Federal Contractor Profile
Sierra Lobo INC
$678M obligated·49 awards·3 agencies·8 NAICS
Federal Contracts
Showing contracts 251–300 of 324 total. Sorted by action date, most recent first. Excludes $0 modifications.
| Date | Agency | PIID | NAICS | Description | Amount |
|---|---|---|---|---|---|
| Nov 30, 2017 | Department of DefenseFA9300 AFTC PZR | FA930018F9000 | 541712 | IGF::OT::IGF ROCKET TECHNOLOGY ENGINEERING SUPPORT ADVICE AND ASSISTANCE SERVICE | $386K |
| Nov 30, 2017 | Department of DefenseFA9300 AFTC PZR | FA930012C0002 | 541712 | ARES 3 BASIC CONTRACT | $33K |
| Nov 30, 2017 | Department of DefenseFA9300 AFTC PZR | FA930018F9000 | 541712 | IGF::OT::IGF ROCKET TECHNOLOGY ENGINEERING SUPPORT ADVICE AND ASSISTANCE SERVICE | $5K |
| Oct 11, 2017 | Department of DefenseFA9300 AFTC PZR | FA930012C0002 | 541712 | ARES 3 BASIC CONTRACT | $187K |
| Sep 26, 2017 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | NNG14CR62C | 541330 | IGF::OT::IGF ENVIRONMENTAL TESTING AND INTEGRATION SERVICES (ETIS) II THIS STATEMENT OF WORK (SOW) SPECIFIES THE REQUIREMENTS FOR ON SITE CONTRACTOR SUPPLIED ENVIRONMENTAL TEST AND INTEGRATION AND OTHER LABORATORY OPERATIONS SERVICES TO THE GODDARD SPACE FLIGHT CENTER (GSFC). THE SCOPE OF THESE SERVICES INCLUDES THE FOLLOWING: OPERATION, MAINTENANCE, AND UPGRADE OF ENVIRONMENTAL TEST EQUIPMENT AND FACILITIES LOCATED IN THE GSFC BUILDING 7/10/15/29 COMPLEX, AREA 300 MAGNETIC TEST SITE AND OTHER TECHNICAL FACILITIES LOCATED AT VARIOUS LOCATIONS WITHIN GSFC INCLUDING THE MANUFACTURING AND ELECTROPLATING EQUIPMENT AND FACILITIES PRIMARILY LOCATED IN GSFC BUILDING 5/10/21 SHOPS MECHANICAL AND OPTICAL INTEGRATION OF SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, FABRICATE, AND MANUFACTURE CUSTOM SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, MANUFACTURE, AND OPERATION OF GROUND HANDLING EQUIPMENT AND FIXTURES DESIGN, MANUFACTURE, AND OPERATION OF OPTICAL ALIGNMENT AND CALIBRATION SYSTEMS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT THERMAL BLANKETS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT AND GROUND SUPPORT SYSTEM CABLE HARNESSES DESIGN, MANUFACTURE, AND INSTALLATION OF TECHNICAL FACILITIES INCLUDING BUILDINGS, BUILDING ELEMENTS, UTILITY SYSTEMS, AND TECHNICAL EQUIPMENT AND SYSTEMS DEFINE, ANALYZE, AND RESOLVE ELECTROMAGNETIC RADIATION ISSUES RELATING TO FACILITY AND SATELLITE GROUND SUPPORT EQUIPMENT OPERATION WITHIN THE TEST COMPLEX. SUPPORT SPECTRUM SIGNATURE ANALYSIS TO INSURE INTERFERENCE-FREE AND SAFE OPERATION OF ALL FACILITY-LOCATED NEAR ELECTROMAGNETIC WAVE SENSING DEVICES. TEST AND INTEGRATION ENGINEERING AND ENGINEERING ANALYSIS CLEANROOM OPERATION AND MAINTENANCE CONTAMINATION CONTROL SERVICES USING QUALIFIED AND EXPERIENCED PERSONNEL MAINTENANCE AND OPERATION OF CERTAIN PHYSICAL PLANT SYSTEMS SUCH AS PROCESSED WATER, EMERGENCY POWER, LN2/GN2 STORAGE SYSTEMS, CONDITIONED CLEANROOM AIR HVAC AND HUMIDITY SYSTEMS RECERTIFICATION (TESTING AND INSPECTION) OF LIFTING DEVICES AND EQUIPMENT (LDE), AND (INSPECTION) OF PRESSURE VESSELS AND PRESSURIZED SYSTEMS (PVS) AT GSFC, GREENBELT, WALLOPS, AND OTHER OFFSITE LOCATIONS. MAINTENANCE OF LDE AT GREENBELT SITE ONLY, NOT AT OTHER SITES; NON-DESTRUCTIVE EXAMINATION TESTING OF LDE AND PVS FACILITY AND OPERATIONS SAFETY DATA ACQUISITION AND ANALYSIS SYSTEM DEVELOPMENT AND MANAGEMENT. | $7.7M |
| Sep 20, 2017 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | NNG14CR62C | 541330 | IGF::OT::IGF ENVIRONMENTAL TESTING AND INTEGRATION SERVICES (ETIS) II THIS STATEMENT OF WORK (SOW) SPECIFIES THE REQUIREMENTS FOR ON SITE CONTRACTOR SUPPLIED ENVIRONMENTAL TEST AND INTEGRATION AND OTHER LABORATORY OPERATIONS SERVICES TO THE GODDARD SPACE FLIGHT CENTER (GSFC). THE SCOPE OF THESE SERVICES INCLUDES THE FOLLOWING: OPERATION, MAINTENANCE, AND UPGRADE OF ENVIRONMENTAL TEST EQUIPMENT AND FACILITIES LOCATED IN THE GSFC BUILDING 7/10/15/29 COMPLEX, AREA 300 MAGNETIC TEST SITE AND OTHER TECHNICAL FACILITIES LOCATED AT VARIOUS LOCATIONS WITHIN GSFC INCLUDING THE MANUFACTURING AND ELECTROPLATING EQUIPMENT AND FACILITIES PRIMARILY LOCATED IN GSFC BUILDING 5/10/21 SHOPS MECHANICAL AND OPTICAL INTEGRATION OF SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, FABRICATE, AND MANUFACTURE CUSTOM SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, MANUFACTURE, AND OPERATION OF GROUND HANDLING EQUIPMENT AND FIXTURES DESIGN, MANUFACTURE, AND OPERATION OF OPTICAL ALIGNMENT AND CALIBRATION SYSTEMS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT THERMAL BLANKETS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT AND GROUND SUPPORT SYSTEM CABLE HARNESSES DESIGN, MANUFACTURE, AND INSTALLATION OF TECHNICAL FACILITIES INCLUDING BUILDINGS, BUILDING ELEMENTS, UTILITY SYSTEMS, AND TECHNICAL EQUIPMENT AND SYSTEMS DEFINE, ANALYZE, AND RESOLVE ELECTROMAGNETIC RADIATION ISSUES RELATING TO FACILITY AND SATELLITE GROUND SUPPORT EQUIPMENT OPERATION WITHIN THE TEST COMPLEX. SUPPORT SPECTRUM SIGNATURE ANALYSIS TO INSURE INTERFERENCE-FREE AND SAFE OPERATION OF ALL FACILITY-LOCATED NEAR ELECTROMAGNETIC WAVE SENSING DEVICES. TEST AND INTEGRATION ENGINEERING AND ENGINEERING ANALYSIS CLEANROOM OPERATION AND MAINTENANCE CONTAMINATION CONTROL SERVICES USING QUALIFIED AND EXPERIENCED PERSONNEL MAINTENANCE AND OPERATION OF CERTAIN PHYSICAL PLANT SYSTEMS SUCH AS PROCESSED WATER, EMERGENCY POWER, LN2/GN2 STORAGE SYSTEMS, CONDITIONED CLEANROOM AIR HVAC AND HUMIDITY SYSTEMS RECERTIFICATION (TESTING AND INSPECTION) OF LIFTING DEVICES AND EQUIPMENT (LDE), AND (INSPECTION) OF PRESSURE VESSELS AND PRESSURIZED SYSTEMS (PVS) AT GSFC, GREENBELT, WALLOPS, AND OTHER OFFSITE LOCATIONS. MAINTENANCE OF LDE AT GREENBELT SITE ONLY, NOT AT OTHER SITES; NON-DESTRUCTIVE EXAMINATION TESTING OF LDE AND PVS FACILITY AND OPERATIONS SAFETY DATA ACQUISITION AND ANALYSIS SYSTEM DEVELOPMENT AND MANAGEMENT. | $6.0M |
| Aug 22, 2017 | Department of DefenseFA9300 AFTC PZR | FA930012C0002 | 541712 | ARES 3 BASIC CONTRACT | $632K |
