Home/Contractors/Sierra Lobo INC/contracts

Federal Contractor Profile

Sierra Lobo INC

$678M obligated·49 awards·3 agencies·8 NAICS

Federal Contracts

Showing contracts 301324 of 324 total. Sorted by action date, most recent first. Excludes $0 modifications.

DateAgencyPIIDNAICSDescriptionAmount
May 26, 2016National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNG14CR62C541330IGF::OT::IGF ENVIRONMENTAL TESTING AND INTEGRATION SERVICES (ETIS) II THIS STATEMENT OF WORK (SOW) SPECIFIES THE REQUIREMENTS FOR ON SITE CONTRACTOR SUPPLIED ENVIRONMENTAL TEST AND INTEGRATION AND OTHER LABORATORY OPERATIONS SERVICES TO THE GODDARD SPACE FLIGHT CENTER (GSFC). THE SCOPE OF THESE SERVICES INCLUDES THE FOLLOWING: OPERATION, MAINTENANCE, AND UPGRADE OF ENVIRONMENTAL TEST EQUIPMENT AND FACILITIES LOCATED IN THE GSFC BUILDING 7/10/15/29 COMPLEX, AREA 300 MAGNETIC TEST SITE AND OTHER TECHNICAL FACILITIES LOCATED AT VARIOUS LOCATIONS WITHIN GSFC INCLUDING THE MANUFACTURING AND ELECTROPLATING EQUIPMENT AND FACILITIES PRIMARILY LOCATED IN GSFC BUILDING 5/10/21 SHOPS MECHANICAL AND OPTICAL INTEGRATION OF SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, FABRICATE, AND MANUFACTURE CUSTOM SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, MANUFACTURE, AND OPERATION OF GROUND HANDLING EQUIPMENT AND FIXTURES DESIGN, MANUFACTURE, AND OPERATION OF OPTICAL ALIGNMENT AND CALIBRATION SYSTEMS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT THERMAL BLANKETS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT AND GROUND SUPPORT SYSTEM CABLE HARNESSES DESIGN, MANUFACTURE, AND INSTALLATION OF TECHNICAL FACILITIES INCLUDING BUILDINGS, BUILDING ELEMENTS, UTILITY SYSTEMS, AND TECHNICAL EQUIPMENT AND SYSTEMS DEFINE, ANALYZE, AND RESOLVE ELECTROMAGNETIC RADIATION ISSUES RELATING TO FACILITY AND SATELLITE GROUND SUPPORT EQUIPMENT OPERATION WITHIN THE TEST COMPLEX. SUPPORT SPECTRUM SIGNATURE ANALYSIS TO INSURE INTERFERENCE-FREE AND SAFE OPERATION OF ALL FACILITY-LOCATED NEAR ELECTROMAGNETIC WAVE SENSING DEVICES. TEST AND INTEGRATION ENGINEERING AND ENGINEERING ANALYSIS CLEANROOM OPERATION AND MAINTENANCE CONTAMINATION CONTROL SERVICES USING QUALIFIED AND EXPERIENCED PERSONNEL MAINTENANCE AND OPERATION OF CERTAIN PHYSICAL PLANT SYSTEMS SUCH AS PROCESSED WATER, EMERGENCY POWER, LN2/GN2 STORAGE SYSTEMS, CONDITIONED CLEANROOM AIR HVAC AND HUMIDITY SYSTEMS RECERTIFICATION (TESTING AND INSPECTION) OF LIFTING DEVICES AND EQUIPMENT (LDE), AND (INSPECTION) OF PRESSURE VESSELS AND PRESSURIZED SYSTEMS (PVS) AT GSFC, GREENBELT, WALLOPS, AND OTHER OFFSITE LOCATIONS. MAINTENANCE OF LDE AT GREENBELT SITE ONLY, NOT AT OTHER SITES; NON-DESTRUCTIVE EXAMINATION TESTING OF LDE AND PVS FACILITY AND OPERATIONS SAFETY DATA ACQUISITION AND ANALYSIS SYSTEM DEVELOPMENT AND MANAGEMENT.$5.0M
May 10, 2016National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNG14CR62C541330IGF::OT::IGF ENVIRONMENTAL TESTING AND INTEGRATION SERVICES (ETIS) II THIS STATEMENT OF WORK (SOW) SPECIFIES THE REQUIREMENTS FOR ON SITE CONTRACTOR SUPPLIED ENVIRONMENTAL TEST AND INTEGRATION AND OTHER LABORATORY OPERATIONS SERVICES TO THE GODDARD SPACE FLIGHT CENTER (GSFC). THE SCOPE OF THESE SERVICES INCLUDES THE FOLLOWING: OPERATION, MAINTENANCE, AND UPGRADE OF ENVIRONMENTAL TEST EQUIPMENT AND FACILITIES LOCATED IN THE GSFC BUILDING 7/10/15/29 COMPLEX, AREA 300 MAGNETIC TEST SITE AND OTHER TECHNICAL FACILITIES LOCATED AT VARIOUS LOCATIONS WITHIN GSFC INCLUDING