATIONS SERVICES TO THE GODDARD SPACE FLIGHT CENTER (GSFC). THE SCOPE OF THESE SERVICES INCLUDES THE FOLLOWING: OPERATION, MAINTENANCE, AND UPGRADE OF ENVIRONMENTAL TEST EQUIPMENT AND FACILITIES LOCATED IN THE GSFC BUILDING 7/10/15/29 COMPLEX, AREA 300 MAGNETIC TEST SITE AND OTHER TECHNICAL FACILITIES LOCATED AT VARIOUS LOCATIONS WITHIN GSFC INCLUDING THE MANUFACTURING AND ELECTROPLATING EQUIPMENT AND FACILITIES PRIMARILY LOCATED IN GSFC BUILDING 5/10/21 SHOPS MECHANICAL AND OPTICAL INTEGRATION OF SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, FABRICATE, AND MANUFACTURE CUSTOM SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, MANUFACTURE, AND OPERATION OF GROUND HANDLING EQUIPMENT AND FIXTURES DESIGN, MANUFACTURE, AND OPERATION OF OPTICAL ALIGNMENT AND CALIBRATION SYSTEMS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT THERMAL BLANKETS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT AND GROUND SUPPORT SYSTEM CABLE HARNESSES DESIGN, MANUFACTURE, AND INSTALLATION OF TECHNICAL FACILITIES INCLUDING BUILDINGS, BUILDING ELEMENTS, UTILITY SYSTEMS, AND TECHNICAL EQUIPMENT AND SYSTEMS DEFINE, ANALYZE, AND RESOLVE ELECTROMAGNETIC RADIATION ISSUES RELATING TO FACILITY AND SATELLITE GROUND SUPPORT EQUIPMENT OPERATION WITHIN THE TEST COMPLEX. SUPPORT SPECTRUM SIGNATURE ANALYSIS TO INSURE INTERFERENCE-FREE AND SAFE OPERATION OF ALL FACILITY-LOCATED NEAR ELECTROMAGNETIC WAVE SENSING DEVICES. TEST AND INTEGRATION ENGINEERING AND ENGINEERING ANALYSIS CLEANROOM OPERATION AND MAINTENANCE CONTAMINATION CONTROL SERVICES USING QUALIFIED AND EXPERIENCED PERSONNEL MAINTENANCE AND OPERATION OF CERTAIN PHYSICAL PLANT SYSTEMS SUCH AS PROCESSED WATER, EMERGENCY POWER, LN2/GN2 STORAGE SYSTEMS, CONDITIONED CLEANROOM AIR HVAC AND HUMIDITY SYSTEMS RECERTIFICATION (TESTING AND INSPECTION) OF LIFTING DEVICES AND EQUIPMENT (LDE), AND (INSPECTION) OF PRESSURE VESSELS AND PRESSURIZED SYSTEMS (PVS) AT GSFC, GREENBELT, WALLOPS, AND OTHER OFFSITE LOCATIONS. MAINTENANCE OF LDE AT GREENBELT SITE ONLY, NOT AT OTHER SITES; NON-DESTRUCTIVE EXAMINATION TESTING OF LDE AND PVS FACILITY AND OPERATIONS SAFETY DATA ACQUISITION AND ANALYSIS SYSTEM DEVELOPMENT AND MANAGEMENT.$300K
Sep 27, 2018National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNG14CR62C541330IGF::OT::IGF ENVIRONMENTAL TESTING AND INTEGRATION SERVICES (ETIS) II THIS STATEMENT OF WORK (SOW) SPECIFIES THE REQUIREMENTS FOR ON SITE CONTRACTOR SUPPLIED ENVIRONMENTAL TEST AND INTEGRATION AND OTHER LABORATORY OPERATIONS SERVICES TO THE GODDARD SPACE FLIGHT CENTER (GSFC). THE SCOPE OF THESE SERVICES INCLUDES THE FOLLOWING: OPERATION, MAINTENANCE, AND UPGRADE OF ENVIRONMENTAL TEST EQUIPMENT AND FACILITIES LOCATED IN THE GSFC BUILDING 7/10/15/29 COMPLEX, AREA 300 MAGNETIC TEST SITE AND OTHER TECHNICAL FACILITIES LOCATED AT VARIOUS LOCATIONS WITHIN GSFC INCLUDING THE MANUFACTURING AND ELECTROPLATING EQUIPMENT AND FACILITIES PRIMARILY LOCATED IN GSFC BUILDING 5/10/21 SHOPS MECHANICAL AND OPTICAL INTEGRATION OF SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, FABRICATE, AND MANUFACTURE CUSTOM SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, MANUFACTURE, AND OPERATION OF GROUND HANDLING EQUIPMENT AND FIXTURES DESIGN, MANUFACTURE, AND OPERATION OF OPTICAL ALIGNMENT AND CALIBRATION SYSTEMS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT THERMAL BLANKETS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT AND GROUND SUPPORT SYSTEM CABLE HARNESSES DESIGN, MANUFACTURE, AND INSTALLATION OF TECHNICAL FACILITIES INCLUDING BUILDINGS, BUILDING ELEMENTS, UTILITY SYSTEMS, AND TECHNICAL EQUIPMENT AND SYSTEMS DEFINE, ANALYZE, AND RESOLVE ELECTROMAGNETIC RADIATION ISSUES RELATING TO FACILITY AND SATELLITE GROUND SUPPORT EQUIPMENT OPERATION WITHIN THE TEST COMPLEX. SUPPORT SPECTRUM SIGNATURE ANALYSIS TO INSURE INTERFERENCE-FREE AND SAFE OPERATION OF ALL FACILITY-LOCATED NEAR ELECTROMAGNETIC WAVE SENSING DEVICES. TEST AND INTEGRATION ENGINEERING AND ENGINEERING ANALYSIS CLEANROOM OPERATION AND MAINTENANCE CONTAMINATION CONTROL SERVICES USING QUALIFIED AND EXPERIENCED PERSONNEL MAINTENANCE AND OPERATION OF CERTAIN PHYSICAL PLANT SYSTEMS SUCH AS PROCESSED WATER, EMERGENCY POWER, LN2/GN2 STORAGE SYSTEMS, CONDITIONED CLEANROOM AIR HVAC AND HUMIDITY SYSTEMS RECERTIFICATION (TESTING AND INSPECTION) OF LIFTING DEVICES AND EQUIPMENT (LDE), AND (INSPECTION) OF PRESSURE VESSELS AND PRESSURIZED SYSTEMS (PVS) AT GSFC, GREENBELT, WALLOPS, AND OTHER OFFSITE LOCATIONS. MAINTENANCE OF LDE AT GREENBELT SITE ONLY, NOT AT OTHER SITES; NON-DESTRUCTIVE EXAMINATION TESTING OF LDE AND PVS FACILITY AND OPERATIONS SAFETY DATA ACQUISITION AND ANALYSIS SYSTEM DEVELOPMENT AND MANAGEMENT.$4.3M