| Aug 21, 2017 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | NNG14CR62C | 541330 | IGF::OT::IGF ENVIRONMENTAL TESTING AND INTEGRATION SERVICES (ETIS) II THIS STATEMENT OF WORK (SOW) SPECIFIES THE REQUIREMENTS FOR ON SITE CONTRACTOR SUPPLIED ENVIRONMENTAL TEST AND INTEGRATION AND OTHER LABORATORY OPERATIONS SERVICES TO THE GODDARD SPACE FLIGHT CENTER (GSFC). THE SCOPE OF THESE SERVICES INCLUDES THE FOLLOWING: OPERATION, MAINTENANCE, AND UPGRADE OF ENVIRONMENTAL TEST EQUIPMENT AND FACILITIES LOCATED IN THE GSFC BUILDING 7/10/15/29 COMPLEX, AREA 300 MAGNETIC TEST SITE AND OTHER TECHNICAL FACILITIES LOCATED AT VARIOUS LOCATIONS WITHIN GSFC INCLUDING THE MANUFACTURING AND ELECTROPLATING EQUIPMENT AND FACILITIES PRIMARILY LOCATED IN GSFC BUILDING 5/10/21 SHOPS MECHANICAL AND OPTICAL INTEGRATION OF SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, FABRICATE, AND MANUFACTURE CUSTOM SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, MANUFACTURE, AND OPERATION OF GROUND HANDLING EQUIPMENT AND FIXTURES DESIGN, MANUFACTURE, AND OPERATION OF OPTICAL ALIGNMENT AND CALIBRATION SYSTEMS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT THERMAL BLANKETS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT AND GROUND SUPPORT SYSTEM CABLE HARNESSES DESIGN, MANUFACTURE, AND INSTALLATION OF TECHNICAL FACILITIES INCLUDING BUILDINGS, BUILDING ELEMENTS, UTILITY SYSTEMS, AND TECHNICAL EQUIPMENT AND SYSTEMS DEFINE, ANALYZE, AND RESOLVE ELECTROMAGNETIC RADIATION ISSUES RELATING TO FACILITY AND SATELLITE GROUND SUPPORT EQUIPMENT OPERATION WITHIN THE TEST COMPLEX. SUPPORT SPECTRUM SIGNATURE ANALYSIS TO INSURE INTERFERENCE-FREE AND SAFE OPERATION OF ALL FACILITY-LOCATED NEAR ELECTROMAGNETIC WAVE SENSING DEVICES. TEST AND INTEGRATION ENGINEERING AND ENGINEERING ANALYSIS CLEANROOM OPERATION AND MAINTENANCE CONTAMINATION CONTROL SERVICES USING QUALIFIED AND EXPERIENCED PERSONNEL MAINTENANCE AND OPERATION OF CERTAIN PHYSICAL PLANT SYSTEMS SUCH AS PROCESSED WATER, EMERGENCY POWER, LN2/GN2 STORAGE SYSTEMS, CONDITIONED CLEANROOM AIR HVAC AND HUMIDITY SYSTEMS RECERTIFICATION (TESTING AND INSPECTION) OF LIFTING DEVICES AND EQUIPMENT (LDE), AND (INSPECTION) OF PRESSURE VESSELS AND PRESSURIZED SYSTEMS (PVS) AT GSFC, GREENBELT, WALLOPS, AND OTHER OFFSITE LOCATIONS. MAINTENANCE OF LDE AT GREENBELT SITE ONLY, NOT AT OTHER SITES; NON-DESTRUCTIVE EXAMINATION TESTING OF LDE AND PVS FACILITY AND OPERATIONS SAFETY DATA ACQUISITION AND ANALYSIS SYSTEM DEVELOPMENT AND MANAGEMENT. | $4.5M |
| Aug 7, 2017 | Department of DefenseFA9300 AFTC PZR | FA930012C0002 | 541712 | ARES 3 BASIC CONTRACT | $50K |
| Jul 14, 2017 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | NNG14CR62C | 541330 | IGF::OT::IGF ENVIRONMENTAL TESTING AND INTEGRATION SERVICES (ETIS) II THIS STATEMENT OF WORK (SOW) SPECIFIES THE REQUIREMENTS FOR ON SITE CONTRACTOR SUPPLIED ENVIRONMENTAL TEST AND INTEGRATION AND OTHER LABORATORY OPERATIONS SERVICES TO THE GODDARD SPACE FLIGHT CENTER (GSFC). THE SCOPE OF THESE SERVICES INCLUDES THE FOLLOWING: OPERATION, MAINTENANCE, AND UPGRADE OF ENVIRONMENTAL TEST EQUIPMENT AND FACILITIES LOCATED IN THE GSFC BUILDING 7/10/15/29 COMPLEX, AREA 300 MAGNETIC TEST SITE AND OTHER TECHNICAL FACILITIES LOCATED AT VARIOUS LOCATIONS WITHIN GSFC INCLUDING THE MANUFACTURING AND ELECTROPLATING EQUIPMENT AND FACILITIES PRIMARILY LOCATED IN GSFC BUILDING 5/10/21 SHOPS MECHANICAL AND OPTICAL INTEGRATION OF SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, FABRICATE, AND MANUFACTURE CUSTOM SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, MANUFACTURE, AND OPERATION OF GROUND HANDLING EQUIPMENT AND FIXTURES DESIGN, MANUFACTURE, AND OPERATION OF OPTICAL ALIGNMENT AND CALIBRATION SYSTEMS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT THERMAL BLANKETS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT AND GROUND SUPPORT SYSTEM CABLE HARNESSES DESIGN, MANUFACTURE, AND INSTALLATION OF TECHNICAL FACILITIES INCLUDING BUILDINGS, BUILDING ELEMENTS, UTILITY SYSTEMS, AND TECHNICAL EQUIPMENT AND SYSTEMS DEFINE, ANALYZE, AND RESOLVE ELECTROMAGNETIC RADIATION ISSUES RELATING TO FACILITY AND SATELLITE GROUND SUPPORT EQUIPMENT OPERATION WITHIN THE TEST COMPLEX. SUPPORT SPECTRUM SIGNATURE ANALYSIS TO INSURE INTERFERENCE-FREE AND SAFE OPERATION OF ALL FACILITY-LOCATED NEAR ELECTROMAGNETIC WAVE SENSING DEVICES. TEST AND INTEGRATION ENGINEERING AND ENGINEERING ANALYSIS CLEANROOM OPERATION AND MAINTENANCE CONTAMINATION CONTROL SERVICES USING QUALIFIED AND EXPERIENCED PERSONNEL MAINTENANCE AND OPERATION OF CERTAIN PHYSICAL PLANT SYSTEMS SUCH AS PROCESSED WATER, EMERGENCY POWER, LN2/GN2 STORAGE SYSTEMS, CONDITIONED CLEANROOM AIR HVAC AND HUMIDITY SYSTEMS RECERTIFICATION (TESTING AND INSPECTION) OF LIFTING DEVICES AND EQUIPMENT (LDE), AND (INSPECTION) OF PRESSURE VESSELS AND PRESSURIZED SYSTEMS (PVS) AT GSFC, GREENBELT, WALLOPS, AND OTHER OFFSITE LOCATIONS. MAINTENANCE OF LDE AT GREENBELT SITE ONLY, NOT AT OTHER SITES; NON-DESTRUCTIVE EXAMINATION TESTING OF LDE AND PVS FACILITY AND OPERATIONS SAFETY DATA ACQUISITION AND ANALYSIS SYSTEM DEVELOPMENT AND MANAGEMENT. | $3.5M |
| Jul 3, 2017 | Department of DefenseFA9300 AFTC PZR | FA930012C0002 | 541712 | ARES 3 BASIC CONTRACT | $394K |
| Jun 21, 2017 | Department of DefenseFA9300 AFTC PZR | FA930012C0002 | 541712 | ARES 3 BASIC CONTRACT | $141K |
| Jun 20, 2017 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | NNG14CR62C | 541330 | IGF::OT::IGF ENVIRONMENTAL TESTING AND INTEGRATION SERVICES (ETIS) II THIS STATEMENT OF WORK (SOW) SPECIFIES THE REQUIREMENTS FOR ON SITE CONTRACTOR SUPPLIED ENVIRONMENTAL TEST AND INTEGRATION AND OTHER LABORATORY OPERATIONS SERVICES TO THE GODDARD SPACE FLIGHT CENTER (GSFC). THE SCOPE OF THESE SERVICES INCLUDES THE FOLLOWING: OPERATION, MAINTENANCE, AND UPGRADE OF ENVIRONMENTAL TEST EQUIPMENT AND FACILITIES LOCATED IN THE GSFC BUILDING 7/10/15/29 COMPLEX, AREA 300 MAGNETIC TEST SITE AND OTHER TECHNICAL FACILITIES LOCATED AT VARIOUS LOCATIONS WITHIN GSFC INCLUDING THE MANUFACTURING AND ELECTROPLATING EQUIPMENT AND FACILITIES PRIMARILY LOCATED IN GSFC BUILDING 5/10/21 SHOPS MECHANICAL AND OPTICAL INTEGRATION OF SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, FABRICATE, AND MANUFACTURE CUSTOM SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, MANUFACTURE, AND OPERATION OF GROUND HANDLING EQUIPMENT AND FIXTURES DESIGN, MANUFACTURE, AND OPERATION OF OPTICAL ALIGNMENT AND CALIBRATION SYSTEMS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT THERMAL BLANKETS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT AND GROUND SUPPORT SYSTEM CABLE HARNESSES DESIGN, MANUFACTURE, AND INSTALLATION OF TECHNICAL FACILITIES INCLUDING BUILDINGS, BUILDING ELEMENTS, UTILITY SYSTEMS, AND TECHNICAL EQUIPMENT AND SYSTEMS DEFINE, ANALYZE, AND RESOLVE ELECTROMAGNETIC RADIATION ISSUES RELATING TO FACILITY AND SATELLITE GROUND SUPPORT EQUIPMENT OPERATION WITHIN THE TEST COMPLEX. SUPPORT SPECTRUM SIGNATURE ANALYSIS TO INSURE INTERFERENCE-FREE AND SAFE OPERATION OF ALL FACILITY-LOCATED NEAR ELECTROMAGNETIC WAVE SENSING DEVICES. TEST AND INTEGRATION ENGINEERING AND ENGINEERING ANALYSIS CLEANROOM OPERATION AND MAINTENANCE CONTAMINATION CONTROL SERVICES USING QUALIFIED AND EXPERIENCED PERSONNEL MAINTENANCE AND OPERATION OF CERTAIN PHYSICAL PLANT SYSTEMS SUCH AS PROCESSED WATER, EMERGENCY POWER, LN2/GN2 STORAGE SYSTEMS, CONDITIONED CLEANROOM AIR HVAC AND HUMIDITY SYSTEMS RECERTIFICATION (TESTING AND INSPECTION) OF LIFTING DEVICES AND EQUIPMENT (LDE), AND (INSPECTION) OF PRESSURE VESSELS AND PRESSURIZED SYSTEMS (PVS) AT GSFC, GREENBELT, WALLOPS, AND OTHER OFFSITE LOCATIONS. MAINTENANCE OF LDE AT GREENBELT SITE ONLY, NOT AT OTHER SITES; NON-DESTRUCTIVE EXAMINATION TESTING OF LDE AND PVS FACILITY AND OPERATIONS SAFETY DATA ACQUISITION AND ANALYSIS SYSTEM DEVELOPMENT AND MANAGEMENT. | $6.5M |