THE MANUFACTURING AND ELECTROPLATING EQUIPMENT AND FACILITIES PRIMARILY LOCATED IN GSFC BUILDING 5/10/21 SHOPS MECHANICAL AND OPTICAL INTEGRATION OF SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, FABRICATE, AND MANUFACTURE CUSTOM SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, MANUFACTURE, AND OPERATION OF GROUND HANDLING EQUIPMENT AND FIXTURES DESIGN, MANUFACTURE, AND OPERATION OF OPTICAL ALIGNMENT AND CALIBRATION SYSTEMS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT THERMAL BLANKETS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT AND GROUND SUPPORT SYSTEM CABLE HARNESSES DESIGN, MANUFACTURE, AND INSTALLATION OF TECHNICAL FACILITIES INCLUDING BUILDINGS, BUILDING ELEMENTS, UTILITY SYSTEMS, AND TECHNICAL EQUIPMENT AND SYSTEMS DEFINE, ANALYZE, AND RESOLVE ELECTROMAGNETIC RADIATION ISSUES RELATING TO FACILITY AND SATELLITE GROUND SUPPORT EQUIPMENT OPERATION WITHIN THE TEST COMPLEX. SUPPORT SPECTRUM SIGNATURE ANALYSIS TO INSURE INTERFERENCE-FREE AND SAFE OPERATION OF ALL FACILITY-LOCATED NEAR ELECTROMAGNETIC WAVE SENSING DEVICES. TEST AND INTEGRATION ENGINEERING AND ENGINEERING ANALYSIS CLEANROOM OPERATION AND MAINTENANCE CONTAMINATION CONTROL SERVICES USING QUALIFIED AND EXPERIENCED PERSONNEL MAINTENANCE AND OPERATION OF CERTAIN PHYSICAL PLANT SYSTEMS SUCH AS PROCESSED WATER, EMERGENCY POWER, LN2/GN2 STORAGE SYSTEMS, CONDITIONED CLEANROOM AIR HVAC AND HUMIDITY SYSTEMS RECERTIFICATION (TESTING AND INSPECTION) OF LIFTING DEVICES AND EQUIPMENT (LDE), AND (INSPECTION) OF PRESSURE VESSELS AND PRESSURIZED SYSTEMS (PVS) AT GSFC, GREENBELT, WALLOPS, AND OTHER OFFSITE LOCATIONS. MAINTENANCE OF LDE AT GREENBELT SITE ONLY, NOT AT OTHER SITES; NON-DESTRUCTIVE EXAMINATION TESTING OF LDE AND PVS FACILITY AND OPERATIONS SAFETY DATA ACQUISITION AND ANALYSIS SYSTEM DEVELOPMENT AND MANAGEMENT.$2.5M
Apr 27, 2016General Services AdministrationGSA FAS AAS REGION 5GS05Q16BMP0001541712IGF::CT,CL::IGF RESEARCH AND DEVELOPMENT STRUCTURAL AND AERODYNAMIC TEST SERVICES$669K
Apr 18, 2016National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTERNNG14CR62C541330IGF::OT::IGF ENVIRONMENTAL TESTING AND INTEGRATION SERVICES (ETIS) II THIS STATEMENT OF WORK (SOW) SPECIFIES THE REQUIREMENTS FOR ON SITE CONTRACTOR SUPPLIED ENVIRONMENTAL TEST AND INTEGRATION AND OTHER LABORATORY OPERATIONS SERVICES TO THE GODDARD SPACE FLIGHT CENTER (GSFC). THE SCOPE OF THESE SERVICES INCLUDES THE FOLLOWING: OPERATION, MAINTENANCE, AND UPGRADE OF ENVIRONMENTAL TEST EQUIPMENT AND FACILITIES LOCATED IN THE GSFC BUILDING 7/10/15/29 COMPLEX, AREA 300 MAGNETIC TEST SITE AND OTHER TECHNICAL FACILITIES LOCATED AT VARIOUS LOCATIONS WITHIN GSFC INCLUDING THE MANUFACTURING AND ELECTROPLATING EQUIPMENT AND FACILITIES PRIMARILY LOCATED IN GSFC BUILDING 5/10/21 SHOPS MECHANICAL AND OPTICAL INTEGRATION OF SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, FABRICATE, AND MANUFACTURE CUSTOM SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, MANUFACTURE, AND OPERATION OF GROUND HANDLING EQUIPMENT AND FIXTURES DESIGN, MANUFACTURE, AND OPERATION OF OPTICAL ALIGNMENT AND CALIBRATION SYSTEMS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT THERMAL BLANKETS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT AND GROUND SUPPORT SYSTEM CABLE HARNESSES DESIGN, MANUFACTURE, AND INSTALLATION OF TECHNICAL FACILITIES INCLUDING BUILDINGS, BUILDING ELEMENTS, UTILITY SYSTEMS, AND TECHNICAL EQUIPMENT AND SYSTEMS DEFINE, ANALYZE, AND