Federal Contractor Profile
The Trustees Of Princeton University
Federal contracting record: $1.7B obligated across 50 awards from 11 agencies, FY 2016–2026.
Company Profile
Parent UEI (Unique Entity Identifier)
NJ1YPQXQG7U5
CAGE Code
4B486
Address
1 NASSAU HALL, PRINCETON, NJ, 085440001
First Federal Award
Oct 1, 2015
Most Recent Award
Aug 27, 2026
Federal Sales Analytics
Toggle between trend, agency drilldown, and treemap. Use the period selector to focus the time window.
Hover any bar for YoY change + award count. Current fiscal year shown at reduced opacity (partial year).
Top Federal Agencies
- Department of Energy$1.6B
94.0% of total obligations
- National Aeronautics and Space Administration$92M
5.3% of total obligations
- Department of Defense$8.3M
0.5% of total obligations
- Department of Health and Human Services$2.4M
0.1% of total obligations
- Agency for International Development$750K
0.0% of total obligations
- Department of the Interior$169K
0.0% of total obligations
- Department of State$131K
0.0% of total obligations
- Smithsonian Institution$62K
0.0% of total obligations
- Department of Homeland Security$0
0.0% of total obligations
- Department of Justice$0
0.0% of total obligations
Top NAICS Activity
- $1.6B
- 541715$80M
RESEARCH AND DEVELOPMENT IN THE PHYSICAL, ENGINEERING, AND LIFE SCIENCES (EXCEPT NANOTECHNOLOGY AND BIOTECHNOLOGY)
8 awards
- 334511$12M
SEARCH, DETECTION, NAVIGATION, GUIDANCE, AERONAUTICAL, AND NAUTICAL SYSTEM AND INSTRUMENT MANUFACTURING
1 awards
- 541712$4.0M
RESEARCH AND DEVELOPMENT IN THE PHYSICAL, ENGINEERING, AND LIFE SCIENCES (EXCEPT BIOTECHNOLOGY)
7 awards
- $3.7M
- $2.0M
- $750K
- $310K
- $186K
- $169K
Recent Federal Awards
| Date | Agency | NAICS | Description | Amount |
|---|---|---|---|---|
| Aug 27, 2026 | Department of EnergySC CHICAGO SERVICE CENTER | 611310 | MANAGEMENT AND OPERATING CONTRACT FOR THE OPERATION OF THE PRINCETON PLASMA PHYSICS LABORATORY (PPPL) | $825K → |
| Aug 27, 2026 | Department of EnergySC CHICAGO SERVICE CENTER | 611310 | MANAGEMENT AND OPERATING CONTRACT FOR THE OPERATION OF THE PRINCETON PLASMA PHYSICS LABORATORY (PPPL) | $12M → |
| Jul 30, 2026 | Department of EnergySC CHICAGO SERVICE CENTER | 611310 | MANAGEMENT AND OPERATING CONTRACT FOR THE OPERATION OF THE PRINCETON PLASMA PHYSICS LABORATORY (PPPL) | $17M → |