| May 31, 2017 | Department of DefenseFA9300 AFTC PZR | FA930012C0002 | 541712 | ARES 3 BASIC CONTRACT | $28K |
| May 17, 2017 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | NNG14CR62C | 541330 | IGF::OT::IGF ENVIRONMENTAL TESTING AND INTEGRATION SERVICES (ETIS) II THIS STATEMENT OF WORK (SOW) SPECIFIES THE REQUIREMENTS FOR ON SITE CONTRACTOR SUPPLIED ENVIRONMENTAL TEST AND INTEGRATION AND OTHER LABORATORY OPERATIONS SERVICES TO THE GODDARD SPACE FLIGHT CENTER (GSFC). THE SCOPE OF THESE SERVICES INCLUDES THE FOLLOWING: OPERATION, MAINTENANCE, AND UPGRADE OF ENVIRONMENTAL TEST EQUIPMENT AND FACILITIES LOCATED IN THE GSFC BUILDING 7/10/15/29 COMPLEX, AREA 300 MAGNETIC TEST SITE AND OTHER TECHNICAL FACILITIES LOCATED AT VARIOUS LOCATIONS WITHIN GSFC INCLUDING THE MANUFACTURING AND ELECTROPLATING EQUIPMENT AND FACILITIES PRIMARILY LOCATED IN GSFC BUILDING 5/10/21 SHOPS MECHANICAL AND OPTICAL INTEGRATION OF SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, FABRICATE, AND MANUFACTURE CUSTOM SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, MANUFACTURE, AND OPERATION OF GROUND HANDLING EQUIPMENT AND FIXTURES DESIGN, MANUFACTURE, AND OPERATION OF OPTICAL ALIGNMENT AND CALIBRATION SYSTEMS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT THERMAL BLANKETS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT AND GROUND SUPPORT SYSTEM CABLE HARNESSES DESIGN, MANUFACTURE, AND INSTALLATION OF TECHNICAL FACILITIES INCLUDING BUILDINGS, BUILDING ELEMENTS, UTILITY SYSTEMS, AND TECHNICAL EQUIPMENT AND SYSTEMS DEFINE, ANALYZE, AND RESOLVE ELECTROMAGNETIC RADIATION ISSUES RELATING TO FACILITY AND SATELLITE GROUND SUPPORT EQUIPMENT OPERATION WITHIN THE TEST COMPLEX. SUPPORT SPECTRUM SIGNATURE ANALYSIS TO INSURE INTERFERENCE-FREE AND SAFE OPERATION OF ALL FACILITY-LOCATED NEAR ELECTROMAGNETIC WAVE SENSING DEVICES. TEST AND INTEGRATION ENGINEERING AND ENGINEERING ANALYSIS CLEANROOM OPERATION AND MAINTENANCE CONTAMINATION CONTROL SERVICES USING QUALIFIED AND EXPERIENCED PERSONNEL MAINTENANCE AND OPERATION OF CERTAIN PHYSICAL PLANT SYSTEMS SUCH AS PROCESSED WATER, EMERGENCY POWER, LN2/GN2 STORAGE SYSTEMS, CONDITIONED CLEANROOM AIR HVAC AND HUMIDITY SYSTEMS RECERTIFICATION (TESTING AND INSPECTION) OF LIFTING DEVICES AND EQUIPMENT (LDE), AND (INSPECTION) OF PRESSURE VESSELS AND PRESSURIZED SYSTEMS (PVS) AT GSFC, GREENBELT, WALLOPS, AND OTHER OFFSITE LOCATIONS. MAINTENANCE OF LDE AT GREENBELT SITE ONLY, NOT AT OTHER SITES; NON-DESTRUCTIVE EXAMINATION TESTING OF LDE AND PVS FACILITY AND OPERATIONS SAFETY DATA ACQUISITION AND ANALYSIS SYSTEM DEVELOPMENT AND MANAGEMENT. | $4.5M |
| May 10, 2017 | General Services AdministrationGSA FAS AAS REGION 5 | GS05Q16BMP0001 | 541712 | IGF::CT,CL::IGF RESEARCH AND DEVELOPMENT STRUCTURAL AND AERODYNAMIC TEST SERVICES | $52K |
| May 2, 2017 | Department of DefenseFA9300 AFTC PZR | FA930012C0002 | 541712 | ARES 3 BASIC CONTRACT | $176K |
| Apr 19, 2017 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | NNG14CR62C | 541330 | IGF::OT::IGF ENVIRONMENTAL TESTING AND INTEGRATION SERVICES (ETIS) II THIS STATEMENT OF WORK (SOW) SPECIFIES THE REQUIREMENTS FOR ON SITE CONTRACTOR SUPPLIED ENVIRONMENTAL TEST AND INTEGRATION AND OTHER LABORATORY OPERATIONS SERVICES TO THE GODDARD SPACE FLIGHT CENTER (GSFC). THE SCOPE OF THESE SERVICES INCLUDES THE FOLLOWING: OPERATION, MAINTENANCE, AND UPGRADE OF ENVIRONMENTAL TEST EQUIPMENT AND FACILITIES LOCATED IN THE GSFC BUILDING 7/10/15/29 COMPLEX, AREA 300 MAGNETIC TEST SITE AND OTHER TECHNICAL FACILITIES LOCATED AT VARIOUS LOCATIONS WITHIN GSFC INCLUDING THE MANUFACTURING AND ELECTROPLATING EQUIPMENT AND FACILITIES PRIMARILY LOCATED IN GSFC BUILDING 5/10/21 SHOPS MECHANICAL AND OPTICAL INTEGRATION OF SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, FABRICATE, AND MANUFACTURE CUSTOM SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, MANUFACTURE, AND OPERATION OF GROUND HANDLING EQUIPMENT AND FIXTURES DESIGN, MANUFACTURE, AND OPERATION OF OPTICAL ALIGNMENT AND CALIBRATION SYSTEMS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT THERMAL BLANKETS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT AND GROUND SUPPORT SYSTEM CABLE HARNESSES DESIGN, MANUFACTURE, AND INSTALLATION OF TECHNICAL FACILITIES INCLUDING BUILDINGS, BUILDING ELEMENTS, UTILITY SYSTEMS, AND TECHNICAL EQUIPMENT AND SYSTEMS DEFINE, ANALYZE, AND RESOLVE ELECTROMAGNETIC RADIATION ISSUES RELATING TO FACILITY AND SATELLITE GROUND SUPPORT EQUIPMENT OPERATION WITHIN THE TEST COMPLEX. SUPPORT SPECTRUM SIGNATURE ANALYSIS TO INSURE INTERFERENCE-FREE AND SAFE OPERATION OF ALL FACILITY-LOCATED NEAR ELECTROMAGNETIC WAVE SENSING DEVICES. TEST AND INTEGRATION ENGINEERING AND ENGINEERING ANALYSIS CLEANROOM OPERATION AND MAINTENANCE CONTAMINATION CONTROL SERVICES USING QUALIFIED AND EXPERIENCED PERSONNEL MAINTENANCE AND OPERATION OF CERTAIN PHYSICAL PLANT SYSTEMS SUCH AS PROCESSED WATER, EMERGENCY POWER, LN2/GN2 STORAGE SYSTEMS, CONDITIONED CLEANROOM AIR HVAC AND HUMIDITY SYSTEMS RECERTIFICATION (TESTING AND INSPECTION) OF LIFTING DEVICES AND EQUIPMENT (LDE), AND (INSPECTION) OF PRESSURE VESSELS AND PRESSURIZED SYSTEMS (PVS) AT GSFC, GREENBELT, WALLOPS, AND OTHER OFFSITE LOCATIONS. MAINTENANCE OF LDE AT GREENBELT SITE ONLY, NOT AT OTHER SITES; NON-DESTRUCTIVE EXAMINATION TESTING OF LDE AND PVS FACILITY AND OPERATIONS SAFETY DATA ACQUISITION AND ANALYSIS SYSTEM DEVELOPMENT AND MANAGEMENT. | $5.0M |
| Apr 7, 2017 | Department of DefenseFA9300 AFTC PZR | FA930012C0002 | 541712 | ARES 3 BASIC CONTRACT | $155K |
| Mar 9, 2017 | Department of DefenseFA9300 AFTC PZR | FA930012C0002 | 541712 | ARES 3 BASIC CONTRACT | $153K |
| Mar 7, 2017 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | NNG14CR62C | 541330 | IGF::OT::IGF ENVIRONMENTAL TESTING AND INTEGRATION SERVICES (ETIS) II THIS STATEMENT OF WORK (SOW) SPECIFIES THE REQUIREMENTS FOR ON SITE CONTRACTOR SUPPLIED ENVIRONMENTAL TEST AND INTEGRATION AND OTHER LABORATORY OPERATIONS SERVICES TO THE GODDARD SPACE FLIGHT CENTER (GSFC). THE SCOPE OF THESE SERVICES INCLUDES THE FOLLOWING: OPERATION, MAINTENANCE, AND UPGRADE OF ENVIRONMENTAL TEST EQUIPMENT AND FACILITIES LOCATED IN THE GSFC BUILDING 7/10/15/29 COMPLEX, AREA 300 MAGNETIC TEST SITE AND OTHER TECHNICAL FACILITIES LOCATED AT VARIOUS LOCATIONS WITHIN GSFC INCLUDING THE MANUFACTURING AND ELECTROPLATING EQUIPMENT AND FACILITIES PRIMARILY LOCATED IN GSFC BUILDING 5/10/21 SHOPS MECHANICAL AND OPTICAL INTEGRATION OF SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, FABRICATE, AND MANUFACTURE CUSTOM SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, MANUFACTURE, AND OPERATION OF GROUND HANDLING EQUIPMENT AND FIXTURES