RESOLVE ELECTROMAGNETIC RADIATION ISSUES RELATING TO FACILITY AND SATELLITE GROUND SUPPORT EQUIPMENT OPERATION WITHIN THE TEST COMPLEX. SUPPORT SPECTRUM SIGNATURE ANALYSIS TO INSURE INTERFERENCE-FREE AND SAFE OPERATION OF ALL FACILITY-LOCATED NEAR ELECTROMAGNETIC WAVE SENSING DEVICES. TEST AND INTEGRATION ENGINEERING AND ENGINEERING ANALYSIS CLEANROOM OPERATION AND MAINTENANCE CONTAMINATION CONTROL SERVICES USING QUALIFIED AND EXPERIENCED PERSONNEL MAINTENANCE AND OPERATION OF CERTAIN PHYSICAL PLANT SYSTEMS SUCH AS PROCESSED WATER, EMERGENCY POWER, LN2/GN2 STORAGE SYSTEMS, CONDITIONED CLEANROOM AIR HVAC AND HUMIDITY SYSTEMS RECERTIFICATION (TESTING AND INSPECTION) OF LIFTING DEVICES AND EQUIPMENT (LDE), AND (INSPECTION) OF PRESSURE VESSELS AND PRESSURIZED SYSTEMS (PVS) AT GSFC, GREENBELT, WALLOPS, AND OTHER OFFSITE LOCATIONS. MAINTENANCE OF LDE AT GREENBELT SITE ONLY, NOT AT OTHER SITES; NON-DESTRUCTIVE EXAMINATION TESTING OF LDE AND PVS FACILITY AND OPERATIONS SAFETY DATA ACQUISITION AND ANALYSIS SYSTEM DEVELOPMENT AND MANAGEMENT.$2.0M
Apr 7, 2016Department of DefenseFA9300 AFTC PZRFA930012C0002541712ARES 3 BASIC CONTRACT$83K
Mar 23, 2016National Aeronautics and Space AdministrationGODDARD SPACE FLIGHT CENTERNNG14CR62C541330IGF::OT::IGF ENVIRONMENTAL TESTING AND INTEGRATION SERVICES (ETIS) II THIS STATEMENT OF WORK (SOW) SPECIFIES THE REQUIREMENTS FOR ON SITE CONTRACTOR SUPPLIED ENVIRONMENTAL TEST AND INTEGRATION AND OTHER LABORATORY OPERATIONS SERVICES TO THE GODDARD SPACE FLIGHT CENTER (GSFC). THE SCOPE OF THESE SERVICES INCLUDES THE FOLLOWING: OPERATION, MAINTENANCE, AND UPGRADE OF ENVIRONMENTAL TEST EQUIPMENT AND FACILITIES LOCATED IN THE GSFC BUILDING 7/10/15/29 COMPLEX, AREA 300 MAGNETIC TEST SITE AND OTHER TECHNICAL FACILITIES LOCATED AT VARIOUS LOCATIONS WITHIN GSFC INCLUDING THE MANUFACTURING AND ELECTROPLATING EQUIPMENT AND FACILITIES PRIMARILY LOCATED IN GSFC BUILDING 5/10/21 SHOPS MECHANICAL AND OPTICAL INTEGRATION OF SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, FABRICATE, AND MANUFACTURE CUSTOM SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, MANUFACTURE, AND OPERATION OF GROUND HANDLING EQUIPMENT AND FIXTURES DESIGN, MANUFACTURE, AND OPERATION OF OPTICAL ALIGNMENT AND CALIBRATION SYSTEMS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT THERMAL BLANKETS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT AND GROUND SUPPORT SYSTEM CABLE HARNESSES DESIGN, MANUFACTURE, AND INSTALLATION OF TECHNICAL FACILITIES INCLUDING BUILDINGS, BUILDING ELEMENTS, UTILITY SYSTEMS, AND TECHNICAL EQUIPMENT AND SYSTEMS DEFINE, ANALYZE, AND RESOLVE ELECTROMAGNETIC RADIATION ISSUES RELATING TO FACILITY AND SATELLITE GROUND SUPPORT EQUIPMENT OPERATION WITHIN THE TEST COMPLEX. SUPPORT SPECTRUM SIGNATURE ANALYSIS TO INSURE INTERFERENCE-FREE AND SAFE OPERATION OF ALL FACILITY-LOCATED NEAR ELECTROMAGNETIC WAVE SENSING DEVICES. TEST AND INTEGRATION ENGINEERING AND ENGINEERING ANALYSIS CLEANROOM OPERATION AND MAINTENANCE CONTAMINATION CONTROL SERVICES USING QUALIFIED AND EXPERIENCED PERSONNEL MAINTENANCE AND OPERATION OF CERTAIN PHYSICAL PLANT SYSTEMS SUCH AS PROCESSED WATER, EMERGENCY POWER, LN2/GN2 STORAGE SYSTEMS, CONDITIONED CLEANROOM AIR HVAC AND HUMIDITY SYSTEMS RECERTIFICATION (TESTING AND INSPECTION) OF LIFTING DEVICES AND EQUIPMENT (LDE), AND (INSPECTION) OF PRESSURE VESSELS AND PRESSURIZED SYSTEMS (PVS) AT GSFC, GREENBELT, WALLOPS, AND OTHER OFFSITE LOCATIONS. MAINTENANCE OF LDE AT GREENBELT SITE ONLY, NOT AT OTHER SITES; NON-DESTRUCTIVE EXAMINATION TESTING OF LDE AND PVS FACILITY AND OPERATIONS SAFETY DATA ACQUISITION AND ANALYSIS SYSTEM DEVELOPMENT AND MANAGEMENT.$4.0M
