Home/Contractors/Sierra Lobo INC/contracts

Federal Contractor Profile

Sierra Lobo INC

$678M obligated·49 awards·3 agencies·8 NAICS

Federal Contracts

Showing contracts 251300 of 324 total. Sorted by action date, most recent first. Excludes $0 modifications.

DateAgencyPIIDNAICSDescriptionAmount
Nov 30, 2017Department of DefenseFA9300 AFTC PZRFA930018F9000541712IGF::OT::IGF ROCKET TECHNOLOGY ENGINEERING SUPPORT ADVICE AND ASSISTANCE SERVICE$386K
Nov 30, 2017Department of DefenseFA9300 AFTC PZRFA930012C0002541712ARES 3 BASIC CONTRACT$33K
Nov 30, 2017Department of DefenseFA9300 AFTC PZRFA930018F9000541712IGF::OT::IGF ROCKET TECHNOLOGY ENGINEERING SUPPORT ADVICE AND ASSISTANCE SERVICE$5K
Oct 11, 2017Department of DefenseFA9300 AFTC PZRFA930012C0002541712ARES 3 BASIC CONTRACT$187K
Sep 26, 2017National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNG14CR62C541330IGF::OT::IGF ENVIRONMENTAL TESTING AND INTEGRATION SERVICES (ETIS) II THIS STATEMENT OF WORK (SOW) SPECIFIES THE REQUIREMENTS FOR ON SITE CONTRACTOR SUPPLIED ENVIRONMENTAL TEST AND INTEGRATION AND OTHER LABORATORY OPERATIONS SERVICES TO THE GODDARD SPACE FLIGHT CENTER (GSFC). THE SCOPE OF THESE SERVICES INCLUDES THE FOLLOWING: OPERATION, MAINTENANCE, AND UPGRADE OF ENVIRONMENTAL TEST EQUIPMENT AND FACILITIES LOCATED IN THE GSFC BUILDING 7/10/15/29 COMPLEX, AREA 300 MAGNETIC TEST SITE AND OTHER TECHNICAL FACILITIES LOCATED AT VARIOUS LOCATIONS WITHIN GSFC INCLUDING THE MANUFACTURING AND ELECTROPLATING EQUIPMENT AND FACILITIES PRIMARILY LOCATED IN GSFC BUILDING 5/10/21 SHOPS MECHANICAL AND OPTICAL INTEGRATION OF SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, FABRICATE, AND MANUFACTURE CUSTOM SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, MANUFACTURE, AND OPERATION OF GROUND HANDLING EQUIPMENT AND FIXTURES DESIGN, MANUFACTURE, AND OPERATION OF OPTICAL ALIGNMENT AND CALIBRATION SYSTEMS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT THERMAL BLANKETS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT AND GROUND SUPPORT SYSTEM CABLE HARNESSES DESIGN, MANUFACTURE, AND INSTALLATION OF TECHNICAL FACILITIES INCLUDING BUILDINGS, BUILDING ELEMENTS, UTILITY SYSTEMS, AND TECHNICAL EQUIPMENT AND SYSTEMS DEFINE, ANALYZE, AND RESOLVE ELECTROMAGNETIC RADIATION ISSUES RELATING TO FACILITY AND SATELLITE GROUND SUPPORT EQUIPMENT OPERATION WITHIN THE TEST COMPLEX. SUPPORT SPECTRUM SIGNATURE ANALYSIS TO INSURE INTERFERENCE-FREE AND SAFE OPERATION OF ALL FACILITY-LOCATED NEAR ELECTROMAGNETIC WAVE SENSING DEVICES. TEST AND INTEGRATION ENGINEERING AND ENGINEERING ANALYSIS CLEANROOM OPERATION AND MAINTENANCE CONTAMINATION CONTROL SERVICES USING QUALIFIED AND EXPERIENCED PERSONNEL MAINTENANCE AND OPERATION OF CERTAIN PHYSICAL PLANT SYSTEMS SUCH AS PROCESSED WATER, EMERGENCY POWER, LN2/GN2 STORAGE SYSTEMS, CONDITIONED CLEANROOM AIR HVAC AND HUMIDITY SYSTEMS RECERTIFICATION (TESTING AND INSPECTION) OF LIFTING DEVICES AND EQUIPMENT (LDE), AND (INSPECTION) OF PRESSURE VESSELS AND PRESSURIZED SYSTEMS (PVS) AT GSFC, GREENBELT, WALLOPS, AND OTHER OFFSITE LOCATIONS. MAINTENANCE OF LDE AT GREENBELT SITE ONLY, NOT AT OTHER SITES; NON-DESTRUCTIVE EXAMINATION TESTING OF LDE AND PVS FACILITY AND OPERATIONS SAFETY DATA ACQUISITION AND ANALYSIS SYSTEM DEVELOPMENT AND MANAGEMENT.$7.7M
Sep 20, 2017National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNG14CR62C541330IGF::OT::IGF ENVIRONMENTAL TESTING AND INTEGRATION SERVICES (ETIS) II THIS STATEMENT OF WORK (SOW) SPECIFIES THE REQUIREMENTS FOR ON SITE CONTRACTOR SUPPLIED ENVIRONMENTAL TEST AND INTEGRATION AND OTHER LABORATORY OPERATIONS SERVICES TO THE GODDARD SPACE FLIGHT CENTER (GSFC). THE SCOPE OF THESE SERVICES INCLUDES THE FOLLOWING: OPERATION, MAINTENANCE, AND UPGRADE OF ENVIRONMENTAL TEST EQUIPMENT AND FACILITIES LOCATED IN THE GSFC BUILDING 7/10/15/29 COMPLEX, AREA 300 MAGNETIC TEST SITE AND OTHER TECHNICAL FACILITIES LOCATED AT VARIOUS LOCATIONS WITHIN GSFC INCLUDING THE MANUFACTURING AND ELECTROPLATING EQUIPMENT AND FACILITIES PRIMARILY LOCATED IN GSFC BUILDING 5/10/21 SHOPS MECHANICAL AND OPTICAL INTEGRATION OF SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, FABRICATE, AND MANUFACTURE CUSTOM SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, MANUFACTURE, AND OPERATION OF GROUND HANDLING EQUIPMENT AND FIXTURES DESIGN, MANUFACTURE, AND OPERATION OF OPTICAL ALIGNMENT AND CALIBRATION SYSTEMS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT THERMAL BLANKETS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT AND GROUND SUPPORT SYSTEM CABLE HARNESSES DESIGN, MANUFACTURE, AND INSTALLATION OF TECHNICAL FACILITIES INCLUDING BUILDINGS, BUILDING ELEMENTS, UTILITY SYSTEMS, AND TECHNICAL EQUIPMENT AND SYSTEMS DEFINE, ANALYZE, AND RESOLVE ELECTROMAGNETIC RADIATION ISSUES RELATING TO FACILITY AND SATELLITE GROUND SUPPORT EQUIPMENT OPERATION WITHIN THE TEST COMPLEX. SUPPORT SPECTRUM SIGNATURE ANALYSIS TO INSURE INTERFERENCE-FREE AND SAFE OPERATION OF ALL FACILITY-LOCATED NEAR ELECTROMAGNETIC WAVE SENSING DEVICES. TEST AND INTEGRATION ENGINEERING AND ENGINEERING ANALYSIS CLEANROOM OPERATION AND MAINTENANCE CONTAMINATION CONTROL SERVICES USING QUALIFIED AND EXPERIENCED PERSONNEL MAINTENANCE AND OPERATION OF CERTAIN PHYSICAL PLANT SYSTEMS SUCH AS PROCESSED WATER, EMERGENCY POWER, LN2/GN2 STORAGE SYSTEMS, CONDITIONED CLEANROOM AIR HVAC AND HUMIDITY SYSTEMS RECERTIFICATION (TESTING AND INSPECTION) OF LIFTING DEVICES AND EQUIPMENT (LDE), AND (INSPECTION) OF PRESSURE VESSELS AND PRESSURIZED SYSTEMS (PVS) AT GSFC, GREENBELT, WALLOPS, AND OTHER OFFSITE LOCATIONS. MAINTENANCE OF LDE AT GREENBELT SITE ONLY, NOT AT OTHER SITES; NON-DESTRUCTIVE EXAMINATION TESTING OF LDE AND PVS FACILITY AND OPERATIONS SAFETY DATA ACQUISITION AND ANALYSIS SYSTEM DEVELOPMENT AND MANAGEMENT.$6.0M
Aug 22, 2017Department of DefenseFA9300 AFTC PZRFA930012C0002541712ARES 3 BASIC CONTRACT$632K