Sep 17, 2018Department of DefenseOFFICE OF NAVAL RESEARCHN0001418C2060541715LONG RANGE BROAD AGENCY ANNOUNCEMENT (BAA) FOR NAVY AND MARINE CORPS SCIENCE&TECHNOLOGY$88K
Sep 12, 2018Department of DefenseFA9300 AFTC PZRFA930018F9000541712IGF::OT::IGF ROCKET TECHNOLOGY ENGINEERING SUPPORT ADVICE AND ASSISTANCE SERVICE$113K
Sep 12, 2018Department of DefenseFA9300 AFTC PZRFA930018F9000541712IGF::OT::IGF ROCKET TECHNOLOGY ENGINEERING SUPPORT ADVICE AND ASSISTANCE SERVICE$579K
Sep 10, 2018Department of DefenseFA9300 AFTC PZRFA930012C0002541712ARES 3 BASIC CONTRACT$95K
Sep 10, 2018Department of DefenseFA9300 AFTC PZRFA930018F9000541712IGF::OT::IGF ROCKET TECHNOLOGY ENGINEERING SUPPORT ADVICE AND ASSISTANCE SERVICE$200K
Sep 10, 2018Department of DefenseFA9300 AFTC PZRFA930018F9000541712IGF::OT::IGF ROCKET TECHNOLOGY ENGINEERING SUPPORT ADVICE AND ASSISTANCE SERVICE$160K
Sep 7, 2018National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNG14CR62C541330IGF::OT::IGF ENVIRONMENTAL TESTING AND INTEGRATION SERVICES (ETIS) II THIS STATEMENT OF WORK (SOW) SPECIFIES THE REQUIREMENTS FOR ON SITE CONTRACTOR SUPPLIED ENVIRONMENTAL TEST AND INTEGRATION AND OTHER LABORATORY OPERATIONS SERVICES TO THE GODDARD SPACE FLIGHT CENTER (GSFC). THE SCOPE OF THESE SERVICES INCLUDES THE FOLLOWING: OPERATION, MAINTENANCE, AND UPGRADE OF ENVIRONMENTAL TEST EQUIPMENT AND FACILITIES LOCATED IN THE GSFC BUILDING 7/10/15/29 COMPLEX, AREA 300 MAGNETIC TEST SITE AND OTHER TECHNICAL FACILITIES LOCATED AT VARIOUS LOCATIONS WITHIN GSFC INCLUDING THE MANUFACTURING AND ELECTROPLATING EQUIPMENT AND FACILITIES PRIMARILY LOCATED IN GSFC BUILDING 5/10/21 SHOPS MECHANICAL AND OPTICAL INTEGRATION OF SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, FABRICATE, AND MANUFACTURE CUSTOM SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, MANUFACTURE, AND OPERATION OF GROUND HANDLING EQUIPMENT AND FIXTURES DESIGN, MANUFACTURE, AND OPERATION OF OPTICAL ALIGNMENT AND CALIBRATION SYSTEMS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT THERMAL BLANKETS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT AND GROUND SUPPORT SYSTEM CABLE HARNESSES DESIGN, MANUFACTURE, AND INSTALLATION OF TECHNICAL FACILITIES INCLUDING BUILDINGS, BUILDING ELEMENTS, UTILITY SYSTEMS, AND TECHNICAL EQUIPMENT AND SYSTEMS DEFINE, ANALYZE, AND RESOLVE ELECTROMAGNETIC RADIATION ISSUES RELATING TO FACILITY AND SATELLITE GROUND SUPPORT EQUIPMENT OPERATION WITHIN THE TEST COMPLEX. SUPPORT SPECTRUM SIGNATURE ANALYSIS TO INSURE INTERFERENCE-FREE AND SAFE OPERATION OF ALL FACILITY-LOCATED NEAR ELECTROMAGNETIC WAVE SENSING DEVICES. TEST AND INTEGRATION ENGINEERING AND ENGINEERING ANALYSIS CLEANROOM OPERATION AND MAINTENANCE CONTAMINATION CONTROL SERVICES USING QUALIFIED AND EXPERIENCED PERSONNEL MAINTENANCE AND OPERATION OF CERTAIN PHYSICAL PLANT SYSTEMS SUCH AS PROCESSED WATER, EMERGENCY POWER, LN2/GN2 STORAGE SYSTEMS, CONDITIONED CLEANROOM AIR HVAC AND HUMIDITY SYSTEMS RECERTIFICATION (TESTING AND INSPECTION) OF LIFTING DEVICES AND EQUIPMENT (LDE), AND (INSPECTION) OF PRESSURE VESSELS AND PRESSURIZED SYSTEMS (PVS) AT GSFC, GREENBELT, WALLOPS, AND OTHER OFFSITE LOCATIONS. MAINTENANCE OF LDE AT GREENBELT SITE ONLY, NOT AT OTHER SITES; NON-DESTRUCTIVE EXAMINATION TESTING OF LDE AND PVS FACILITY AND OPERATIONS SAFETY DATA ACQUISITION AND ANALYSIS SYSTEM DEVELOPMENT AND MANAGEMENT.$3.0M