Mar 7, 2016National Aeronautics and Space AdministrationGODDARD SPACE FLIGHT CENTERNNG14CR62C541330IGF::OT::IGF ENVIRONMENTAL TESTING AND INTEGRATION SERVICES (ETIS) II THIS STATEMENT OF WORK (SOW) SPECIFIES THE REQUIREMENTS FOR ON SITE CONTRACTOR SUPPLIED ENVIRONMENTAL TEST AND INTEGRATION AND OTHER LABORATORY OPERATIONS SERVICES TO THE GODDARD SPACE FLIGHT CENTER (GSFC). THE SCOPE OF THESE SERVICES INCLUDES THE FOLLOWING: OPERATION, MAINTENANCE, AND UPGRADE OF ENVIRONMENTAL TEST EQUIPMENT AND FACILITIES LOCATED IN THE GSFC BUILDING 7/10/15/29 COMPLEX, AREA 300 MAGNETIC TEST SITE AND OTHER TECHNICAL FACILITIES LOCATED AT VARIOUS LOCATIONS WITHIN GSFC INCLUDING THE MANUFACTURING AND ELECTROPLATING EQUIPMENT AND FACILITIES PRIMARILY LOCATED IN GSFC BUILDING 5/10/21 SHOPS MECHANICAL AND OPTICAL INTEGRATION OF SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, FABRICATE, AND MANUFACTURE CUSTOM SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, MANUFACTURE, AND OPERATION OF GROUND HANDLING EQUIPMENT AND FIXTURES DESIGN, MANUFACTURE, AND OPERATION OF OPTICAL ALIGNMENT AND CALIBRATION SYSTEMS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT THERMAL BLANKETS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT AND GROUND SUPPORT SYSTEM CABLE HARNESSES DESIGN, MANUFACTURE, AND INSTALLATION OF TECHNICAL FACILITIES INCLUDING BUILDINGS, BUILDING ELEMENTS, UTILITY SYSTEMS, AND TECHNICAL EQUIPMENT AND SYSTEMS DEFINE, ANALYZE, AND RESOLVE ELECTROMAGNETIC RADIATION ISSUES RELATING TO FACILITY AND SATELLITE GROUND SUPPORT EQUIPMENT OPERATION WITHIN THE TEST COMPLEX. SUPPORT SPECTRUM SIGNATURE ANALYSIS TO INSURE INTERFERENCE-FREE AND SAFE OPERATION OF ALL FACILITY-LOCATED NEAR ELECTROMAGNETIC WAVE SENSING DEVICES. TEST AND INTEGRATION ENGINEERING AND ENGINEERING ANALYSIS CLEANROOM OPERATION AND MAINTENANCE CONTAMINATION CONTROL SERVICES USING QUALIFIED AND EXPERIENCED PERSONNEL MAINTENANCE AND OPERATION OF CERTAIN PHYSICAL PLANT SYSTEMS SUCH AS PROCESSED WATER, EMERGENCY POWER, LN2/GN2 STORAGE SYSTEMS, CONDITIONED CLEANROOM AIR HVAC AND HUMIDITY SYSTEMS RECERTIFICATION (TESTING AND INSPECTION) OF LIFTING DEVICES AND EQUIPMENT (LDE), AND (INSPECTION) OF PRESSURE VESSELS AND PRESSURIZED SYSTEMS (PVS) AT GSFC, GREENBELT, WALLOPS, AND OTHER OFFSITE LOCATIONS. MAINTENANCE OF LDE AT GREENBELT SITE ONLY, NOT AT OTHER SITES; NON-DESTRUCTIVE EXAMINATION TESTING OF LDE AND PVS FACILITY AND OPERATIONS SAFETY DATA ACQUISITION AND ANALYSIS SYSTEM DEVELOPMENT AND MANAGEMENT.$3.5M
Mar 1, 2016Department of DefenseFA9300 AFTC PZRFA930012C0002541712ARES 3 BASIC CONTRACT$49K
Feb 29, 2016General Services AdministrationGSA/FAS ASSISTED AND EXPANDED ACQUISITION (R05)GS05Q16BMP0001541712IGF::CT,CL::IGF RESEARCH AND DEVELOPMENT STRUCTURAL AND AERODYNAMIC TEST SERVICES$3.5M
Feb 23, 2016Department of DefenseFA9300 AFTC PZRFA930012C0002541712ARES 3 BASIC CONTRACT$437K