| Jul 17, 2026 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | 334511 | IGF::OT::IGF THIS CONTRACT IS FOR IBEX INTERSTELLAR BOUNDARY EXPLORER (IBEX) SUPPORT. THIS CONTRACT IS A RESULT OF A PI TRANSFER FROM NNG05EC85C. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE IBEX MISSION INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS (PAYLOAD, SPACECRAFT, LAUNCH VEHICLE, SPACECRAFT TO LAUNCH-VEHICLE INTERFACES, LAUNCH AND FLIGHT OPERATIONS) AND 3) POST-OPERATIONS DATA ANALYSIS AND ARCHIVING. IN PERFORMANCE OF THIS EFFORT, THE IBEX TEAM SHALL: A. MANAGE THE PROJECT, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS SPECIFIED IN 3.0 MANAGEMENT, ABOVE. B. PROVIDE DAY-TO-DAY MANAGEMENT AND COORDINATION OF THE PROJECT AS DELEGATED BY THE PI TO THE PROJECT MANAGER (PM), INCLUDING MONITORING AND REPORTING TECHNICAL PROGRESS AND FINANCIAL STATUS, IMPLEMENTING THE RISK MANAGEMENT PLAN AND CONDUCTING MISSION LEVEL REVIEWS AS SPECIFIED IN SECTION 4.3, SYSTEM LEVEL REVIEWS. C. CONDUCT REVIEWS FOR ALL PAYLOAD SENSORS, PAYLOAD SUPPORT INFRASTRUCTURE AND ASSOCIATED GSE. D. PERFORM SCIENTIFIC ANALYSES IN SUPPORT OF THE MISSION SCIENCE REQUIREMENTS. E. PERFORM SYSTEMS ENGINEERING TO COORDINATE THE DESIGN OF THE INSTRUMENT COMPLEMENT AND SPACECRAFT BUS COMPONENTS AND TO ENSURE THE COMPATIBILITY OF THE SPACE-TO-GROUND AND NETWORK COMMUNICATIONS. F. PERFORM TRADE STUDIES TO ELIMINATE AND MITIGATE RISKS G. DELIVER THE IBEX FLIGHT SEGMENT TO VANDENBERG AIR FORCE BASE (VAFB), SUPPORT INTEGRATION WITH THE LAUNCH VEHICLE, AND ASSIST THE LAUNCH OPERATIONS H. ESTABLISH THE MISSION CONTROL CENTER (MCC) AND IBEX SCIENCE OPERATIONS AND DATA ANALYSIS CENTER (ISOC) INCLUDING ALL COMPUTERS, NETWORKS, AND OPERATING SOFTWARE, INSTRUMENT DATABASES AND PROCEDURES NECESSARY TO FUNCTIONALLY TEST AND LATER CONTROL THE SPACECRAFT I. HOLD SCIENCE TEAM MEETINGS AS WELL AS TECHNICAL INTERCHANGE MEETINGS. J. BASELINE THE SCIENCE REQUIREMENTS AND SCIENCE ANALYSIS PLAN INTO AN IBEX MISSION DEFINITION REQUIREMENTS AGREEMENT (MDRA) AND THE IBEX DATA MANAGEMENT PLAN. K. IMPLEMENT AN APPROVED MISSION ASSURANCE PLAN. L. IMPLEMENT A SYSTEMS ENGINEERING FUNCTION TO VERIFY PERFORMANCE SPECIFICATION COMPLIANCE TO THE MISSION SCIENCE REQUIREMENTS. M. DESIGN, FABRICATE, INTEGRATE AND TEST THE PAYLOAD, SPACECRAFT, SOLID ROCKET MOTOR AND LAUNCH VEHICLE ADAPTER, AND INTEGRATE THE IBEX FLIGHT SEGMENT WITH THE LAUNCH VEHICLE. N. IMPLEMENT A SAFETY PROGRAM INCLUDING THE GENERATION OF THE MISSILE SYSTEM PRE-LAUNCH SAFETY PACKAGE (MSPSP). O. SUPPORT LAUNCH, PERFORM ON-ORBIT CHECKOUT, AND ESTABLISH ON-ORBIT DATA ACQUISITION CONTACT WITH THE PAYLOAD. WITHIN THE FIRST 30 DAYS AFTER LAUNCH, INITIAL ENGINEERING AND SCIENCE CHECKOUT AND VERIFICATION OF SPACECRAFT IN-FLIGHT OPERATION WILL BE PERFORMED. P. PROVIDE THE SERVICES OF THE MCC AND THE ISOC. Q. CONDUCT THE E/PO PROGRAM IN COOPERATION WITH THE IDENTIFIED TEAM MEMBERS. | $255K → |