Aug 16, 2018National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNG14CR62C541330IGF::OT::IGF ENVIRONMENTAL TESTING AND INTEGRATION SERVICES (ETIS) II THIS STATEMENT OF WORK (SOW) SPECIFIES THE REQUIREMENTS FOR ON SITE CONTRACTOR SUPPLIED ENVIRONMENTAL TEST AND INTEGRATION AND OTHER LABORATORY OPERATIONS SERVICES TO THE GODDARD SPACE FLIGHT CENTER (GSFC). THE SCOPE OF THESE SERVICES INCLUDES THE FOLLOWING: OPERATION, MAINTENANCE, AND UPGRADE OF ENVIRONMENTAL TEST EQUIPMENT AND FACILITIES LOCATED IN THE GSFC BUILDING 7/10/15/29 COMPLEX, AREA 300 MAGNETIC TEST SITE AND OTHER TECHNICAL FACILITIES LOCATED AT VARIOUS LOCATIONS WITHIN GSFC INCLUDING THE MANUFACTURING AND ELECTROPLATING EQUIPMENT AND FACILITIES PRIMARILY LOCATED IN GSFC BUILDING 5/10/21 SHOPS MECHANICAL AND OPTICAL INTEGRATION OF SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, FABRICATE, AND MANUFACTURE CUSTOM SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, MANUFACTURE, AND OPERATION OF GROUND HANDLING EQUIPMENT AND FIXTURES DESIGN, MANUFACTURE, AND OPERATION OF OPTICAL ALIGNMENT AND CALIBRATION SYSTEMS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT THERMAL BLANKETS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT AND GROUND SUPPORT SYSTEM CABLE HARNESSES DESIGN, MANUFACTURE, AND INSTALLATION OF TECHNICAL FACILITIES INCLUDING BUILDINGS, BUILDING ELEMENTS, UTILITY SYSTEMS, AND TECHNICAL EQUIPMENT AND SYSTEMS DEFINE, ANALYZE, AND RESOLVE ELECTROMAGNETIC RADIATION ISSUES RELATING TO FACILITY AND SATELLITE GROUND SUPPORT EQUIPMENT OPERATION WITHIN THE TEST COMPLEX. SUPPORT SPECTRUM SIGNATURE ANALYSIS TO INSURE INTERFERENCE-FREE AND SAFE OPERATION OF ALL FACILITY-LOCATED NEAR ELECTROMAGNETIC WAVE SENSING DEVICES. TEST AND INTEGRATION ENGINEERING AND ENGINEERING ANALYSIS CLEANROOM OPERATION AND MAINTENANCE CONTAMINATION CONTROL SERVICES USING QUALIFIED AND EXPERIENCED PERSONNEL MAINTENANCE AND OPERATION OF CERTAIN PHYSICAL PLANT SYSTEMS SUCH AS PROCESSED WATER, EMERGENCY POWER, LN2/GN2 STORAGE SYSTEMS, CONDITIONED CLEANROOM AIR HVAC AND HUMIDITY SYSTEMS RECERTIFICATION (TESTING AND INSPECTION) OF LIFTING DEVICES AND EQUIPMENT (LDE), AND (INSPECTION) OF PRESSURE VESSELS AND PRESSURIZED SYSTEMS (PVS) AT GSFC, GREENBELT, WALLOPS, AND OTHER OFFSITE LOCATIONS. MAINTENANCE OF LDE AT GREENBELT SITE ONLY, NOT AT OTHER SITES; NON-DESTRUCTIVE EXAMINATION TESTING OF LDE AND PVS FACILITY AND OPERATIONS SAFETY DATA ACQUISITION AND ANALYSIS SYSTEM DEVELOPMENT AND MANAGEMENT.$2.5M
Aug 14, 2018Department of DefenseOFFICE OF NAVAL RESEARCHN0001418C2060541715LONG RANGE BROAD AGENCY ANNOUNCEMENT (BAA) FOR NAVY AND MARINE CORPS SCIENCE&TECHNOLOGY$201K
Jul 18, 2018Department of DefenseFA9300 AFTC PZRFA930018F9000541712IGF::OT::IGF ROCKET TECHNOLOGY ENGINEERING SUPPORT ADVICE AND ASSISTANCE SERVICE$842K
Jul 18, 2018Department of DefenseFA9300 AFTC PZRFA930018F9000541712IGF::OT::IGF ROCKET TECHNOLOGY ENGINEERING SUPPORT ADVICE AND ASSISTANCE SERVICE$21K
Jul 13, 2018National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNG14CR62C541330IGF::OT::IGF ENVIRONMENTAL TESTING AND INTEGRATION SERVICES (ETIS) II THIS STATEMENT OF WORK (SOW) SPECIFIES THE REQUIREMENTS FOR ON SITE CONTRACTOR SUPPLIED ENVIRONMENTAL TEST AND INTEGRATION AND OTHER LABORATORY OPERATIONS SERVICES TO THE GODDARD SPACE FLIGHT CENTER (GSFC). THE SCOPE OF THESE SERVICES INCLUDES THE FOLLOWING: OPERATION, MAINTENANCE, AND UPGRADE OF ENVIRONMENTAL TEST EQUIPMENT AND FACILITIES LOCATED IN THE GSFC BUILDING 7/10/15/29 COMPLEX, AREA 300 MAGNETIC TEST SITE AND OTHER TECHNICAL FACILITIES LOCATED AT VARIOUS LOCATIONS WITHIN GSFC INCLUDING THE MANUFACTURING AND ELECTROPLATING EQUIPMENT AND FACILITIES PRIMARILY LOCATED IN GSFC BUILDING 5/10/21 SHOPS MECHANICAL AND OPTICAL INTEGRATION OF SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, FABRICATE, AND MANUFACTURE CUSTOM SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, MANUFACTURE, AND OPERATION OF GROUND HANDLING EQUIPMENT AND FIXTURES DESIGN, MANUFACTURE, AND OPERATION OF OPTICAL ALIGNMENT AND CALIBRATION SYSTEMS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT THERMAL BLANKETS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT AND GROUND SUPPORT SYSTEM CABLE HARNESSES DESIGN, MANUFACTURE, AND INSTALLATION OF TECHNICAL FACILITIES INCLUDING BUILDINGS, BUILDING ELEMENTS, UTILITY SYSTEMS, AND TECHNICAL