Feb 3, 2016National Aeronautics and Space AdministrationGODDARD SPACE FLIGHT CENTERNNG14CR62C541330IGF::OT::IGF ENVIRONMENTAL TESTING AND INTEGRATION SERVICES (ETIS) II THIS STATEMENT OF WORK (SOW) SPECIFIES THE REQUIREMENTS FOR ON SITE CONTRACTOR SUPPLIED ENVIRONMENTAL TEST AND INTEGRATION AND OTHER LABORATORY OPERATIONS SERVICES TO THE GODDARD SPACE FLIGHT CENTER (GSFC). THE SCOPE OF THESE SERVICES INCLUDES THE FOLLOWING: OPERATION, MAINTENANCE, AND UPGRADE OF ENVIRONMENTAL TEST EQUIPMENT AND FACILITIES LOCATED IN THE GSFC BUILDING 7/10/15/29 COMPLEX, AREA 300 MAGNETIC TEST SITE AND OTHER TECHNICAL FACILITIES LOCATED AT VARIOUS LOCATIONS WITHIN GSFC INCLUDING THE MANUFACTURING AND ELECTROPLATING EQUIPMENT AND FACILITIES PRIMARILY LOCATED IN GSFC BUILDING 5/10/21 SHOPS MECHANICAL AND OPTICAL INTEGRATION OF SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, FABRICATE, AND MANUFACTURE CUSTOM SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, MANUFACTURE, AND OPERATION OF GROUND HANDLING EQUIPMENT AND FIXTURES DESIGN, MANUFACTURE, AND OPERATION OF OPTICAL ALIGNMENT AND CALIBRATION SYSTEMS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT THERMAL BLANKETS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT AND GROUND SUPPORT SYSTEM CABLE HARNESSES DESIGN, MANUFACTURE, AND INSTALLATION OF TECHNICAL FACILITIES INCLUDING BUILDINGS, BUILDING ELEMENTS, UTILITY SYSTEMS, AND TECHNICAL EQUIPMENT AND SYSTEMS DEFINE, ANALYZE, AND RESOLVE ELECTROMAGNETIC RADIATION ISSUES RELATING TO FACILITY AND SATELLITE GROUND SUPPORT EQUIPMENT OPERATION WITHIN THE TEST COMPLEX. SUPPORT SPECTRUM SIGNATURE ANALYSIS TO INSURE INTERFERENCE-FREE AND SAFE OPERATION OF ALL FACILITY-LOCATED NEAR ELECTROMAGNETIC WAVE SENSING DEVICES. TEST AND INTEGRATION ENGINEERING AND ENGINEERING ANALYSIS CLEANROOM OPERATION AND MAINTENANCE CONTAMINATION CONTROL SERVICES USING QUALIFIED AND EXPERIENCED PERSONNEL MAINTENANCE AND OPERATION OF CERTAIN PHYSICAL PLANT SYSTEMS SUCH AS PROCESSED WATER, EMERGENCY POWER, LN2/GN2 STORAGE SYSTEMS, CONDITIONED CLEANROOM AIR HVAC AND HUMIDITY SYSTEMS RECERTIFICATION (TESTING AND INSPECTION) OF LIFTING DEVICES AND EQUIPMENT (LDE), AND (INSPECTION) OF PRESSURE VESSELS AND PRESSURIZED SYSTEMS (PVS) AT GSFC, GREENBELT, WALLOPS, AND OTHER OFFSITE LOCATIONS. MAINTENANCE OF LDE AT GREENBELT SITE ONLY, NOT AT OTHER SITES; NON-DESTRUCTIVE EXAMINATION TESTING OF LDE AND PVS FACILITY AND OPERATIONS SAFETY DATA ACQUISITION AND ANALYSIS SYSTEM DEVELOPMENT AND MANAGEMENT.$4.0M
Jan 29, 2016General Services AdministrationGSA/FAS ASSISTED AND EXPANDED ACQUISITION (R05)GS05Q16BMP0001541712IGF::CT,CL::IGF RESEARCH AND DEVELOPMENT STRUCTURAL AND AERODYNAMIC TEST SERVICES$1.3M
Jan 14, 2016National Aeronautics and Space AdministrationGODDARD SPACE FLIGHT CENTERNNG14CR62C541330IGF::OT::IGF ENVIRONMENTAL TESTING AND INTEGRATION SERVICES (ETIS) II THIS STATEMENT OF WORK (SOW) SPECIFIES THE REQUIREMENTS FOR ON SITE CONTRACTOR SUPPLIED ENVIRONMENTAL TEST AND INTEGRATION AND OTHER LABORATORY OPERATIONS SERVICES TO THE GODDARD SPACE FLIGHT CENTER (GSFC). THE SCOPE OF THESE SERVICES INCLUDES THE FOLLOWING: OPERATION, MAINTENANCE, AND UPGRADE OF ENVIRONMENTAL TEST EQUIPMENT AND FACILITIES LOCATED IN THE GSFC BUILDING 7/10/15/29 COMPLEX, AREA 300 MAGNETIC TEST SITE AND OTHER TECHNICAL FACILITIES LOCATED AT VARIOUS LOCATIONS WITHIN GSFC INCLUDING THE MANUFACTURING AND ELECTROPLATING EQUIPMENT AND FACILITIES PRIMARILY LOCATED IN GSFC BUILDING 5/10/21 SHOPS MECHANICAL AND OPTICAL INTEGRATION OF SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, FABRICATE, AND MANUFACTURE CUSTOM SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, MANUFACTURE, AND OPERATION OF GROUND HANDLING EQUIPMENT AND FIXTURES DESIGN, MANUFACTURE, AND OPERATION OF OPTICAL ALIGNMENT AND CALIBRATION