Home/Contractors/The Trustees Of Princeton University

Federal Contractor Profile

The Trustees Of Princeton University

Federal contracting record: $1.6B obligated across 50 awards from 11 agencies, FY 20162026.

$1.6B
Total Obligated
50
Award Records
11
Agencies Served
15
NAICS Codes

Company Profile

UEI (Unique Entity Identifier)

NJ1YPQXQG7U5

CAGE Code

4B486

Parent Organization

The Trustees Of Princeton University

Address

1 NASSAU HALL, PRINCETON, NJ, 085440001

First Federal Award

Oct 1, 2015

Most Recent Award

Apr 21, 2026

Federal Sales Analytics

Toggle between trend, agency drilldown, and treemap. Use the period selector to focus the time window.

Hover any bar for YoY change + award count. Current fiscal year shown at reduced opacity (partial year).

Top Federal Agencies

  • Department of Energy

    1 awards · 95.0% of total

    $1.5B
  • National Aeronautics and Space Administration

    6 awards · 4.2% of total

    $65M
  • Department of Defense

    21 awards · 0.5% of total

    $8.3M
  • Department of Health and Human Services

    10 awards · 0.2% of total

    $3.0M
  • Agency for International Development

    1 awards · 0.0% of total

    $750K
  • Department of the Interior

    3 awards · 0.0% of total

    $169K
  • Department of State

    3 awards · 0.0% of total

    $131K
  • Smithsonian Institution

    2 awards · 0.0% of total

    $62K
  • Department of Justice

    1 awards · 0.0% of total

    $0
  • Department of Homeland Security

    1 awards · 0.0% of total

    $0

Top NAICS Activity

  • 611310

    COLLEGES, UNIVERSITIES, AND PROFESSIONAL SCHOOLS

    11 awards

    $1.5B
  • 541715

    RESEARCH AND DEVELOPMENT IN THE PHYSICAL, ENGINEERING, AND LIFE SCIENCES (EXCEPT NANOTECHNOLOGY AND BIOTECHNOLOGY)

    8 awards

    $54M
  • 334511

    SEARCH, DETECTION, NAVIGATION, GUIDANCE, AERONAUTICAL, AND NAUTICAL SYSTEM AND INSTRUMENT MANUFACTURING

    1 awards

    $12M
  • 541712

    RESEARCH AND DEVELOPMENT IN THE PHYSICAL, ENGINEERING, AND LIFE SCIENCES (EXCEPT BIOTECHNOLOGY)

    7 awards

    $4.0M
  • 541711

    RESEARCH AND DEVELOPMENT IN BIOTECHNOLOGY

    2 awards

    $3.7M
  • 541714

    RESEARCH AND DEVELOPMENT IN BIOTECHNOLOGY (EXCEPT NANOBIOTECHNOLOGY)