EQUIPMENT AND SYSTEMS DEFINE, ANALYZE, AND RESOLVE ELECTROMAGNETIC RADIATION ISSUES RELATING TO FACILITY AND SATELLITE GROUND SUPPORT EQUIPMENT OPERATION WITHIN THE TEST COMPLEX. SUPPORT SPECTRUM SIGNATURE ANALYSIS TO INSURE INTERFERENCE-FREE AND SAFE OPERATION OF ALL FACILITY-LOCATED NEAR ELECTROMAGNETIC WAVE SENSING DEVICES. TEST AND INTEGRATION ENGINEERING AND ENGINEERING ANALYSIS CLEANROOM OPERATION AND MAINTENANCE CONTAMINATION CONTROL SERVICES USING QUALIFIED AND EXPERIENCED PERSONNEL MAINTENANCE AND OPERATION OF CERTAIN PHYSICAL PLANT SYSTEMS SUCH AS PROCESSED WATER, EMERGENCY POWER, LN2/GN2 STORAGE SYSTEMS, CONDITIONED CLEANROOM AIR HVAC AND HUMIDITY SYSTEMS RECERTIFICATION (TESTING AND INSPECTION) OF LIFTING DEVICES AND EQUIPMENT (LDE), AND (INSPECTION) OF PRESSURE VESSELS AND PRESSURIZED SYSTEMS (PVS) AT GSFC, GREENBELT, WALLOPS, AND OTHER OFFSITE LOCATIONS. MAINTENANCE OF LDE AT GREENBELT SITE ONLY, NOT AT OTHER SITES; NON-DESTRUCTIVE EXAMINATION TESTING OF LDE AND PVS FACILITY AND OPERATIONS SAFETY DATA ACQUISITION AND ANALYSIS SYSTEM DEVELOPMENT AND MANAGEMENT.$5.5M
Jun 13, 2018National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNG14CR62C541330IGF::OT::IGF ENVIRONMENTAL TESTING AND INTEGRATION SERVICES (ETIS) II THIS STATEMENT OF WORK (SOW) SPECIFIES THE REQUIREMENTS FOR ON SITE CONTRACTOR SUPPLIED ENVIRONMENTAL TEST AND INTEGRATION AND OTHER LABORATORY OPERATIONS SERVICES TO THE GODDARD SPACE FLIGHT CENTER (GSFC). THE SCOPE OF THESE SERVICES INCLUDES THE FOLLOWING: OPERATION, MAINTENANCE, AND UPGRADE OF ENVIRONMENTAL TEST EQUIPMENT AND FACILITIES LOCATED IN THE GSFC BUILDING 7/10/15/29 COMPLEX, AREA 300 MAGNETIC TEST SITE AND OTHER TECHNICAL FACILITIES LOCATED AT VARIOUS LOCATIONS WITHIN GSFC INCLUDING THE MANUFACTURING AND ELECTROPLATING EQUIPMENT AND FACILITIES PRIMARILY LOCATED IN GSFC BUILDING 5/10/21 SHOPS MECHANICAL AND OPTICAL INTEGRATION OF SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, FABRICATE, AND MANUFACTURE CUSTOM SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, MANUFACTURE, AND OPERATION OF GROUND HANDLING EQUIPMENT AND FIXTURES DESIGN, MANUFACTURE, AND OPERATION OF OPTICAL ALIGNMENT AND CALIBRATION SYSTEMS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT THERMAL BLANKETS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT AND GROUND SUPPORT SYSTEM CABLE HARNESSES DESIGN, MANUFACTURE, AND INSTALLATION OF TECHNICAL FACILITIES INCLUDING BUILDINGS, BUILDING ELEMENTS, UTILITY SYSTEMS, AND TECHNICAL EQUIPMENT AND SYSTEMS DEFINE, ANALYZE, AND RESOLVE ELECTROMAGNETIC RADIATION ISSUES RELATING TO FACILITY AND SATELLITE GROUND SUPPORT EQUIPMENT OPERATION WITHIN THE TEST COMPLEX. SUPPORT SPECTRUM SIGNATURE ANALYSIS TO INSURE INTERFERENCE-FREE AND SAFE OPERATION OF ALL FACILITY-LOCATED NEAR ELECTROMAGNETIC WAVE SENSING DEVICES. TEST AND INTEGRATION ENGINEERING AND ENGINEERING ANALYSIS CLEANROOM OPERATION AND MAINTENANCE CONTAMINATION CONTROL SERVICES USING QUALIFIED AND EXPERIENCED PERSONNEL MAINTENANCE AND OPERATION OF CERTAIN PHYSICAL PLANT SYSTEMS SUCH AS PROCESSED WATER, EMERGENCY POWER, LN2/GN2 STORAGE SYSTEMS, CONDITIONED CLEANROOM AIR HVAC AND HUMIDITY SYSTEMS RECERTIFICATION (TESTING AND INSPECTION) OF LIFTING DEVICES AND EQUIPMENT (LDE), AND (INSPECTION) OF PRESSURE VESSELS AND PRESSURIZED SYSTEMS (PVS) AT GSFC, GREENBELT, WALLOPS, AND OTHER OFFSITE LOCATIONS. MAINTENANCE OF LDE AT GREENBELT SITE ONLY, NOT AT OTHER SITES; NON-DESTRUCTIVE EXAMINATION TESTING OF LDE AND PVS FACILITY AND OPERATIONS SAFETY DATA ACQUISITION AND ANALYSIS SYSTEM DEVELOPMENT AND MANAGEMENT.$5.0M
May 30, 2018Department of DefenseFA9300 AFTC PZRFA930018F9000541712IGF::OT::IGF ROCKET TECHNOLOGY ENGINEERING SUPPORT ADVICE AND ASSISTANCE SERVICE$7K
May 30, 2018Department of DefenseFA9300 AFTC PZRFA930018F9000541712IGF::OT::IGF ROCKET TECHNOLOGY ENGINEERING SUPPORT ADVICE AND ASSISTANCE SERVICE$181K
May 10, 2018Department of DefenseFA9300 AFTC PZRFA930018F9000541712IGF::OT::IGF ROCKET TECHNOLOGY ENGINEERING SUPPORT ADVICE AND ASSISTANCE SERVICE$3K