Aug 21, 2017National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNG14CR62C541330IGF::OT::IGF ENVIRONMENTAL TESTING AND INTEGRATION SERVICES (ETIS) II THIS STATEMENT OF WORK (SOW) SPECIFIES THE REQUIREMENTS FOR ON SITE CONTRACTOR SUPPLIED ENVIRONMENTAL TEST AND INTEGRATION AND OTHER LABORATORY OPERATIONS SERVICES TO THE GODDARD SPACE FLIGHT CENTER (GSFC). THE SCOPE OF THESE SERVICES INCLUDES THE FOLLOWING: OPERATION, MAINTENANCE, AND UPGRADE OF ENVIRONMENTAL TEST EQUIPMENT AND FACILITIES LOCATED IN THE GSFC BUILDING 7/10/15/29 COMPLEX, AREA 300 MAGNETIC TEST SITE AND OTHER TECHNICAL FACILITIES LOCATED AT VARIOUS LOCATIONS WITHIN GSFC INCLUDING THE MANUFACTURING AND ELECTROPLATING EQUIPMENT AND FACILITIES PRIMARILY LOCATED IN GSFC BUILDING 5/10/21 SHOPS MECHANICAL AND OPTICAL INTEGRATION OF SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, FABRICATE, AND MANUFACTURE CUSTOM SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, MANUFACTURE, AND OPERATION OF GROUND HANDLING EQUIPMENT AND FIXTURES DESIGN, MANUFACTURE, AND OPERATION OF OPTICAL ALIGNMENT AND CALIBRATION SYSTEMS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT THERMAL BLANKETS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT AND GROUND SUPPORT SYSTEM CABLE HARNESSES DESIGN, MANUFACTURE, AND INSTALLATION OF TECHNICAL FACILITIES INCLUDING BUILDINGS, BUILDING ELEMENTS, UTILITY SYSTEMS, AND TECHNICAL EQUIPMENT AND SYSTEMS DEFINE, ANALYZE, AND RESOLVE ELECTROMAGNETIC RADIATION ISSUES RELATING TO FACILITY AND SATELLITE GROUND SUPPORT EQUIPMENT OPERATION WITHIN THE TEST COMPLEX. SUPPORT SPECTRUM SIGNATURE ANALYSIS TO INSURE INTERFERENCE-FREE AND SAFE OPERATION OF ALL FACILITY-LOCATED NEAR ELECTROMAGNETIC WAVE SENSING DEVICES. TEST AND INTEGRATION ENGINEERING AND ENGINEERING ANALYSIS CLEANROOM OPERATION AND MAINTENANCE CONTAMINATION CONTROL SERVICES USING QUALIFIED AND EXPERIENCED PERSONNEL MAINTENANCE AND OPERATION OF CERTAIN PHYSICAL PLANT SYSTEMS SUCH AS PROCESSED WATER, EMERGENCY POWER, LN2/GN2 STORAGE SYSTEMS, CONDITIONED CLEANROOM AIR HVAC AND HUMIDITY SYSTEMS RECERTIFICATION (TESTING AND INSPECTION) OF LIFTING DEVICES AND EQUIPMENT (LDE), AND (INSPECTION) OF PRESSURE VESSELS AND PRESSURIZED SYSTEMS (PVS) AT GSFC, GREENBELT, WALLOPS, AND OTHER OFFSITE LOCATIONS. MAINTENANCE OF LDE AT GREENBELT SITE ONLY, NOT AT OTHER SITES; NON-DESTRUCTIVE EXAMINATION TESTING OF LDE AND PVS FACILITY AND OPERATIONS SAFETY DATA ACQUISITION AND ANALYSIS SYSTEM DEVELOPMENT AND MANAGEMENT.$4.5M
Aug 7, 2017Department of DefenseFA9300 AFTC PZRFA930012C0002541712ARES 3 BASIC CONTRACT$50K
Jul 14, 2017National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNG14CR62C541330IGF::OT::IGF ENVIRONMENTAL TESTING AND INTEGRATION SERVICES (ETIS) II THIS STATEMENT OF WORK (SOW) SPECIFIES THE REQUIREMENTS FOR ON SITE CONTRACTOR SUPPLIED ENVIRONMENTAL TEST AND INTEGRATION AND OTHER LABORATORY OPERATIONS SERVICES TO THE GODDARD SPACE FLIGHT CENTER (GSFC). THE SCOPE OF THESE SERVICES INCLUDES THE FOLLOWING: OPERATION, MAINTENANCE, AND UPGRADE OF ENVIRONMENTAL TEST EQUIPMENT AND FACILITIES LOCATED IN THE GSFC BUILDING 7/10/15/29 COMPLEX, AREA 300 MAGNETIC TEST SITE AND OTHER TECHNICAL FACILITIES LOCATED AT VARIOUS LOCATIONS WITHIN GSFC INCLUDING THE MANUFACTURING AND ELECTROPLATING EQUIPMENT AND FACILITIES PRIMARILY LOCATED IN GSFC BUILDING 5/10/21 SHOPS MECHANICAL AND OPTICAL INTEGRATION OF SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, FABRICATE, AND MANUFACTURE CUSTOM SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, MANUFACTURE, AND OPERATION OF GROUND HANDLING EQUIPMENT AND FIXTURES DESIGN, MANUFACTURE, AND OPERATION OF OPTICAL ALIGNMENT AND CALIBRATION SYSTEMS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT THERMAL BLANKETS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT AND GROUND SUPPORT SYSTEM CABLE HARNESSES DESIGN, MANUFACTURE, AND INSTALLATION OF TECHNICAL FACILITIES INCLUDING BUILDINGS, BUILDING ELEMENTS, UTILITY SYSTEMS, AND TECHNICAL EQUIPMENT AND SYSTEMS DEFINE, ANALYZE, AND RESOLVE ELECTROMAGNETIC RADIATION ISSUES RELATING TO FACILITY AND SATELLITE GROUND SUPPORT EQUIPMENT OPERATION WITHIN THE TEST COMPLEX. SUPPORT SPECTRUM SIGNATURE ANALYSIS TO INSURE INTERFERENCE-FREE AND SAFE OPERATION OF ALL FACILITY-LOCATED NEAR ELECTROMAGNETIC WAVE SENSING DEVICES. TEST AND INTEGRATION ENGINEERING AND ENGINEERING ANALYSIS CLEANROOM OPERATION AND MAINTENANCE CONTAMINATION CONTROL SERVICES USING QUALIFIED AND EXPERIENCED PERSONNEL MAINTENANCE AND OPERATION OF CERTAIN PHYSICAL PLANT SYSTEMS SUCH AS PROCESSED WATER, EMERGENCY POWER, LN2/GN2 STORAGE SYSTEMS, CONDITIONED CLEANROOM AIR HVAC AND HUMIDITY SYSTEMS RECERTIFICATION (TESTING AND INSPECTION) OF LIFTING DEVICES AND EQUIPMENT (LDE), AND (INSPECTION) OF PRESSURE VESSELS AND PRESSURIZED SYSTEMS (PVS) AT GSFC, GREENBELT, WALLOPS, AND OTHER OFFSITE LOCATIONS. MAINTENANCE OF LDE AT GREENBELT SITE ONLY, NOT AT OTHER SITES; NON-DESTRUCTIVE EXAMINATION TESTING OF LDE AND PVS FACILITY AND OPERATIONS SAFETY DATA ACQUISITION AND ANALYSIS SYSTEM DEVELOPMENT AND MANAGEMENT.$3.5M
Jul 3, 2017Department of DefenseFA9300 AFTC PZRFA930012C0002541712ARES 3 BASIC CONTRACT$394K
Jun 21, 2017Department of DefenseFA9300 AFTC PZRFA930012C0002541712ARES 3 BASIC CONTRACT$141K
Jun 20, 2017National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNG14CR62C541330IGF::OT::IGF ENVIRONMENTAL TESTING AND INTEGRATION SERVICES (ETIS) II THIS STATEMENT OF WORK (SOW) SPECIFIES THE REQUIREMENTS FOR ON SITE CONTRACTOR SUPPLIED ENVIRONMENTAL TEST AND INTEGRATION AND OTHER LABORATORY OPERATIONS SERVICES TO THE GODDARD SPACE FLIGHT CENTER (GSFC). THE SCOPE OF THESE SERVICES INCLUDES THE FOLLOWING: OPERATION, MAINTENANCE, AND UPGRADE OF ENVIRONMENTAL TEST EQUIPMENT AND FACILITIES LOCATED IN THE GSFC BUILDING 7/10/15/29 COMPLEX, AREA 300 MAGNETIC TEST SITE AND OTHER TECHNICAL FACILITIES LOCATED AT VARIOUS LOCATIONS WITHIN GSFC INCLUDING THE MANUFACTURING AND ELECTROPLATING EQUIPMENT AND FACILITIES PRIMARILY LOCATED IN GSFC BUILDING 5/10/21 SHOPS MECHANICAL AND OPTICAL INTEGRATION OF SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, FABRICATE, AND MANUFACTURE CUSTOM SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, MANUFACTURE, AND OPERATION OF GROUND HANDLING EQUIPMENT AND FIXTURES DESIGN, MANUFACTURE, AND OPERATION OF OPTICAL ALIGNMENT AND CALIBRATION SYSTEMS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT THERMAL BLANKETS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT AND GROUND SUPPORT SYSTEM CABLE HARNESSES DESIGN, MANUFACTURE, AND INSTALLATION OF TECHNICAL FACILITIES INCLUDING BUILDINGS, BUILDING ELEMENTS, UTILITY SYSTEMS, AND TECHNICAL EQUIPMENT AND SYSTEMS DEFINE, ANALYZE, AND RESOLVE ELECTROMAGNETIC RADIATION ISSUES RELATING TO FACILITY AND SATELLITE GROUND SUPPORT EQUIPMENT OPERATION WITHIN THE TEST COMPLEX. SUPPORT SPECTRUM SIGNATURE ANALYSIS TO INSURE INTERFERENCE-FREE AND SAFE OPERATION OF ALL FACILITY-LOCATED NEAR ELECTROMAGNETIC WAVE SENSING DEVICES. TEST AND INTEGRATION ENGINEERING AND ENGINEERING ANALYSIS CLEANROOM OPERATION AND MAINTENANCE CONTAMINATION CONTROL SERVICES USING QUALIFIED AND EXPERIENCED PERSONNEL MAINTENANCE AND OPERATION OF CERTAIN PHYSICAL PLANT SYSTEMS SUCH AS PROCESSED WATER, EMERGENCY POWER, LN2/GN2 STORAGE SYSTEMS, CONDITIONED CLEANROOM AIR HVAC AND HUMIDITY SYSTEMS RECERTIFICATION (TESTING AND INSPECTION) OF LIFTING DEVICES AND EQUIPMENT (LDE), AND (INSPECTION) OF PRESSURE VESSELS AND PRESSURIZED SYSTEMS (PVS) AT GSFC, GREENBELT, WALLOPS, AND OTHER OFFSITE LOCATIONS. MAINTENANCE OF LDE AT GREENBELT SITE ONLY, NOT AT OTHER SITES; NON-DESTRUCTIVE EXAMINATION TESTING OF LDE AND PVS FACILITY AND OPERATIONS SAFETY DATA ACQUISITION AND ANALYSIS SYSTEM DEVELOPMENT AND MANAGEMENT.$6.5M