    1 awards

    $2.7M
  • 541910

    MARKETING RESEARCH AND PUBLIC OPINION POLLING

    1 awards

    $750K
  • 611710

    EDUCATIONAL SUPPORT SERVICES

    9 awards

    $310K
  • 334516

    ANALYTICAL LABORATORY INSTRUMENT MANUFACTURING

    1 awards

    $186K
  • 541710

    RESEARCH AND DEVELOPMENT IN THE PHYSICAL, ENGINEERING, AND LIFE SCIENCES

    2 awards

    $169K

Recent Federal Awards

DateAgencyNAICSDescriptionAmount
Apr 21, 2026National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER541715INTERSTELLAR MAPPING AND ACCELERATION PROBE (IMAP) IS A WATERSHED MISSION THAT SIMULTANEOUSLY INVESTIGATES THE ACCELERATION OF ENERGETIC PARTICLES AND INTERACTION OF THE SOLAR WIND WITH THE LOCAL INTERSTELLAR MEDIUM. IMAP WILL 1) ADVANCE THE UNDERSTANDING OF THE TEMPORAL AND SPATIAL EVOLUTION OF THE BOUNDARY REGION IN WHICH THE SOLAR WIND AND INTERSTELLAR MEDIUM INTERACT, 2) IDENTIFY AND ADVANCE THE UNDERSTANDING OF PROCESSES RELATED TO THE INTERACTIONS OF THE MAGNETIC FIELD OF THE SUN AND THE LOCAL INTERSTELLAR MEDIUM, 3) IMPROVE THE UNDERSTANDING OF THE COMPOSITION AND PROPERTIES OF THE LOCAL INTERSTELLAR MEDIUM, AND 4) IDENTIFY AND ADVANCE THE UNDERSTANDING OF PARTICLE INJECTION AND ACCELERATION PROCESSES NEAR THE SUN, IN THE HELIOSPHERE AND HELIOSHEATH. IMAP IS BASED ON A COMPLETE AND SYNERGISTIC SET OF OBSERVATIONS. IN SITU AT 1AU, THIS REQUIRES DETAILED OBSERVATIONS OF THE SOLAR WIND ELECTRONS AND IONS SUPRATHERMAL, PICKUP, AND ENERGETIC ION POPULATIONS AND MAGNETIC FIELD. FOR THE OUTER HELIOSPHERE INTERACTION, IT REQUIRES ADVANCED GLOBAL OBSERVATIONS OF THE REMOTE PLASMA AND ENERGETIC IONS OVER A BROAD ENERGY RANGE VIA ENERGETIC NEUTRAL ATOM (ENA) IMAGING, AS WELL AS PRECISE OBSERVATION OF THE NEUTRAL INTERSTELLAR ATOMS PENETRATING THE HELIOSPHERE. COMPLEMENTARY OBSERVATIONS OF INTERSTELLAR DUST AND THE UV GLOW OF INTERSTELLAR NEUTRALS, WHILE NOT REQUIRED FOR THE THRESHOLD MISSION, ADD IMPORTANT CONTEXT AND INSIGHTS TO DEEPEN PHYSICAL UNDERSTANDING OF THE BASELINE MISSION. THESE OBSERVATIONAL NEEDS WILL REQUIRE AN INTEGRATED AND COORDINATED SUITE OF 10 INSTRUMENTS THAT SPAN BOTH THE IN SITU AND REMOTE IMAGING ASPECTS OF THE INVESTIGATION. AS THE PI INSTITUTION PRINCETON UNIVERSITY OVERSEES THE DEVELOPMENT OF IMAP TO ENSURE COST, RISK, AND SCIENCE OBJECTIVES ARE MET IN THE CONTEXT OF AN OVERALL PLAN TO DEVELOP, INTEGRATE, TEST, LAUNCH, COMMISSION, AND OPERATE THE IMAP MISSION. PRINCETON WILL DEVELOP THE SOLAR WIND AND PICKUP ION (SWAPI) INSTRUMENT, MANAGE THE MISSION SCIENCE TEAM, DEVELOP THE INTERSTELLAR DUST EXPERIMENT (IDEX) INSTRUMENT DATA PIPELINE, INITIATE THE FUTURE LEADERS PROGRAM, AND OVERSEE THE MISSION STUDENT COLLABORATION.$1.1M
Apr 8, 2026National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER334511IGF::OT::IGF THIS CONTRACT IS FOR IBEX INTERSTELLAR BOUNDARY EXPLORER (IBEX) SUPPORT. THIS CONTRACT IS A RESULT OF A PI TRANSFER FROM NNG05EC85C. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE IBEX MISSION INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS (PAYLOAD, SPACECRAFT, LAUNCH VEHICLE, SPACECRAFT TO LAUNCH-VEHICLE INTERFACES, LAUNCH AND FLIGHT OPERATIONS) AND 3) POST-OPERATIONS DATA ANALYSIS AND ARCHIVING. IN PERFORMANCE OF THIS EFFORT, THE IBEX TEAM SHALL: A. MANAGE THE PROJECT, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS SPECIFIED IN 3.0 MANAGEMENT, ABOVE. B. PROVIDE DAY-TO-DAY MANAGEMENT AND COORDINATION OF THE PROJECT AS DELEGATED BY THE PI TO THE PROJECT MANAGER (PM), INCLUDING MONITORING AND REPORTING TECHNICAL PROGRESS AND FINANCIAL STATUS, IMPLEMENTING THE RISK MANAGEMENT PLAN AND CONDUCTING MISSION LEVEL REVIEWS AS SPECIFIED IN SECTION 4.3, SYSTEM LEVEL REVIEWS. C. CONDUCT REVIEWS FOR ALL PAYLOAD SENSORS, PAYLOAD SUPPORT INFRASTRUCTURE AND ASSOCIATED GSE. D. PERFORM SCIENTIFIC ANALYSES IN SUPPORT OF THE MISSION SCIENCE REQUIREMENTS. E. PERFORM SYSTEMS ENGINEERING TO COORDINATE THE DESIGN OF THE INSTRUMENT COMPLEMENT AND SPACECRAFT BUS COMPONENTS AND TO