Federal Contractor Profile
The Trustees Of Princeton University
$1.6B obligated·50 awards·11 agencies·15 NAICS
Federal Contracts
Showing contracts 151–200 of 266 total. Sorted by action date, most recent first. Excludes $0 modifications.
| Date | Agency | PIID | NAICS | Description | Amount |
|---|---|---|---|---|---|
| Nov 14, 2019 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | 80GSFC19C0027 | 541715 | INTERSTELLAR MAPPING AND ACCELERATION PROBE (IMAP) IS A WATERSHED MISSION THAT SIMULTANEOUSLY INVESTIGATES THE ACCELERATION OF ENERGETIC PARTICLES AND INTERACTION OF THE SOLAR WIND WITH THE LOCAL INTERSTELLAR MEDIUM. IMAP WILL 1) ADVANCE THE UNDERSTANDING OF THE TEMPORAL AND SPATIAL EVOLUTION OF THE BOUNDARY REGION IN WHICH THE SOLAR WIND AND INTERSTELLAR MEDIUM INTERACT, 2) IDENTIFY AND ADVANCE THE UNDERSTANDING OF PROCESSES RELATED TO THE INTERACTIONS OF THE MAGNETIC FIELD OF THE SUN AND THE LOCAL INTERSTELLAR MEDIUM, 3) IMPROVE THE UNDERSTANDING OF THE COMPOSITION AND PROPERTIES OF THE LOCAL INTERSTELLAR MEDIUM, AND 4) IDENTIFY AND ADVANCE THE UNDERSTANDING OF PARTICLE INJECTION AND ACCELERATION PROCESSES NEAR THE SUN, IN THE HELIOSPHERE AND HELIOSHEATH. IMAP IS BASED ON A COMPLETE AND SYNERGISTIC SET OF OBSERVATIONS. IN SITU AT 1AU, THIS REQUIRES DETAILED OBSERVATIONS OF THE SOLAR WIND ELECTRONS AND IONS SUPRATHERMAL, PICKUP, AND ENERGETIC ION POPULATIONS AND MAGNETIC FIELD. FOR THE OUTER HELIOSPHERE INTERACTION, IT REQUIRES ADVANCED GLOBAL OBSERVATIONS OF THE REMOTE PLASMA AND ENERGETIC IONS OVER A BROAD ENERGY RANGE VIA ENERGETIC NEUTRAL ATOM (ENA) IMAGING, AS WELL AS PRECISE OBSERVATION OF THE NEUTRAL INTERSTELLAR ATOMS PENETRATING THE HELIOSPHERE. COMPLEMENTARY OBSERVATIONS OF INTERSTELLAR DUST AND THE UV GLOW OF INTERSTELLAR NEUTRALS, WHILE NOT REQUIRED FOR THE THRESHOLD MISSION, ADD IMPORTANT CONTEXT AND INSIGHTS TO DEEPEN PHYSICAL UNDERSTANDING OF THE BASELINE MISSION. THESE OBSERVATIONAL NEEDS WILL REQUIRE AN INTEGRATED AND COORDINATED SUITE OF 10 INSTRUMENTS THAT SPAN BOTH THE IN SITU AND REMOTE IMAGING ASPECTS OF THE INVESTIGATION. AS THE PI INSTITUTION PRINCETON UNIVERSITY OVERSEES THE DEVELOPMENT OF IMAP TO ENSURE COST, RISK, AND SCIENCE OBJECTIVES ARE MET IN THE CONTEXT OF AN OVERALL PLAN TO DEVELOP, INTEGRATE, TEST, LAUNCH, COMMISSION, AND OPERATE THE IMAP MISSION. PRINCETON WILL DEVELOP THE SOLAR WIND AND PICKUP ION (SWAPI) INSTRUMENT, MANAGE THE MISSION SCIENCE TEAM, DEVELOP THE INTERSTELLAR DUST EXPERIMENT (IDEX) INSTRUMENT DATA PIPELINE, INITIATE THE FUTURE LEADERS PROGRAM, AND OVERSEE THE MISSION STUDENT COLLABORATION. | $44K |
| Oct 29, 2019 | Department of EnergySC CHICAGO SERVICE CENTER | DEAC0209CH11466 | 611310 | MANAGEMENT AND OPERATING CONTRACT FOR THE OPERATION OF THE PRINCETON PLASMA PHYSICS LABORATORY (PPPL) | $12M |
| Sep 30, 2019 | Department of EnergySC CHICAGO SERVICE CENTER | DEAC0209CH11466 | 611310 | MANAGEMENT AND OPERATING CONTRACT FOR THE OPERATION OF THE PRINCETON PLASMA PHYSICS LABORATORY (PPPL) | $450K |
| Sep 25, 2019 | Department of EnergySC CHICAGO SERVICE CENTER | DEAC0209CH11466 | 611310 | MANAGEMENT AND OPERATING CONTRACT FOR THE OPERATION OF THE PRINCETON PLASMA PHYSICS LABORATORY (PPPL) | $40M |
| Sep 23, 2019 | Department of DefenseW4LD USA HECSA | W912HQ19P0108 | 541715 | ER20-1219 | $200K |
| Sep 13, 2019 | Department of Health and Human ServicesNATIONAL INSTITUTES OF HEALTH NIDA | 75N95019P00666 | 611310 | PRINCETON UNIVERSITY:1106623 [19-006199] | $25K |