May 31, 2017Department of DefenseFA9300 AFTC PZRFA930012C0002541712ARES 3 BASIC CONTRACT$28K
May 17, 2017National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNG14CR62C541330IGF::OT::IGF ENVIRONMENTAL TESTING AND INTEGRATION SERVICES (ETIS) II THIS STATEMENT OF WORK (SOW) SPECIFIES THE REQUIREMENTS FOR ON SITE CONTRACTOR SUPPLIED ENVIRONMENTAL TEST AND INTEGRATION AND OTHER LABORATORY OPERATIONS SERVICES TO THE GODDARD SPACE FLIGHT CENTER (GSFC). THE SCOPE OF THESE SERVICES INCLUDES THE FOLLOWING: OPERATION, MAINTENANCE, AND UPGRADE OF ENVIRONMENTAL TEST EQUIPMENT AND FACILITIES LOCATED IN THE GSFC BUILDING 7/10/15/29 COMPLEX, AREA 300 MAGNETIC TEST SITE AND OTHER TECHNICAL FACILITIES LOCATED AT VARIOUS LOCATIONS WITHIN GSFC INCLUDING THE MANUFACTURING AND ELECTROPLATING EQUIPMENT AND FACILITIES PRIMARILY LOCATED IN GSFC BUILDING 5/10/21 SHOPS MECHANICAL AND OPTICAL INTEGRATION OF SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, FABRICATE, AND MANUFACTURE CUSTOM SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, MANUFACTURE, AND OPERATION OF GROUND HANDLING EQUIPMENT AND FIXTURES DESIGN, MANUFACTURE, AND OPERATION OF OPTICAL ALIGNMENT AND CALIBRATION SYSTEMS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT THERMAL BLANKETS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT AND GROUND SUPPORT SYSTEM CABLE HARNESSES DESIGN, MANUFACTURE, AND INSTALLATION OF TECHNICAL FACILITIES INCLUDING BUILDINGS, BUILDING ELEMENTS, UTILITY SYSTEMS, AND TECHNICAL EQUIPMENT AND SYSTEMS DEFINE, ANALYZE, AND RESOLVE ELECTROMAGNETIC RADIATION ISSUES RELATING TO FACILITY AND SATELLITE GROUND SUPPORT EQUIPMENT OPERATION WITHIN THE TEST COMPLEX. SUPPORT SPECTRUM SIGNATURE ANALYSIS TO INSURE INTERFERENCE-FREE AND SAFE OPERATION OF ALL FACILITY-LOCATED NEAR ELECTROMAGNETIC WAVE SENSING DEVICES. TEST AND INTEGRATION ENGINEERING AND ENGINEERING ANALYSIS CLEANROOM OPERATION AND MAINTENANCE CONTAMINATION CONTROL SERVICES USING QUALIFIED AND EXPERIENCED PERSONNEL MAINTENANCE AND OPERATION OF CERTAIN PHYSICAL PLANT SYSTEMS SUCH AS PROCESSED WATER, EMERGENCY POWER, LN2/GN2 STORAGE SYSTEMS, CONDITIONED CLEANROOM AIR HVAC AND HUMIDITY SYSTEMS RECERTIFICATION (TESTING AND INSPECTION) OF LIFTING DEVICES AND EQUIPMENT (LDE), AND (INSPECTION) OF PRESSURE VESSELS AND PRESSURIZED SYSTEMS (PVS) AT GSFC, GREENBELT, WALLOPS, AND OTHER OFFSITE LOCATIONS. MAINTENANCE OF LDE AT GREENBELT SITE ONLY, NOT AT OTHER SITES; NON-DESTRUCTIVE EXAMINATION TESTING OF LDE AND PVS FACILITY AND OPERATIONS SAFETY DATA ACQUISITION AND ANALYSIS SYSTEM DEVELOPMENT AND MANAGEMENT.$4.5M
May 10, 2017General Services AdministrationGSA FAS AAS REGION 5GS05Q16BMP0001541712IGF::CT,CL::IGF RESEARCH AND DEVELOPMENT STRUCTURAL AND AERODYNAMIC TEST SERVICES$52K
May 2, 2017Department of DefenseFA9300 AFTC PZRFA930012C0002541712ARES 3 BASIC CONTRACT$176K
Apr 19, 2017National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNG14CR62C541330IGF::OT::IGF ENVIRONMENTAL TESTING AND INTEGRATION SERVICES (ETIS) II THIS STATEMENT OF WORK (SOW) SPECIFIES THE REQUIREMENTS FOR ON SITE CONTRACTOR SUPPLIED ENVIRONMENTAL TEST AND INTEGRATION AND OTHER LABORATORY OPERATIONS SERVICES TO THE GODDARD SPACE FLIGHT CENTER (GSFC). THE SCOPE OF THESE SERVICES INCLUDES THE FOLLOWING: OPERATION, MAINTENANCE, AND UPGRADE OF ENVIRONMENTAL TEST EQUIPMENT AND FACILITIES LOCATED IN THE GSFC BUILDING 7/10/15/29 COMPLEX, AREA 300 MAGNETIC TEST SITE AND OTHER TECHNICAL FACILITIES LOCATED AT VARIOUS LOCATIONS WITHIN GSFC INCLUDING THE MANUFACTURING AND ELECTROPLATING EQUIPMENT AND FACILITIES PRIMARILY LOCATED IN GSFC BUILDING 5/10/21 SHOPS MECHANICAL AND OPTICAL INTEGRATION OF SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, FABRICATE, AND MANUFACTURE CUSTOM SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, MANUFACTURE, AND OPERATION OF GROUND HANDLING EQUIPMENT AND FIXTURES DESIGN, MANUFACTURE, AND OPERATION OF OPTICAL ALIGNMENT AND CALIBRATION SYSTEMS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT THERMAL BLANKETS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT AND GROUND SUPPORT SYSTEM CABLE HARNESSES DESIGN, MANUFACTURE, AND INSTALLATION OF TECHNICAL FACILITIES INCLUDING BUILDINGS, BUILDING ELEMENTS, UTILITY SYSTEMS, AND TECHNICAL EQUIPMENT AND SYSTEMS DEFINE, ANALYZE, AND RESOLVE ELECTROMAGNETIC RADIATION ISSUES RELATING TO FACILITY AND SATELLITE GROUND SUPPORT EQUIPMENT OPERATION WITHIN THE TEST COMPLEX. SUPPORT SPECTRUM SIGNATURE ANALYSIS TO INSURE INTERFERENCE-FREE AND SAFE OPERATION OF ALL FACILITY-LOCATED NEAR ELECTROMAGNETIC WAVE SENSING DEVICES. TEST AND INTEGRATION ENGINEERING AND ENGINEERING ANALYSIS CLEANROOM OPERATION AND MAINTENANCE CONTAMINATION CONTROL SERVICES USING QUALIFIED AND EXPERIENCED PERSONNEL MAINTENANCE AND OPERATION OF CERTAIN PHYSICAL PLANT SYSTEMS SUCH AS PROCESSED WATER, EMERGENCY POWER, LN2/GN2 STORAGE SYSTEMS, CONDITIONED CLEANROOM AIR HVAC AND HUMIDITY SYSTEMS RECERTIFICATION (TESTING AND INSPECTION) OF LIFTING DEVICES AND EQUIPMENT (LDE), AND (INSPECTION) OF PRESSURE VESSELS AND PRESSURIZED SYSTEMS (PVS) AT GSFC, GREENBELT, WALLOPS, AND OTHER OFFSITE LOCATIONS. MAINTENANCE OF LDE AT GREENBELT SITE ONLY, NOT AT OTHER SITES; NON-DESTRUCTIVE EXAMINATION TESTING OF LDE AND PVS FACILITY AND OPERATIONS SAFETY DATA ACQUISITION AND ANALYSIS SYSTEM DEVELOPMENT AND MANAGEMENT.$5.0M
Apr 7, 2017Department of DefenseFA9300 AFTC PZRFA930012C0002541712ARES 3 BASIC CONTRACT$155K
Mar 9, 2017Department of DefenseFA9300 AFTC PZRFA930012C0002541712ARES 3 BASIC CONTRACT$153K
Mar 7, 2017National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNG14CR62C541330IGF::OT::IGF ENVIRONMENTAL TESTING AND INTEGRATION SERVICES (ETIS) II THIS STATEMENT OF WORK (SOW) SPECIFIES THE REQUIREMENTS FOR ON SITE CONTRACTOR SUPPLIED ENVIRONMENTAL TEST AND INTEGRATION AND OTHER LABORATORY OPERATIONS SERVICES TO THE GODDARD SPACE FLIGHT CENTER (GSFC). THE SCOPE OF THESE SERVICES INCLUDES THE FOLLOWING: OPERATION, MAINTENANCE, AND UPGRADE OF ENVIRONMENTAL TEST EQUIPMENT AND FACILITIES LOCATED IN THE GSFC BUILDING 7/10/15/29 COMPLEX, AREA 300 MAGNETIC TEST SITE AND OTHER TECHNICAL FACILITIES LOCATED AT VARIOUS LOCATIONS WITHIN GSFC INCLUDING THE MANUFACTURING AND ELECTROPLATING EQUIPMENT AND FACILITIES PRIMARILY LOCATED IN GSFC BUILDING 5/10/21 SHOPS MECHANICAL AND OPTICAL INTEGRATION OF SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, FABRICATE, AND MANUFACTURE CUSTOM SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, MANUFACTURE, AND OPERATION OF GROUND HANDLING EQUIPMENT AND FIXTURES DESIGN, MANUFACTURE, AND OPERATION