ENSURE THE COMPATIBILITY OF THE SPACE-TO-GROUND AND NETWORK COMMUNICATIONS. F. PERFORM TRADE STUDIES TO ELIMINATE AND MITIGATE RISKS G. DELIVER THE IBEX FLIGHT SEGMENT TO VANDENBERG AIR FORCE BASE (VAFB), SUPPORT INTEGRATION WITH THE LAUNCH VEHICLE, AND ASSIST THE LAUNCH OPERATIONS H. ESTABLISH THE MISSION CONTROL CENTER (MCC) AND IBEX SCIENCE OPERATIONS AND DATA ANALYSIS CENTER (ISOC) INCLUDING ALL COMPUTERS, NETWORKS, AND OPERATING SOFTWARE, INSTRUMENT DATABASES AND PROCEDURES NECESSARY TO FUNCTIONALLY TEST AND LATER CONTROL THE SPACECRAFT I. HOLD SCIENCE TEAM MEETINGS AS WELL AS TECHNICAL INTERCHANGE MEETINGS. J. BASELINE THE SCIENCE REQUIREMENTS AND SCIENCE ANALYSIS PLAN INTO AN IBEX MISSION DEFINITION REQUIREMENTS AGREEMENT (MDRA) AND THE IBEX DATA MANAGEMENT PLAN. K. IMPLEMENT AN APPROVED MISSION ASSURANCE PLAN. L. IMPLEMENT A SYSTEMS ENGINEERING FUNCTION TO VERIFY PERFORMANCE SPECIFICATION COMPLIANCE TO THE MISSION SCIENCE REQUIREMENTS. M. DESIGN, FABRICATE, INTEGRATE AND TEST THE PAYLOAD, SPACECRAFT, SOLID ROCKET MOTOR AND LAUNCH VEHICLE ADAPTER, AND INTEGRATE THE IBEX FLIGHT SEGMENT WITH THE LAUNCH VEHICLE. N. IMPLEMENT A SAFETY PROGRAM INCLUDING THE GENERATION OF THE MISSILE SYSTEM PRE-LAUNCH SAFETY PACKAGE (MSPSP). O. SUPPORT LAUNCH, PERFORM ON-ORBIT CHECKOUT, AND ESTABLISH ON-ORBIT DATA ACQUISITION CONTACT WITH THE PAYLOAD. WITHIN THE FIRST 30 DAYS AFTER LAUNCH, INITIAL ENGINEERING AND SCIENCE CHECKOUT AND VERIFICATION OF SPACECRAFT IN-FLIGHT OPERATION WILL BE PERFORMED. P. PROVIDE THE SERVICES OF THE MCC AND THE ISOC. Q. CONDUCT THE E/PO PROGRAM IN COOPERATION WITH THE IDENTIFIED TEAM MEMBERS.$310K
Mar 26, 2026Department of EnergySC CHICAGO SERVICE CENTER611310MANAGEMENT AND OPERATING CONTRACT FOR THE OPERATION OF THE PRINCETON PLASMA PHYSICS LABORATORY (PPPL)$11M
Mar 6, 2026National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER334511IGF::OT::IGF THIS CONTRACT IS FOR IBEX INTERSTELLAR BOUNDARY EXPLORER (IBEX) SUPPORT. THIS CONTRACT IS A RESULT OF A PI TRANSFER FROM NNG05EC85C. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE IBEX MISSION INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS (PAYLOAD, SPACECRAFT, LAUNCH VEHICLE, SPACECRAFT TO LAUNCH-VEHICLE INTERFACES, LAUNCH AND FLIGHT OPERATIONS) AND 3) POST-OPERATIONS DATA ANALYSIS AND ARCHIVING. IN PERFORMANCE OF THIS EFFORT, THE IBEX TEAM SHALL: A. MANAGE THE PROJECT, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS SPECIFIED IN 3.0 MANAGEMENT, ABOVE. B. PROVIDE DAY-TO-DAY MANAGEMENT AND COORDINATION OF THE PROJECT AS DELEGATED BY THE PI TO THE PROJECT MANAGER (PM), INCLUDING MONITORING AND REPORTING TECHNICAL PROGRESS AND FINANCIAL STATUS, IMPLEMENTING THE RISK MANAGEMENT PLAN AND CONDUCTING MISSION LEVEL REVIEWS AS SPECIFIED IN SECTION 4.3, SYSTEM LEVEL REVIEWS. C. CONDUCT REVIEWS FOR ALL PAYLOAD SENSORS, PAYLOAD SUPPORT INFRASTRUCTURE AND ASSOCIATED GSE. D. PERFORM SCIENTIFIC ANALYSES IN SUPPORT OF THE MISSION SCIENCE REQUIREMENTS. E. PERFORM SYSTEMS ENGINEERING TO COORDINATE THE DESIGN OF THE INSTRUMENT COMPLEMENT AND SPACECRAFT BUS COMPONENTS AND TO ENSURE THE COMPATIBILITY OF THE SPACE-TO-GROUND AND NETWORK COMMUNICATIONS. F. PERFORM TRADE STUDIES TO ELIMINATE AND MITIGATE RISKS G. DELIVER THE IBEX FLIGHT SEGMENT TO VANDENBERG AIR FORCE BASE (VAFB), SUPPORT INTEGRATION WITH THE LAUNCH VEHICLE, AND ASSIST THE LAUNCH OPERATIONS H. ESTABLISH THE MISSION CONTROL CENTER (MCC) AND IBEX SCIENCE OPERATIONS AND DATA ANALYSIS CENTER (ISOC) INCLUDING ALL COMPUTERS, NETWORKS, AND OPERATING SOFTWARE, INSTRUMENT DATABASES AND PROCEDURES NECESSARY TO FUNCTIONALLY TEST AND LATER CONTROL THE SPACECRAFT I. HOLD SCIENCE TEAM MEETINGS AS WELL AS TECHNICAL INTERCHANGE MEETINGS. J. BASELINE THE SCIENCE REQUIREMENTS AND SCIENCE ANALYSIS PLAN INTO AN IBEX MISSION DEFINITION REQUIREMENTS AGREEMENT (MDRA) AND THE IBEX DATA MANAGEMENT PLAN. K. IMPLEMENT AN APPROVED MISSION ASSURANCE PLAN. L. IMPLEMENT A SYSTEMS ENGINEERING FUNCTION TO VERIFY PERFORMANCE