| Sep 11, 2019 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | NNG17FC93C | 334511 | IGF::OT::IGF THIS CONTRACT IS FOR IBEX INTERSTELLAR BOUNDARY EXPLORER (IBEX) SUPPORT. THIS CONTRACT IS A RESULT OF A PI TRANSFER FROM NNG05EC85C. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE IBEX MISSION INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS (PAYLOAD, SPACECRAFT, LAUNCH VEHICLE, SPACECRAFT TO LAUNCH-VEHICLE INTERFACES, LAUNCH AND FLIGHT OPERATIONS) AND 3) POST-OPERATIONS DATA ANALYSIS AND ARCHIVING. IN PERFORMANCE OF THIS EFFORT, THE IBEX TEAM SHALL: A. MANAGE THE PROJECT, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS SPECIFIED IN 3.0 MANAGEMENT, ABOVE. B. PROVIDE DAY-TO-DAY MANAGEMENT AND COORDINATION OF THE PROJECT AS DELEGATED BY THE PI TO THE PROJECT MANAGER (PM), INCLUDING MONITORING AND REPORTING TECHNICAL PROGRESS AND FINANCIAL STATUS, IMPLEMENTING THE RISK MANAGEMENT PLAN AND CONDUCTING MISSION LEVEL REVIEWS AS SPECIFIED IN SECTION 4.3, SYSTEM LEVEL REVIEWS. C. CONDUCT REVIEWS FOR ALL PAYLOAD SENSORS, PAYLOAD SUPPORT INFRASTRUCTURE AND ASSOCIATED GSE. D. PERFORM SCIENTIFIC ANALYSES IN SUPPORT OF THE MISSION SCIENCE REQUIREMENTS. E. PERFORM SYSTEMS ENGINEERING TO COORDINATE THE DESIGN OF THE INSTRUMENT COMPLEMENT AND SPACECRAFT BUS COMPONENTS AND TO ENSURE THE COMPATIBILITY OF THE SPACE-TO-GROUND AND NETWORK COMMUNICATIONS. F. PERFORM TRADE STUDIES TO ELIMINATE AND MITIGATE RISKS G. DELIVER THE IBEX FLIGHT SEGMENT TO VANDENBERG AIR FORCE BASE (VAFB), SUPPORT INTEGRATION WITH THE LAUNCH VEHICLE, AND ASSIST THE LAUNCH OPERATIONS H. ESTABLISH THE MISSION CONTROL CENTER (MCC) AND IBEX SCIENCE OPERATIONS AND DATA ANALYSIS CENTER (ISOC) INCLUDING ALL COMPUTERS, NETWORKS, AND OPERATING SOFTWARE, INSTRUMENT DATABASES AND PROCEDURES NECESSARY TO FUNCTIONALLY TEST AND LATER CONTROL THE SPACECRAFT I. HOLD SCIENCE TEAM MEETINGS AS WELL AS TECHNICAL INTERCHANGE MEETINGS. J. BASELINE THE SCIENCE REQUIREMENTS AND SCIENCE ANALYSIS PLAN INTO AN IBEX MISSION DEFINITION REQUIREMENTS AGREEMENT (MDRA) AND THE IBEX DATA MANAGEMENT PLAN. K. IMPLEMENT AN APPROVED MISSION ASSURANCE PLAN. L. IMPLEMENT A SYSTEMS ENGINEERING FUNCTION TO VERIFY PERFORMANCE SPECIFICATION COMPLIANCE TO THE MISSION SCIENCE REQUIREMENTS. M. DESIGN, FABRICATE, INTEGRATE AND TEST THE PAYLOAD, SPACECRAFT, SOLID ROCKET MOTOR AND LAUNCH VEHICLE ADAPTER, AND INTEGRATE THE IBEX FLIGHT SEGMENT WITH THE LAUNCH VEHICLE. N. IMPLEMENT A SAFETY PROGRAM INCLUDING THE GENERATION OF THE MISSILE SYSTEM PRE-LAUNCH SAFETY PACKAGE (MSPSP). O. SUPPORT LAUNCH, PERFORM ON-ORBIT CHECKOUT, AND ESTABLISH ON-ORBIT DATA ACQUISITION CONTACT WITH THE PAYLOAD. WITHIN THE FIRST 30 DAYS AFTER LAUNCH, INITIAL ENGINEERING AND SCIENCE CHECKOUT AND VERIFICATION OF SPACECRAFT IN-FLIGHT OPERATION WILL BE PERFORMED. P. PROVIDE THE SERVICES OF THE MCC AND THE ISOC. Q. CONDUCT THE E/PO PROGRAM IN COOPERATION WITH THE IDENTIFIED TEAM MEMBERS. | $1.1M |
| Aug 29, 2019 | Department of EnergySC CHICAGO SERVICE CENTER | DEAC0209CH11466 | 611310 | MANAGEMENT AND OPERATING CONTRACT FOR THE OPERATION OF THE PRINCETON PLASMA PHYSICS LABORATORY (PPPL) | $30K |
| Aug 29, 2019 | Department of DefenseNAVSUP FLT LOG CTR SAN DIEGO | N0024419F0533 | 611710 | TUTION AND FEES | $52K |
| Aug 28, 2019 | Department of EnergySC CHICAGO SERVICE CENTER | DEAC0209CH11466 | 611310 | MANAGEMENT AND OPERATING CONTRACT FOR THE OPERATION OF THE PRINCETON PLASMA PHYSICS LABORATORY (PPPL) | $3.3M |
| Aug 28, 2019 | Department of EnergySC CHICAGO SERVICE CENTER | DEAC0209CH11466 | 611310 | MANAGEMENT AND OPERATING CONTRACT FOR THE OPERATION OF THE PRINCETON PLASMA PHYSICS LABORATORY (PPPL) | $9K |
| Aug 27, 2019 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | NNG17FC93C | 334511 | IGF::OT::IGF THIS CONTRACT IS FOR IBEX INTERSTELLAR BOUNDARY EXPLORER (IBEX) SUPPORT. THIS CONTRACT IS A RESULT OF A PI TRANSFER FROM NNG05EC85C. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE IBEX MISSION INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS (PAYLOAD, SPACECRAFT, LAUNCH VEHICLE, SPACECRAFT TO LAUNCH-VEHICLE INTERFACES, LAUNCH AND FLIGHT OPERATIONS) AND 3) POST-OPERATIONS DATA ANALYSIS AND ARCHIVING. IN PERFORMANCE OF THIS EFFORT, THE IBEX TEAM SHALL: A. MANAGE THE PROJECT, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS SPECIFIED IN 3.0 MANAGEMENT, ABOVE. B. PROVIDE DAY-TO-DAY MANAGEMENT AND COORDINATION OF THE PROJECT AS DELEGATED BY THE PI TO THE PROJECT MANAGER (PM), INCLUDING MONITORING AND REPORTING TECHNICAL PROGRESS AND FINANCIAL