DESIGN, MANUFACTURE, AND OPERATION OF OPTICAL ALIGNMENT AND CALIBRATION SYSTEMS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT THERMAL BLANKETS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT AND GROUND SUPPORT SYSTEM CABLE HARNESSES DESIGN, MANUFACTURE, AND INSTALLATION OF TECHNICAL FACILITIES INCLUDING BUILDINGS, BUILDING ELEMENTS, UTILITY SYSTEMS, AND TECHNICAL EQUIPMENT AND SYSTEMS DEFINE, ANALYZE, AND RESOLVE ELECTROMAGNETIC RADIATION ISSUES RELATING TO FACILITY AND SATELLITE GROUND SUPPORT EQUIPMENT OPERATION WITHIN THE TEST COMPLEX. SUPPORT SPECTRUM SIGNATURE ANALYSIS TO INSURE INTERFERENCE-FREE AND SAFE OPERATION OF ALL FACILITY-LOCATED NEAR ELECTROMAGNETIC WAVE SENSING DEVICES. TEST AND INTEGRATION ENGINEERING AND ENGINEERING ANALYSIS CLEANROOM OPERATION AND MAINTENANCE CONTAMINATION CONTROL SERVICES USING QUALIFIED AND EXPERIENCED PERSONNEL MAINTENANCE AND OPERATION OF CERTAIN PHYSICAL PLANT SYSTEMS SUCH AS PROCESSED WATER, EMERGENCY POWER, LN2/GN2 STORAGE SYSTEMS, CONDITIONED CLEANROOM AIR HVAC AND HUMIDITY SYSTEMS RECERTIFICATION (TESTING AND INSPECTION) OF LIFTING DEVICES AND EQUIPMENT (LDE), AND (INSPECTION) OF PRESSURE VESSELS AND PRESSURIZED SYSTEMS (PVS) AT GSFC, GREENBELT, WALLOPS, AND OTHER OFFSITE LOCATIONS. MAINTENANCE OF LDE AT GREENBELT SITE ONLY, NOT AT OTHER SITES; NON-DESTRUCTIVE EXAMINATION TESTING OF LDE AND PVS FACILITY AND OPERATIONS SAFETY DATA ACQUISITION AND ANALYSIS SYSTEM DEVELOPMENT AND MANAGEMENT. | $1.0M |
| Feb 16, 2017 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | NNG14CR62C | 541330 | IGF::OT::IGF ENVIRONMENTAL TESTING AND INTEGRATION SERVICES (ETIS) II THIS STATEMENT OF WORK (SOW) SPECIFIES THE REQUIREMENTS FOR ON SITE CONTRACTOR SUPPLIED ENVIRONMENTAL TEST AND INTEGRATION AND OTHER LABORATORY OPERATIONS SERVICES TO THE GODDARD SPACE FLIGHT CENTER (GSFC). THE SCOPE OF THESE SERVICES INCLUDES THE FOLLOWING: OPERATION, MAINTENANCE, AND UPGRADE OF ENVIRONMENTAL TEST EQUIPMENT AND FACILITIES LOCATED IN THE GSFC BUILDING 7/10/15/29 COMPLEX, AREA 300 MAGNETIC TEST SITE AND OTHER TECHNICAL FACILITIES LOCATED AT VARIOUS LOCATIONS WITHIN GSFC INCLUDING THE MANUFACTURING AND ELECTROPLATING EQUIPMENT AND FACILITIES PRIMARILY LOCATED IN GSFC BUILDING 5/10/21 SHOPS MECHANICAL AND OPTICAL INTEGRATION OF SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, FABRICATE, AND MANUFACTURE CUSTOM SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, MANUFACTURE, AND OPERATION OF GROUND HANDLING EQUIPMENT AND FIXTURES DESIGN, MANUFACTURE, AND OPERATION OF OPTICAL ALIGNMENT AND CALIBRATION SYSTEMS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT THERMAL BLANKETS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT AND GROUND SUPPORT SYSTEM CABLE HARNESSES DESIGN, MANUFACTURE, AND INSTALLATION OF TECHNICAL FACILITIES INCLUDING BUILDINGS, BUILDING ELEMENTS, UTILITY SYSTEMS, AND TECHNICAL EQUIPMENT AND SYSTEMS DEFINE, ANALYZE, AND RESOLVE ELECTROMAGNETIC RADIATION ISSUES RELATING TO FACILITY AND SATELLITE GROUND SUPPORT EQUIPMENT OPERATION WITHIN THE TEST COMPLEX. SUPPORT SPECTRUM SIGNATURE ANALYSIS TO INSURE INTERFERENCE-FREE AND SAFE OPERATION OF ALL FACILITY-LOCATED NEAR ELECTROMAGNETIC WAVE SENSING DEVICES. TEST AND INTEGRATION ENGINEERING AND ENGINEERING ANALYSIS CLEANROOM OPERATION AND MAINTENANCE CONTAMINATION CONTROL SERVICES USING QUALIFIED AND EXPERIENCED PERSONNEL MAINTENANCE AND OPERATION OF CERTAIN PHYSICAL PLANT SYSTEMS SUCH AS PROCESSED WATER, EMERGENCY POWER, LN2/GN2 STORAGE SYSTEMS, CONDITIONED CLEANROOM AIR HVAC AND HUMIDITY SYSTEMS RECERTIFICATION (TESTING AND INSPECTION) OF LIFTING DEVICES AND EQUIPMENT (LDE), AND (INSPECTION) OF PRESSURE VESSELS AND PRESSURIZED SYSTEMS (PVS) AT GSFC, GREENBELT, WALLOPS, AND OTHER OFFSITE LOCATIONS. MAINTENANCE OF LDE AT GREENBELT SITE ONLY, NOT AT OTHER SITES; NON-DESTRUCTIVE EXAMINATION TESTING OF LDE AND PVS FACILITY AND OPERATIONS SAFETY DATA ACQUISITION AND ANALYSIS SYSTEM DEVELOPMENT AND MANAGEMENT. | $1.0M |
| Feb 7, 2017 | General Services AdministrationGSA FAS AAS REGION 5 | GS05Q16BMP0001 | 541712 | IGF::CT,CL::IGF RESEARCH AND DEVELOPMENT STRUCTURAL AND AERODYNAMIC TEST SERVICES | $651K |
| Jan 30, 2017 | Department of DefenseFA9300 AFTC PZR | FA930012C0002 | 541712 | ARES 3 BASIC CONTRACT | $50K |
| Jan 19, 2017 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | NNG14CR62C | 541330 | IGF::OT::IGF ENVIRONMENTAL TESTING AND INTEGRATION SERVICES (ETIS) II THIS STATEMENT OF WORK (SOW) SPECIFIES THE REQUIREMENTS FOR ON SITE CONTRACTOR SUPPLIED ENVIRONMENTAL TEST AND INTEGRATION AND OTHER LABORATORY OPERATIONS SERVICES TO THE GODDARD SPACE FLIGHT CENTER (GSFC). THE SCOPE OF THESE SERVICES INCLUDES THE FOLLOWING: OPERATION, MAINTENANCE, AND UPGRADE OF ENVIRONMENTAL TEST EQUIPMENT AND FACILITIES LOCATED IN THE GSFC BUILDING 7/10/15/29 COMPLEX, AREA 300 MAGNETIC TEST SITE AND OTHER TECHNICAL FACILITIES LOCATED AT VARIOUS LOCATIONS WITHIN GSFC INCLUDING THE MANUFACTURING AND ELECTROPLATING EQUIPMENT AND FACILITIES PRIMARILY LOCATED IN GSFC BUILDING 5/10/21 SHOPS MECHANICAL AND OPTICAL INTEGRATION OF SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, FABRICATE, AND MANUFACTURE CUSTOM SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, MANUFACTURE, AND OPERATION OF GROUND HANDLING EQUIPMENT AND FIXTURES DESIGN, MANUFACTURE, AND OPERATION OF OPTICAL ALIGNMENT AND CALIBRATION SYSTEMS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT THERMAL BLANKETS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT AND GROUND SUPPORT SYSTEM CABLE HARNESSES DESIGN, MANUFACTURE, AND INSTALLATION OF TECHNICAL FACILITIES INCLUDING BUILDINGS, BUILDING ELEMENTS, UTILITY SYSTEMS, AND TECHNICAL EQUIPMENT AND SYSTEMS DEFINE, ANALYZE, AND RESOLVE ELECTROMAGNETIC RADIATION ISSUES RELATING TO FACILITY AND SATELLITE GROUND SUPPORT EQUIPMENT OPERATION WITHIN THE TEST COMPLEX. SUPPORT SPECTRUM SIGNATURE ANALYSIS TO INSURE INTERFERENCE-FREE AND SAFE OPERATION OF ALL FACILITY-LOCATED NEAR ELECTROMAGNETIC WAVE SENSING DEVICES. TEST AND INTEGRATION ENGINEERING AND ENGINEERING ANALYSIS CLEANROOM OPERATION AND MAINTENANCE CONTAMINATION CONTROL SERVICES USING QUALIFIED AND EXPERIENCED PERSONNEL MAINTENANCE AND OPERATION OF CERTAIN PHYSICAL PLANT SYSTEMS SUCH AS PROCESSED WATER, EMERGENCY POWER, LN2/GN2 STORAGE SYSTEMS, CONDITIONED CLEANROOM AIR HVAC AND HUMIDITY SYSTEMS RECERTIFICATION (TESTING AND INSPECTION) OF LIFTING DEVICES AND EQUIPMENT (LDE), AND (INSPECTION) OF PRESSURE VESSELS AND PRESSURIZED SYSTEMS (PVS) AT GSFC, GREENBELT, WALLOPS, AND OTHER OFFSITE LOCATIONS. MAINTENANCE OF LDE AT GREENBELT SITE ONLY, NOT AT OTHER SITES; NON-DESTRUCTIVE EXAMINATION TESTING OF LDE AND PVS FACILITY AND OPERATIONS SAFETY DATA ACQUISITION AND ANALYSIS SYSTEM DEVELOPMENT AND MANAGEMENT. | $7.0M |