SPECIFICATION COMPLIANCE TO THE MISSION SCIENCE REQUIREMENTS. M. DESIGN, FABRICATE, INTEGRATE AND TEST THE PAYLOAD, SPACECRAFT, SOLID ROCKET MOTOR AND LAUNCH VEHICLE ADAPTER, AND INTEGRATE THE IBEX FLIGHT SEGMENT WITH THE LAUNCH VEHICLE. N. IMPLEMENT A SAFETY PROGRAM INCLUDING THE GENERATION OF THE MISSILE SYSTEM PRE-LAUNCH SAFETY PACKAGE (MSPSP). O. SUPPORT LAUNCH, PERFORM ON-ORBIT CHECKOUT, AND ESTABLISH ON-ORBIT DATA ACQUISITION CONTACT WITH THE PAYLOAD. WITHIN THE FIRST 30 DAYS AFTER LAUNCH, INITIAL ENGINEERING AND SCIENCE CHECKOUT AND VERIFICATION OF SPACECRAFT IN-FLIGHT OPERATION WILL BE PERFORMED. P. PROVIDE THE SERVICES OF THE MCC AND THE ISOC. Q. CONDUCT THE E/PO PROGRAM IN COOPERATION WITH THE IDENTIFIED TEAM MEMBERS.$135K
Feb 19, 2026National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER541715INTERSTELLAR MAPPING AND ACCELERATION PROBE (IMAP) IS A WATERSHED MISSION THAT SIMULTANEOUSLY INVESTIGATES THE ACCELERATION OF ENERGETIC PARTICLES AND INTERACTION OF THE SOLAR WIND WITH THE LOCAL INTERSTELLAR MEDIUM. IMAP WILL 1) ADVANCE THE UNDERSTANDING OF THE TEMPORAL AND SPATIAL EVOLUTION OF THE BOUNDARY REGION IN WHICH THE SOLAR WIND AND INTERSTELLAR MEDIUM INTERACT, 2) IDENTIFY AND ADVANCE THE UNDERSTANDING OF PROCESSES RELATED TO THE INTERACTIONS OF THE MAGNETIC FIELD OF THE SUN AND THE LOCAL INTERSTELLAR MEDIUM, 3) IMPROVE THE UNDERSTANDING OF THE COMPOSITION AND PROPERTIES OF THE LOCAL INTERSTELLAR MEDIUM, AND 4) IDENTIFY AND ADVANCE THE UNDERSTANDING OF PARTICLE INJECTION AND ACCELERATION PROCESSES NEAR THE SUN, IN THE HELIOSPHERE AND HELIOSHEATH. IMAP IS BASED ON A COMPLETE AND SYNERGISTIC SET OF OBSERVATIONS. IN SITU AT 1AU, THIS REQUIRES DETAILED OBSERVATIONS OF THE SOLAR WIND ELECTRONS AND IONS SUPRATHERMAL, PICKUP, AND ENERGETIC ION POPULATIONS AND MAGNETIC FIELD. FOR THE OUTER HELIOSPHERE INTERACTION, IT REQUIRES ADVANCED GLOBAL OBSERVATIONS OF THE REMOTE PLASMA AND ENERGETIC IONS OVER A BROAD ENERGY RANGE VIA ENERGETIC NEUTRAL ATOM (ENA) IMAGING, AS WELL AS PRECISE OBSERVATION OF THE NEUTRAL INTERSTELLAR ATOMS PENETRATING THE HELIOSPHERE. COMPLEMENTARY OBSERVATIONS OF INTERSTELLAR DUST AND THE UV GLOW OF INTERSTELLAR NEUTRALS, WHILE NOT REQUIRED FOR THE THRESHOLD MISSION, ADD IMPORTANT CONTEXT AND INSIGHTS TO DEEPEN PHYSICAL UNDERSTANDING OF THE BASELINE MISSION. THESE OBSERVATIONAL NEEDS WILL REQUIRE AN INTEGRATED AND COORDINATED SUITE OF 10 INSTRUMENTS THAT SPAN BOTH THE IN SITU AND REMOTE IMAGING ASPECTS OF THE INVESTIGATION. AS THE PI INSTITUTION PRINCETON UNIVERSITY OVERSEES THE DEVELOPMENT OF IMAP TO ENSURE COST, RISK, AND SCIENCE OBJECTIVES ARE MET IN THE CONTEXT OF AN OVERALL PLAN TO DEVELOP, INTEGRATE, TEST, LAUNCH, COMMISSION, AND OPERATE THE IMAP MISSION. PRINCETON WILL DEVELOP THE SOLAR WIND AND PICKUP ION (SWAPI) INSTRUMENT, MANAGE THE MISSION SCIENCE TEAM, DEVELOP THE INTERSTELLAR DUST EXPERIMENT (IDEX) INSTRUMENT DATA PIPELINE, INITIATE THE FUTURE LEADERS PROGRAM, AND OVERSEE THE MISSION STUDENT COLLABORATION.$337K
Jan 27, 2026Department of EnergySC CHICAGO SERVICE CENTER611310MANAGEMENT AND OPERATING CONTRACT FOR THE OPERATION OF THE PRINCETON PLASMA PHYSICS LABORATORY (PPPL)$278K
Jan 14, 2026National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER541715INTERSTELLAR MAPPING AND ACCELERATION PROBE (IMAP) IS A WATERSHED MISSION THAT SIMULTANEOUSLY INVESTIGATES THE ACCELERATION OF ENERGETIC PARTICLES AND INTERACTION OF THE SOLAR WIND WITH THE LOCAL INTERSTELLAR MEDIUM. IMAP WILL 1) ADVANCE THE UNDERSTANDING OF THE TEMPORAL AND SPATIAL EVOLUTION OF THE BOUNDARY REGION IN WHICH THE SOLAR WIND AND INTERSTELLAR MEDIUM INTERACT, 2) IDENTIFY AND ADVANCE THE UNDERSTANDING OF PROCESSES RELATED TO THE INTERACTIONS OF THE MAGNETIC FIELD OF THE SUN AND THE LOCAL INTERSTELLAR MEDIUM, 3) IMPROVE THE UNDERSTANDING OF THE COMPOSITION AND PROPERTIES OF THE LOCAL INTERSTELLAR MEDIUM, AND 4) IDENTIFY AND ADVANCE THE UNDERSTANDING OF PARTICLE INJECTION AND ACCELERATION PROCESSES NEAR THE SUN, IN THE