STATUS, IMPLEMENTING THE RISK MANAGEMENT PLAN AND CONDUCTING MISSION LEVEL REVIEWS AS SPECIFIED IN SECTION 4.3, SYSTEM LEVEL REVIEWS. C. CONDUCT REVIEWS FOR ALL PAYLOAD SENSORS, PAYLOAD SUPPORT INFRASTRUCTURE AND ASSOCIATED GSE. D. PERFORM SCIENTIFIC ANALYSES IN SUPPORT OF THE MISSION SCIENCE REQUIREMENTS. E. PERFORM SYSTEMS ENGINEERING TO COORDINATE THE DESIGN OF THE INSTRUMENT COMPLEMENT AND SPACECRAFT BUS COMPONENTS AND TO ENSURE THE COMPATIBILITY OF THE SPACE-TO-GROUND AND NETWORK COMMUNICATIONS. F. PERFORM TRADE STUDIES TO ELIMINATE AND MITIGATE RISKS G. DELIVER THE IBEX FLIGHT SEGMENT TO VANDENBERG AIR FORCE BASE (VAFB), SUPPORT INTEGRATION WITH THE LAUNCH VEHICLE, AND ASSIST THE LAUNCH OPERATIONS H. ESTABLISH THE MISSION CONTROL CENTER (MCC) AND IBEX SCIENCE OPERATIONS AND DATA ANALYSIS CENTER (ISOC) INCLUDING ALL COMPUTERS, NETWORKS, AND OPERATING SOFTWARE, INSTRUMENT DATABASES AND PROCEDURES NECESSARY TO FUNCTIONALLY TEST AND LATER CONTROL THE SPACECRAFT I. HOLD SCIENCE TEAM MEETINGS AS WELL AS TECHNICAL INTERCHANGE MEETINGS. J. BASELINE THE SCIENCE REQUIREMENTS AND SCIENCE ANALYSIS PLAN INTO AN IBEX MISSION DEFINITION REQUIREMENTS AGREEMENT (MDRA) AND THE IBEX DATA MANAGEMENT PLAN. K. IMPLEMENT AN APPROVED MISSION ASSURANCE PLAN. L. IMPLEMENT A SYSTEMS ENGINEERING FUNCTION TO VERIFY PERFORMANCE SPECIFICATION COMPLIANCE TO THE MISSION SCIENCE REQUIREMENTS. M. DESIGN, FABRICATE, INTEGRATE AND TEST THE PAYLOAD, SPACECRAFT, SOLID ROCKET MOTOR AND LAUNCH VEHICLE ADAPTER, AND INTEGRATE THE IBEX FLIGHT SEGMENT WITH THE LAUNCH VEHICLE. N. IMPLEMENT A SAFETY PROGRAM INCLUDING THE GENERATION OF THE MISSILE SYSTEM PRE-LAUNCH SAFETY PACKAGE (MSPSP). O. SUPPORT LAUNCH, PERFORM ON-ORBIT CHECKOUT, AND ESTABLISH ON-ORBIT DATA ACQUISITION CONTACT WITH THE PAYLOAD. WITHIN THE FIRST 30 DAYS AFTER LAUNCH, INITIAL ENGINEERING AND SCIENCE CHECKOUT AND VERIFICATION OF SPACECRAFT IN-FLIGHT OPERATION WILL BE PERFORMED. P. PROVIDE THE SERVICES OF THE MCC AND THE ISOC. Q. CONDUCT THE E/PO PROGRAM IN COOPERATION WITH THE IDENTIFIED TEAM MEMBERS. | $448K |
| Jul 22, 2019 | Department of EnergySC CHICAGO SERVICE CENTER | DEAC0209CH11466 | 611310 | MANAGEMENT AND OPERATING CONTRACT FOR THE OPERATION OF THE PRINCETON PLASMA PHYSICS LABORATORY (PPPL) | $7.3M |
| Jul 9, 2019 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | NNG16PJ30C | 541712 | IGF::OT::IGF WFIRST SCIENCE INVESTIGATION TEAMS AND ADJUTANT SCIENTISTS RESEARCH OPPORTUNITIES IN SPACE AND EARTH SCIENCES-2015 (ROSES-2015) NASA RESEARCH ANNOUNCEMENT (NRA) NNH15ZDA001N-WFIRST WAS ISSUED ON JULY 17, 2015. THIS NRA SOLICITED PROPOSALS FOR SCIENCE INVESTIGATION TEAMS (SITS) FOR THE WIDE-FIELD INFRARED SURVEY TELESCOPE (WFIRST), WHICH RESULTED IN THE FORMATION OF A FORMULATION SCIENCE WORKING GROUP (FSWG) FOR THE MISSION. IN ADDITION TO THE WFIRST SITS, THE CALL SOLICITED INDIVIDUALS TO SERVE AS ADJUTANT SCIENTISTS FOR THE WFIRST WIDE-FIELD INSTRUMENT (WFI) AND FOR THE WFIRST CORONAGRAPH INSTRUMENT (CGI). THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE FOLLOWING TASKS IN SUPPORT OF WFIRST FORMULATION AND IMPLEMENTATION: COORDINATE THE WORK BEING DONE BY THE SCIENCE INVESTIGATION TEAMS (SITS) ASSOCIATED WITH THE WFIRST WIDE-FIELD IMAGER IN ORDER TO DEVELOP A COHERENT AND COMPREHENSIVE SET OF SCIENTIFIC PERFORMANCE REQUIREMENTS, OBSERVATIONAL STRATEGIES, SCIENCE DATA ANALYSIS TECHNIQUES, PRECURSOR OBSERVATION REQUIREMENTS, GROUND AND FLIGHT CALIBRATION APPROACHES, ANCILLARY DATA COLLECTION/INCORPORATION, ANALYSIS, DISSEMINATION AND DOCUMENTATION OF THE PROPOSED SCIENCE INVESTIGATIONS. | $324K |
| Jun 27, 2019 | Department of EnergySC CHICAGO SERVICE CENTER | DEAC0209CH11466 | 611310 | MANAGEMENT AND OPERATING CONTRACT FOR THE OPERATION OF THE PRINCETON PLASMA PHYSICS LABORATORY (PPPL) | $1.7M |