May 10, 2018National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNG14CR62C541330IGF::OT::IGF ENVIRONMENTAL TESTING AND INTEGRATION SERVICES (ETIS) II THIS STATEMENT OF WORK (SOW) SPECIFIES THE REQUIREMENTS FOR ON SITE CONTRACTOR SUPPLIED ENVIRONMENTAL TEST AND INTEGRATION AND OTHER LABORATORY OPERATIONS SERVICES TO THE GODDARD SPACE FLIGHT CENTER (GSFC). THE SCOPE OF THESE SERVICES INCLUDES THE FOLLOWING: OPERATION, MAINTENANCE, AND UPGRADE OF ENVIRONMENTAL TEST EQUIPMENT AND FACILITIES LOCATED IN THE GSFC BUILDING 7/10/15/29 COMPLEX, AREA 300 MAGNETIC TEST SITE AND OTHER TECHNICAL FACILITIES LOCATED AT VARIOUS LOCATIONS WITHIN GSFC INCLUDING THE MANUFACTURING AND ELECTROPLATING EQUIPMENT AND FACILITIES PRIMARILY LOCATED IN GSFC BUILDING 5/10/21 SHOPS MECHANICAL AND OPTICAL INTEGRATION OF SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, FABRICATE, AND MANUFACTURE CUSTOM SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, MANUFACTURE, AND OPERATION OF GROUND HANDLING EQUIPMENT AND FIXTURES DESIGN, MANUFACTURE, AND OPERATION OF OPTICAL ALIGNMENT AND CALIBRATION SYSTEMS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT THERMAL BLANKETS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT AND GROUND SUPPORT SYSTEM CABLE HARNESSES DESIGN, MANUFACTURE, AND INSTALLATION OF TECHNICAL FACILITIES INCLUDING BUILDINGS, BUILDING ELEMENTS, UTILITY SYSTEMS, AND TECHNICAL EQUIPMENT AND SYSTEMS DEFINE, ANALYZE, AND RESOLVE ELECTROMAGNETIC RADIATION ISSUES RELATING TO FACILITY AND SATELLITE GROUND SUPPORT EQUIPMENT OPERATION WITHIN THE TEST COMPLEX. SUPPORT SPECTRUM SIGNATURE ANALYSIS TO INSURE INTERFERENCE-FREE AND SAFE OPERATION OF ALL FACILITY-LOCATED NEAR ELECTROMAGNETIC WAVE SENSING DEVICES. TEST AND INTEGRATION ENGINEERING AND ENGINEERING ANALYSIS CLEANROOM OPERATION AND MAINTENANCE CONTAMINATION CONTROL SERVICES USING QUALIFIED AND EXPERIENCED PERSONNEL MAINTENANCE AND OPERATION OF CERTAIN PHYSICAL PLANT SYSTEMS SUCH AS PROCESSED WATER, EMERGENCY POWER, LN2/GN2 STORAGE SYSTEMS, CONDITIONED CLEANROOM AIR HVAC AND HUMIDITY SYSTEMS RECERTIFICATION (TESTING AND INSPECTION) OF LIFTING DEVICES AND EQUIPMENT (LDE), AND (INSPECTION) OF PRESSURE VESSELS AND PRESSURIZED SYSTEMS (PVS) AT GSFC, GREENBELT, WALLOPS, AND OTHER OFFSITE LOCATIONS. MAINTENANCE OF LDE AT GREENBELT SITE ONLY, NOT AT OTHER SITES; NON-DESTRUCTIVE EXAMINATION TESTING OF LDE AND PVS FACILITY AND OPERATIONS SAFETY DATA ACQUISITION AND ANALYSIS SYSTEM DEVELOPMENT AND MANAGEMENT.$1.9M
May 10, 2018Department of DefenseFA9300 AFTC PZRFA930018F9000541712IGF::OT::IGF ROCKET TECHNOLOGY ENGINEERING SUPPORT ADVICE AND ASSISTANCE SERVICE$328K
Apr 20, 2018Department of DefenseFA9300 AFTC PZRFA930018F9000541712IGF::OT::IGF ROCKET TECHNOLOGY ENGINEERING SUPPORT ADVICE AND ASSISTANCE SERVICE$134K
Apr 20, 2018Department of DefenseFA9300 AFTC PZRFA930018F9000541712IGF::OT::IGF ROCKET TECHNOLOGY ENGINEERING SUPPORT ADVICE AND ASSISTANCE SERVICE$6K
Apr 17, 2018National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNG14CR62C541330IGF::OT::IGF ENVIRONMENTAL TESTING AND INTEGRATION SERVICES (ETIS) II THIS STATEMENT OF WORK (SOW) SPECIFIES THE REQUIREMENTS FOR ON SITE CONTRACTOR SUPPLIED ENVIRONMENTAL TEST AND INTEGRATION AND OTHER LABORATORY OPERATIONS SERVICES TO THE GODDARD SPACE FLIGHT CENTER (GSFC). THE SCOPE OF THESE SERVICES INCLUDES THE FOLLOWING: OPERATION, MAINTENANCE, AND UPGRADE OF ENVIRONMENTAL TEST EQUIPMENT AND FACILITIES LOCATED IN THE GSFC BUILDING 7/10/15/29 COMPLEX, AREA 300 MAGNETIC TEST SITE AND OTHER TECHNICAL FACILITIES LOCATED AT VARIOUS LOCATIONS WITHIN GSFC INCLUDING THE MANUFACTURING AND ELECTROPLATING EQUIPMENT AND FACILITIES PRIMARILY LOCATED IN GSFC BUILDING 5/10/21 SHOPS MECHANICAL AND OPTICAL INTEGRATION OF SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, FABRICATE, AND MANUFACTURE CUSTOM SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, MANUFACTURE, AND OPERATION OF GROUND HANDLING EQUIPMENT AND FIXTURES DESIGN, MANUFACTURE, AND OPERATION OF OPTICAL ALIGNMENT AND CALIBRATION SYSTEMS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT THERMAL BLANKETS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT AND GROUND SUPPORT SYSTEM CABLE HARNESSES DESIGN, MANUFACTURE, AND