| Jan 13, 2017 | General Services AdministrationGSA FAS AAS REGION 5 | GS05Q16BMP0001 | 541712 | IGF::CT,CL::IGF RESEARCH AND DEVELOPMENT STRUCTURAL AND AERODYNAMIC TEST SERVICES | $1.7M |
| Jan 10, 2017 | Department of DefenseFA9300 AFTC PZR | FA930012C0002 | 541712 | ARES 3 BASIC CONTRACT | $190K |
| Dec 16, 2016 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | NNG14CR62C | 541330 | IGF::OT::IGF ENVIRONMENTAL TESTING AND INTEGRATION SERVICES (ETIS) II THIS STATEMENT OF WORK (SOW) SPECIFIES THE REQUIREMENTS FOR ON SITE CONTRACTOR SUPPLIED ENVIRONMENTAL TEST AND INTEGRATION AND OTHER LABORATORY OPERATIONS SERVICES TO THE GODDARD SPACE FLIGHT CENTER (GSFC). THE SCOPE OF THESE SERVICES INCLUDES THE FOLLOWING: OPERATION, MAINTENANCE, AND UPGRADE OF ENVIRONMENTAL TEST EQUIPMENT AND FACILITIES LOCATED IN THE GSFC BUILDING 7/10/15/29 COMPLEX, AREA 300 MAGNETIC TEST SITE AND OTHER TECHNICAL FACILITIES LOCATED AT VARIOUS LOCATIONS WITHIN GSFC INCLUDING THE MANUFACTURING AND ELECTROPLATING EQUIPMENT AND FACILITIES PRIMARILY LOCATED IN GSFC BUILDING 5/10/21 SHOPS MECHANICAL AND OPTICAL INTEGRATION OF SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, FABRICATE, AND MANUFACTURE CUSTOM SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, MANUFACTURE, AND OPERATION OF GROUND HANDLING EQUIPMENT AND FIXTURES DESIGN, MANUFACTURE, AND OPERATION OF OPTICAL ALIGNMENT AND CALIBRATION SYSTEMS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT THERMAL BLANKETS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT AND GROUND SUPPORT SYSTEM CABLE HARNESSES DESIGN, MANUFACTURE, AND INSTALLATION OF TECHNICAL FACILITIES INCLUDING BUILDINGS, BUILDING ELEMENTS, UTILITY SYSTEMS, AND TECHNICAL EQUIPMENT AND SYSTEMS DEFINE, ANALYZE, AND RESOLVE ELECTROMAGNETIC RADIATION ISSUES RELATING TO FACILITY AND SATELLITE GROUND SUPPORT EQUIPMENT OPERATION WITHIN THE TEST COMPLEX. SUPPORT SPECTRUM SIGNATURE ANALYSIS TO INSURE INTERFERENCE-FREE AND SAFE OPERATION OF ALL FACILITY-LOCATED NEAR ELECTROMAGNETIC WAVE SENSING DEVICES. TEST AND INTEGRATION ENGINEERING AND ENGINEERING ANALYSIS CLEANROOM OPERATION AND MAINTENANCE CONTAMINATION CONTROL SERVICES USING QUALIFIED AND EXPERIENCED PERSONNEL MAINTENANCE AND OPERATION OF CERTAIN PHYSICAL PLANT SYSTEMS SUCH AS PROCESSED WATER, EMERGENCY POWER, LN2/GN2 STORAGE SYSTEMS, CONDITIONED CLEANROOM AIR HVAC AND HUMIDITY SYSTEMS RECERTIFICATION (TESTING AND INSPECTION) OF LIFTING DEVICES AND EQUIPMENT (LDE), AND (INSPECTION) OF PRESSURE VESSELS AND PRESSURIZED SYSTEMS (PVS) AT GSFC, GREENBELT, WALLOPS, AND OTHER OFFSITE LOCATIONS. MAINTENANCE OF LDE AT GREENBELT SITE ONLY, NOT AT OTHER SITES; NON-DESTRUCTIVE EXAMINATION TESTING OF LDE AND PVS FACILITY AND OPERATIONS SAFETY DATA ACQUISITION AND ANALYSIS SYSTEM DEVELOPMENT AND MANAGEMENT. | $1.5M |
| Dec 16, 2016 | Department of DefenseFA9300 AFTC PZR | FA930012C0002 | 541712 | ARES 3 BASIC CONTRACT | $257K |
| Nov 30, 2016 | Department of DefenseW6QK ACC-APG | 0005 | 541710 | ORDER PERIOD 5 | $105K |
| Nov 16, 2016 | General Services AdministrationGSA FAS AAS REGION 5 | GS05Q16BMP0001 | 541712 | IGF::CT,CL::IGF RESEARCH AND DEVELOPMENT STRUCTURAL AND AERODYNAMIC TEST SERVICES | $48K |
| Nov 4, 2016 | General Services AdministrationGSA FAS AAS REGION 5 | GS05Q16BMP0001 | 541712 | IGF::CT,CL::IGF RESEARCH AND DEVELOPMENT STRUCTURAL AND AERODYNAMIC TEST SERVICES | $890K |
| Oct 31, 2016 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | NNG14CR62C | 541330 | IGF::OT::IGF ENVIRONMENTAL TESTING AND INTEGRATION SERVICES (ETIS) II THIS STATEMENT OF WORK (SOW) SPECIFIES THE REQUIREMENTS FOR ON SITE CONTRACTOR SUPPLIED ENVIRONMENTAL TEST AND INTEGRATION AND OTHER LABORATORY OPERATIONS SERVICES TO THE GODDARD SPACE FLIGHT CENTER (GSFC). THE SCOPE OF THESE SERVICES INCLUDES THE FOLLOWING: OPERATION, MAINTENANCE, AND UPGRADE OF ENVIRONMENTAL TEST EQUIPMENT AND FACILITIES LOCATED IN THE GSFC BUILDING 7/10/15/29 COMPLEX, AREA 300 MAGNETIC TEST SITE AND OTHER TECHNICAL FACILITIES LOCATED AT VARIOUS LOCATIONS WITHIN GSFC INCLUDING THE MANUFACTURING AND ELECTROPLATING EQUIPMENT AND FACILITIES PRIMARILY LOCATED IN GSFC BUILDING 5/10/21 SHOPS MECHANICAL AND OPTICAL INTEGRATION OF SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, FABRICATE, AND MANUFACTURE CUSTOM SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, MANUFACTURE, AND OPERATION OF GROUND HANDLING EQUIPMENT AND FIXTURES DESIGN, MANUFACTURE, AND OPERATION OF OPTICAL ALIGNMENT AND CALIBRATION SYSTEMS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT THERMAL BLANKETS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT AND GROUND SUPPORT SYSTEM CABLE HARNESSES DESIGN, MANUFACTURE, AND INSTALLATION OF TECHNICAL FACILITIES INCLUDING BUILDINGS, BUILDING ELEMENTS, UTILITY SYSTEMS, AND TECHNICAL EQUIPMENT AND SYSTEMS DEFINE, ANALYZE, AND RESOLVE ELECTROMAGNETIC RADIATION ISSUES RELATING TO FACILITY AND SATELLITE GROUND SUPPORT EQUIPMENT OPERATION WITHIN THE TEST COMPLEX. SUPPORT SPECTRUM SIGNATURE ANALYSIS TO INSURE INTERFERENCE-FREE AND SAFE OPERATION OF ALL FACILITY-LOCATED NEAR ELECTROMAGNETIC WAVE SENSING DEVICES. TEST AND INTEGRATION ENGINEERING AND ENGINEERING ANALYSIS CLEANROOM OPERATION AND MAINTENANCE CONTAMINATION CONTROL SERVICES USING QUALIFIED AND EXPERIENCED PERSONNEL MAINTENANCE AND OPERATION OF CERTAIN PHYSICAL PLANT SYSTEMS SUCH AS PROCESSED WATER, EMERGENCY POWER, LN2/GN2 STORAGE SYSTEMS, CONDITIONED CLEANROOM AIR HVAC AND HUMIDITY SYSTEMS RECERTIFICATION (TESTING AND INSPECTION) OF LIFTING DEVICES AND EQUIPMENT (LDE), AND (INSPECTION) OF PRESSURE VESSELS AND PRESSURIZED SYSTEMS (PVS) AT GSFC, GREENBELT, WALLOPS, AND OTHER OFFSITE LOCATIONS. MAINTENANCE OF LDE AT GREENBELT SITE ONLY, NOT AT OTHER SITES; NON-DESTRUCTIVE EXAMINATION TESTING OF LDE AND PVS FACILITY AND OPERATIONS SAFETY DATA ACQUISITION AND ANALYSIS SYSTEM DEVELOPMENT AND MANAGEMENT. | $248K |
| Oct 25, 2016 | Department of DefenseFA9300 AFTC PZR | FA930012C0002 | 541712 | ARES 3 BASIC CONTRACT | $100K |
| Oct 21, 2016 | Department of DefenseFA9300 AFTC PZR | FA930012C0002 | 541712 | ARES 3 BASIC CONTRACT | $44K |