HELIOSPHERE AND HELIOSHEATH. IMAP IS BASED ON A COMPLETE AND SYNERGISTIC SET OF OBSERVATIONS. IN SITU AT 1AU, THIS REQUIRES DETAILED OBSERVATIONS OF THE SOLAR WIND ELECTRONS AND IONS SUPRATHERMAL, PICKUP, AND ENERGETIC ION POPULATIONS AND MAGNETIC FIELD. FOR THE OUTER HELIOSPHERE INTERACTION, IT REQUIRES ADVANCED GLOBAL OBSERVATIONS OF THE REMOTE PLASMA AND ENERGETIC IONS OVER A BROAD ENERGY RANGE VIA ENERGETIC NEUTRAL ATOM (ENA) IMAGING, AS WELL AS PRECISE OBSERVATION OF THE NEUTRAL INTERSTELLAR ATOMS PENETRATING THE HELIOSPHERE. COMPLEMENTARY OBSERVATIONS OF INTERSTELLAR DUST AND THE UV GLOW OF INTERSTELLAR NEUTRALS, WHILE NOT REQUIRED FOR THE THRESHOLD MISSION, ADD IMPORTANT CONTEXT AND INSIGHTS TO DEEPEN PHYSICAL UNDERSTANDING OF THE BASELINE MISSION. THESE OBSERVATIONAL NEEDS WILL REQUIRE AN INTEGRATED AND COORDINATED SUITE OF 10 INSTRUMENTS THAT SPAN BOTH THE IN SITU AND REMOTE IMAGING ASPECTS OF THE INVESTIGATION. AS THE PI INSTITUTION PRINCETON UNIVERSITY OVERSEES THE DEVELOPMENT OF IMAP TO ENSURE COST, RISK, AND SCIENCE OBJECTIVES ARE MET IN THE CONTEXT OF AN OVERALL PLAN TO DEVELOP, INTEGRATE, TEST, LAUNCH, COMMISSION, AND OPERATE THE IMAP MISSION. PRINCETON WILL DEVELOP THE SOLAR WIND AND PICKUP ION (SWAPI) INSTRUMENT, MANAGE THE MISSION SCIENCE TEAM, DEVELOP THE INTERSTELLAR DUST EXPERIMENT (IDEX) INSTRUMENT DATA PIPELINE, INITIATE THE FUTURE LEADERS PROGRAM, AND OVERSEE THE MISSION STUDENT COLLABORATION.$6.0M
Dec 18, 2025Department of EnergySC CHICAGO SERVICE CENTER611310MANAGEMENT AND OPERATING CONTRACT FOR THE OPERATION OF THE PRINCETON PLASMA PHYSICS LABORATORY (PPPL)$38M
Nov 12, 2025Department of DefenseW4LD USA HECSA541715SERDP ER25-4757 PRINCETON UNIVERSITY - BIODEGRADATION OF PER- AND POLYFLUORINATED ALKYL SUBSTANCES IN AFFF-IMPACTED SEDIMENTS BY ACIDIMICROBIUM SP. A6 BRIDGING THE GAP BETWEEN LABORATORY EXPERIMENTS AND FIELD DEMONSTRATION - PART I$225K
Nov 10, 2025Department of EnergySC CHICAGO SERVICE CENTER611310MANAGEMENT AND OPERATING CONTRACT FOR THE OPERATION OF THE PRINCETON PLASMA PHYSICS LABORATORY (PPPL)$2.4M
Nov 3, 2025Department of DefenseW4LD USA HECSA541715SERDP ER25-4757 PRINCETON UNIVERSITY - BIODEGRADATION OF PER- AND POLYFLUORINATED ALKYL SUBSTANCES IN AFFF-IMPACTED SEDIMENTS BY ACIDIMICROBIUM SP. A6 BRIDGING THE GAP BETWEEN LABORATORY EXPERIMENTS AND FIELD DEMONSTRATION - PART I$25K
Oct 28, 2025Department of EnergySC CHICAGO SERVICE CENTER611310MANAGEMENT AND OPERATING CONTRACT FOR THE OPERATION OF THE PRINCETON PLASMA PHYSICS LABORATORY (PPPL)$1.3M
Oct 9, 2025Department of EnergySC CHICAGO SERVICE CENTER611310MANAGEMENT AND OPERATING CONTRACT FOR THE OPERATION OF THE PRINCETON PLASMA PHYSICS LABORATORY (PPPL)$336K
Sep 30, 2025National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER334511IGF::OT::IGF THIS CONTRACT IS FOR IBEX INTERSTELLAR BOUNDARY EXPLORER (IBEX) SUPPORT. THIS CONTRACT IS A RESULT OF A PI TRANSFER FROM NNG05EC85C. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE IBEX MISSION INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS (PAYLOAD, SPACECRAFT, LAUNCH VEHICLE, SPACECRAFT TO LAUNCH-VEHICLE INTERFACES, LAUNCH AND FLIGHT OPERATIONS) AND 3) POST-OPERATIONS DATA ANALYSIS AND ARCHIVING. IN PERFORMANCE OF THIS EFFORT, THE IBEX TEAM SHALL: A. MANAGE THE PROJECT, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS SPECIFIED IN 3.0 MANAGEMENT, ABOVE. B. PROVIDE DAY-TO-DAY MANAGEMENT AND COORDINATION OF THE PROJECT AS DELEGATED BY THE PI TO THE PROJECT MANAGER (PM), INCLUDING MONITORING AND REPORTING TECHNICAL PROGRESS AND FINANCIAL STATUS, IMPLEMENTING THE RISK MANAGEMENT PLAN AND CONDUCTING MISSION LEVEL REVIEWS AS SPECIFIED IN SECTION 4.3, SYSTEM LEVEL REVIEWS. C. CONDUCT REVIEWS FOR ALL PAYLOAD SENSORS, PAYLOAD SUPPORT INFRASTRUCTURE AND ASSOCIATED GSE. D. PERFORM SCIENTIFIC ANALYSES IN SUPPORT OF THE MISSION SCIENCE REQUIREMENTS. E. PERFORM SYSTEMS ENGINEERING TO COORDINATE THE DESIGN OF THE INSTRUMENT COMPLEMENT AND SPACECRAFT BUS COMPONENTS AND TO ENSURE