INSTALLATION OF TECHNICAL FACILITIES INCLUDING BUILDINGS, BUILDING ELEMENTS, UTILITY SYSTEMS, AND TECHNICAL EQUIPMENT AND SYSTEMS DEFINE, ANALYZE, AND RESOLVE ELECTROMAGNETIC RADIATION ISSUES RELATING TO FACILITY AND SATELLITE GROUND SUPPORT EQUIPMENT OPERATION WITHIN THE TEST COMPLEX. SUPPORT SPECTRUM SIGNATURE ANALYSIS TO INSURE INTERFERENCE-FREE AND SAFE OPERATION OF ALL FACILITY-LOCATED NEAR ELECTROMAGNETIC WAVE SENSING DEVICES. TEST AND INTEGRATION ENGINEERING AND ENGINEERING ANALYSIS CLEANROOM OPERATION AND MAINTENANCE CONTAMINATION CONTROL SERVICES USING QUALIFIED AND EXPERIENCED PERSONNEL MAINTENANCE AND OPERATION OF CERTAIN PHYSICAL PLANT SYSTEMS SUCH AS PROCESSED WATER, EMERGENCY POWER, LN2/GN2 STORAGE SYSTEMS, CONDITIONED CLEANROOM AIR HVAC AND HUMIDITY SYSTEMS RECERTIFICATION (TESTING AND INSPECTION) OF LIFTING DEVICES AND EQUIPMENT (LDE), AND (INSPECTION) OF PRESSURE VESSELS AND PRESSURIZED SYSTEMS (PVS) AT GSFC, GREENBELT, WALLOPS, AND OTHER OFFSITE LOCATIONS. MAINTENANCE OF LDE AT GREENBELT SITE ONLY, NOT AT OTHER SITES; NON-DESTRUCTIVE EXAMINATION TESTING OF LDE AND PVS FACILITY AND OPERATIONS SAFETY DATA ACQUISITION AND ANALYSIS SYSTEM DEVELOPMENT AND MANAGEMENT.$4.0M
Mar 16, 2018National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNG14CR62C541330IGF::OT::IGF ENVIRONMENTAL TESTING AND INTEGRATION SERVICES (ETIS) II THIS STATEMENT OF WORK (SOW) SPECIFIES THE REQUIREMENTS FOR ON SITE CONTRACTOR SUPPLIED ENVIRONMENTAL TEST AND INTEGRATION AND OTHER LABORATORY OPERATIONS SERVICES TO THE GODDARD SPACE FLIGHT CENTER (GSFC). THE SCOPE OF THESE SERVICES INCLUDES THE FOLLOWING: OPERATION, MAINTENANCE, AND UPGRADE OF ENVIRONMENTAL TEST EQUIPMENT AND FACILITIES LOCATED IN THE GSFC BUILDING 7/10/15/29 COMPLEX, AREA 300 MAGNETIC TEST SITE AND OTHER TECHNICAL FACILITIES LOCATED AT VARIOUS LOCATIONS WITHIN GSFC INCLUDING THE MANUFACTURING AND ELECTROPLATING EQUIPMENT AND FACILITIES PRIMARILY LOCATED IN GSFC BUILDING 5/10/21 SHOPS MECHANICAL AND OPTICAL INTEGRATION OF SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, FABRICATE, AND MANUFACTURE CUSTOM SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, MANUFACTURE, AND OPERATION OF GROUND HANDLING EQUIPMENT AND FIXTURES DESIGN, MANUFACTURE, AND OPERATION OF OPTICAL ALIGNMENT AND CALIBRATION SYSTEMS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT THERMAL BLANKETS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT AND GROUND SUPPORT SYSTEM CABLE HARNESSES DESIGN, MANUFACTURE, AND INSTALLATION OF TECHNICAL FACILITIES INCLUDING BUILDINGS, BUILDING ELEMENTS, UTILITY SYSTEMS, AND TECHNICAL EQUIPMENT AND SYSTEMS DEFINE, ANALYZE, AND RESOLVE ELECTROMAGNETIC RADIATION ISSUES RELATING TO FACILITY AND SATELLITE GROUND SUPPORT EQUIPMENT OPERATION WITHIN THE TEST COMPLEX. SUPPORT SPECTRUM SIGNATURE ANALYSIS TO INSURE INTERFERENCE-FREE AND SAFE OPERATION OF ALL FACILITY-LOCATED NEAR ELECTROMAGNETIC WAVE SENSING DEVICES. TEST AND INTEGRATION ENGINEERING AND ENGINEERING ANALYSIS CLEANROOM OPERATION AND MAINTENANCE CONTAMINATION CONTROL SERVICES USING QUALIFIED AND EXPERIENCED PERSONNEL MAINTENANCE AND OPERATION OF CERTAIN PHYSICAL PLANT SYSTEMS SUCH AS PROCESSED WATER, EMERGENCY POWER, LN2/GN2 STORAGE SYSTEMS, CONDITIONED CLEANROOM AIR HVAC AND HUMIDITY SYSTEMS RECERTIFICATION (TESTING AND INSPECTION) OF LIFTING DEVICES AND EQUIPMENT (LDE), AND (INSPECTION) OF PRESSURE VESSELS AND PRESSURIZED SYSTEMS (PVS) AT GSFC, GREENBELT, WALLOPS, AND OTHER OFFSITE LOCATIONS. MAINTENANCE OF LDE AT GREENBELT SITE ONLY, NOT AT OTHER SITES; NON-DESTRUCTIVE EXAMINATION TESTING OF LDE AND PVS FACILITY AND OPERATIONS SAFETY DATA ACQUISITION AND ANALYSIS SYSTEM DEVELOPMENT AND MANAGEMENT.$4.0M
Mar 6, 2018Department of DefenseW6QK ACC-APG0001541712INCREMENTAL FUNDING$545