| Sep 29, 2016 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | NNG14CR62C | 541330 | IGF::OT::IGF ENVIRONMENTAL TESTING AND INTEGRATION SERVICES (ETIS) II THIS STATEMENT OF WORK (SOW) SPECIFIES THE REQUIREMENTS FOR ON SITE CONTRACTOR SUPPLIED ENVIRONMENTAL TEST AND INTEGRATION AND OTHER LABORATORY OPERATIONS SERVICES TO THE GODDARD SPACE FLIGHT CENTER (GSFC). THE SCOPE OF THESE SERVICES INCLUDES THE FOLLOWING: OPERATION, MAINTENANCE, AND UPGRADE OF ENVIRONMENTAL TEST EQUIPMENT AND FACILITIES LOCATED IN THE GSFC BUILDING 7/10/15/29 COMPLEX, AREA 300 MAGNETIC TEST SITE AND OTHER TECHNICAL FACILITIES LOCATED AT VARIOUS LOCATIONS WITHIN GSFC INCLUDING THE MANUFACTURING AND ELECTROPLATING EQUIPMENT AND FACILITIES PRIMARILY LOCATED IN GSFC BUILDING 5/10/21 SHOPS MECHANICAL AND OPTICAL INTEGRATION OF SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, FABRICATE, AND MANUFACTURE CUSTOM SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, MANUFACTURE, AND OPERATION OF GROUND HANDLING EQUIPMENT AND FIXTURES DESIGN, MANUFACTURE, AND OPERATION OF OPTICAL ALIGNMENT AND CALIBRATION SYSTEMS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT THERMAL BLANKETS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT AND GROUND SUPPORT SYSTEM CABLE HARNESSES DESIGN, MANUFACTURE, AND INSTALLATION OF TECHNICAL FACILITIES INCLUDING BUILDINGS, BUILDING ELEMENTS, UTILITY SYSTEMS, AND TECHNICAL EQUIPMENT AND SYSTEMS DEFINE, ANALYZE, AND RESOLVE ELECTROMAGNETIC RADIATION ISSUES RELATING TO FACILITY AND SATELLITE GROUND SUPPORT EQUIPMENT OPERATION WITHIN THE TEST COMPLEX. SUPPORT SPECTRUM SIGNATURE ANALYSIS TO INSURE INTERFERENCE-FREE AND SAFE OPERATION OF ALL FACILITY-LOCATED NEAR ELECTROMAGNETIC WAVE SENSING DEVICES. TEST AND INTEGRATION ENGINEERING AND ENGINEERING ANALYSIS CLEANROOM OPERATION AND MAINTENANCE CONTAMINATION CONTROL SERVICES USING QUALIFIED AND EXPERIENCED PERSONNEL MAINTENANCE AND OPERATION OF CERTAIN PHYSICAL PLANT SYSTEMS SUCH AS PROCESSED WATER, EMERGENCY POWER, LN2/GN2 STORAGE SYSTEMS, CONDITIONED CLEANROOM AIR HVAC AND HUMIDITY SYSTEMS RECERTIFICATION (TESTING AND INSPECTION) OF LIFTING DEVICES AND EQUIPMENT (LDE), AND (INSPECTION) OF PRESSURE VESSELS AND PRESSURIZED SYSTEMS (PVS) AT GSFC, GREENBELT, WALLOPS, AND OTHER OFFSITE LOCATIONS. MAINTENANCE OF LDE AT GREENBELT SITE ONLY, NOT AT OTHER SITES; NON-DESTRUCTIVE EXAMINATION TESTING OF LDE AND PVS FACILITY AND OPERATIONS SAFETY DATA ACQUISITION AND ANALYSIS SYSTEM DEVELOPMENT AND MANAGEMENT. | $1.7M |
| Sep 27, 2016 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | NNG14CR62C | 541330 | IGF::OT::IGF ENVIRONMENTAL TESTING AND INTEGRATION SERVICES (ETIS) II THIS STATEMENT OF WORK (SOW) SPECIFIES THE REQUIREMENTS FOR ON SITE CONTRACTOR SUPPLIED ENVIRONMENTAL TEST AND INTEGRATION AND OTHER LABORATORY OPERATIONS SERVICES TO THE GODDARD SPACE FLIGHT CENTER (GSFC). THE SCOPE OF THESE SERVICES INCLUDES THE FOLLOWING: OPERATION, MAINTENANCE, AND UPGRADE OF ENVIRONMENTAL TEST EQUIPMENT AND FACILITIES LOCATED IN THE GSFC BUILDING 7/10/15/29 COMPLEX, AREA 300 MAGNETIC TEST SITE AND OTHER TECHNICAL FACILITIES LOCATED AT VARIOUS LOCATIONS WITHIN GSFC INCLUDING THE MANUFACTURING AND ELECTROPLATING EQUIPMENT AND FACILITIES PRIMARILY LOCATED IN GSFC BUILDING 5/10/21 SHOPS MECHANICAL AND OPTICAL INTEGRATION OF SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, FABRICATE, AND MANUFACTURE CUSTOM SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, MANUFACTURE, AND OPERATION OF GROUND HANDLING EQUIPMENT AND FIXTURES DESIGN, MANUFACTURE, AND OPERATION OF OPTICAL ALIGNMENT AND CALIBRATION SYSTEMS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT THERMAL BLANKETS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT AND GROUND SUPPORT SYSTEM CABLE HARNESSES DESIGN, MANUFACTURE, AND INSTALLATION OF TECHNICAL FACILITIES INCLUDING BUILDINGS, BUILDING ELEMENTS, UTILITY SYSTEMS, AND TECHNICAL EQUIPMENT AND SYSTEMS DEFINE, ANALYZE, AND RESOLVE ELECTROMAGNETIC RADIATION ISSUES RELATING TO FACILITY AND SATELLITE GROUND SUPPORT EQUIPMENT OPERATION WITHIN THE TEST COMPLEX. SUPPORT SPECTRUM SIGNATURE ANALYSIS TO INSURE INTERFERENCE-FREE AND SAFE OPERATION OF ALL FACILITY-LOCATED NEAR ELECTROMAGNETIC WAVE SENSING DEVICES. TEST AND INTEGRATION ENGINEERING AND ENGINEERING ANALYSIS CLEANROOM OPERATION AND MAINTENANCE CONTAMINATION CONTROL SERVICES USING QUALIFIED AND EXPERIENCED PERSONNEL MAINTENANCE AND OPERATION OF CERTAIN PHYSICAL PLANT SYSTEMS SUCH AS PROCESSED WATER, EMERGENCY POWER, LN2/GN2 STORAGE SYSTEMS, CONDITIONED CLEANROOM AIR HVAC AND HUMIDITY SYSTEMS RECERTIFICATION (TESTING AND INSPECTION) OF LIFTING DEVICES AND EQUIPMENT (LDE), AND (INSPECTION) OF PRESSURE VESSELS AND PRESSURIZED SYSTEMS (PVS) AT GSFC, GREENBELT, WALLOPS, AND OTHER OFFSITE LOCATIONS. MAINTENANCE OF LDE AT GREENBELT SITE ONLY, NOT AT OTHER SITES; NON-DESTRUCTIVE EXAMINATION TESTING OF LDE AND PVS FACILITY AND OPERATIONS SAFETY DATA ACQUISITION AND ANALYSIS SYSTEM DEVELOPMENT AND MANAGEMENT. | $5.7M |
| Sep 15, 2016 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | NNG14CR62C | 541330 | IGF::OT::IGF ENVIRONMENTAL TESTING AND INTEGRATION SERVICES (ETIS) II THIS STATEMENT OF WORK (SOW) SPECIFIES THE REQUIREMENTS FOR ON SITE CONTRACTOR SUPPLIED ENVIRONMENTAL TEST AND INTEGRATION AND OTHER LABORATORY OPERATIONS SERVICES TO THE GODDARD SPACE FLIGHT CENTER (GSFC). THE SCOPE OF THESE SERVICES INCLUDES THE FOLLOWING: OPERATION, MAINTENANCE, AND UPGRADE OF ENVIRONMENTAL TEST EQUIPMENT AND FACILITIES LOCATED IN THE GSFC BUILDING 7/10/15/29 COMPLEX, AREA 300 MAGNETIC TEST SITE AND OTHER TECHNICAL FACILITIES LOCATED AT VARIOUS LOCATIONS WITHIN GSFC INCLUDING THE MANUFACTURING AND ELECTROPLATING EQUIPMENT AND FACILITIES PRIMARILY LOCATED IN GSFC BUILDING 5/10/21 SHOPS MECHANICAL AND OPTICAL INTEGRATION OF SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, FABRICATE, AND MANUFACTURE CUSTOM SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, MANUFACTURE, AND OPERATION OF GROUND HANDLING EQUIPMENT AND FIXTURES DESIGN, MANUFACTURE, AND OPERATION OF OPTICAL ALIGNMENT AND CALIBRATION SYSTEMS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT THERMAL BLANKETS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT AND GROUND SUPPORT SYSTEM CABLE HARNESSES DESIGN, MANUFACTURE, AND INSTALLATION OF TECHNICAL FACILITIES INCLUDING BUILDINGS, BUILDING ELEMENTS, UTILITY SYSTEMS, AND TECHNICAL EQUIPMENT AND SYSTEMS DEFINE, ANALYZE, AND RESOLVE ELECTROMAGNETIC RADIATION ISSUES RELATING TO FACILITY AND SATELLITE GROUND SUPPORT EQUIPMENT OPERATION WITHIN THE TEST COMPLEX. SUPPORT SPECTRUM SIGNATURE ANALYSIS TO INSURE INTERFERENCE-FREE AND SAFE OPERATION OF ALL FACILITY-LOCATED NEAR ELECTROMAGNETIC WAVE SENSING DEVICES. TEST AND INTEGRATION ENGINEERING AND ENGINEERING ANALYSIS CLEANROOM OPERATION AND MAINTENANCE CONTAMINATION CONTROL SERVICES USING QUALIFIED AND EXPERIENCED PERSONNEL MAINTENANCE AND OPERATION OF CERTAIN PHYSICAL PLANT SYSTEMS SUCH AS PROCESSED WATER, EMERGENCY POWER, LN2/GN2 STORAGE SYSTEMS, CONDITIONED CLEANROOM AIR HVAC AND HUMIDITY SYSTEMS RECERTIFICATION (TESTING AND INSPECTION) OF LIFTING DEVICES AND EQUIPMENT (LDE), AND (INSPECTION) OF PRESSURE VESSELS AND PRESSURIZED SYSTEMS (PVS) AT GSFC, GREENBELT, WALLOPS, AND OTHER OFFSITE LOCATIONS. MAINTENANCE OF LDE AT GREENBELT SITE ONLY, NOT AT OTHER SITES; NON-DESTRUCTIVE EXAMINATION TESTING OF LDE AND PVS FACILITY AND OPERATIONS SAFETY DATA ACQUISITION AND ANALYSIS SYSTEM DEVELOPMENT AND MANAGEMENT. | $10M |
| Sep 14, 2016 | Department of DefenseFA9300 AFTC PZR | FA930012C0002 | 541712 | ARES 3 BASIC CONTRACT | $243K |