| Jun 25, 2019 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | NNG16PJ29C | 541712 | IGF::OT::IGF WFIRST SCIENCE INVESTIGATION TEAMS AND ADJUTANT SCIENTISTS RESEARCH OPPORTUNITIES IN SPACE AND EARTH SCIENCES-2015 (ROSES-2015) NASA RESEARCH ANNOUNCEMENT (NRA) NNH15ZDA001N-WFIRST WAS ISSUED ON JULY 17, 2015. THIS NRA SOLICITED PROPOSALS FOR SCIENCE INVESTIGATION TEAMS (SITS) FOR THE WIDE-FIELD INFRARED SURVEY TELESCOPE (WFIRST), WHICH RESULTED IN THE FORMATION OF A FORMULATION SCIENCE WORKING GROUP (FSWG) FOR THE MISSION. IN ADDITION TO THE WFIRST SITS, THE CALL SOLICITED INDIVIDUALS TO SERVE AS ADJUTANT SCIENTISTS FOR THE WFIRST WIDE-FIELD INSTRUMENT (WFI) AND FOR THE WFIRST CORONAGRAPH INSTRUMENT (CGI). THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE FOLLOWING TASKS IN SUPPORT OF WFIRST FORMULATION AND IMPLEMENTATION: COORDINATE THE WORK BEING DONE BY THE SCIENCE INVESTIGATION TEAMS (SITS) ASSOCIATED WITH THE WFIRST CORONAGRAPH INSTRUMENT IN ORDER TO DEVELOP A COHERENT AND COMPREHENSIVE SET OF SCIENTIFIC PERFORMANCE REQUIREMENTS, OBSERVATIONAL STRATEGIES, SCIENCE DATA ANALYSIS TECHNIQUES, PRECURSOR OBSERVATION REQUIREMENTS, GROUND AND FLIGHT CALIBRATION APPROACHES, ANCILLARY DATA COLLECTION/INCORPORATION, ANALYSIS, DISSEMINATION AND DOCUMENTATION OF THE PROPOSED SCIENCE INVESTIGATIONS. | $225K |
| Jun 20, 2019 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | 80GSFC19C0027 | 541715 | INTERSTELLAR MAPPING AND ACCELERATION PROBE (IMAP) IS A WATERSHED MISSION THAT SIMULTANEOUSLY INVESTIGATES THE ACCELERATION OF ENERGETIC PARTICLES AND INTERACTION OF THE SOLAR WIND WITH THE LOCAL INTERSTELLAR MEDIUM. IMAP WILL 1) ADVANCE THE UNDERSTANDING OF THE TEMPORAL AND SPATIAL EVOLUTION OF THE BOUNDARY REGION IN WHICH THE SOLAR WIND AND INTERSTELLAR MEDIUM INTERACT, 2) IDENTIFY AND ADVANCE THE UNDERSTANDING OF PROCESSES RELATED TO THE INTERACTIONS OF THE MAGNETIC FIELD OF THE SUN AND THE LOCAL INTERSTELLAR MEDIUM, 3) IMPROVE THE UNDERSTANDING OF THE COMPOSITION AND PROPERTIES OF THE LOCAL INTERSTELLAR MEDIUM, AND 4) IDENTIFY AND ADVANCE THE UNDERSTANDING OF PARTICLE INJECTION AND ACCELERATION PROCESSES NEAR THE SUN, IN THE HELIOSPHERE AND HELIOSHEATH. IMAP IS BASED ON A COMPLETE AND SYNERGISTIC SET OF OBSERVATIONS. IN SITU AT 1AU, THIS REQUIRES DETAILED OBSERVATIONS OF THE SOLAR WIND ELECTRONS AND IONS SUPRATHERMAL, PICKUP, AND ENERGETIC ION POPULATIONS AND MAGNETIC FIELD. FOR THE OUTER HELIOSPHERE INTERACTION, IT REQUIRES ADVANCED GLOBAL OBSERVATIONS OF THE REMOTE PLASMA AND ENERGETIC IONS OVER A BROAD ENERGY RANGE VIA ENERGETIC NEUTRAL ATOM (ENA) IMAGING, AS WELL AS PRECISE OBSERVATION OF THE NEUTRAL INTERSTELLAR ATOMS PENETRATING THE HELIOSPHERE. COMPLEMENTARY OBSERVATIONS OF INTERSTELLAR DUST AND THE UV GLOW OF INTERSTELLAR NEUTRALS, WHILE NOT REQUIRED FOR THE THRESHOLD MISSION, ADD IMPORTANT CONTEXT AND INSIGHTS TO DEEPEN PHYSICAL UNDERSTANDING OF THE BASELINE MISSION. THESE OBSERVATIONAL NEEDS WILL REQUIRE AN INTEGRATED AND COORDINATED SUITE OF 10 INSTRUMENTS THAT SPAN BOTH THE IN SITU AND REMOTE IMAGING ASPECTS OF THE INVESTIGATION. AS THE PI INSTITUTION PRINCETON UNIVERSITY OVERSEES THE DEVELOPMENT OF IMAP TO ENSURE COST, RISK, AND SCIENCE OBJECTIVES ARE MET IN THE CONTEXT OF AN OVERALL PLAN TO DEVELOP, INTEGRATE, TEST, LAUNCH, COMMISSION, AND OPERATE THE IMAP MISSION. PRINCETON WILL DEVELOP THE SOLAR WIND AND PICKUP ION (SWAPI) INSTRUMENT, MANAGE THE MISSION SCIENCE TEAM, DEVELOP THE INTERSTELLAR DUST EXPERIMENT (IDEX) INSTRUMENT DATA PIPELINE, INITIATE THE FUTURE LEADERS PROGRAM, AND OVERSEE THE MISSION STUDENT COLLABORATION. | $100K |
| Jun 6, 2019 | Department of DefenseNAVAL MEDICAL RESEARCH CENTER | N3239819P0023 | 112990 | MALARIA STUDY OF THE P. VIVAX PARASITE @ PRINCETON UNIVERSITY. | $125K |
| Jun 6, 2019 | Department of DefenseNAVAL MEDICAL LOGISTICS COMMAND | N6264518C4010 | 541715 | A PROSPECTIVE STUDY OF THE EFFECTS OF REPETITIVE LOW LEVEL BLAST EXPOSURE (RLLBE) ON FITNESS FOR DUTY IN SOCOM WARRIORS | $87K |
| May 28, 2019 | Department of EnergySC CHICAGO SERVICE CENTER | DEAC0209CH11466 | 611310 | MANAGEMENT AND OPERATING CONTRACT FOR THE OPERATION OF THE PRINCETON PLASMA PHYSICS LABORATORY (PPPL) | $331K |