| Jul 7, 2026 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | 541715 | INTERSTELLAR MAPPING AND ACCELERATION PROBE (IMAP) IS A WATERSHED MISSION THAT SIMULTANEOUSLY INVESTIGATES THE ACCELERATION OF ENERGETIC PARTICLES AND INTERACTION OF THE SOLAR WIND WITH THE LOCAL INTERSTELLAR MEDIUM. IMAP WILL 1) ADVANCE THE UNDERSTANDING OF THE TEMPORAL AND SPATIAL EVOLUTION OF THE BOUNDARY REGION IN WHICH THE SOLAR WIND AND INTERSTELLAR MEDIUM INTERACT, 2) IDENTIFY AND ADVANCE THE UNDERSTANDING OF PROCESSES RELATED TO THE INTERACTIONS OF THE MAGNETIC FIELD OF THE SUN AND THE LOCAL INTERSTELLAR MEDIUM, 3) IMPROVE THE UNDERSTANDING OF THE COMPOSITION AND PROPERTIES OF THE LOCAL INTERSTELLAR MEDIUM, AND 4) IDENTIFY AND ADVANCE THE UNDERSTANDING OF PARTICLE INJECTION AND ACCELERATION PROCESSES NEAR THE SUN, IN THE HELIOSPHERE AND HELIOSHEATH. IMAP IS BASED ON A COMPLETE AND SYNERGISTIC SET OF OBSERVATIONS. IN SITU AT 1AU, THIS REQUIRES DETAILED OBSERVATIONS OF THE SOLAR WIND ELECTRONS AND IONS SUPRATHERMAL, PICKUP, AND ENERGETIC ION POPULATIONS AND MAGNETIC FIELD. FOR THE OUTER HELIOSPHERE INTERACTION, IT REQUIRES ADVANCED GLOBAL OBSERVATIONS OF THE REMOTE PLASMA AND ENERGETIC IONS OVER A BROAD ENERGY RANGE VIA ENERGETIC NEUTRAL ATOM (ENA) IMAGING, AS WELL AS PRECISE OBSERVATION OF THE NEUTRAL INTERSTELLAR ATOMS PENETRATING THE HELIOSPHERE. COMPLEMENTARY OBSERVATIONS OF INTERSTELLAR DUST AND THE UV GLOW OF INTERSTELLAR NEUTRALS, WHILE NOT REQUIRED FOR THE THRESHOLD MISSION, ADD IMPORTANT CONTEXT AND INSIGHTS TO DEEPEN PHYSICAL UNDERSTANDING OF THE BASELINE MISSION. THESE OBSERVATIONAL NEEDS WILL REQUIRE AN INTEGRATED AND COORDINATED SUITE OF 10 INSTRUMENTS THAT SPAN BOTH THE IN SITU AND REMOTE IMAGING ASPECTS OF THE INVESTIGATION. AS THE PI INSTITUTION PRINCETON UNIVERSITY OVERSEES THE DEVELOPMENT OF IMAP TO ENSURE COST, RISK, AND SCIENCE OBJECTIVES ARE MET IN THE CONTEXT OF AN OVERALL PLAN TO DEVELOP, INTEGRATE, TEST, LAUNCH, COMMISSION, AND OPERATE THE IMAP MISSION. PRINCETON WILL DEVELOP THE SOLAR WIND AND PICKUP ION (SWAPI) INSTRUMENT, MANAGE THE MISSION SCIENCE TEAM, DEVELOP THE INTERSTELLAR DUST EXPERIMENT (IDEX) INSTRUMENT DATA PIPELINE, INITIATE THE FUTURE LEADERS PROGRAM, AND OVERSEE THE MISSION STUDENT COLLABORATION. | $994K → |
| Jun 25, 2026 | Department of EnergySC CHICAGO SERVICE CENTER | 611310 | MANAGEMENT AND OPERATING CONTRACT FOR THE OPERATION OF THE PRINCETON PLASMA PHYSICS LABORATORY (PPPL) | $16M → |
| May 26, 2026 | Department of EnergySC CHICAGO SERVICE CENTER | 611310 | MANAGEMENT AND OPERATING CONTRACT FOR THE OPERATION OF THE PRINCETON PLASMA PHYSICS LABORATORY (PPPL) | $28M → |