Feb 16, 2018National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNG14CR62C541330IGF::OT::IGF ENVIRONMENTAL TESTING AND INTEGRATION SERVICES (ETIS) II THIS STATEMENT OF WORK (SOW) SPECIFIES THE REQUIREMENTS FOR ON SITE CONTRACTOR SUPPLIED ENVIRONMENTAL TEST AND INTEGRATION AND OTHER LABORATORY OPERATIONS SERVICES TO THE GODDARD SPACE FLIGHT CENTER (GSFC). THE SCOPE OF THESE SERVICES INCLUDES THE FOLLOWING: OPERATION, MAINTENANCE, AND UPGRADE OF ENVIRONMENTAL TEST EQUIPMENT AND FACILITIES LOCATED IN THE GSFC BUILDING 7/10/15/29 COMPLEX, AREA 300 MAGNETIC TEST SITE AND OTHER TECHNICAL FACILITIES LOCATED AT VARIOUS LOCATIONS WITHIN GSFC INCLUDING THE MANUFACTURING AND ELECTROPLATING EQUIPMENT AND FACILITIES PRIMARILY LOCATED IN GSFC BUILDING 5/10/21 SHOPS MECHANICAL AND OPTICAL INTEGRATION OF SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, FABRICATE, AND MANUFACTURE CUSTOM SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, MANUFACTURE, AND OPERATION OF GROUND HANDLING EQUIPMENT AND FIXTURES DESIGN, MANUFACTURE, AND OPERATION OF OPTICAL ALIGNMENT AND CALIBRATION SYSTEMS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT THERMAL BLANKETS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT AND GROUND SUPPORT SYSTEM CABLE HARNESSES DESIGN, MANUFACTURE, AND INSTALLATION OF TECHNICAL FACILITIES INCLUDING BUILDINGS, BUILDING ELEMENTS, UTILITY SYSTEMS, AND TECHNICAL EQUIPMENT AND SYSTEMS DEFINE, ANALYZE, AND RESOLVE ELECTROMAGNETIC RADIATION ISSUES RELATING TO FACILITY AND SATELLITE GROUND SUPPORT EQUIPMENT OPERATION WITHIN THE TEST COMPLEX. SUPPORT SPECTRUM SIGNATURE ANALYSIS TO INSURE INTERFERENCE-FREE AND SAFE OPERATION OF ALL FACILITY-LOCATED NEAR ELECTROMAGNETIC WAVE SENSING DEVICES. TEST AND INTEGRATION ENGINEERING AND ENGINEERING ANALYSIS CLEANROOM OPERATION AND MAINTENANCE CONTAMINATION CONTROL SERVICES USING QUALIFIED AND EXPERIENCED PERSONNEL MAINTENANCE AND OPERATION OF CERTAIN PHYSICAL PLANT SYSTEMS SUCH AS PROCESSED WATER, EMERGENCY POWER, LN2/GN2 STORAGE SYSTEMS, CONDITIONED CLEANROOM AIR HVAC AND HUMIDITY SYSTEMS RECERTIFICATION (TESTING AND INSPECTION) OF LIFTING DEVICES AND EQUIPMENT (LDE), AND (INSPECTION) OF PRESSURE VESSELS AND PRESSURIZED SYSTEMS (PVS) AT GSFC, GREENBELT, WALLOPS, AND OTHER OFFSITE LOCATIONS. MAINTENANCE OF LDE AT GREENBELT SITE ONLY, NOT AT OTHER SITES; NON-DESTRUCTIVE EXAMINATION TESTING OF LDE AND PVS FACILITY AND OPERATIONS SAFETY DATA ACQUISITION AND ANALYSIS SYSTEM DEVELOPMENT AND MANAGEMENT.$5.0M
Feb 14, 2018Department of DefenseFA9300 AFTC PZRFA930018F9000541712IGF::OT::IGF ROCKET TECHNOLOGY ENGINEERING SUPPORT ADVICE AND ASSISTANCE SERVICE$721K
Feb 14, 2018Department of DefenseFA9300 AFTC PZRFA930018F9000541712IGF::OT::IGF ROCKET TECHNOLOGY ENGINEERING SUPPORT ADVICE AND ASSISTANCE SERVICE$70K
Jan 24, 2018Department of DefenseFA9300 AFTC PZRFA930018F9000541712IGF::OT::IGF ROCKET TECHNOLOGY ENGINEERING SUPPORT ADVICE AND ASSISTANCE SERVICE$220K
Jan 24, 2018Department of DefenseFA9300 AFTC PZRFA930018F9000541712IGF::OT::IGF ROCKET TECHNOLOGY ENGINEERING SUPPORT ADVICE AND ASSISTANCE SERVICE$15K
Jan 18, 2018National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNG14CR62C541330IGF::OT::IGF ENVIRONMENTAL TESTING AND INTEGRATION SERVICES (ETIS) II THIS STATEMENT OF WORK (SOW) SPECIFIES THE REQUIREMENTS FOR ON SITE CONTRACTOR SUPPLIED ENVIRONMENTAL TEST AND INTEGRATION AND OTHER LABORATORY OPERATIONS SERVICES TO THE GODDARD SPACE FLIGHT CENTER (GSFC). THE SCOPE OF THESE SERVICES INCLUDES THE FOLLOWING: OPERATION, MAINTENANCE, AND UPGRADE OF ENVIRONMENTAL TEST EQUIPMENT AND FACILITIES LOCATED IN THE GSFC BUILDING 7/10/15/29 COMPLEX, AREA 300 MAGNETIC TEST SITE AND OTHER TECHNICAL FACILITIES LOCATED AT VARIOUS LOCATIONS WITHIN GSFC INCLUDING THE MANUFACTURING AND ELECTROPLATING EQUIPMENT AND FACILITIES PRIMARILY LOCATED IN GSFC BUILDING 5/10/21 SHOPS MECHANICAL AND OPTICAL INTEGRATION OF SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, FABRICATE, AND MANUFACTURE CUSTOM SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, MANUFACTURE, AND OPERATION OF GROUND HANDLING EQUIPMENT AND FIXTURES DESIGN, MANUFACTURE, AND OPERATION OF OPTICAL ALIGNMENT AND CALIBRATION SYSTEMS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT THERMAL BLANKETS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT AND GROUND SUPPORT SYSTEM CABLE HARNESSES DESIGN, MANUFACTURE, AND INSTALLATION OF TECHNICAL FACILITIES INCLUDING BUILDINGS, BUILDING ELEMENTS, UTILITY SYSTEMS, AND TECHNICAL