| May 28, 2019 | Department of EnergySC CHICAGO SERVICE CENTER | DEAC0209CH11466 | 611310 | MANAGEMENT AND OPERATING CONTRACT FOR THE OPERATION OF THE PRINCETON PLASMA PHYSICS LABORATORY (PPPL) | $4.5M |
| Apr 29, 2019 | Department of EnergySC CHICAGO SERVICE CENTER | DEAC0209CH11466 | 611310 | MANAGEMENT AND OPERATING CONTRACT FOR THE OPERATION OF THE PRINCETON PLASMA PHYSICS LABORATORY (PPPL) | $25M |
| Apr 5, 2019 | Department of EnergySC CHICAGO SERVICE CENTER | DEAC0209CH11466 | 611310 | MANAGEMENT AND OPERATING CONTRACT FOR THE OPERATION OF THE PRINCETON PLASMA PHYSICS LABORATORY (PPPL) | $1.2M |
| Mar 27, 2019 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | NNG17FC93C | 334511 | IGF::OT::IGF THIS CONTRACT IS FOR IBEX INTERSTELLAR BOUNDARY EXPLORER (IBEX) SUPPORT. THIS CONTRACT IS A RESULT OF A PI TRANSFER FROM NNG05EC85C. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE IBEX MISSION INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS (PAYLOAD, SPACECRAFT, LAUNCH VEHICLE, SPACECRAFT TO LAUNCH-VEHICLE INTERFACES, LAUNCH AND FLIGHT OPERATIONS) AND 3) POST-OPERATIONS DATA ANALYSIS AND ARCHIVING. IN PERFORMANCE OF THIS EFFORT, THE IBEX TEAM SHALL: A. MANAGE THE PROJECT, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS SPECIFIED IN 3.0 MANAGEMENT, ABOVE. B. PROVIDE DAY-TO-DAY MANAGEMENT AND COORDINATION OF THE PROJECT AS DELEGATED BY THE PI TO THE PROJECT MANAGER (PM), INCLUDING MONITORING AND REPORTING TECHNICAL PROGRESS AND FINANCIAL STATUS, IMPLEMENTING THE RISK MANAGEMENT PLAN AND CONDUCTING MISSION LEVEL REVIEWS AS SPECIFIED IN SECTION 4.3, SYSTEM LEVEL REVIEWS. C. CONDUCT REVIEWS FOR ALL PAYLOAD SENSORS, PAYLOAD SUPPORT INFRASTRUCTURE AND ASSOCIATED GSE. D. PERFORM SCIENTIFIC ANALYSES IN SUPPORT OF THE MISSION SCIENCE REQUIREMENTS. E. PERFORM SYSTEMS ENGINEERING TO COORDINATE THE DESIGN OF THE INSTRUMENT COMPLEMENT AND SPACECRAFT BUS COMPONENTS AND TO ENSURE THE COMPATIBILITY OF THE SPACE-TO-GROUND AND NETWORK COMMUNICATIONS. F. PERFORM TRADE STUDIES TO ELIMINATE AND MITIGATE RISKS G. DELIVER THE IBEX FLIGHT SEGMENT TO VANDENBERG AIR FORCE BASE (VAFB), SUPPORT INTEGRATION WITH THE LAUNCH VEHICLE, AND ASSIST THE LAUNCH OPERATIONS H. ESTABLISH THE MISSION CONTROL CENTER (MCC) AND IBEX SCIENCE OPERATIONS AND DATA ANALYSIS CENTER (ISOC) INCLUDING ALL COMPUTERS, NETWORKS, AND OPERATING SOFTWARE, INSTRUMENT DATABASES AND PROCEDURES NECESSARY TO FUNCTIONALLY TEST AND LATER CONTROL THE SPACECRAFT I. HOLD SCIENCE TEAM MEETINGS AS WELL AS TECHNICAL INTERCHANGE MEETINGS. J. BASELINE THE SCIENCE REQUIREMENTS AND SCIENCE ANALYSIS PLAN INTO AN IBEX MISSION DEFINITION REQUIREMENTS AGREEMENT (MDRA) AND THE IBEX DATA MANAGEMENT PLAN. K. IMPLEMENT AN APPROVED MISSION ASSURANCE PLAN. L. IMPLEMENT A SYSTEMS ENGINEERING FUNCTION TO VERIFY PERFORMANCE SPECIFICATION COMPLIANCE TO THE MISSION SCIENCE REQUIREMENTS. M. DESIGN, FABRICATE, INTEGRATE AND TEST THE PAYLOAD, SPACECRAFT, SOLID ROCKET MOTOR AND LAUNCH VEHICLE ADAPTER, AND INTEGRATE THE IBEX FLIGHT SEGMENT WITH THE LAUNCH VEHICLE. N. IMPLEMENT A SAFETY PROGRAM INCLUDING THE GENERATION OF THE MISSILE SYSTEM PRE-LAUNCH SAFETY PACKAGE (MSPSP). O. SUPPORT LAUNCH, PERFORM ON-ORBIT CHECKOUT, AND ESTABLISH ON-ORBIT DATA ACQUISITION CONTACT WITH THE PAYLOAD. WITHIN THE FIRST 30 DAYS AFTER LAUNCH, INITIAL ENGINEERING AND SCIENCE CHECKOUT AND VERIFICATION OF SPACECRAFT IN-FLIGHT OPERATION WILL BE PERFORMED. P. PROVIDE THE SERVICES OF THE MCC AND THE ISOC. Q. CONDUCT THE E/PO PROGRAM IN COOPERATION WITH THE IDENTIFIED TEAM MEMBERS. | $500K |
| Mar 26, 2019 | Department of EnergySC CHICAGO SERVICE CENTER | DEAC0209CH11466 | 611310 | MANAGEMENT AND OPERATING CONTRACT FOR THE OPERATION OF THE PRINCETON PLASMA PHYSICS LABORATORY (PPPL) | $275K |
| Feb 25, 2019 | Department of EnergySC CHICAGO SERVICE CENTER | DEAC0209CH11466 | 611310 | MANAGEMENT AND OPERATING CONTRACT FOR THE OPERATION OF THE PRINCETON PLASMA PHYSICS LABORATORY (PPPL) | $21M |