THE COMPATIBILITY OF THE SPACE-TO-GROUND AND NETWORK COMMUNICATIONS. F. PERFORM TRADE STUDIES TO ELIMINATE AND MITIGATE RISKS G. DELIVER THE IBEX FLIGHT SEGMENT TO VANDENBERG AIR FORCE BASE (VAFB), SUPPORT INTEGRATION WITH THE LAUNCH VEHICLE, AND ASSIST THE LAUNCH OPERATIONS H. ESTABLISH THE MISSION CONTROL CENTER (MCC) AND IBEX SCIENCE OPERATIONS AND DATA ANALYSIS CENTER (ISOC) INCLUDING ALL COMPUTERS, NETWORKS, AND OPERATING SOFTWARE, INSTRUMENT DATABASES AND PROCEDURES NECESSARY TO FUNCTIONALLY TEST AND LATER CONTROL THE SPACECRAFT I. HOLD SCIENCE TEAM MEETINGS AS WELL AS TECHNICAL INTERCHANGE MEETINGS. J. BASELINE THE SCIENCE REQUIREMENTS AND SCIENCE ANALYSIS PLAN INTO AN IBEX MISSION DEFINITION REQUIREMENTS AGREEMENT (MDRA) AND THE IBEX DATA MANAGEMENT PLAN. K. IMPLEMENT AN APPROVED MISSION ASSURANCE PLAN. L. IMPLEMENT A SYSTEMS ENGINEERING FUNCTION TO VERIFY PERFORMANCE SPECIFICATION COMPLIANCE TO THE MISSION SCIENCE REQUIREMENTS. M. DESIGN, FABRICATE, INTEGRATE AND TEST THE PAYLOAD, SPACECRAFT, SOLID ROCKET MOTOR AND LAUNCH VEHICLE ADAPTER, AND INTEGRATE THE IBEX FLIGHT SEGMENT WITH THE LAUNCH VEHICLE. N. IMPLEMENT A SAFETY PROGRAM INCLUDING THE GENERATION OF THE MISSILE SYSTEM PRE-LAUNCH SAFETY PACKAGE (MSPSP). O. SUPPORT LAUNCH, PERFORM ON-ORBIT CHECKOUT, AND ESTABLISH ON-ORBIT DATA ACQUISITION CONTACT WITH THE PAYLOAD. WITHIN THE FIRST 30 DAYS AFTER LAUNCH, INITIAL ENGINEERING AND SCIENCE CHECKOUT AND VERIFICATION OF SPACECRAFT IN-FLIGHT OPERATION WILL BE PERFORMED. P. PROVIDE THE SERVICES OF THE MCC AND THE ISOC. Q. CONDUCT THE E/PO PROGRAM IN COOPERATION WITH THE IDENTIFIED TEAM MEMBERS.$533K
Sep 30, 2025Department of EnergySC CHICAGO SERVICE CENTER611310MANAGEMENT AND OPERATING CONTRACT FOR THE OPERATION OF THE PRINCETON PLASMA PHYSICS LABORATORY (PPPL)$58M
Sep 15, 2025National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER334511IGF::OT::IGF THIS CONTRACT IS FOR IBEX INTERSTELLAR BOUNDARY EXPLORER (IBEX) SUPPORT. THIS CONTRACT IS A RESULT OF A PI TRANSFER FROM NNG05EC85C. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE IBEX MISSION INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS (PAYLOAD, SPACECRAFT, LAUNCH VEHICLE, SPACECRAFT TO LAUNCH-VEHICLE INTERFACES, LAUNCH AND FLIGHT OPERATIONS) AND 3) POST-OPERATIONS DATA ANALYSIS AND ARCHIVING. IN PERFORMANCE OF THIS EFFORT, THE IBEX TEAM SHALL: A. MANAGE THE PROJECT, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS SPECIFIED IN 3.0 MANAGEMENT, ABOVE. B. PROVIDE DAY-TO-DAY MANAGEMENT AND COORDINATION OF THE PROJECT AS DELEGATED BY THE PI TO THE PROJECT MANAGER (PM), INCLUDING MONITORING AND REPORTING TECHNICAL PROGRESS AND FINANCIAL STATUS, IMPLEMENTING THE RISK MANAGEMENT PLAN AND CONDUCTING MISSION LEVEL REVIEWS AS SPECIFIED IN SECTION 4.3, SYSTEM LEVEL REVIEWS. C. CONDUCT REVIEWS FOR ALL PAYLOAD SENSORS, PAYLOAD SUPPORT INFRASTRUCTURE AND ASSOCIATED GSE. D. PERFORM SCIENTIFIC ANALYSES IN SUPPORT OF THE MISSION SCIENCE REQUIREMENTS. E. PERFORM SYSTEMS ENGINEERING TO COORDINATE THE DESIGN OF THE INSTRUMENT COMPLEMENT AND SPACECRAFT BUS COMPONENTS AND TO ENSURE THE COMPATIBILITY OF THE SPACE-TO-GROUND AND NETWORK COMMUNICATIONS. F. PERFORM TRADE STUDIES TO ELIMINATE AND MITIGATE RISKS G. DELIVER THE IBEX FLIGHT SEGMENT TO VANDENBERG AIR FORCE BASE (VAFB), SUPPORT INTEGRATION WITH THE LAUNCH VEHICLE, AND ASSIST THE LAUNCH OPERATIONS H. ESTABLISH THE MISSION CONTROL CENTER (MCC) AND IBEX SCIENCE OPERATIONS AND DATA ANALYSIS CENTER (ISOC) INCLUDING ALL COMPUTERS, NETWORKS, AND OPERATING SOFTWARE, INSTRUMENT DATABASES AND PROCEDURES NECESSARY TO FUNCTIONALLY TEST AND LATER CONTROL THE SPACECRAFT I. HOLD SCIENCE TEAM MEETINGS AS WELL AS TECHNICAL INTERCHANGE MEETINGS. J. BASELINE THE SCIENCE REQUIREMENTS AND SCIENCE ANALYSIS PLAN INTO AN IBEX MISSION DEFINITION REQUIREMENTS AGREEMENT (MDRA) AND THE IBEX DATA MANAGEMENT PLAN. K. IMPLEMENT AN APPROVED MISSION ASSURANCE PLAN. L. IMPLEMENT A SYSTEMS ENGINEERING FUNCTION TO VERIFY PERFORMANCE SPECIFICATION