OF OPTICAL ALIGNMENT AND CALIBRATION SYSTEMS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT THERMAL BLANKETS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT AND GROUND SUPPORT SYSTEM CABLE HARNESSES DESIGN, MANUFACTURE, AND INSTALLATION OF TECHNICAL FACILITIES INCLUDING BUILDINGS, BUILDING ELEMENTS, UTILITY SYSTEMS, AND TECHNICAL EQUIPMENT AND SYSTEMS DEFINE, ANALYZE, AND RESOLVE ELECTROMAGNETIC RADIATION ISSUES RELATING TO FACILITY AND SATELLITE GROUND SUPPORT EQUIPMENT OPERATION WITHIN THE TEST COMPLEX. SUPPORT SPECTRUM SIGNATURE ANALYSIS TO INSURE INTERFERENCE-FREE AND SAFE OPERATION OF ALL FACILITY-LOCATED NEAR ELECTROMAGNETIC WAVE SENSING DEVICES. TEST AND INTEGRATION ENGINEERING AND ENGINEERING ANALYSIS CLEANROOM OPERATION AND MAINTENANCE CONTAMINATION CONTROL SERVICES USING QUALIFIED AND EXPERIENCED PERSONNEL MAINTENANCE AND OPERATION OF CERTAIN PHYSICAL PLANT SYSTEMS SUCH AS PROCESSED WATER, EMERGENCY POWER, LN2/GN2 STORAGE SYSTEMS, CONDITIONED CLEANROOM AIR HVAC AND HUMIDITY SYSTEMS RECERTIFICATION (TESTING AND INSPECTION) OF LIFTING DEVICES AND EQUIPMENT (LDE), AND (INSPECTION) OF PRESSURE VESSELS AND PRESSURIZED SYSTEMS (PVS) AT GSFC, GREENBELT, WALLOPS, AND OTHER OFFSITE LOCATIONS. MAINTENANCE OF LDE AT GREENBELT SITE ONLY, NOT AT OTHER SITES; NON-DESTRUCTIVE EXAMINATION TESTING OF LDE AND PVS FACILITY AND OPERATIONS SAFETY DATA ACQUISITION AND ANALYSIS SYSTEM DEVELOPMENT AND MANAGEMENT.$1.0M
Feb 16, 2017National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNG14CR62C541330IGF::OT::IGF ENVIRONMENTAL TESTING AND INTEGRATION SERVICES (ETIS) II THIS STATEMENT OF WORK (SOW) SPECIFIES THE REQUIREMENTS FOR ON SITE CONTRACTOR SUPPLIED ENVIRONMENTAL TEST AND INTEGRATION AND OTHER LABORATORY OPERATIONS SERVICES TO THE GODDARD SPACE FLIGHT CENTER (GSFC). THE SCOPE OF THESE SERVICES INCLUDES THE FOLLOWING: OPERATION, MAINTENANCE, AND UPGRADE OF ENVIRONMENTAL TEST EQUIPMENT AND FACILITIES LOCATED IN THE GSFC BUILDING 7/10/15/29 COMPLEX, AREA 300 MAGNETIC TEST SITE AND OTHER TECHNICAL FACILITIES LOCATED AT VARIOUS LOCATIONS WITHIN GSFC INCLUDING THE MANUFACTURING AND ELECTROPLATING EQUIPMENT AND FACILITIES PRIMARILY LOCATED IN GSFC BUILDING 5/10/21 SHOPS MECHANICAL AND OPTICAL INTEGRATION OF SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, FABRICATE, AND MANUFACTURE CUSTOM SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, MANUFACTURE, AND OPERATION OF GROUND HANDLING EQUIPMENT AND FIXTURES DESIGN, MANUFACTURE, AND OPERATION OF OPTICAL ALIGNMENT AND CALIBRATION SYSTEMS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT THERMAL BLANKETS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT AND GROUND SUPPORT SYSTEM CABLE HARNESSES DESIGN, MANUFACTURE, AND INSTALLATION OF TECHNICAL FACILITIES INCLUDING BUILDINGS, BUILDING ELEMENTS, UTILITY SYSTEMS, AND TECHNICAL EQUIPMENT AND SYSTEMS DEFINE, ANALYZE, AND RESOLVE ELECTROMAGNETIC RADIATION ISSUES RELATING TO FACILITY AND SATELLITE GROUND SUPPORT EQUIPMENT OPERATION WITHIN THE TEST COMPLEX. SUPPORT SPECTRUM SIGNATURE ANALYSIS TO INSURE INTERFERENCE-FREE AND SAFE OPERATION OF ALL FACILITY-LOCATED NEAR ELECTROMAGNETIC WAVE SENSING DEVICES. TEST AND INTEGRATION ENGINEERING AND ENGINEERING ANALYSIS CLEANROOM OPERATION AND MAINTENANCE CONTAMINATION CONTROL SERVICES USING QUALIFIED AND EXPERIENCED PERSONNEL MAINTENANCE AND OPERATION OF CERTAIN PHYSICAL PLANT SYSTEMS SUCH AS PROCESSED WATER, EMERGENCY POWER, LN2/GN2 STORAGE SYSTEMS, CONDITIONED CLEANROOM AIR HVAC AND HUMIDITY SYSTEMS RECERTIFICATION (TESTING AND INSPECTION) OF LIFTING DEVICES AND EQUIPMENT (LDE), AND (INSPECTION) OF PRESSURE VESSELS AND PRESSURIZED SYSTEMS (PVS) AT GSFC, GREENBELT, WALLOPS, AND OTHER OFFSITE LOCATIONS. MAINTENANCE OF LDE AT GREENBELT SITE ONLY, NOT AT OTHER SITES; NON-DESTRUCTIVE EXAMINATION TESTING OF LDE AND PVS FACILITY AND OPERATIONS SAFETY DATA ACQUISITION AND ANALYSIS SYSTEM DEVELOPMENT AND MANAGEMENT.$1.0M
Feb 7, 2017General Services AdministrationGSA FAS AAS REGION 5GS05Q16BMP0001541712IGF::CT,CL::IGF RESEARCH AND DEVELOPMENT STRUCTURAL AND AERODYNAMIC TEST SERVICES$651K
Jan 30, 2017Department of DefenseFA9300 AFTC PZRFA930012C0002541712ARES 3 BASIC CONTRACT$50K
Jan 19, 2017National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNG14CR62C541330IGF::OT::IGF ENVIRONMENTAL TESTING AND INTEGRATION SERVICES (ETIS) II THIS STATEMENT OF WORK (SOW) SPECIFIES THE REQUIREMENTS FOR ON SITE CONTRACTOR SUPPLIED ENVIRONMENTAL TEST AND INTEGRATION AND OTHER LABORATORY OPERATIONS SERVICES TO THE GODDARD SPACE FLIGHT CENTER (GSFC). THE SCOPE OF THESE SERVICES INCLUDES THE FOLLOWING: OPERATION, MAINTENANCE, AND UPGRADE OF ENVIRONMENTAL TEST EQUIPMENT AND FACILITIES LOCATED IN THE GSFC BUILDING 7/10/15/29 COMPLEX, AREA 300 MAGNETIC TEST SITE AND OTHER TECHNICAL FACILITIES LOCATED AT VARIOUS LOCATIONS WITHIN GSFC INCLUDING THE MANUFACTURING AND ELECTROPLATING EQUIPMENT AND FACILITIES PRIMARILY LOCATED IN GSFC BUILDING 5/10/21 SHOPS MECHANICAL AND OPTICAL INTEGRATION OF SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, FABRICATE, AND MANUFACTURE CUSTOM SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, MANUFACTURE, AND OPERATION OF GROUND HANDLING EQUIPMENT AND FIXTURES DESIGN, MANUFACTURE, AND OPERATION OF OPTICAL ALIGNMENT AND CALIBRATION SYSTEMS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT THERMAL BLANKETS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT AND GROUND SUPPORT SYSTEM CABLE HARNESSES DESIGN, MANUFACTURE, AND INSTALLATION OF TECHNICAL FACILITIES INCLUDING BUILDINGS, BUILDING ELEMENTS, UTILITY SYSTEMS, AND TECHNICAL EQUIPMENT AND SYSTEMS DEFINE, ANALYZE, AND RESOLVE ELECTROMAGNETIC RADIATION ISSUES RELATING TO FACILITY AND SATELLITE GROUND SUPPORT EQUIPMENT OPERATION WITHIN THE TEST COMPLEX. SUPPORT SPECTRUM SIGNATURE ANALYSIS TO INSURE INTERFERENCE-FREE AND SAFE OPERATION OF ALL FACILITY-LOCATED NEAR ELECTROMAGNETIC WAVE SENSING DEVICES. TEST AND INTEGRATION ENGINEERING AND ENGINEERING ANALYSIS CLEANROOM OPERATION AND MAINTENANCE CONTAMINATION CONTROL SERVICES USING QUALIFIED AND EXPERIENCED PERSONNEL MAINTENANCE AND OPERATION OF CERTAIN PHYSICAL PLANT SYSTEMS SUCH AS PROCESSED WATER, EMERGENCY POWER, LN2/GN2 STORAGE SYSTEMS, CONDITIONED CLEANROOM AIR HVAC AND HUMIDITY SYSTEMS RECERTIFICATION (TESTING AND INSPECTION) OF LIFTING DEVICES AND EQUIPMENT (LDE), AND (INSPECTION) OF PRESSURE VESSELS AND PRESSURIZED SYSTEMS (PVS) AT GSFC, GREENBELT, WALLOPS, AND OTHER OFFSITE LOCATIONS. MAINTENANCE OF LDE AT GREENBELT SITE ONLY, NOT AT OTHER SITES; NON-DESTRUCTIVE EXAMINATION TESTING OF LDE AND PVS FACILITY AND OPERATIONS SAFETY DATA ACQUISITION AND ANALYSIS SYSTEM DEVELOPMENT AND MANAGEMENT.$7.0M