| Jan 24, 2019 | Department of EnergySC CHICAGO SERVICE CENTER | DEAC0209CH11466 | 611310 | MANAGEMENT AND OPERATING CONTRACT FOR THE OPERATION OF THE PRINCETON PLASMA PHYSICS LABORATORY (PPPL) | $9.0M |
| Jan 17, 2019 | Department of DefenseNAVSUP FLT LOG CTR SAN DIEGO | N0024419F0138 | 611710 | TUTION AND FEES | $25K |
| Dec 18, 2018 | Department of EnergySC CHICAGO SERVICE CENTER | DEAC0209CH11466 | 611310 | MANAGEMENT AND OPERATING CONTRACT FOR THE OPERATION OF THE PRINCETON PLASMA PHYSICS LABORATORY (PPPL) | $8.4M |
| Dec 18, 2018 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | 80GSFC19C0027 | 541715 | INTERSTELLAR MAPPING AND ACCELERATION PROBE (IMAP) IS A WATERSHED MISSION THAT SIMULTANEOUSLY INVESTIGATES THE ACCELERATION OF ENERGETIC PARTICLES AND INTERACTION OF THE SOLAR WIND WITH THE LOCAL INTERSTELLAR MEDIUM. IMAP WILL 1) ADVANCE THE UNDERSTANDING OF THE TEMPORAL AND SPATIAL EVOLUTION OF THE BOUNDARY REGION IN WHICH THE SOLAR WIND AND INTERSTELLAR MEDIUM INTERACT, 2) IDENTIFY AND ADVANCE THE UNDERSTANDING OF PROCESSES RELATED TO THE INTERACTIONS OF THE MAGNETIC FIELD OF THE SUN AND THE LOCAL INTERSTELLAR MEDIUM, 3) IMPROVE THE UNDERSTANDING OF THE COMPOSITION AND PROPERTIES OF THE LOCAL INTERSTELLAR MEDIUM, AND 4) IDENTIFY AND ADVANCE THE UNDERSTANDING OF PARTICLE INJECTION AND ACCELERATION PROCESSES NEAR THE SUN, IN THE HELIOSPHERE AND HELIOSHEATH. IMAP IS BASED ON A COMPLETE AND SYNERGISTIC SET OF OBSERVATIONS. IN SITU AT 1AU, THIS REQUIRES DETAILED OBSERVATIONS OF THE SOLAR WIND ELECTRONS AND IONS SUPRATHERMAL, PICKUP, AND ENERGETIC ION POPULATIONS AND MAGNETIC FIELD. FOR THE OUTER HELIOSPHERE INTERACTION, IT REQUIRES ADVANCED GLOBAL OBSERVATIONS OF THE REMOTE PLASMA AND ENERGETIC IONS OVER A BROAD ENERGY RANGE VIA ENERGETIC NEUTRAL ATOM (ENA) IMAGING, AS WELL AS PRECISE OBSERVATION OF THE NEUTRAL INTERSTELLAR ATOMS PENETRATING THE HELIOSPHERE. COMPLEMENTARY OBSERVATIONS OF INTERSTELLAR DUST AND THE UV GLOW OF INTERSTELLAR NEUTRALS, WHILE NOT REQUIRED FOR THE THRESHOLD MISSION, ADD IMPORTANT CONTEXT AND INSIGHTS TO DEEPEN PHYSICAL UNDERSTANDING OF THE BASELINE MISSION. THESE OBSERVATIONAL NEEDS WILL REQUIRE AN INTEGRATED AND COORDINATED SUITE OF 10 INSTRUMENTS THAT SPAN BOTH THE IN SITU AND REMOTE IMAGING ASPECTS OF THE INVESTIGATION. AS THE PI INSTITUTION PRINCETON UNIVERSITY OVERSEES THE DEVELOPMENT OF IMAP TO ENSURE COST, RISK, AND SCIENCE OBJECTIVES ARE MET IN THE CONTEXT OF AN OVERALL PLAN TO DEVELOP, INTEGRATE, TEST, LAUNCH, COMMISSION, AND OPERATE THE IMAP MISSION. PRINCETON WILL DEVELOP THE SOLAR WIND AND PICKUP ION (SWAPI) INSTRUMENT, MANAGE THE MISSION SCIENCE TEAM, DEVELOP THE INTERSTELLAR DUST EXPERIMENT (IDEX) INSTRUMENT DATA PIPELINE, INITIATE THE FUTURE LEADERS PROGRAM, AND OVERSEE THE MISSION STUDENT COLLABORATION. | $700K |
| Nov 27, 2018 | Department of EnergySC CHICAGO SERVICE CENTER | DEAC0209CH11466 | 611310 | MANAGEMENT AND OPERATING CONTRACT FOR THE OPERATION OF THE PRINCETON PLASMA PHYSICS LABORATORY (PPPL) | $0 |
| Nov 27, 2018 | Department of EnergySC CHICAGO SERVICE CENTER | DEAC0209CH11466 | 611310 | MANAGEMENT AND OPERATING CONTRACT FOR THE OPERATION OF THE PRINCETON PLASMA PHYSICS LABORATORY (PPPL) | $8.5M |
| Oct 25, 2018 | Department of EnergySC CHICAGO SERVICE CENTER | DEAC0209CH11466 | 611310 | MANAGEMENT AND OPERATING CONTRACT FOR THE OPERATION OF THE PRINCETON PLASMA PHYSICS LABORATORY (PPPL) | $8.1M |
| Sep 26, 2018 | Department of EnergySC CHICAGO SERVICE CENTER | DEAC0209CH11466 | 611310 | MANAGEMENT AND OPERATING CONTRACT FOR THE OPERATION OF THE PRINCETON PLASMA PHYSICS LABORATORY (PPPL) | $73K |
| Sep 26, 2018 | Department of EnergySC CHICAGO SERVICE CENTER | DEAC0209CH11466 | 611310 | MANAGEMENT AND OPERATING CONTRACT FOR THE OPERATION OF THE PRINCETON PLASMA PHYSICS LABORATORY (PPPL) | $7.3M |
| Sep 25, 2018 | Department of DefenseNAVAL MEDICAL LOGISTICS COMMAND | N6264518C4010 | 541715 | A PROSPECTIVE STUDY OF THE EFFECTS OF REPETITIVE LOW LEVEL BLAST EXPOSURE (RLLBE) ON FITNESS FOR DUTY IN SOCOM WARRIORS | $576K |