COMPLIANCE TO THE MISSION SCIENCE REQUIREMENTS. M. DESIGN, FABRICATE, INTEGRATE AND TEST THE PAYLOAD, SPACECRAFT, SOLID ROCKET MOTOR AND LAUNCH VEHICLE ADAPTER, AND INTEGRATE THE IBEX FLIGHT SEGMENT WITH THE LAUNCH VEHICLE. N. IMPLEMENT A SAFETY PROGRAM INCLUDING THE GENERATION OF THE MISSILE SYSTEM PRE-LAUNCH SAFETY PACKAGE (MSPSP). O. SUPPORT LAUNCH, PERFORM ON-ORBIT CHECKOUT, AND ESTABLISH ON-ORBIT DATA ACQUISITION CONTACT WITH THE PAYLOAD. WITHIN THE FIRST 30 DAYS AFTER LAUNCH, INITIAL ENGINEERING AND SCIENCE CHECKOUT AND VERIFICATION OF SPACECRAFT IN-FLIGHT OPERATION WILL BE PERFORMED. P. PROVIDE THE SERVICES OF THE MCC AND THE ISOC. Q. CONDUCT THE E/PO PROGRAM IN COOPERATION WITH THE IDENTIFIED TEAM MEMBERS.$13K
Aug 26, 2025Department of EnergySC CHICAGO SERVICE CENTER611310MANAGEMENT AND OPERATING CONTRACT FOR THE OPERATION OF THE PRINCETON PLASMA PHYSICS LABORATORY (PPPL)$204K
Aug 26, 2025Department of EnergySC CHICAGO SERVICE CENTER611310MANAGEMENT AND OPERATING CONTRACT FOR THE OPERATION OF THE PRINCETON PLASMA PHYSICS LABORATORY (PPPL)$1.3M
Aug 22, 2025National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER541715INTERSTELLAR MAPPING AND ACCELERATION PROBE (IMAP) IS A WATERSHED MISSION THAT SIMULTANEOUSLY INVESTIGATES THE ACCELERATION OF ENERGETIC PARTICLES AND INTERACTION OF THE SOLAR WIND WITH THE LOCAL INTERSTELLAR MEDIUM. IMAP WILL 1) ADVANCE THE UNDERSTANDING OF THE TEMPORAL AND SPATIAL EVOLUTION OF THE BOUNDARY REGION IN WHICH THE SOLAR WIND AND INTERSTELLAR MEDIUM INTERACT, 2) IDENTIFY AND ADVANCE THE UNDERSTANDING OF PROCESSES RELATED TO THE INTERACTIONS OF THE MAGNETIC FIELD OF THE SUN AND THE LOCAL INTERSTELLAR MEDIUM, 3) IMPROVE THE UNDERSTANDING OF THE COMPOSITION AND PROPERTIES OF THE LOCAL INTERSTELLAR MEDIUM, AND 4) IDENTIFY AND ADVANCE THE UNDERSTANDING OF PARTICLE INJECTION AND ACCELERATION PROCESSES NEAR THE SUN, IN THE HELIOSPHERE AND HELIOSHEATH. IMAP IS BASED ON A COMPLETE AND SYNERGISTIC SET OF OBSERVATIONS. IN SITU AT 1AU, THIS REQUIRES DETAILED OBSERVATIONS OF THE SOLAR WIND ELECTRONS AND IONS SUPRATHERMAL, PICKUP, AND ENERGETIC ION POPULATIONS AND MAGNETIC FIELD. FOR THE OUTER HELIOSPHERE INTERACTION, IT REQUIRES ADVANCED GLOBAL OBSERVATIONS OF THE REMOTE PLASMA AND ENERGETIC IONS OVER A BROAD ENERGY RANGE VIA ENERGETIC NEUTRAL ATOM (ENA) IMAGING, AS WELL AS PRECISE OBSERVATION OF THE NEUTRAL INTERSTELLAR ATOMS PENETRATING THE HELIOSPHERE. COMPLEMENTARY OBSERVATIONS OF INTERSTELLAR DUST AND THE UV GLOW OF INTERSTELLAR NEUTRALS, WHILE NOT REQUIRED FOR THE THRESHOLD MISSION, ADD IMPORTANT CONTEXT AND INSIGHTS TO DEEPEN PHYSICAL UNDERSTANDING OF THE BASELINE MISSION. THESE OBSERVATIONAL NEEDS WILL REQUIRE AN INTEGRATED AND COORDINATED SUITE OF 10 INSTRUMENTS THAT SPAN BOTH THE IN SITU AND REMOTE IMAGING ASPECTS OF THE INVESTIGATION. AS THE PI INSTITUTION PRINCETON UNIVERSITY OVERSEES THE DEVELOPMENT OF IMAP TO ENSURE COST, RISK, AND SCIENCE OBJECTIVES ARE MET IN THE CONTEXT OF AN OVERALL PLAN TO DEVELOP, INTEGRATE, TEST, LAUNCH, COMMISSION, AND OPERATE THE IMAP MISSION. PRINCETON WILL DEVELOP THE SOLAR WIND AND PICKUP ION (SWAPI) INSTRUMENT, MANAGE THE MISSION SCIENCE TEAM, DEVELOP THE INTERSTELLAR DUST EXPERIMENT (IDEX) INSTRUMENT DATA PIPELINE, INITIATE THE FUTURE LEADERS PROGRAM, AND OVERSEE THE MISSION STUDENT COLLABORATION.$1.5M
Jul 28, 2025Department of EnergySC CHICAGO SERVICE CENTER611310MANAGEMENT AND OPERATING CONTRACT FOR THE OPERATION OF THE PRINCETON PLASMA PHYSICS LABORATORY (PPPL)$38M
Jul 11, 2025Smithsonian InstitutionSMITHSONIAN TROPICAL RESEARCH INSTITUTE611310RESEARCH SUPPORT SERVICES$57K
Jun 26, 2025Department of EnergySC CHICAGO SERVICE CENTER611310MANAGEMENT AND OPERATING CONTRACT FOR THE OPERATION OF THE PRINCETON PLASMA PHYSICS LABORATORY (PPPL)$27M