SYSTEMS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT THERMAL BLANKETS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT AND GROUND SUPPORT SYSTEM CABLE HARNESSES DESIGN, MANUFACTURE, AND INSTALLATION OF TECHNICAL FACILITIES INCLUDING BUILDINGS, BUILDING ELEMENTS, UTILITY SYSTEMS, AND TECHNICAL EQUIPMENT AND SYSTEMS DEFINE, ANALYZE, AND RESOLVE ELECTROMAGNETIC RADIATION ISSUES RELATING TO FACILITY AND SATELLITE GROUND SUPPORT EQUIPMENT OPERATION WITHIN THE TEST COMPLEX. SUPPORT SPECTRUM SIGNATURE ANALYSIS TO INSURE INTERFERENCE-FREE AND SAFE OPERATION OF ALL FACILITY-LOCATED NEAR ELECTROMAGNETIC WAVE SENSING DEVICES. TEST AND INTEGRATION ENGINEERING AND ENGINEERING ANALYSIS CLEANROOM OPERATION AND MAINTENANCE CONTAMINATION CONTROL SERVICES USING QUALIFIED AND EXPERIENCED PERSONNEL MAINTENANCE AND OPERATION OF CERTAIN PHYSICAL PLANT SYSTEMS SUCH AS PROCESSED WATER, EMERGENCY POWER, LN2/GN2 STORAGE SYSTEMS, CONDITIONED CLEANROOM AIR HVAC AND HUMIDITY SYSTEMS RECERTIFICATION (TESTING AND INSPECTION) OF LIFTING DEVICES AND EQUIPMENT (LDE), AND (INSPECTION) OF PRESSURE VESSELS AND PRESSURIZED SYSTEMS (PVS) AT GSFC, GREENBELT, WALLOPS, AND OTHER OFFSITE LOCATIONS. MAINTENANCE OF LDE AT GREENBELT SITE ONLY, NOT AT OTHER SITES; NON-DESTRUCTIVE EXAMINATION TESTING OF LDE AND PVS FACILITY AND OPERATIONS SAFETY DATA ACQUISITION AND ANALYSIS SYSTEM DEVELOPMENT AND MANAGEMENT.$1.0M
Dec 30, 2015Department of DefenseW6QK ACC-APG ADELPHIW911QX16C0004541712IGF::OT::IGF SBIR PHASE III RESEARCH AND DEVELOPMENT IN MAGNET CAPTURE SYSTEM$44K
Dec 18, 2015General Services AdministrationGSA/FAS ASSISTED AND EXPANDED ACQUISITION (R05)GS05T10BMC0014541712BUILDING 65 RESEARCH AND DEVELOPMENT STRUCTURAL TEST SERVCIES$677K
Dec 17, 2015General Services AdministrationGSA/FAS ASSISTED AND EXPANDED ACQUISITION (R05)GS05Q16BMP0001541712IGF::CT,CL::IGF RESEARCH AND DEVELOPMENT STRUCTURAL AND AERODYNAMIC TEST SERVICES$1.3M
Dec 15, 2015National Aeronautics and Space AdministrationGODDARD SPACE FLIGHT CENTERNNG14CR62C541330IGF::OT::IGF ENVIRONMENTAL TESTING AND INTEGRATION SERVICES (ETIS) II THIS STATEMENT OF WORK (SOW) SPECIFIES THE REQUIREMENTS FOR ON SITE CONTRACTOR SUPPLIED ENVIRONMENTAL TEST AND INTEGRATION AND OTHER LABORATORY OPERATIONS SERVICES TO THE GODDARD SPACE FLIGHT CENTER (GSFC). THE SCOPE OF THESE SERVICES INCLUDES THE FOLLOWING: OPERATION, MAINTENANCE, AND UPGRADE OF ENVIRONMENTAL TEST EQUIPMENT AND FACILITIES LOCATED IN THE GSFC BUILDING 7/10/15/29 COMPLEX, AREA 300 MAGNETIC TEST SITE AND OTHER TECHNICAL FACILITIES LOCATED AT VARIOUS LOCATIONS WITHIN GSFC INCLUDING THE MANUFACTURING AND ELECTROPLATING EQUIPMENT AND FACILITIES PRIMARILY LOCATED IN GSFC BUILDING 5/10/21 SHOPS MECHANICAL AND OPTICAL INTEGRATION OF SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, FABRICATE, AND MANUFACTURE CUSTOM SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, MANUFACTURE, AND OPERATION OF GROUND HANDLING EQUIPMENT AND FIXTURES DESIGN, MANUFACTURE, AND OPERATION OF OPTICAL ALIGNMENT AND CALIBRATION SYSTEMS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT THERMAL BLANKETS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT AND GROUND SUPPORT SYSTEM CABLE HARNESSES DESIGN, MANUFACTURE, AND INSTALLATION OF TECHNICAL FACILITIES INCLUDING BUILDINGS, BUILDING ELEMENTS, UTILITY SYSTEMS, AND TECHNICAL EQUIPMENT AND SYSTEMS DEFINE, ANALYZE, AND RESOLVE ELECTROMAGNETIC RADIATION ISSUES RELATING TO FACILITY AND SATELLITE GROUND