| Sep 5, 2018 | Department of DefenseNAVSUP FLT LOG CTR SAN DIEGO | N0024418F0728 | 611710 | TUTION AND FEES | $25K |
| Aug 29, 2018 | Department of Health and Human ServicesNATIONAL INSTITUTES OF HEALTH NIDA | 75N95018P00569 | 611310 | SERVICES OF DR. NIV AND ASSOCIATED PERSONNEL FOR EXPERIMENTS WILL EMPLOY STATE OF THE ART MODELING APPROACHES. | $25K |
| Aug 27, 2018 | Department of EnergySC CHICAGO SERVICE CENTER | DEAC0209CH11466 | 611310 | MANAGEMENT AND OPERATING CONTRACT FOR THE OPERATION OF THE PRINCETON PLASMA PHYSICS LABORATORY (PPPL) | $3.4M |
| Aug 27, 2018 | Department of EnergySC CHICAGO SERVICE CENTER | DEAC0209CH11466 | 611310 | MANAGEMENT AND OPERATING CONTRACT FOR THE OPERATION OF THE PRINCETON PLASMA PHYSICS LABORATORY (PPPL) | $92K |
| Aug 10, 2018 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | NNG17FC93C | 334511 | IGF::OT::IGF THIS CONTRACT IS FOR IBEX INTERSTELLAR BOUNDARY EXPLORER (IBEX) SUPPORT. THIS CONTRACT IS A RESULT OF A PI TRANSFER FROM NNG05EC85C. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE IBEX MISSION INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS (PAYLOAD, SPACECRAFT, LAUNCH VEHICLE, SPACECRAFT TO LAUNCH-VEHICLE INTERFACES, LAUNCH AND FLIGHT OPERATIONS) AND 3) POST-OPERATIONS DATA ANALYSIS AND ARCHIVING. IN PERFORMANCE OF THIS EFFORT, THE IBEX TEAM SHALL: A. MANAGE THE PROJECT, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS SPECIFIED IN 3.0 MANAGEMENT, ABOVE. B. PROVIDE DAY-TO-DAY MANAGEMENT AND COORDINATION OF THE PROJECT AS DELEGATED BY THE PI TO THE PROJECT MANAGER (PM), INCLUDING MONITORING AND REPORTING TECHNICAL PROGRESS AND FINANCIAL STATUS, IMPLEMENTING THE RISK MANAGEMENT PLAN AND CONDUCTING MISSION LEVEL REVIEWS AS SPECIFIED IN SECTION 4.3, SYSTEM LEVEL REVIEWS. C. CONDUCT REVIEWS FOR ALL PAYLOAD SENSORS, PAYLOAD SUPPORT INFRASTRUCTURE AND ASSOCIATED GSE. D. PERFORM SCIENTIFIC ANALYSES IN SUPPORT OF THE MISSION SCIENCE REQUIREMENTS. E. PERFORM SYSTEMS ENGINEERING TO COORDINATE THE DESIGN OF THE INSTRUMENT COMPLEMENT AND SPACECRAFT BUS COMPONENTS AND TO ENSURE THE COMPATIBILITY OF THE SPACE-TO-GROUND AND NETWORK COMMUNICATIONS. F. PERFORM TRADE STUDIES TO ELIMINATE AND MITIGATE RISKS G. DELIVER THE IBEX FLIGHT SEGMENT TO VANDENBERG AIR FORCE BASE (VAFB), SUPPORT INTEGRATION WITH THE LAUNCH VEHICLE, AND ASSIST THE LAUNCH OPERATIONS H. ESTABLISH THE MISSION CONTROL CENTER (MCC) AND IBEX SCIENCE OPERATIONS AND DATA ANALYSIS CENTER (ISOC) INCLUDING ALL COMPUTERS, NETWORKS, AND OPERATING SOFTWARE, INSTRUMENT DATABASES AND PROCEDURES NECESSARY TO FUNCTIONALLY TEST AND LATER CONTROL THE SPACECRAFT I. HOLD SCIENCE TEAM MEETINGS AS WELL AS TECHNICAL INTERCHANGE MEETINGS. J. BASELINE THE SCIENCE REQUIREMENTS AND SCIENCE ANALYSIS PLAN INTO AN IBEX MISSION DEFINITION REQUIREMENTS AGREEMENT (MDRA) AND THE IBEX DATA MANAGEMENT PLAN. K. IMPLEMENT AN APPROVED MISSION ASSURANCE PLAN. L. IMPLEMENT A SYSTEMS ENGINEERING FUNCTION TO VERIFY PERFORMANCE SPECIFICATION COMPLIANCE TO THE MISSION SCIENCE REQUIREMENTS. M. DESIGN, FABRICATE, INTEGRATE AND TEST THE PAYLOAD, SPACECRAFT, SOLID ROCKET MOTOR AND LAUNCH VEHICLE ADAPTER, AND INTEGRATE THE IBEX FLIGHT SEGMENT WITH THE LAUNCH VEHICLE. N. IMPLEMENT A SAFETY PROGRAM INCLUDING THE GENERATION OF THE MISSILE SYSTEM PRE-LAUNCH SAFETY PACKAGE (MSPSP). O. SUPPORT LAUNCH, PERFORM ON-ORBIT CHECKOUT, AND ESTABLISH ON-ORBIT DATA ACQUISITION CONTACT WITH THE PAYLOAD. WITHIN THE FIRST 30 DAYS AFTER LAUNCH, INITIAL ENGINEERING AND SCIENCE CHECKOUT AND VERIFICATION OF SPACECRAFT IN-FLIGHT OPERATION WILL BE PERFORMED. P. PROVIDE THE SERVICES OF THE MCC AND THE ISOC. Q. CONDUCT THE E/PO PROGRAM IN COOPERATION WITH THE IDENTIFIED TEAM MEMBERS. | $952K |
| Aug 6, 2018 | Department of Health and Human ServicesNATIONAL INSTITUTES OF HEALTH NIDA | 75N95018P00473 | 611310 | PROFESSIONAL SERVICES DR. NIV AND ASSOCIATED PERSONNEL FOR EXPERIMENTS WILL EMPLOY STATE-OF-THE-ART COMPUTATIONAL MODELING APPROACHES TO EXTRACT NEUROBIOLOGICAL | $23K |