| May 12, 2026 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | 541715 | INTERSTELLAR MAPPING AND ACCELERATION PROBE (IMAP) IS A WATERSHED MISSION THAT SIMULTANEOUSLY INVESTIGATES THE ACCELERATION OF ENERGETIC PARTICLES AND INTERACTION OF THE SOLAR WIND WITH THE LOCAL INTERSTELLAR MEDIUM. IMAP WILL 1) ADVANCE THE UNDERSTANDING OF THE TEMPORAL AND SPATIAL EVOLUTION OF THE BOUNDARY REGION IN WHICH THE SOLAR WIND AND INTERSTELLAR MEDIUM INTERACT, 2) IDENTIFY AND ADVANCE THE UNDERSTANDING OF PROCESSES RELATED TO THE INTERACTIONS OF THE MAGNETIC FIELD OF THE SUN AND THE LOCAL INTERSTELLAR MEDIUM, 3) IMPROVE THE UNDERSTANDING OF THE COMPOSITION AND PROPERTIES OF THE LOCAL INTERSTELLAR MEDIUM, AND 4) IDENTIFY AND ADVANCE THE UNDERSTANDING OF PARTICLE INJECTION AND ACCELERATION PROCESSES NEAR THE SUN, IN THE HELIOSPHERE AND HELIOSHEATH. IMAP IS BASED ON A COMPLETE AND SYNERGISTIC SET OF OBSERVATIONS. IN SITU AT 1AU, THIS REQUIRES DETAILED OBSERVATIONS OF THE SOLAR WIND ELECTRONS AND IONS SUPRATHERMAL, PICKUP, AND ENERGETIC ION POPULATIONS AND MAGNETIC FIELD. FOR THE OUTER HELIOSPHERE INTERACTION, IT REQUIRES ADVANCED GLOBAL OBSERVATIONS OF THE REMOTE PLASMA AND ENERGETIC IONS OVER A BROAD ENERGY RANGE VIA ENERGETIC NEUTRAL ATOM (ENA) IMAGING, AS WELL AS PRECISE OBSERVATION OF THE NEUTRAL INTERSTELLAR ATOMS PENETRATING THE HELIOSPHERE. COMPLEMENTARY OBSERVATIONS OF INTERSTELLAR DUST AND THE UV GLOW OF INTERSTELLAR NEUTRALS, WHILE NOT REQUIRED FOR THE THRESHOLD MISSION, ADD IMPORTANT CONTEXT AND INSIGHTS TO DEEPEN PHYSICAL UNDERSTANDING OF THE BASELINE MISSION. THESE OBSERVATIONAL NEEDS WILL REQUIRE AN INTEGRATED AND COORDINATED SUITE OF 10 INSTRUMENTS THAT SPAN BOTH THE IN SITU AND REMOTE IMAGING ASPECTS OF THE INVESTIGATION. AS THE PI INSTITUTION PRINCETON UNIVERSITY OVERSEES THE DEVELOPMENT OF IMAP TO ENSURE COST, RISK, AND SCIENCE OBJECTIVES ARE MET IN THE CONTEXT OF AN OVERALL PLAN TO DEVELOP, INTEGRATE, TEST, LAUNCH, COMMISSION, AND OPERATE THE IMAP MISSION. PRINCETON WILL DEVELOP THE SOLAR WIND AND PICKUP ION (SWAPI) INSTRUMENT, MANAGE THE MISSION SCIENCE TEAM, DEVELOP THE INTERSTELLAR DUST EXPERIMENT (IDEX) INSTRUMENT DATA PIPELINE, INITIATE THE FUTURE LEADERS PROGRAM, AND OVERSEE THE MISSION STUDENT COLLABORATION. | $25M → |
| Apr 28, 2026 | Department of EnergySC CHICAGO SERVICE CENTER | 611310 | MANAGEMENT AND OPERATING CONTRACT FOR THE OPERATION OF THE PRINCETON PLASMA PHYSICS LABORATORY (PPPL) | $45M → |