| Sep 13, 2016 | General Services AdministrationGSA FAS AAS REGION 5 | GS05Q16BMP0001 | 541712 | IGF::CT,CL::IGF RESEARCH AND DEVELOPMENT STRUCTURAL AND AERODYNAMIC TEST SERVICES | $926K |
| Sep 2, 2016 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | NNG14CR62C | 541330 | IGF::OT::IGF ENVIRONMENTAL TESTING AND INTEGRATION SERVICES (ETIS) II THIS STATEMENT OF WORK (SOW) SPECIFIES THE REQUIREMENTS FOR ON SITE CONTRACTOR SUPPLIED ENVIRONMENTAL TEST AND INTEGRATION AND OTHER LABORATORY OPERATIONS SERVICES TO THE GODDARD SPACE FLIGHT CENTER (GSFC). THE SCOPE OF THESE SERVICES INCLUDES THE FOLLOWING: OPERATION, MAINTENANCE, AND UPGRADE OF ENVIRONMENTAL TEST EQUIPMENT AND FACILITIES LOCATED IN THE GSFC BUILDING 7/10/15/29 COMPLEX, AREA 300 MAGNETIC TEST SITE AND OTHER TECHNICAL FACILITIES LOCATED AT VARIOUS LOCATIONS WITHIN GSFC INCLUDING THE MANUFACTURING AND ELECTROPLATING EQUIPMENT AND FACILITIES PRIMARILY LOCATED IN GSFC BUILDING 5/10/21 SHOPS MECHANICAL AND OPTICAL INTEGRATION OF SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, FABRICATE, AND MANUFACTURE CUSTOM SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, MANUFACTURE, AND OPERATION OF GROUND HANDLING EQUIPMENT AND FIXTURES DESIGN, MANUFACTURE, AND OPERATION OF OPTICAL ALIGNMENT AND CALIBRATION SYSTEMS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT THERMAL BLANKETS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT AND GROUND SUPPORT SYSTEM CABLE HARNESSES DESIGN, MANUFACTURE, AND INSTALLATION OF TECHNICAL FACILITIES INCLUDING BUILDINGS, BUILDING ELEMENTS, UTILITY SYSTEMS, AND TECHNICAL EQUIPMENT AND SYSTEMS DEFINE, ANALYZE, AND RESOLVE ELECTROMAGNETIC RADIATION ISSUES RELATING TO FACILITY AND SATELLITE GROUND SUPPORT EQUIPMENT OPERATION WITHIN THE TEST COMPLEX. SUPPORT SPECTRUM SIGNATURE ANALYSIS TO INSURE INTERFERENCE-FREE AND SAFE OPERATION OF ALL FACILITY-LOCATED NEAR ELECTROMAGNETIC WAVE SENSING DEVICES. TEST AND INTEGRATION ENGINEERING AND ENGINEERING ANALYSIS CLEANROOM OPERATION AND MAINTENANCE CONTAMINATION CONTROL SERVICES USING QUALIFIED AND EXPERIENCED PERSONNEL MAINTENANCE AND OPERATION OF CERTAIN PHYSICAL PLANT SYSTEMS SUCH AS PROCESSED WATER, EMERGENCY POWER, LN2/GN2 STORAGE SYSTEMS, CONDITIONED CLEANROOM AIR HVAC AND HUMIDITY SYSTEMS RECERTIFICATION (TESTING AND INSPECTION) OF LIFTING DEVICES AND EQUIPMENT (LDE), AND (INSPECTION) OF PRESSURE VESSELS AND PRESSURIZED SYSTEMS (PVS) AT GSFC, GREENBELT, WALLOPS, AND OTHER OFFSITE LOCATIONS. MAINTENANCE OF LDE AT GREENBELT SITE ONLY, NOT AT OTHER SITES; NON-DESTRUCTIVE EXAMINATION TESTING OF LDE AND PVS FACILITY AND OPERATIONS SAFETY DATA ACQUISITION AND ANALYSIS SYSTEM DEVELOPMENT AND MANAGEMENT. | $118K |
| Aug 26, 2016 | General Services AdministrationGSA FAS AAS REGION 5 | GS05Q16BMP0001 | 541712 | IGF::CT,CL::IGF RESEARCH AND DEVELOPMENT STRUCTURAL AND AERODYNAMIC TEST SERVICES | $494K |
| Aug 22, 2016 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | NNG14CR62C | 541330 | IGF::OT::IGF ENVIRONMENTAL TESTING AND INTEGRATION SERVICES (ETIS) II THIS STATEMENT OF WORK (SOW) SPECIFIES THE REQUIREMENTS FOR ON SITE CONTRACTOR SUPPLIED ENVIRONMENTAL TEST AND INTEGRATION AND OTHER LABORATORY OPERATIONS SERVICES TO THE GODDARD SPACE FLIGHT CENTER (GSFC). THE SCOPE OF THESE SERVICES INCLUDES THE FOLLOWING: OPERATION, MAINTENANCE, AND UPGRADE OF ENVIRONMENTAL TEST EQUIPMENT AND FACILITIES LOCATED IN THE GSFC BUILDING 7/10/15/29 COMPLEX, AREA 300 MAGNETIC TEST SITE AND OTHER TECHNICAL FACILITIES LOCATED AT VARIOUS LOCATIONS WITHIN GSFC INCLUDING THE MANUFACTURING AND ELECTROPLATING EQUIPMENT AND FACILITIES PRIMARILY LOCATED IN GSFC BUILDING 5/10/21 SHOPS MECHANICAL AND OPTICAL INTEGRATION OF SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, FABRICATE, AND MANUFACTURE CUSTOM SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, MANUFACTURE, AND OPERATION OF GROUND HANDLING EQUIPMENT AND FIXTURES DESIGN, MANUFACTURE, AND OPERATION OF OPTICAL ALIGNMENT AND CALIBRATION SYSTEMS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT THERMAL BLANKETS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT AND GROUND SUPPORT SYSTEM CABLE HARNESSES DESIGN, MANUFACTURE, AND INSTALLATION OF TECHNICAL FACILITIES INCLUDING BUILDINGS, BUILDING ELEMENTS, UTILITY SYSTEMS, AND TECHNICAL EQUIPMENT AND SYSTEMS DEFINE, ANALYZE, AND RESOLVE ELECTROMAGNETIC RADIATION ISSUES RELATING TO FACILITY AND SATELLITE GROUND SUPPORT EQUIPMENT OPERATION WITHIN THE TEST COMPLEX. SUPPORT SPECTRUM SIGNATURE ANALYSIS TO INSURE INTERFERENCE-FREE AND SAFE OPERATION OF ALL FACILITY-LOCATED NEAR ELECTROMAGNETIC WAVE SENSING DEVICES. TEST AND INTEGRATION ENGINEERING AND ENGINEERING ANALYSIS CLEANROOM OPERATION AND MAINTENANCE CONTAMINATION CONTROL SERVICES USING QUALIFIED AND EXPERIENCED PERSONNEL MAINTENANCE AND OPERATION OF CERTAIN PHYSICAL PLANT SYSTEMS SUCH AS PROCESSED WATER, EMERGENCY POWER, LN2/GN2 STORAGE SYSTEMS, CONDITIONED CLEANROOM AIR HVAC AND HUMIDITY SYSTEMS RECERTIFICATION (TESTING AND INSPECTION) OF LIFTING DEVICES AND EQUIPMENT (LDE), AND (INSPECTION) OF PRESSURE VESSELS AND PRESSURIZED SYSTEMS (PVS) AT GSFC, GREENBELT, WALLOPS, AND OTHER OFFSITE LOCATIONS. MAINTENANCE OF LDE AT GREENBELT SITE ONLY, NOT AT OTHER SITES; NON-DESTRUCTIVE EXAMINATION TESTING OF LDE AND PVS FACILITY AND OPERATIONS SAFETY DATA ACQUISITION AND ANALYSIS SYSTEM DEVELOPMENT AND MANAGEMENT. | $4.6M |
| Aug 16, 2016 | Department of DefenseFA9300 AFTC PZR | FA930012C0002 | 541712 | ARES 3 BASIC CONTRACT | $49K |
| Jul 19, 2016 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | NNG14CR62C | 541330 | IGF::OT::IGF ENVIRONMENTAL TESTING AND INTEGRATION SERVICES (ETIS) II THIS STATEMENT OF WORK (SOW) SPECIFIES THE REQUIREMENTS FOR ON SITE CONTRACTOR SUPPLIED ENVIRONMENTAL TEST AND INTEGRATION AND OTHER LABORATORY OPERATIONS SERVICES TO THE GODDARD SPACE FLIGHT CENTER (GSFC). THE SCOPE OF THESE SERVICES INCLUDES THE FOLLOWING: OPERATION, MAINTENANCE, AND UPGRADE OF ENVIRONMENTAL TEST EQUIPMENT AND FACILITIES LOCATED IN THE GSFC BUILDING 7/10/15/29 COMPLEX, AREA 300 MAGNETIC TEST SITE AND OTHER TECHNICAL FACILITIES LOCATED AT VARIOUS LOCATIONS WITHIN GSFC INCLUDING THE MANUFACTURING AND ELECTROPLATING EQUIPMENT AND FACILITIES PRIMARILY LOCATED IN GSFC BUILDING 5/10/21 SHOPS MECHANICAL AND OPTICAL INTEGRATION OF SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, FABRICATE, AND MANUFACTURE CUSTOM SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, MANUFACTURE, AND OPERATION OF GROUND HANDLING EQUIPMENT AND FIXTURES DESIGN, MANUFACTURE, AND OPERATION OF OPTICAL ALIGNMENT AND CALIBRATION SYSTEMS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT THERMAL BLANKETS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT AND GROUND SUPPORT SYSTEM CABLE HARNESSES DESIGN, MANUFACTURE, AND INSTALLATION OF