Jan 13, 2017General Services AdministrationGSA FAS AAS REGION 5GS05Q16BMP0001541712IGF::CT,CL::IGF RESEARCH AND DEVELOPMENT STRUCTURAL AND AERODYNAMIC TEST SERVICES$1.7M
Jan 10, 2017Department of DefenseFA9300 AFTC PZRFA930012C0002541712ARES 3 BASIC CONTRACT$190K
Dec 16, 2016National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNG14CR62C541330IGF::OT::IGF ENVIRONMENTAL TESTING AND INTEGRATION SERVICES (ETIS) II THIS STATEMENT OF WORK (SOW) SPECIFIES THE REQUIREMENTS FOR ON SITE CONTRACTOR SUPPLIED ENVIRONMENTAL TEST AND INTEGRATION AND OTHER LABORATORY OPERATIONS SERVICES TO THE GODDARD SPACE FLIGHT CENTER (GSFC). THE SCOPE OF THESE SERVICES INCLUDES THE FOLLOWING: OPERATION, MAINTENANCE, AND UPGRADE OF ENVIRONMENTAL TEST EQUIPMENT AND FACILITIES LOCATED IN THE GSFC BUILDING 7/10/15/29 COMPLEX, AREA 300 MAGNETIC TEST SITE AND OTHER TECHNICAL FACILITIES LOCATED AT VARIOUS LOCATIONS WITHIN GSFC INCLUDING THE MANUFACTURING AND ELECTROPLATING EQUIPMENT AND FACILITIES PRIMARILY LOCATED IN GSFC BUILDING 5/10/21 SHOPS MECHANICAL AND OPTICAL INTEGRATION OF SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, FABRICATE, AND MANUFACTURE CUSTOM SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, MANUFACTURE, AND OPERATION OF GROUND HANDLING EQUIPMENT AND FIXTURES DESIGN, MANUFACTURE, AND OPERATION OF OPTICAL ALIGNMENT AND CALIBRATION SYSTEMS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT THERMAL BLANKETS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT AND GROUND SUPPORT SYSTEM CABLE HARNESSES DESIGN, MANUFACTURE, AND INSTALLATION OF TECHNICAL FACILITIES INCLUDING BUILDINGS, BUILDING ELEMENTS, UTILITY SYSTEMS, AND TECHNICAL EQUIPMENT AND SYSTEMS DEFINE, ANALYZE, AND RESOLVE ELECTROMAGNETIC RADIATION ISSUES RELATING TO FACILITY AND SATELLITE GROUND SUPPORT EQUIPMENT OPERATION WITHIN THE TEST COMPLEX. SUPPORT SPECTRUM SIGNATURE ANALYSIS TO INSURE INTERFERENCE-FREE AND SAFE OPERATION OF ALL FACILITY-LOCATED NEAR ELECTROMAGNETIC WAVE SENSING DEVICES. TEST AND INTEGRATION ENGINEERING AND ENGINEERING ANALYSIS CLEANROOM OPERATION AND MAINTENANCE CONTAMINATION CONTROL SERVICES USING QUALIFIED AND EXPERIENCED PERSONNEL MAINTENANCE AND OPERATION OF CERTAIN PHYSICAL PLANT SYSTEMS SUCH AS PROCESSED WATER, EMERGENCY POWER, LN2/GN2 STORAGE SYSTEMS, CONDITIONED CLEANROOM AIR HVAC AND HUMIDITY SYSTEMS RECERTIFICATION (TESTING AND INSPECTION) OF LIFTING DEVICES AND EQUIPMENT (LDE), AND (INSPECTION) OF PRESSURE VESSELS AND PRESSURIZED SYSTEMS (PVS) AT GSFC, GREENBELT, WALLOPS, AND OTHER OFFSITE LOCATIONS. MAINTENANCE OF LDE AT GREENBELT SITE ONLY, NOT AT OTHER SITES; NON-DESTRUCTIVE EXAMINATION TESTING OF LDE AND PVS FACILITY AND OPERATIONS SAFETY DATA ACQUISITION AND ANALYSIS SYSTEM DEVELOPMENT AND MANAGEMENT.$1.5M
Dec 16, 2016Department of DefenseFA9300 AFTC PZRFA930012C0002541712ARES 3 BASIC CONTRACT$257K
Nov 30, 2016Department of DefenseW6QK ACC-APG0005541710ORDER PERIOD 5$105K
Nov 16, 2016General Services AdministrationGSA FAS AAS REGION 5GS05Q16BMP0001541712IGF::CT,CL::IGF RESEARCH AND DEVELOPMENT STRUCTURAL AND AERODYNAMIC TEST SERVICES$48K
Nov 4, 2016General Services AdministrationGSA FAS AAS REGION 5GS05Q16BMP0001541712IGF::CT,CL::IGF RESEARCH AND DEVELOPMENT STRUCTURAL AND AERODYNAMIC TEST SERVICES$890K
Oct 31, 2016National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNG14CR62C541330IGF::OT::IGF ENVIRONMENTAL TESTING AND INTEGRATION SERVICES (ETIS) II THIS STATEMENT OF WORK (SOW) SPECIFIES THE REQUIREMENTS FOR ON SITE CONTRACTOR SUPPLIED ENVIRONMENTAL TEST AND INTEGRATION AND OTHER LABORATORY OPERATIONS SERVICES TO THE GODDARD SPACE FLIGHT CENTER (GSFC). THE SCOPE OF THESE SERVICES INCLUDES THE FOLLOWING: OPERATION, MAINTENANCE, AND UPGRADE OF ENVIRONMENTAL TEST EQUIPMENT AND FACILITIES LOCATED IN THE GSFC BUILDING 7/10/15/29 COMPLEX, AREA 300 MAGNETIC TEST SITE AND OTHER TECHNICAL FACILITIES LOCATED AT VARIOUS LOCATIONS WITHIN GSFC INCLUDING THE MANUFACTURING AND ELECTROPLATING EQUIPMENT AND FACILITIES PRIMARILY LOCATED IN GSFC BUILDING 5/10/21 SHOPS MECHANICAL AND OPTICAL INTEGRATION OF SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, FABRICATE, AND MANUFACTURE CUSTOM SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, MANUFACTURE, AND OPERATION OF GROUND HANDLING EQUIPMENT AND FIXTURES DESIGN, MANUFACTURE, AND OPERATION OF OPTICAL ALIGNMENT AND CALIBRATION SYSTEMS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT THERMAL BLANKETS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT AND GROUND SUPPORT SYSTEM CABLE HARNESSES DESIGN, MANUFACTURE, AND INSTALLATION OF TECHNICAL FACILITIES INCLUDING BUILDINGS, BUILDING ELEMENTS, UTILITY SYSTEMS, AND TECHNICAL EQUIPMENT AND SYSTEMS DEFINE, ANALYZE, AND RESOLVE ELECTROMAGNETIC RADIATION ISSUES RELATING TO FACILITY AND SATELLITE GROUND SUPPORT EQUIPMENT OPERATION WITHIN THE TEST COMPLEX. SUPPORT SPECTRUM SIGNATURE ANALYSIS TO INSURE INTERFERENCE-FREE AND SAFE OPERATION OF ALL FACILITY-LOCATED NEAR ELECTROMAGNETIC WAVE SENSING DEVICES. TEST AND INTEGRATION ENGINEERING AND ENGINEERING ANALYSIS CLEANROOM OPERATION AND MAINTENANCE CONTAMINATION CONTROL SERVICES USING QUALIFIED AND EXPERIENCED PERSONNEL MAINTENANCE AND OPERATION OF CERTAIN PHYSICAL PLANT SYSTEMS SUCH AS PROCESSED WATER, EMERGENCY POWER, LN2/GN2 STORAGE SYSTEMS, CONDITIONED CLEANROOM AIR HVAC AND HUMIDITY SYSTEMS RECERTIFICATION (TESTING AND INSPECTION) OF LIFTING DEVICES AND EQUIPMENT (LDE), AND (INSPECTION) OF PRESSURE VESSELS AND PRESSURIZED SYSTEMS (PVS) AT GSFC, GREENBELT, WALLOPS, AND OTHER OFFSITE LOCATIONS. MAINTENANCE OF LDE AT GREENBELT SITE ONLY, NOT AT OTHER SITES; NON-DESTRUCTIVE EXAMINATION TESTING OF LDE AND PVS FACILITY AND OPERATIONS SAFETY DATA ACQUISITION AND ANALYSIS SYSTEM DEVELOPMENT AND MANAGEMENT.$248K
Oct 25, 2016Department of DefenseFA9300 AFTC PZRFA930012C0002541712ARES 3 BASIC CONTRACT$100K
Oct 21, 2016Department of DefenseFA9300 AFTC PZRFA930012C0002541712ARES 3 BASIC CONTRACT$44K