EQUIPMENT AND SYSTEMS DEFINE, ANALYZE, AND RESOLVE ELECTROMAGNETIC RADIATION ISSUES RELATING TO FACILITY AND SATELLITE GROUND SUPPORT EQUIPMENT OPERATION WITHIN THE TEST COMPLEX. SUPPORT SPECTRUM SIGNATURE ANALYSIS TO INSURE INTERFERENCE-FREE AND SAFE OPERATION OF ALL FACILITY-LOCATED NEAR ELECTROMAGNETIC WAVE SENSING DEVICES. TEST AND INTEGRATION ENGINEERING AND ENGINEERING ANALYSIS CLEANROOM OPERATION AND MAINTENANCE CONTAMINATION CONTROL SERVICES USING QUALIFIED AND EXPERIENCED PERSONNEL MAINTENANCE AND OPERATION OF CERTAIN PHYSICAL PLANT SYSTEMS SUCH AS PROCESSED WATER, EMERGENCY POWER, LN2/GN2 STORAGE SYSTEMS, CONDITIONED CLEANROOM AIR HVAC AND HUMIDITY SYSTEMS RECERTIFICATION (TESTING AND INSPECTION) OF LIFTING DEVICES AND EQUIPMENT (LDE), AND (INSPECTION) OF PRESSURE VESSELS AND PRESSURIZED SYSTEMS (PVS) AT GSFC, GREENBELT, WALLOPS, AND OTHER OFFSITE LOCATIONS. MAINTENANCE OF LDE AT GREENBELT SITE ONLY, NOT AT OTHER SITES; NON-DESTRUCTIVE EXAMINATION TESTING OF LDE AND PVS FACILITY AND OPERATIONS SAFETY DATA ACQUISITION AND ANALYSIS SYSTEM DEVELOPMENT AND MANAGEMENT.$3.5M
Jan 12, 2018Department of DefenseFA9300 AFTC PZRFA930012C0002541712ARES 3 BASIC CONTRACT$8K
Dec 14, 2017Department of DefenseFA9300 AFTC PZRFA930018F9000541712IGF::OT::IGF ROCKET TECHNOLOGY ENGINEERING SUPPORT ADVICE AND ASSISTANCE SERVICE$10K
Dec 14, 2017Department of DefenseFA9300 AFTC PZRFA930018F9000541712IGF::OT::IGF ROCKET TECHNOLOGY ENGINEERING SUPPORT ADVICE AND ASSISTANCE SERVICE$90K
Dec 12, 2017National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNG14CR62C541330IGF::OT::IGF ENVIRONMENTAL TESTING AND INTEGRATION SERVICES (ETIS) II THIS STATEMENT OF WORK (SOW) SPECIFIES THE REQUIREMENTS FOR ON SITE CONTRACTOR SUPPLIED ENVIRONMENTAL TEST AND INTEGRATION AND OTHER LABORATORY OPERATIONS SERVICES TO THE GODDARD SPACE FLIGHT CENTER (GSFC). THE SCOPE OF THESE SERVICES INCLUDES THE FOLLOWING: OPERATION, MAINTENANCE, AND UPGRADE OF ENVIRONMENTAL TEST EQUIPMENT AND FACILITIES LOCATED IN THE GSFC BUILDING 7/10/15/29 COMPLEX, AREA 300 MAGNETIC TEST SITE AND OTHER TECHNICAL FACILITIES LOCATED AT VARIOUS LOCATIONS WITHIN GSFC INCLUDING THE MANUFACTURING AND ELECTROPLATING EQUIPMENT AND FACILITIES PRIMARILY LOCATED IN GSFC BUILDING 5/10/21 SHOPS MECHANICAL AND OPTICAL INTEGRATION OF SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, FABRICATE, AND MANUFACTURE CUSTOM SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, MANUFACTURE, AND OPERATION OF GROUND HANDLING EQUIPMENT AND FIXTURES DESIGN, MANUFACTURE, AND OPERATION OF OPTICAL ALIGNMENT AND CALIBRATION SYSTEMS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT THERMAL BLANKETS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT AND GROUND SUPPORT SYSTEM CABLE HARNESSES DESIGN, MANUFACTURE, AND INSTALLATION OF TECHNICAL FACILITIES INCLUDING BUILDINGS, BUILDING ELEMENTS, UTILITY SYSTEMS, AND TECHNICAL EQUIPMENT AND SYSTEMS DEFINE, ANALYZE, AND RESOLVE ELECTROMAGNETIC RADIATION ISSUES RELATING TO FACILITY AND SATELLITE GROUND SUPPORT EQUIPMENT OPERATION WITHIN THE TEST COMPLEX. SUPPORT SPECTRUM SIGNATURE ANALYSIS TO INSURE INTERFERENCE-FREE AND SAFE OPERATION OF ALL FACILITY-LOCATED NEAR ELECTROMAGNETIC WAVE SENSING DEVICES. TEST AND INTEGRATION ENGINEERING AND ENGINEERING ANALYSIS CLEANROOM OPERATION AND MAINTENANCE CONTAMINATION CONTROL SERVICES USING QUALIFIED AND EXPERIENCED PERSONNEL MAINTENANCE AND OPERATION OF CERTAIN PHYSICAL PLANT SYSTEMS SUCH AS PROCESSED WATER, EMERGENCY POWER, LN2/GN2 STORAGE SYSTEMS, CONDITIONED CLEANROOM AIR HVAC AND HUMIDITY SYSTEMS RECERTIFICATION (TESTING AND INSPECTION) OF LIFTING DEVICES AND EQUIPMENT (LDE), AND (INSPECTION) OF PRESSURE VESSELS AND PRESSURIZED SYSTEMS (PVS) AT GSFC, GREENBELT, WALLOPS, AND OTHER OFFSITE LOCATIONS. MAINTENANCE OF LDE AT GREENBELT SITE ONLY, NOT AT OTHER SITES; NON-DESTRUCTIVE EXAMINATION TESTING OF LDE AND PVS FACILITY AND OPERATIONS SAFETY DATA ACQUISITION AND ANALYSIS SYSTEM DEVELOPMENT AND MANAGEMENT.$5.0M

Get Alerted Before Sierra Lobo INC's Next Recompete

Mindy monitors active contracts and flags recompetes 12 months out so you can position to compete.