| Jul 30, 2018 | Department of EnergySC CHICAGO SERVICE CENTER | DEAC0209CH11466 | 611310 | MANAGEMENT AND OPERATING CONTRACT FOR THE OPERATION OF THE PRINCETON PLASMA PHYSICS LABORATORY (PPPL) | $43M |
| Jul 30, 2018 | Department of EnergySC CHICAGO SERVICE CENTER | DEAC0209CH11466 | 611310 | MANAGEMENT AND OPERATING CONTRACT FOR THE OPERATION OF THE PRINCETON PLASMA PHYSICS LABORATORY (PPPL) | $63K |
| Jun 26, 2018 | Department of EnergySC CHICAGO SERVICE CENTER | DEAC0209CH11466 | 611310 | MANAGEMENT AND OPERATING CONTRACT FOR THE OPERATION OF THE PRINCETON PLASMA PHYSICS LABORATORY (PPPL) | $34M |
| May 24, 2018 | Department of EnergySC CHICAGO SERVICE CENTER | DEAC0209CH11466 | 611310 | MANAGEMENT AND OPERATING CONTRACT FOR THE OPERATION OF THE PRINCETON PLASMA PHYSICS LABORATORY (PPPL) | $7.1M |
| May 22, 2018 | Department of DefenseDEFENSE THREAT REDUCTION AGENCY | HDTRA116C0025 | 541711 | IGF::OT::IGF BASE PERIOD: ULTRASENSITIVE RAPID EBOLA VIRUS ANTIGEN DIAGNOSTIC ASSAY | $525K |
| Apr 30, 2018 | Department of EnergySC CHICAGO SERVICE CENTER | DEAC0209CH11466 | 611310 | MANAGEMENT AND OPERATING CONTRACT FOR THE OPERATION OF THE PRINCETON PLASMA PHYSICS LABORATORY (PPPL) | $6.2M |
| Apr 25, 2018 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | NNG16PJ29C | 541712 | IGF::OT::IGF WFIRST SCIENCE INVESTIGATION TEAMS AND ADJUTANT SCIENTISTS RESEARCH OPPORTUNITIES IN SPACE AND EARTH SCIENCES-2015 (ROSES-2015) NASA RESEARCH ANNOUNCEMENT (NRA) NNH15ZDA001N-WFIRST WAS ISSUED ON JULY 17, 2015. THIS NRA SOLICITED PROPOSALS FOR SCIENCE INVESTIGATION TEAMS (SITS) FOR THE WIDE-FIELD INFRARED SURVEY TELESCOPE (WFIRST), WHICH RESULTED IN THE FORMATION OF A FORMULATION SCIENCE WORKING GROUP (FSWG) FOR THE MISSION. IN ADDITION TO THE WFIRST SITS, THE CALL SOLICITED INDIVIDUALS TO SERVE AS ADJUTANT SCIENTISTS FOR THE WFIRST WIDE-FIELD INSTRUMENT (WFI) AND FOR THE WFIRST CORONAGRAPH INSTRUMENT (CGI). THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE FOLLOWING TASKS IN SUPPORT OF WFIRST FORMULATION AND IMPLEMENTATION: COORDINATE THE WORK BEING DONE BY THE SCIENCE INVESTIGATION TEAMS (SITS) ASSOCIATED WITH THE WFIRST CORONAGRAPH INSTRUMENT IN ORDER TO DEVELOP A COHERENT AND COMPREHENSIVE SET OF SCIENTIFIC PERFORMANCE REQUIREMENTS, OBSERVATIONAL STRATEGIES, SCIENCE DATA ANALYSIS TECHNIQUES, PRECURSOR OBSERVATION REQUIREMENTS, GROUND AND FLIGHT CALIBRATION APPROACHES, ANCILLARY DATA COLLECTION/INCORPORATION, ANALYSIS, DISSEMINATION AND DOCUMENTATION OF THE PROPOSED SCIENCE INVESTIGATIONS. | $230K |
| Apr 20, 2018 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | NNG16PJ30C | 541712 | IGF::OT::IGF WFIRST SCIENCE INVESTIGATION TEAMS AND ADJUTANT SCIENTISTS RESEARCH OPPORTUNITIES IN SPACE AND EARTH SCIENCES-2015 (ROSES-2015) NASA RESEARCH ANNOUNCEMENT (NRA) NNH15ZDA001N-WFIRST WAS ISSUED ON JULY 17, 2015. THIS NRA SOLICITED PROPOSALS FOR SCIENCE INVESTIGATION TEAMS (SITS) FOR THE WIDE-FIELD INFRARED SURVEY TELESCOPE (WFIRST), WHICH RESULTED IN THE FORMATION OF A FORMULATION SCIENCE WORKING GROUP (FSWG) FOR THE MISSION. IN ADDITION TO THE WFIRST SITS, THE CALL SOLICITED INDIVIDUALS TO SERVE AS ADJUTANT SCIENTISTS FOR THE WFIRST WIDE-FIELD INSTRUMENT (WFI) AND FOR THE WFIRST CORONAGRAPH INSTRUMENT (CGI). THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE FOLLOWING TASKS IN SUPPORT OF WFIRST FORMULATION AND IMPLEMENTATION: COORDINATE THE WORK BEING DONE BY THE SCIENCE INVESTIGATION TEAMS (SITS) ASSOCIATED WITH THE WFIRST WIDE-FIELD IMAGER IN ORDER TO DEVELOP A COHERENT AND COMPREHENSIVE SET OF SCIENTIFIC PERFORMANCE REQUIREMENTS, OBSERVATIONAL STRATEGIES, SCIENCE DATA ANALYSIS TECHNIQUES, PRECURSOR OBSERVATION REQUIREMENTS, GROUND AND FLIGHT CALIBRATION APPROACHES, ANCILLARY DATA COLLECTION/INCORPORATION, ANALYSIS, DISSEMINATION AND DOCUMENTATION OF THE PROPOSED SCIENCE INVESTIGATIONS. | $272K |
Get Alerted Before The Trustees Of Princeton University's Next Recompete
Mindy monitors active contracts and flags recompetes 12 months out so you can position to compete.
Start Free