Sep 29, 2016National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNG14CR62C541330IGF::OT::IGF ENVIRONMENTAL TESTING AND INTEGRATION SERVICES (ETIS) II THIS STATEMENT OF WORK (SOW) SPECIFIES THE REQUIREMENTS FOR ON SITE CONTRACTOR SUPPLIED ENVIRONMENTAL TEST AND INTEGRATION AND OTHER LABORATORY OPERATIONS SERVICES TO THE GODDARD SPACE FLIGHT CENTER (GSFC). THE SCOPE OF THESE SERVICES INCLUDES THE FOLLOWING: OPERATION, MAINTENANCE, AND UPGRADE OF ENVIRONMENTAL TEST EQUIPMENT AND FACILITIES LOCATED IN THE GSFC BUILDING 7/10/15/29 COMPLEX, AREA 300 MAGNETIC TEST SITE AND OTHER TECHNICAL FACILITIES LOCATED AT VARIOUS LOCATIONS WITHIN GSFC INCLUDING THE MANUFACTURING AND ELECTROPLATING EQUIPMENT AND FACILITIES PRIMARILY LOCATED IN GSFC BUILDING 5/10/21 SHOPS MECHANICAL AND OPTICAL INTEGRATION OF SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, FABRICATE, AND MANUFACTURE CUSTOM SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, MANUFACTURE, AND OPERATION OF GROUND HANDLING EQUIPMENT AND FIXTURES DESIGN, MANUFACTURE, AND OPERATION OF OPTICAL ALIGNMENT AND CALIBRATION SYSTEMS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT THERMAL BLANKETS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT AND GROUND SUPPORT SYSTEM CABLE HARNESSES DESIGN, MANUFACTURE, AND INSTALLATION OF TECHNICAL FACILITIES INCLUDING BUILDINGS, BUILDING ELEMENTS, UTILITY SYSTEMS, AND TECHNICAL EQUIPMENT AND SYSTEMS DEFINE, ANALYZE, AND RESOLVE ELECTROMAGNETIC RADIATION ISSUES RELATING TO FACILITY AND SATELLITE GROUND SUPPORT EQUIPMENT OPERATION WITHIN THE TEST COMPLEX. SUPPORT SPECTRUM SIGNATURE ANALYSIS TO INSURE INTERFERENCE-FREE AND SAFE OPERATION OF ALL FACILITY-LOCATED NEAR ELECTROMAGNETIC WAVE SENSING DEVICES. TEST AND INTEGRATION ENGINEERING AND ENGINEERING ANALYSIS CLEANROOM OPERATION AND MAINTENANCE CONTAMINATION CONTROL SERVICES USING QUALIFIED AND EXPERIENCED PERSONNEL MAINTENANCE AND OPERATION OF CERTAIN PHYSICAL PLANT SYSTEMS SUCH AS PROCESSED WATER, EMERGENCY POWER, LN2/GN2 STORAGE SYSTEMS, CONDITIONED CLEANROOM AIR HVAC AND HUMIDITY SYSTEMS RECERTIFICATION (TESTING AND INSPECTION) OF LIFTING DEVICES AND EQUIPMENT (LDE), AND (INSPECTION) OF PRESSURE VESSELS AND PRESSURIZED SYSTEMS (PVS) AT GSFC, GREENBELT, WALLOPS, AND OTHER OFFSITE LOCATIONS. MAINTENANCE OF LDE AT GREENBELT SITE ONLY, NOT AT OTHER SITES; NON-DESTRUCTIVE EXAMINATION TESTING OF LDE AND PVS FACILITY AND OPERATIONS SAFETY DATA ACQUISITION AND ANALYSIS SYSTEM DEVELOPMENT AND MANAGEMENT.$1.7M
Sep 27, 2016National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNG14CR62C541330IGF::OT::IGF ENVIRONMENTAL TESTING AND INTEGRATION SERVICES (ETIS) II THIS STATEMENT OF WORK (SOW) SPECIFIES THE REQUIREMENTS FOR ON SITE CONTRACTOR SUPPLIED ENVIRONMENTAL TEST AND INTEGRATION AND OTHER LABORATORY OPERATIONS SERVICES TO THE GODDARD SPACE FLIGHT CENTER (GSFC). THE SCOPE OF THESE SERVICES INCLUDES THE FOLLOWING: OPERATION, MAINTENANCE, AND UPGRADE OF ENVIRONMENTAL TEST EQUIPMENT AND FACILITIES LOCATED IN THE GSFC BUILDING 7/10/15/29 COMPLEX, AREA 300 MAGNETIC TEST SITE AND OTHER TECHNICAL FACILITIES LOCATED AT VARIOUS LOCATIONS WITHIN GSFC INCLUDING THE MANUFACTURING AND ELECTROPLATING EQUIPMENT AND FACILITIES PRIMARILY LOCATED IN GSFC BUILDING 5/10/21 SHOPS MECHANICAL AND OPTICAL INTEGRATION OF SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, FABRICATE, AND MANUFACTURE CUSTOM SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, MANUFACTURE, AND OPERATION OF GROUND HANDLING EQUIPMENT AND FIXTURES DESIGN, MANUFACTURE, AND OPERATION OF OPTICAL ALIGNMENT AND CALIBRATION SYSTEMS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT THERMAL BLANKETS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT AND GROUND SUPPORT SYSTEM CABLE HARNESSES DESIGN, MANUFACTURE, AND INSTALLATION OF TECHNICAL FACILITIES INCLUDING BUILDINGS, BUILDING ELEMENTS, UTILITY SYSTEMS, AND TECHNICAL EQUIPMENT AND SYSTEMS DEFINE, ANALYZE, AND RESOLVE ELECTROMAGNETIC RADIATION ISSUES RELATING TO FACILITY AND SATELLITE GROUND SUPPORT EQUIPMENT OPERATION WITHIN THE TEST COMPLEX. SUPPORT SPECTRUM SIGNATURE ANALYSIS TO INSURE INTERFERENCE-FREE AND SAFE OPERATION OF ALL FACILITY-LOCATED NEAR ELECTROMAGNETIC WAVE SENSING DEVICES. TEST AND INTEGRATION ENGINEERING AND ENGINEERING ANALYSIS CLEANROOM OPERATION AND MAINTENANCE CONTAMINATION CONTROL SERVICES USING QUALIFIED AND EXPERIENCED PERSONNEL MAINTENANCE AND OPERATION OF CERTAIN PHYSICAL PLANT SYSTEMS SUCH AS PROCESSED WATER, EMERGENCY POWER, LN2/GN2 STORAGE SYSTEMS, CONDITIONED CLEANROOM AIR HVAC AND HUMIDITY SYSTEMS RECERTIFICATION (TESTING AND INSPECTION) OF LIFTING DEVICES AND EQUIPMENT (LDE), AND (INSPECTION) OF PRESSURE VESSELS AND PRESSURIZED SYSTEMS (PVS) AT GSFC, GREENBELT, WALLOPS, AND OTHER OFFSITE LOCATIONS. MAINTENANCE OF LDE AT GREENBELT SITE ONLY, NOT AT OTHER SITES; NON-DESTRUCTIVE EXAMINATION TESTING OF LDE AND PVS FACILITY AND OPERATIONS SAFETY DATA ACQUISITION AND ANALYSIS SYSTEM DEVELOPMENT AND MANAGEMENT.$5.7M
Sep 15, 2016National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNG14CR62C541330IGF::OT::IGF ENVIRONMENTAL TESTING AND INTEGRATION SERVICES (ETIS) II THIS STATEMENT OF WORK (SOW) SPECIFIES THE REQUIREMENTS FOR ON SITE CONTRACTOR SUPPLIED ENVIRONMENTAL TEST AND INTEGRATION AND OTHER LABORATORY OPERATIONS SERVICES TO THE GODDARD SPACE FLIGHT CENTER (GSFC). THE SCOPE OF THESE SERVICES INCLUDES THE FOLLOWING: OPERATION, MAINTENANCE, AND UPGRADE OF ENVIRONMENTAL TEST EQUIPMENT AND FACILITIES LOCATED IN THE GSFC BUILDING 7/10/15/29 COMPLEX, AREA 300 MAGNETIC TEST SITE AND OTHER TECHNICAL FACILITIES LOCATED AT VARIOUS LOCATIONS WITHIN GSFC INCLUDING THE MANUFACTURING AND ELECTROPLATING EQUIPMENT AND FACILITIES PRIMARILY LOCATED IN GSFC BUILDING 5/10/21 SHOPS MECHANICAL AND OPTICAL INTEGRATION OF SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, FABRICATE, AND MANUFACTURE CUSTOM SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, MANUFACTURE, AND OPERATION OF GROUND HANDLING EQUIPMENT AND FIXTURES DESIGN, MANUFACTURE, AND OPERATION OF OPTICAL ALIGNMENT AND CALIBRATION SYSTEMS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT THERMAL BLANKETS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT AND GROUND SUPPORT SYSTEM CABLE HARNESSES DESIGN, MANUFACTURE, AND INSTALLATION OF TECHNICAL FACILITIES INCLUDING BUILDINGS, BUILDING ELEMENTS, UTILITY SYSTEMS, AND TECHNICAL EQUIPMENT AND SYSTEMS DEFINE, ANALYZE, AND RESOLVE ELECTROMAGNETIC RADIATION ISSUES RELATING TO FACILITY AND SATELLITE GROUND SUPPORT EQUIPMENT OPERATION WITHIN THE TEST COMPLEX. SUPPORT SPECTRUM SIGNATURE ANALYSIS TO INSURE INTERFERENCE-FREE AND SAFE OPERATION OF ALL FACILITY-LOCATED NEAR ELECTROMAGNETIC WAVE SENSING DEVICES. TEST AND INTEGRATION ENGINEERING AND ENGINEERING ANALYSIS CLEANROOM OPERATION AND MAINTENANCE CONTAMINATION CONTROL SERVICES USING QUALIFIED AND EXPERIENCED PERSONNEL MAINTENANCE AND OPERATION OF CERTAIN PHYSICAL PLANT SYSTEMS SUCH AS PROCESSED WATER, EMERGENCY POWER, LN2/GN2 STORAGE SYSTEMS, CONDITIONED CLEANROOM AIR HVAC AND HUMIDITY SYSTEMS RECERTIFICATION (TESTING AND INSPECTION) OF LIFTING DEVICES AND EQUIPMENT (LDE), AND (INSPECTION) OF PRESSURE VESSELS AND PRESSURIZED SYSTEMS (PVS) AT GSFC, GREENBELT, WALLOPS, AND OTHER OFFSITE LOCATIONS. MAINTENANCE OF LDE AT GREENBELT SITE ONLY, NOT AT OTHER SITES; NON-DESTRUCTIVE EXAMINATION TESTING OF LDE AND PVS FACILITY AND OPERATIONS SAFETY DATA ACQUISITION AND ANALYSIS SYSTEM DEVELOPMENT AND MANAGEMENT.$10M
Sep 14, 2016Department of DefenseFA9300 AFTC PZRFA930012C0002541712ARES 3 BASIC CONTRACT$243K