TECHNICAL FACILITIES INCLUDING BUILDINGS, BUILDING ELEMENTS, UTILITY SYSTEMS, AND TECHNICAL EQUIPMENT AND SYSTEMS DEFINE, ANALYZE, AND RESOLVE ELECTROMAGNETIC RADIATION ISSUES RELATING TO FACILITY AND SATELLITE GROUND SUPPORT EQUIPMENT OPERATION WITHIN THE TEST COMPLEX. SUPPORT SPECTRUM SIGNATURE ANALYSIS TO INSURE INTERFERENCE-FREE AND SAFE OPERATION OF ALL FACILITY-LOCATED NEAR ELECTROMAGNETIC WAVE SENSING DEVICES. TEST AND INTEGRATION ENGINEERING AND ENGINEERING ANALYSIS CLEANROOM OPERATION AND MAINTENANCE CONTAMINATION CONTROL SERVICES USING QUALIFIED AND EXPERIENCED PERSONNEL MAINTENANCE AND OPERATION OF CERTAIN PHYSICAL PLANT SYSTEMS SUCH AS PROCESSED WATER, EMERGENCY POWER, LN2/GN2 STORAGE SYSTEMS, CONDITIONED CLEANROOM AIR HVAC AND HUMIDITY SYSTEMS RECERTIFICATION (TESTING AND INSPECTION) OF LIFTING DEVICES AND EQUIPMENT (LDE), AND (INSPECTION) OF PRESSURE VESSELS AND PRESSURIZED SYSTEMS (PVS) AT GSFC, GREENBELT, WALLOPS, AND OTHER OFFSITE LOCATIONS. MAINTENANCE OF LDE AT GREENBELT SITE ONLY, NOT AT OTHER SITES; NON-DESTRUCTIVE EXAMINATION TESTING OF LDE AND PVS FACILITY AND OPERATIONS SAFETY DATA ACQUISITION AND ANALYSIS SYSTEM DEVELOPMENT AND MANAGEMENT. | $4.3M |
| Jul 8, 2016 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | NNG14CR62C | 541330 | IGF::OT::IGF ENVIRONMENTAL TESTING AND INTEGRATION SERVICES (ETIS) II THIS STATEMENT OF WORK (SOW) SPECIFIES THE REQUIREMENTS FOR ON SITE CONTRACTOR SUPPLIED ENVIRONMENTAL TEST AND INTEGRATION AND OTHER LABORATORY OPERATIONS SERVICES TO THE GODDARD SPACE FLIGHT CENTER (GSFC). THE SCOPE OF THESE SERVICES INCLUDES THE FOLLOWING: OPERATION, MAINTENANCE, AND UPGRADE OF ENVIRONMENTAL TEST EQUIPMENT AND FACILITIES LOCATED IN THE GSFC BUILDING 7/10/15/29 COMPLEX, AREA 300 MAGNETIC TEST SITE AND OTHER TECHNICAL FACILITIES LOCATED AT VARIOUS LOCATIONS WITHIN GSFC INCLUDING THE MANUFACTURING AND ELECTROPLATING EQUIPMENT AND FACILITIES PRIMARILY LOCATED IN GSFC BUILDING 5/10/21 SHOPS MECHANICAL AND OPTICAL INTEGRATION OF SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, FABRICATE, AND MANUFACTURE CUSTOM SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, MANUFACTURE, AND OPERATION OF GROUND HANDLING EQUIPMENT AND FIXTURES DESIGN, MANUFACTURE, AND OPERATION OF OPTICAL ALIGNMENT AND CALIBRATION SYSTEMS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT THERMAL BLANKETS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT AND GROUND SUPPORT SYSTEM CABLE HARNESSES DESIGN, MANUFACTURE, AND INSTALLATION OF TECHNICAL FACILITIES INCLUDING BUILDINGS, BUILDING ELEMENTS, UTILITY SYSTEMS, AND TECHNICAL EQUIPMENT AND SYSTEMS DEFINE, ANALYZE, AND RESOLVE ELECTROMAGNETIC RADIATION ISSUES RELATING TO FACILITY AND SATELLITE GROUND SUPPORT EQUIPMENT OPERATION WITHIN THE TEST COMPLEX. SUPPORT SPECTRUM SIGNATURE ANALYSIS TO INSURE INTERFERENCE-FREE AND SAFE OPERATION OF ALL FACILITY-LOCATED NEAR ELECTROMAGNETIC WAVE SENSING DEVICES. TEST AND INTEGRATION ENGINEERING AND ENGINEERING ANALYSIS CLEANROOM OPERATION AND MAINTENANCE CONTAMINATION CONTROL SERVICES USING QUALIFIED AND EXPERIENCED PERSONNEL MAINTENANCE AND OPERATION OF CERTAIN PHYSICAL PLANT SYSTEMS SUCH AS PROCESSED WATER, EMERGENCY POWER, LN2/GN2 STORAGE SYSTEMS, CONDITIONED CLEANROOM AIR HVAC AND HUMIDITY SYSTEMS RECERTIFICATION (TESTING AND INSPECTION) OF LIFTING DEVICES AND EQUIPMENT (LDE), AND (INSPECTION) OF PRESSURE VESSELS AND PRESSURIZED SYSTEMS (PVS) AT GSFC, GREENBELT, WALLOPS, AND OTHER OFFSITE LOCATIONS. MAINTENANCE OF LDE AT GREENBELT SITE ONLY, NOT AT OTHER SITES; NON-DESTRUCTIVE EXAMINATION TESTING OF LDE AND PVS FACILITY AND OPERATIONS SAFETY DATA ACQUISITION AND ANALYSIS SYSTEM DEVELOPMENT AND MANAGEMENT. | $3.5M |
| Jun 29, 2016 | Department of DefenseW6QK ACC-APG ADELPHI | W911QX16C0004 | 541712 | IGF::OT::IGF SBIR PHASE III RESEARCH AND DEVELOPMENT IN MAGNET CAPTURE SYSTEM | $216K |
| Jun 27, 2016 | General Services AdministrationGSA FAS AAS REGION 5 | GS05Q16BMP0001 | 541712 | IGF::CT,CL::IGF RESEARCH AND DEVELOPMENT STRUCTURAL AND AERODYNAMIC TEST SERVICES | $168K |
| Jun 14, 2016 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | NNG14CR62C | 541330 | IGF::OT::IGF ENVIRONMENTAL TESTING AND INTEGRATION SERVICES (ETIS) II THIS STATEMENT OF WORK (SOW) SPECIFIES THE REQUIREMENTS FOR ON SITE CONTRACTOR SUPPLIED ENVIRONMENTAL TEST AND INTEGRATION AND OTHER LABORATORY OPERATIONS SERVICES TO THE GODDARD SPACE FLIGHT CENTER (GSFC). THE SCOPE OF THESE SERVICES INCLUDES THE FOLLOWING: OPERATION, MAINTENANCE, AND UPGRADE OF ENVIRONMENTAL TEST EQUIPMENT AND FACILITIES LOCATED IN THE GSFC BUILDING 7/10/15/29 COMPLEX, AREA 300 MAGNETIC TEST SITE AND OTHER TECHNICAL FACILITIES LOCATED AT VARIOUS LOCATIONS WITHIN GSFC INCLUDING THE MANUFACTURING AND ELECTROPLATING EQUIPMENT AND FACILITIES PRIMARILY LOCATED IN GSFC BUILDING 5/10/21 SHOPS MECHANICAL AND OPTICAL INTEGRATION OF SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, FABRICATE, AND MANUFACTURE CUSTOM SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, MANUFACTURE, AND OPERATION OF GROUND HANDLING EQUIPMENT AND FIXTURES DESIGN, MANUFACTURE, AND OPERATION OF OPTICAL ALIGNMENT AND CALIBRATION SYSTEMS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT THERMAL BLANKETS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT AND GROUND SUPPORT SYSTEM CABLE HARNESSES DESIGN, MANUFACTURE, AND INSTALLATION OF TECHNICAL FACILITIES INCLUDING BUILDINGS, BUILDING ELEMENTS, UTILITY SYSTEMS, AND TECHNICAL EQUIPMENT AND SYSTEMS DEFINE, ANALYZE, AND RESOLVE ELECTROMAGNETIC RADIATION ISSUES RELATING TO FACILITY AND SATELLITE GROUND SUPPORT EQUIPMENT OPERATION WITHIN THE TEST COMPLEX. SUPPORT SPECTRUM SIGNATURE ANALYSIS TO INSURE INTERFERENCE-FREE AND SAFE OPERATION OF ALL FACILITY-LOCATED NEAR ELECTROMAGNETIC WAVE SENSING DEVICES. TEST AND INTEGRATION ENGINEERING AND ENGINEERING ANALYSIS CLEANROOM OPERATION AND MAINTENANCE CONTAMINATION CONTROL SERVICES USING QUALIFIED AND EXPERIENCED PERSONNEL MAINTENANCE AND OPERATION OF CERTAIN PHYSICAL PLANT SYSTEMS SUCH AS PROCESSED WATER, EMERGENCY POWER, LN2/GN2 STORAGE SYSTEMS, CONDITIONED CLEANROOM AIR HVAC AND HUMIDITY SYSTEMS RECERTIFICATION (TESTING AND INSPECTION) OF LIFTING DEVICES AND EQUIPMENT (LDE), AND (INSPECTION) OF PRESSURE VESSELS AND PRESSURIZED SYSTEMS (PVS) AT GSFC, GREENBELT, WALLOPS, AND OTHER OFFSITE LOCATIONS. MAINTENANCE OF LDE AT GREENBELT SITE ONLY, NOT AT OTHER SITES; NON-DESTRUCTIVE EXAMINATION TESTING OF LDE AND PVS FACILITY AND OPERATIONS SAFETY DATA ACQUISITION AND ANALYSIS SYSTEM DEVELOPMENT AND MANAGEMENT. | $1.1M |
| Jun 1, 2016 | Department of DefenseFA9300 AFTC PZR | FA930012C0002 | 541712 | ARES 3 BASIC CONTRACT | $2.0M |
Get Alerted Before Sierra Lobo INC's Next Recompete
Mindy monitors active contracts and flags recompetes 12 months out so you can position to compete.
Start Free