SUPPORT EQUIPMENT OPERATION WITHIN THE TEST COMPLEX. SUPPORT SPECTRUM SIGNATURE ANALYSIS TO INSURE INTERFERENCE-FREE AND SAFE OPERATION OF ALL FACILITY-LOCATED NEAR ELECTROMAGNETIC WAVE SENSING DEVICES. TEST AND INTEGRATION ENGINEERING AND ENGINEERING ANALYSIS CLEANROOM OPERATION AND MAINTENANCE CONTAMINATION CONTROL SERVICES USING QUALIFIED AND EXPERIENCED PERSONNEL MAINTENANCE AND OPERATION OF CERTAIN PHYSICAL PLANT SYSTEMS SUCH AS PROCESSED WATER, EMERGENCY POWER, LN2/GN2 STORAGE SYSTEMS, CONDITIONED CLEANROOM AIR HVAC AND HUMIDITY SYSTEMS RECERTIFICATION (TESTING AND INSPECTION) OF LIFTING DEVICES AND EQUIPMENT (LDE), AND (INSPECTION) OF PRESSURE VESSELS AND PRESSURIZED SYSTEMS (PVS) AT GSFC, GREENBELT, WALLOPS, AND OTHER OFFSITE LOCATIONS. MAINTENANCE OF LDE AT GREENBELT SITE ONLY, NOT AT OTHER SITES; NON-DESTRUCTIVE EXAMINATION TESTING OF LDE AND PVS FACILITY AND OPERATIONS SAFETY DATA ACQUISITION AND ANALYSIS SYSTEM DEVELOPMENT AND MANAGEMENT.$5.0M
Nov 13, 2015General Services AdministrationGSA/FAS ASSISTED AND EXPANDED ACQUISITION (R05)GS05Q16BMP0001541712IGF::CT,CL::IGF RESEARCH AND DEVELOPMENT STRUCTURAL AND AERODYNAMIC TEST SERVICES$416K
Nov 13, 2015General Services AdministrationGSA/FAS ASSISTED AND EXPANDED ACQUISITION (R05)GS05T10BMC0014541712BUILDING 65 RESEARCH AND DEVELOPMENT STRUCTURAL TEST SERVCIES$416K
Nov 5, 2015Department of DefenseFA9300 AFTC PZRFA930012C0002541712ARES 3 BASIC CONTRACT$151K
Nov 5, 2015National Aeronautics and Space AdministrationGODDARD SPACE FLIGHT CENTERNNG14CR62C541330IGF::OT::IGF ENVIRONMENTAL TESTING AND INTEGRATION SERVICES (ETIS) II THIS STATEMENT OF WORK (SOW) SPECIFIES THE REQUIREMENTS FOR ON SITE CONTRACTOR SUPPLIED ENVIRONMENTAL TEST AND INTEGRATION AND OTHER LABORATORY OPERATIONS SERVICES TO THE GODDARD SPACE FLIGHT CENTER (GSFC). THE SCOPE OF THESE SERVICES INCLUDES THE FOLLOWING: OPERATION, MAINTENANCE, AND UPGRADE OF ENVIRONMENTAL TEST EQUIPMENT AND FACILITIES LOCATED IN THE GSFC BUILDING 7/10/15/29 COMPLEX, AREA 300 MAGNETIC TEST SITE AND OTHER TECHNICAL FACILITIES LOCATED AT VARIOUS LOCATIONS WITHIN GSFC INCLUDING THE MANUFACTURING AND ELECTROPLATING EQUIPMENT AND FACILITIES PRIMARILY LOCATED IN GSFC BUILDING 5/10/21 SHOPS MECHANICAL AND OPTICAL INTEGRATION OF SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, FABRICATE, AND MANUFACTURE CUSTOM SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, MANUFACTURE, AND OPERATION OF GROUND HANDLING EQUIPMENT AND FIXTURES DESIGN, MANUFACTURE, AND OPERATION OF OPTICAL ALIGNMENT AND CALIBRATION SYSTEMS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT THERMAL BLANKETS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT AND GROUND SUPPORT SYSTEM CABLE HARNESSES DESIGN, MANUFACTURE, AND INSTALLATION OF TECHNICAL FACILITIES INCLUDING BUILDINGS, BUILDING ELEMENTS, UTILITY SYSTEMS, AND TECHNICAL EQUIPMENT AND SYSTEMS DEFINE, ANALYZE, AND RESOLVE ELECTROMAGNETIC RADIATION ISSUES RELATING TO FACILITY AND SATELLITE GROUND SUPPORT EQUIPMENT OPERATION WITHIN THE TEST COMPLEX. SUPPORT SPECTRUM SIGNATURE ANALYSIS TO INSURE INTERFERENCE-FREE AND SAFE OPERATION OF ALL FACILITY-LOCATED NEAR ELECTROMAGNETIC WAVE SENSING DEVICES. TEST AND INTEGRATION ENGINEERING AND ENGINEERING ANALYSIS CLEANROOM OPERATION AND MAINTENANCE CONTAMINATION CONTROL SERVICES USING QUALIFIED AND EXPERIENCED PERSONNEL MAINTENANCE AND OPERATION OF CERTAIN PHYSICAL PLANT SYSTEMS SUCH AS PROCESSED WATER, EMERGENCY POWER, LN2/GN2 STORAGE SYSTEMS, CONDITIONED CLEANROOM AIR HVAC AND HUMIDITY SYSTEMS RECERTIFICATION (TESTING AND INSPECTION) OF LIFTING DEVICES AND EQUIPMENT (LDE), AND (INSPECTION) OF PRESSURE VESSELS AND PRESSURIZED SYSTEMS (PVS) AT GSFC, GREENBELT, WALLOPS, AND OTHER OFFSITE LOCATIONS. MAINTENANCE OF LDE AT GREENBELT SITE ONLY, NOT AT OTHER SITES; NON-DESTRUCTIVE EXAMINATION TESTING OF LDE AND PVS FACILITY AND OPERATIONS SAFETY DATA ACQUISITION AND ANALYSIS SYSTEM DEVELOPMENT AND MANAGEMENT.$5.5M