Sep 13, 2016General Services AdministrationGSA FAS AAS REGION 5GS05Q16BMP0001541712IGF::CT,CL::IGF RESEARCH AND DEVELOPMENT STRUCTURAL AND AERODYNAMIC TEST SERVICES$926K
Sep 2, 2016National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNG14CR62C541330IGF::OT::IGF ENVIRONMENTAL TESTING AND INTEGRATION SERVICES (ETIS) II THIS STATEMENT OF WORK (SOW) SPECIFIES THE REQUIREMENTS FOR ON SITE CONTRACTOR SUPPLIED ENVIRONMENTAL TEST AND INTEGRATION AND OTHER LABORATORY OPERATIONS SERVICES TO THE GODDARD SPACE FLIGHT CENTER (GSFC). THE SCOPE OF THESE SERVICES INCLUDES THE FOLLOWING: OPERATION, MAINTENANCE, AND UPGRADE OF ENVIRONMENTAL TEST EQUIPMENT AND FACILITIES LOCATED IN THE GSFC BUILDING 7/10/15/29 COMPLEX, AREA 300 MAGNETIC TEST SITE AND OTHER TECHNICAL FACILITIES LOCATED AT VARIOUS LOCATIONS WITHIN GSFC INCLUDING THE MANUFACTURING AND ELECTROPLATING EQUIPMENT AND FACILITIES PRIMARILY LOCATED IN GSFC BUILDING 5/10/21 SHOPS MECHANICAL AND OPTICAL INTEGRATION OF SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, FABRICATE, AND MANUFACTURE CUSTOM SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, MANUFACTURE, AND OPERATION OF GROUND HANDLING EQUIPMENT AND FIXTURES DESIGN, MANUFACTURE, AND OPERATION OF OPTICAL ALIGNMENT AND CALIBRATION SYSTEMS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT THERMAL BLANKETS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT AND GROUND SUPPORT SYSTEM CABLE HARNESSES DESIGN, MANUFACTURE, AND INSTALLATION OF TECHNICAL FACILITIES INCLUDING BUILDINGS, BUILDING ELEMENTS, UTILITY SYSTEMS, AND TECHNICAL EQUIPMENT AND SYSTEMS DEFINE, ANALYZE, AND RESOLVE ELECTROMAGNETIC RADIATION ISSUES RELATING TO FACILITY AND SATELLITE GROUND SUPPORT EQUIPMENT OPERATION WITHIN THE TEST COMPLEX. SUPPORT SPECTRUM SIGNATURE ANALYSIS TO INSURE INTERFERENCE-FREE AND SAFE OPERATION OF ALL FACILITY-LOCATED NEAR ELECTROMAGNETIC WAVE SENSING DEVICES. TEST AND INTEGRATION ENGINEERING AND ENGINEERING ANALYSIS CLEANROOM OPERATION AND MAINTENANCE CONTAMINATION CONTROL SERVICES USING QUALIFIED AND EXPERIENCED PERSONNEL MAINTENANCE AND OPERATION OF CERTAIN PHYSICAL PLANT SYSTEMS SUCH AS PROCESSED WATER, EMERGENCY POWER, LN2/GN2 STORAGE SYSTEMS, CONDITIONED CLEANROOM AIR HVAC AND HUMIDITY SYSTEMS RECERTIFICATION (TESTING AND INSPECTION) OF LIFTING DEVICES AND EQUIPMENT (LDE), AND (INSPECTION) OF PRESSURE VESSELS AND PRESSURIZED SYSTEMS (PVS) AT GSFC, GREENBELT, WALLOPS, AND OTHER OFFSITE LOCATIONS. MAINTENANCE OF LDE AT GREENBELT SITE ONLY, NOT AT OTHER SITES; NON-DESTRUCTIVE EXAMINATION TESTING OF LDE AND PVS FACILITY AND OPERATIONS SAFETY DATA ACQUISITION AND ANALYSIS SYSTEM DEVELOPMENT AND MANAGEMENT.$118K
Aug 26, 2016General Services AdministrationGSA FAS AAS REGION 5GS05Q16BMP0001541712IGF::CT,CL::IGF RESEARCH AND DEVELOPMENT STRUCTURAL AND AERODYNAMIC TEST SERVICES$494K
Aug 22, 2016National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNG14CR62C541330IGF::OT::IGF ENVIRONMENTAL TESTING AND INTEGRATION SERVICES (ETIS) II THIS STATEMENT OF WORK (SOW) SPECIFIES THE REQUIREMENTS FOR ON SITE CONTRACTOR SUPPLIED ENVIRONMENTAL TEST AND INTEGRATION AND OTHER LABORATORY OPERATIONS SERVICES TO THE GODDARD SPACE FLIGHT CENTER (GSFC). THE SCOPE OF THESE SERVICES INCLUDES THE FOLLOWING: OPERATION, MAINTENANCE, AND UPGRADE OF ENVIRONMENTAL TEST EQUIPMENT AND FACILITIES LOCATED IN THE GSFC BUILDING 7/10/15/29 COMPLEX, AREA 300 MAGNETIC TEST SITE AND OTHER TECHNICAL FACILITIES LOCATED AT VARIOUS LOCATIONS WITHIN GSFC INCLUDING THE MANUFACTURING AND ELECTROPLATING EQUIPMENT AND FACILITIES PRIMARILY LOCATED IN GSFC BUILDING 5/10/21 SHOPS MECHANICAL AND OPTICAL INTEGRATION OF SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, FABRICATE, AND MANUFACTURE CUSTOM SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, MANUFACTURE, AND OPERATION OF GROUND HANDLING EQUIPMENT AND FIXTURES DESIGN, MANUFACTURE, AND OPERATION OF OPTICAL ALIGNMENT AND CALIBRATION SYSTEMS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT THERMAL BLANKETS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT AND GROUND SUPPORT SYSTEM CABLE HARNESSES DESIGN, MANUFACTURE, AND INSTALLATION OF TECHNICAL FACILITIES INCLUDING BUILDINGS, BUILDING ELEMENTS, UTILITY SYSTEMS, AND TECHNICAL EQUIPMENT AND SYSTEMS DEFINE, ANALYZE, AND RESOLVE ELECTROMAGNETIC RADIATION ISSUES RELATING TO FACILITY AND SATELLITE GROUND SUPPORT EQUIPMENT OPERATION WITHIN THE TEST COMPLEX. SUPPORT SPECTRUM SIGNATURE ANALYSIS TO INSURE INTERFERENCE-FREE AND SAFE OPERATION OF ALL FACILITY-LOCATED NEAR ELECTROMAGNETIC WAVE SENSING DEVICES. TEST AND INTEGRATION ENGINEERING AND ENGINEERING ANALYSIS CLEANROOM OPERATION AND MAINTENANCE CONTAMINATION CONTROL SERVICES USING QUALIFIED AND EXPERIENCED PERSONNEL MAINTENANCE AND OPERATION OF CERTAIN PHYSICAL PLANT SYSTEMS SUCH AS PROCESSED WATER, EMERGENCY POWER, LN2/GN2 STORAGE SYSTEMS, CONDITIONED CLEANROOM AIR HVAC AND HUMIDITY SYSTEMS RECERTIFICATION (TESTING AND INSPECTION) OF LIFTING DEVICES AND EQUIPMENT (LDE), AND (INSPECTION) OF PRESSURE VESSELS AND PRESSURIZED SYSTEMS (PVS) AT GSFC, GREENBELT, WALLOPS, AND OTHER OFFSITE LOCATIONS. MAINTENANCE OF LDE AT GREENBELT SITE ONLY, NOT AT OTHER SITES; NON-DESTRUCTIVE EXAMINATION TESTING OF LDE AND PVS FACILITY AND OPERATIONS SAFETY DATA ACQUISITION AND ANALYSIS SYSTEM DEVELOPMENT AND MANAGEMENT.$4.6M
Aug 16, 2016Department of DefenseFA9300 AFTC PZRFA930012C0002541712ARES 3 BASIC CONTRACT$49K
Jul 19, 2016National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNG14CR62C541330IGF::OT::IGF ENVIRONMENTAL TESTING AND INTEGRATION SERVICES (ETIS) II THIS STATEMENT OF WORK (SOW) SPECIFIES THE REQUIREMENTS FOR ON SITE CONTRACTOR SUPPLIED ENVIRONMENTAL TEST AND INTEGRATION AND OTHER LABORATORY OPERATIONS SERVICES TO THE GODDARD SPACE FLIGHT CENTER (GSFC). THE SCOPE OF THESE SERVICES INCLUDES THE FOLLOWING: OPERATION, MAINTENANCE, AND UPGRADE OF ENVIRONMENTAL TEST EQUIPMENT AND FACILITIES LOCATED IN THE GSFC BUILDING 7/10/15/29 COMPLEX, AREA 300 MAGNETIC TEST SITE AND OTHER TECHNICAL FACILITIES LOCATED AT VARIOUS LOCATIONS WITHIN GSFC INCLUDING THE MANUFACTURING AND ELECTROPLATING EQUIPMENT AND FACILITIES PRIMARILY LOCATED IN GSFC BUILDING 5/10/21 SHOPS MECHANICAL AND OPTICAL INTEGRATION OF SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, FABRICATE, AND MANUFACTURE CUSTOM SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, MANUFACTURE, AND OPERATION OF GROUND HANDLING EQUIPMENT AND FIXTURES DESIGN, MANUFACTURE, AND OPERATION OF OPTICAL ALIGNMENT AND CALIBRATION SYSTEMS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT THERMAL BLANKETS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT AND GROUND SUPPORT SYSTEM CABLE HARNESSES DESIGN, MANUFACTURE, AND INSTALLATION OF TECHNICAL FACILITIES