Jun 11, 2025National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER334511IGF::OT::IGF THIS CONTRACT IS FOR IBEX INTERSTELLAR BOUNDARY EXPLORER (IBEX) SUPPORT. THIS CONTRACT IS A RESULT OF A PI TRANSFER FROM NNG05EC85C. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE IBEX MISSION INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS (PAYLOAD, SPACECRAFT, LAUNCH VEHICLE, SPACECRAFT TO LAUNCH-VEHICLE INTERFACES, LAUNCH AND FLIGHT OPERATIONS) AND 3) POST-OPERATIONS DATA ANALYSIS AND ARCHIVING. IN PERFORMANCE OF THIS EFFORT, THE IBEX TEAM SHALL: A. MANAGE THE PROJECT, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS SPECIFIED IN 3.0 MANAGEMENT, ABOVE. B. PROVIDE DAY-TO-DAY MANAGEMENT AND COORDINATION OF THE PROJECT AS DELEGATED BY THE PI TO THE PROJECT MANAGER (PM), INCLUDING MONITORING AND REPORTING TECHNICAL PROGRESS AND FINANCIAL STATUS, IMPLEMENTING THE RISK MANAGEMENT PLAN AND CONDUCTING MISSION LEVEL REVIEWS AS SPECIFIED IN SECTION 4.3, SYSTEM LEVEL REVIEWS. C. CONDUCT REVIEWS FOR ALL PAYLOAD SENSORS, PAYLOAD SUPPORT INFRASTRUCTURE AND ASSOCIATED GSE. D. PERFORM SCIENTIFIC ANALYSES IN SUPPORT OF THE MISSION SCIENCE REQUIREMENTS. E. PERFORM SYSTEMS ENGINEERING TO COORDINATE THE DESIGN OF THE INSTRUMENT COMPLEMENT AND SPACECRAFT BUS COMPONENTS AND TO ENSURE THE COMPATIBILITY OF THE SPACE-TO-GROUND AND NETWORK COMMUNICATIONS. F. PERFORM TRADE STUDIES TO ELIMINATE AND MITIGATE RISKS G. DELIVER THE IBEX FLIGHT SEGMENT TO VANDENBERG AIR FORCE BASE (VAFB), SUPPORT INTEGRATION WITH THE LAUNCH VEHICLE, AND ASSIST THE LAUNCH OPERATIONS H. ESTABLISH THE MISSION CONTROL CENTER (MCC) AND IBEX SCIENCE OPERATIONS AND DATA ANALYSIS CENTER (ISOC) INCLUDING ALL COMPUTERS, NETWORKS, AND OPERATING SOFTWARE, INSTRUMENT DATABASES AND PROCEDURES NECESSARY TO FUNCTIONALLY TEST AND LATER CONTROL THE SPACECRAFT I. HOLD SCIENCE TEAM MEETINGS AS WELL AS TECHNICAL INTERCHANGE MEETINGS. J. BASELINE THE SCIENCE REQUIREMENTS AND SCIENCE ANALYSIS PLAN INTO AN IBEX MISSION DEFINITION REQUIREMENTS AGREEMENT (MDRA) AND THE IBEX DATA MANAGEMENT PLAN. K. IMPLEMENT AN APPROVED MISSION ASSURANCE PLAN. L. IMPLEMENT A SYSTEMS ENGINEERING FUNCTION TO VERIFY PERFORMANCE SPECIFICATION COMPLIANCE TO THE MISSION SCIENCE REQUIREMENTS. M. DESIGN, FABRICATE, INTEGRATE AND TEST THE PAYLOAD, SPACECRAFT, SOLID ROCKET MOTOR AND LAUNCH VEHICLE ADAPTER, AND INTEGRATE THE IBEX FLIGHT SEGMENT WITH THE LAUNCH VEHICLE. N. IMPLEMENT A SAFETY PROGRAM INCLUDING THE GENERATION OF THE MISSILE SYSTEM PRE-LAUNCH SAFETY PACKAGE (MSPSP). O. SUPPORT LAUNCH, PERFORM ON-ORBIT CHECKOUT, AND ESTABLISH ON-ORBIT DATA ACQUISITION CONTACT WITH THE PAYLOAD. WITHIN THE FIRST 30 DAYS AFTER LAUNCH, INITIAL ENGINEERING AND SCIENCE CHECKOUT AND VERIFICATION OF SPACECRAFT IN-FLIGHT OPERATION WILL BE PERFORMED. P. PROVIDE THE SERVICES OF THE MCC AND THE ISOC. Q. CONDUCT THE E/PO PROGRAM IN COOPERATION WITH THE IDENTIFIED TEAM MEMBERS.$210K
May 22, 2025Department of EnergySC CHICAGO SERVICE CENTER611310MANAGEMENT AND OPERATING CONTRACT FOR THE OPERATION OF THE PRINCETON PLASMA PHYSICS LABORATORY (PPPL)$11M
Apr 28, 2025Department of EnergySC CHICAGO SERVICE CENTER611310MANAGEMENT AND OPERATING CONTRACT FOR THE OPERATION OF THE PRINCETON PLASMA PHYSICS LABORATORY (PPPL)$5.7M

Subawards Paid Out

The Trustees Of Princeton University acts as a prime contractor and pays subcontractors on federal awards. Aggregated from USAspending sub-award reporting (FY2016-FY2026).

$50K
Total Paid to Subs
1
Sub Awards
1
Distinct Subawardees

Top 1 Subawardees

Subawards Received

The Trustees Of Princeton University also receives subaward dollars from other prime contractors. Aggregated from USAspending sub-award reporting (FY2016-FY2026).

$7.4M
Total Received
19
Sub Awards
8
Distinct Primes

Top 8 Primes Paying The Trustees Of Princeton University

Related Contractors

Other companies active in NAICS 611310COLLEGES, UNIVERSITIES, AND PROFESSIONAL SCHOOLS.

Track The Trustees Of Princeton University Recompetes Before They Post

Mindy monitors The Trustees Of Princeton University's active contracts and alerts you 12 months before they expire — so you can position to compete on recompete.

Get Free Recompete Alerts