Nov 4, 2015General Services AdministrationGSA/FAS ASSISTED AND EXPANDED ACQUISITION (R05)GS05T10BMC0014541712BUILDING 65 RESEARCH AND DEVELOPMENT STRUCTURAL TEST SERVCIES$55K
Oct 14, 2015National Aeronautics and Space AdministrationGODDARD SPACE FLIGHT CENTERNNG14CR62C541330IGF::OT::IGF ENVIRONMENTAL TESTING AND INTEGRATION SERVICES (ETIS) II THIS STATEMENT OF WORK (SOW) SPECIFIES THE REQUIREMENTS FOR ON SITE CONTRACTOR SUPPLIED ENVIRONMENTAL TEST AND INTEGRATION AND OTHER LABORATORY OPERATIONS SERVICES TO THE GODDARD SPACE FLIGHT CENTER (GSFC). THE SCOPE OF THESE SERVICES INCLUDES THE FOLLOWING: OPERATION, MAINTENANCE, AND UPGRADE OF ENVIRONMENTAL TEST EQUIPMENT AND FACILITIES LOCATED IN THE GSFC BUILDING 7/10/15/29 COMPLEX, AREA 300 MAGNETIC TEST SITE AND OTHER TECHNICAL FACILITIES LOCATED AT VARIOUS LOCATIONS WITHIN GSFC INCLUDING THE MANUFACTURING AND ELECTROPLATING EQUIPMENT AND FACILITIES PRIMARILY LOCATED IN GSFC BUILDING 5/10/21 SHOPS MECHANICAL AND OPTICAL INTEGRATION OF SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, FABRICATE, AND MANUFACTURE CUSTOM SPACECRAFT, FLIGHT EXPERIMENT COMPONENTS, INSTRUMENTS, SUB-ASSEMBLIES AND SYSTEMS DESIGN, MANUFACTURE, AND OPERATION OF GROUND HANDLING EQUIPMENT AND FIXTURES DESIGN, MANUFACTURE, AND OPERATION OF OPTICAL ALIGNMENT AND CALIBRATION SYSTEMS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT THERMAL BLANKETS DESIGN, MANUFACTURE AND INSTALLATION OF SPACE FLIGHT AND GROUND SUPPORT SYSTEM CABLE HARNESSES DESIGN, MANUFACTURE, AND INSTALLATION OF TECHNICAL FACILITIES INCLUDING BUILDINGS, BUILDING ELEMENTS, UTILITY SYSTEMS, AND TECHNICAL EQUIPMENT AND SYSTEMS DEFINE, ANALYZE, AND RESOLVE ELECTROMAGNETIC RADIATION ISSUES RELATING TO FACILITY AND SATELLITE GROUND SUPPORT EQUIPMENT OPERATION WITHIN THE TEST COMPLEX. SUPPORT SPECTRUM SIGNATURE ANALYSIS TO INSURE INTERFERENCE-FREE AND SAFE OPERATION OF ALL FACILITY-LOCATED NEAR ELECTROMAGNETIC WAVE SENSING DEVICES. TEST AND INTEGRATION ENGINEERING AND ENGINEERING ANALYSIS CLEANROOM OPERATION AND MAINTENANCE CONTAMINATION CONTROL SERVICES USING QUALIFIED AND EXPERIENCED PERSONNEL MAINTENANCE AND OPERATION OF CERTAIN PHYSICAL PLANT SYSTEMS SUCH AS PROCESSED WATER, EMERGENCY POWER, LN2/GN2 STORAGE SYSTEMS, CONDITIONED CLEANROOM AIR HVAC AND HUMIDITY SYSTEMS RECERTIFICATION (TESTING AND INSPECTION) OF LIFTING DEVICES AND EQUIPMENT (LDE), AND (INSPECTION) OF PRESSURE VESSELS AND PRESSURIZED SYSTEMS (PVS) AT GSFC, GREENBELT, WALLOPS, AND OTHER OFFSITE LOCATIONS. MAINTENANCE OF LDE AT GREENBELT SITE ONLY, NOT AT OTHER SITES; NON-DESTRUCTIVE EXAMINATION TESTING OF LDE AND PVS FACILITY AND OPERATIONS SAFETY DATA ACQUISITION AND ANALYSIS SYSTEM DEVELOPMENT AND MANAGEMENT.$3.5M
Oct 7, 2015Department of DefenseFA9300 AFTC PZRFA930012C0002541712ARES 3 BASIC CONTRACT$35K

Get Alerted Before Sierra Lobo INC's Next Recompete

Mindy monitors active contracts and flags recompetes 12 months out so you can position to compete.

Start Free