INCLUDING BUILDINGS, BUILDING ELEMENTS, UTILITY SYSTEMS, AND TECHNICAL EQUIPMENT AND SYSTEMS DEFINE, ANALYZE, AND RESOLVE ELECTROMAGNETIC RADIATION ISSUES RELATING TO FACILITY AND SATELLITE GROUND SUPPORT EQUIPMENT OPERATION WITHIN THE TEST COMPLEX. SUPPORT SPECTRUM SIGNATURE ANALYSIS TO INSURE INTERFERENCE-FREE AND SAFE OPERATION OF ALL FACILITY-LOCATED NEAR ELECTROMAGNETIC WAVE SENSING DEVICES. TEST AND INTEGRATION ENGINEERING AND ENGINEERING ANALYSIS CLEANROOM OPERATION AND MAINTENANCE CONTAMINATION CONTROL SERVICES USING QUALIFIED AND EXPERIENCED PERSONNEL MAINTENANCE AND OPERATION OF CERTAIN PHYSICAL PLANT SYSTEMS SUCH AS PROCESSED WATER, EMERGENCY POWER, LN2/GN2 STORAGE SYSTEMS, CONDITIONED CLEANROOM AIR HVAC AND HUMIDITY SYSTEMS RECERTIFICATION (TESTING AND INSPECTION) OF LIFTING DEVICES AND EQUIPMENT (LDE), AND (INSPECTION) OF PRESSURE VESSELS AND PRESSURIZED SYSTEMS (PVS) AT GSFC, GREENBELT, WALLOPS, AND OTHER OFFSITE LOCATIONS. MAINTENANCE OF LDE AT GREENBELT SITE ONLY, NOT AT OTHER SITES; NON-DESTRUCTIVE EXAMINATION TESTING OF LDE AND PVS FACILITY AND OPERATIONS SAFETY DATA ACQUISITION AND ANALYSIS SYSTEM DEVELOPMENT AND MANAGEMENT.$4.3M
Jul 8, 2016National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNG14CR62C541330IGF::OT::IGF ENVIRONMENTAL TESTING AND INTEGRATION SERVICES (ETIS) II THIS STATEMENT OF WORK (SOW) SPECIFIES THE REQUIREMENTS FOR ON SITE CONTRACTOR SUPPLIED ENVIRONMENTAL TEST AND INTEGRATION AND OTHER LABORATORY OPERATIONS SERVICES TO THE GODDARD SPACE FLIGHT CENTER (GSFC). THE SCOPE OF THESE SERVICES INCLUDES THE FOLLOWING: OPERATION, MAINTENANCE, AND UPGRADE OF ENVIRONMENTAL TEST EQUIPMENT AND FACILITIES LOCATED IN THE GSFC BUILDING 7/10/15/29 COMPLEX, AREA 300 MAGNETIC TEST SITE AND OTHER TECHNICAL FACILITIES LOCATED AT VARIOUS LOCATIONS WITHIN GSFC INCLUDING THE MANUFACTURING AND ELECTROPLATING EQUIPMENT AND FACILITIES PRIMARILY LOCATED IN GSFC BUILDING 5/10/21 SHOPS MECHANICAL AND OPTICAL INTEGRATION OF SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, FABRICATE, AND MANUFACTURE CUSTOM SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, MANUFACTURE, AND OPERATION OF GROUND HANDLING EQUIPMENT AND FIXTURES DESIGN, MANUFACTURE, AND OPERATION OF OPTICAL ALIGNMENT AND CALIBRATION SYSTEMS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT THERMAL BLANKETS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT AND GROUND SUPPORT SYSTEM CABLE HARNESSES DESIGN, MANUFACTURE, AND INSTALLATION OF TECHNICAL FACILITIES INCLUDING BUILDINGS, BUILDING ELEMENTS, UTILITY SYSTEMS, AND TECHNICAL EQUIPMENT AND SYSTEMS DEFINE, ANALYZE, AND RESOLVE ELECTROMAGNETIC RADIATION ISSUES RELATING TO FACILITY AND SATELLITE GROUND SUPPORT EQUIPMENT OPERATION WITHIN THE TEST COMPLEX. SUPPORT SPECTRUM SIGNATURE ANALYSIS TO INSURE INTERFERENCE-FREE AND SAFE OPERATION OF ALL FACILITY-LOCATED NEAR ELECTROMAGNETIC WAVE SENSING DEVICES. TEST AND INTEGRATION ENGINEERING AND ENGINEERING ANALYSIS CLEANROOM OPERATION AND MAINTENANCE CONTAMINATION CONTROL SERVICES USING QUALIFIED AND EXPERIENCED PERSONNEL MAINTENANCE AND OPERATION OF CERTAIN PHYSICAL PLANT SYSTEMS SUCH AS PROCESSED WATER, EMERGENCY POWER, LN2/GN2 STORAGE SYSTEMS, CONDITIONED CLEANROOM AIR HVAC AND HUMIDITY SYSTEMS RECERTIFICATION (TESTING AND INSPECTION) OF LIFTING DEVICES AND EQUIPMENT (LDE), AND (INSPECTION) OF PRESSURE VESSELS AND PRESSURIZED SYSTEMS (PVS) AT GSFC, GREENBELT, WALLOPS, AND OTHER OFFSITE LOCATIONS. MAINTENANCE OF LDE AT GREENBELT SITE ONLY, NOT AT OTHER SITES; NON-DESTRUCTIVE EXAMINATION TESTING OF LDE AND PVS FACILITY AND OPERATIONS SAFETY DATA ACQUISITION AND ANALYSIS SYSTEM DEVELOPMENT AND MANAGEMENT.$3.5M
Jun 29, 2016Department of DefenseW6QK ACC-APG ADELPHIW911QX16C0004541712IGF::OT::IGF SBIR PHASE III RESEARCH AND DEVELOPMENT IN MAGNET CAPTURE SYSTEM$216K
Jun 27, 2016General Services AdministrationGSA FAS AAS REGION 5GS05Q16BMP0001541712IGF::CT,CL::IGF RESEARCH AND DEVELOPMENT STRUCTURAL AND AERODYNAMIC TEST SERVICES$168K
Jun 14, 2016National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNG14CR62C541330IGF::OT::IGF ENVIRONMENTAL TESTING AND INTEGRATION SERVICES (ETIS) II THIS STATEMENT OF WORK (SOW) SPECIFIES THE REQUIREMENTS FOR ON SITE CONTRACTOR SUPPLIED ENVIRONMENTAL TEST AND INTEGRATION AND OTHER LABORATORY OPERATIONS SERVICES TO THE GODDARD SPACE FLIGHT CENTER (GSFC). THE SCOPE OF THESE SERVICES INCLUDES THE FOLLOWING: OPERATION, MAINTENANCE, AND UPGRADE OF ENVIRONMENTAL TEST EQUIPMENT AND FACILITIES LOCATED IN THE GSFC BUILDING 7/10/15/29 COMPLEX, AREA 300 MAGNETIC TEST SITE AND OTHER TECHNICAL FACILITIES LOCATED AT VARIOUS LOCATIONS WITHIN GSFC INCLUDING THE MANUFACTURING AND ELECTROPLATING EQUIPMENT AND FACILITIES PRIMARILY LOCATED IN GSFC BUILDING 5/10/21 SHOPS MECHANICAL AND OPTICAL INTEGRATION OF SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, FABRICATE, AND MANUFACTURE CUSTOM SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, MANUFACTURE, AND OPERATION OF GROUND HANDLING EQUIPMENT AND FIXTURES DESIGN, MANUFACTURE, AND OPERATION OF OPTICAL ALIGNMENT AND CALIBRATION SYSTEMS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT THERMAL BLANKETS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT AND GROUND SUPPORT SYSTEM CABLE HARNESSES DESIGN, MANUFACTURE, AND INSTALLATION OF TECHNICAL FACILITIES INCLUDING BUILDINGS, BUILDING ELEMENTS, UTILITY SYSTEMS, AND TECHNICAL EQUIPMENT AND SYSTEMS DEFINE, ANALYZE, AND RESOLVE ELECTROMAGNETIC RADIATION ISSUES RELATING TO FACILITY AND SATELLITE GROUND SUPPORT EQUIPMENT OPERATION WITHIN THE TEST COMPLEX. SUPPORT SPECTRUM SIGNATURE ANALYSIS TO INSURE INTERFERENCE-FREE AND SAFE OPERATION OF ALL FACILITY-LOCATED NEAR ELECTROMAGNETIC WAVE SENSING DEVICES. TEST AND INTEGRATION ENGINEERING AND ENGINEERING ANALYSIS CLEANROOM OPERATION AND MAINTENANCE CONTAMINATION CONTROL SERVICES USING QUALIFIED AND EXPERIENCED PERSONNEL MAINTENANCE AND OPERATION OF CERTAIN PHYSICAL PLANT SYSTEMS SUCH AS PROCESSED WATER, EMERGENCY POWER, LN2/GN2 STORAGE SYSTEMS, CONDITIONED CLEANROOM AIR HVAC AND HUMIDITY SYSTEMS RECERTIFICATION (TESTING AND INSPECTION) OF LIFTING DEVICES AND EQUIPMENT (LDE), AND (INSPECTION) OF PRESSURE VESSELS AND PRESSURIZED SYSTEMS (PVS) AT GSFC, GREENBELT, WALLOPS, AND OTHER OFFSITE LOCATIONS. MAINTENANCE OF LDE AT GREENBELT SITE ONLY, NOT AT OTHER SITES; NON-DESTRUCTIVE EXAMINATION TESTING OF LDE AND PVS FACILITY AND OPERATIONS SAFETY DATA ACQUISITION AND ANALYSIS SYSTEM DEVELOPMENT AND MANAGEMENT.$1.1M
Jun 1, 2016Department of DefenseFA9300 AFTC PZRFA930012C0002541712ARES 3 BASIC CONTRACT$2.0M

Get Alerted Before Sierra Lobo INC's Next Recompete

Mindy monitors active contracts and flags recompetes 12 months out so you can position to compete.

Start Free