| Apr 21, 2026 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | 541715 | INTERSTELLAR MAPPING AND ACCELERATION PROBE (IMAP) IS A WATERSHED MISSION THAT SIMULTANEOUSLY INVESTIGATES THE ACCELERATION OF ENERGETIC PARTICLES AND INTERACTION OF THE SOLAR WIND WITH THE LOCAL INTERSTELLAR MEDIUM. IMAP WILL 1) ADVANCE THE UNDERSTANDING OF THE TEMPORAL AND SPATIAL EVOLUTION OF THE BOUNDARY REGION IN WHICH THE SOLAR WIND AND INTERSTELLAR MEDIUM INTERACT, 2) IDENTIFY AND ADVANCE THE UNDERSTANDING OF PROCESSES RELATED TO THE INTERACTIONS OF THE MAGNETIC FIELD OF THE SUN AND THE LOCAL INTERSTELLAR MEDIUM, 3) IMPROVE THE UNDERSTANDING OF THE COMPOSITION AND PROPERTIES OF THE LOCAL INTERSTELLAR MEDIUM, AND 4) IDENTIFY AND ADVANCE THE UNDERSTANDING OF PARTICLE INJECTION AND ACCELERATION PROCESSES NEAR THE SUN, IN THE HELIOSPHERE AND HELIOSHEATH. IMAP IS BASED ON A COMPLETE AND SYNERGISTIC SET OF OBSERVATIONS. IN SITU AT 1AU, THIS REQUIRES DETAILED OBSERVATIONS OF THE SOLAR WIND ELECTRONS AND IONS SUPRATHERMAL, PICKUP, AND ENERGETIC ION POPULATIONS AND MAGNETIC FIELD. FOR THE OUTER HELIOSPHERE INTERACTION, IT REQUIRES ADVANCED GLOBAL OBSERVATIONS OF THE REMOTE PLASMA AND ENERGETIC IONS OVER A BROAD ENERGY RANGE VIA ENERGETIC NEUTRAL ATOM (ENA) IMAGING, AS WELL AS PRECISE OBSERVATION OF THE NEUTRAL INTERSTELLAR ATOMS PENETRATING THE HELIOSPHERE. COMPLEMENTARY OBSERVATIONS OF INTERSTELLAR DUST AND THE UV GLOW OF INTERSTELLAR NEUTRALS, WHILE NOT REQUIRED FOR THE THRESHOLD MISSION, ADD IMPORTANT CONTEXT AND INSIGHTS TO DEEPEN PHYSICAL UNDERSTANDING OF THE BASELINE MISSION. THESE OBSERVATIONAL NEEDS WILL REQUIRE AN INTEGRATED AND COORDINATED SUITE OF 10 INSTRUMENTS THAT SPAN BOTH THE IN SITU AND REMOTE IMAGING ASPECTS OF THE INVESTIGATION. AS THE PI INSTITUTION PRINCETON UNIVERSITY OVERSEES THE DEVELOPMENT OF IMAP TO ENSURE COST, RISK, AND SCIENCE OBJECTIVES ARE MET IN THE CONTEXT OF AN OVERALL PLAN TO DEVELOP, INTEGRATE, TEST, LAUNCH, COMMISSION, AND OPERATE THE IMAP MISSION. PRINCETON WILL DEVELOP THE SOLAR WIND AND PICKUP ION (SWAPI) INSTRUMENT, MANAGE THE MISSION SCIENCE TEAM, DEVELOP THE INTERSTELLAR DUST EXPERIMENT (IDEX) INSTRUMENT DATA PIPELINE, INITIATE THE FUTURE LEADERS PROGRAM, AND OVERSEE THE MISSION STUDENT COLLABORATION. | $1.1M → |
| Apr 8, 2026 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | 334511 | IGF::OT::IGF THIS CONTRACT IS FOR IBEX INTERSTELLAR BOUNDARY EXPLORER (IBEX) SUPPORT. THIS CONTRACT IS A RESULT OF A PI TRANSFER FROM NNG05EC85C. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE IBEX MISSION INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS (PAYLOAD, SPACECRAFT, LAUNCH VEHICLE, SPACECRAFT TO LAUNCH-VEHICLE INTERFACES, LAUNCH AND FLIGHT OPERATIONS) AND 3) POST-OPERATIONS DATA ANALYSIS AND ARCHIVING. IN PERFORMANCE OF THIS EFFORT, THE IBEX TEAM SHALL: A. MANAGE THE PROJECT, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS SPECIFIED IN 3.0 MANAGEMENT, ABOVE. B. PROVIDE DAY-TO-DAY MANAGEMENT AND COORDINATION OF THE PROJECT AS DELEGATED BY THE PI TO THE PROJECT MANAGER (PM), INCLUDING MONITORING AND REPORTING TECHNICAL PROGRESS AND FINANCIAL STATUS, IMPLEMENTING THE RISK MANAGEMENT PLAN AND CONDUCTING MISSION LEVEL REVIEWS AS SPECIFIED IN SECTION 4.3, SYSTEM LEVEL REVIEWS. C. CONDUCT REVIEWS FOR ALL PAYLOAD SENSORS, PAYLOAD SUPPORT INFRASTRUCTURE AND ASSOCIATED GSE. D. PERFORM SCIENTIFIC ANALYSES IN SUPPORT OF THE MISSION SCIENCE REQUIREMENTS. E. PERFORM SYSTEMS ENGINEERING TO COORDINATE THE DESIGN OF THE INSTRUMENT COMPLEMENT AND SPACECRAFT BUS COMPONENTS AND TO ENSURE THE COMPATIBILITY OF THE SPACE-TO-GROUND AND NETWORK COMMUNICATIONS. F. PERFORM TRADE STUDIES TO ELIMINATE AND MITIGATE RISKS G. DELIVER THE IBEX FLIGHT SEGMENT TO VANDENBERG AIR FORCE BASE (VAFB), SUPPORT INTEGRATION WITH THE LAUNCH VEHICLE, AND ASSIST THE LAUNCH OPERATIONS H. ESTABLISH THE MISSION CONTROL CENTER (MCC) AND IBEX SCIENCE OPERATIONS AND DATA ANALYSIS CENTER (ISOC) INCLUDING ALL COMPUTERS, NETWORKS, AND OPERATING SOFTWARE, INSTRUMENT DATABASES AND PROCEDURES NECESSARY TO FUNCTIONALLY TEST AND LATER CONTROL THE SPACECRAFT I. HOLD SCIENCE TEAM MEETINGS AS WELL AS TECHNICAL INTERCHANGE MEETINGS. J. BASELINE THE SCIENCE REQUIREMENTS AND SCIENCE ANALYSIS PLAN INTO AN IBEX MISSION DEFINITION REQUIREMENTS AGREEMENT (MDRA) AND THE IBEX DATA MANAGEMENT PLAN. K. IMPLEMENT AN APPROVED MISSION ASSURANCE PLAN. L. IMPLEMENT A SYSTEMS ENGINEERING FUNCTION TO VERIFY PERFORMANCE SPECIFICATION COMPLIANCE TO THE MISSION SCIENCE REQUIREMENTS. M. DESIGN, FABRICATE, INTEGRATE AND TEST THE PAYLOAD, SPACECRAFT, SOLID ROCKET MOTOR AND LAUNCH VEHICLE ADAPTER, AND INTEGRATE THE IBEX FLIGHT SEGMENT WITH THE LAUNCH VEHICLE. N. IMPLEMENT A SAFETY PROGRAM INCLUDING THE GENERATION OF THE MISSILE SYSTEM PRE-LAUNCH SAFETY PACKAGE (MSPSP). O. SUPPORT LAUNCH, PERFORM ON-ORBIT CHECKOUT, AND ESTABLISH ON-ORBIT DATA ACQUISITION CONTACT WITH THE PAYLOAD. WITHIN THE FIRST 30 DAYS AFTER LAUNCH, INITIAL ENGINEERING AND SCIENCE CHECKOUT AND VERIFICATION OF SPACECRAFT IN-FLIGHT OPERATION WILL BE PERFORMED. P. PROVIDE THE SERVICES OF THE MCC AND THE ISOC. Q. CONDUCT THE E/PO PROGRAM IN COOPERATION WITH THE IDENTIFIED TEAM MEMBERS. | $310K → |
| Mar 26, 2026 | Department of EnergySC CHICAGO SERVICE CENTER | 611310 | MANAGEMENT AND OPERATING CONTRACT FOR THE OPERATION OF THE PRINCETON PLASMA PHYSICS LABORATORY (PPPL) | $11M → |
| Mar 6, 2026 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | 334511 | IGF::OT::IGF THIS CONTRACT IS FOR IBEX INTERSTELLAR BOUNDARY EXPLORER (IBEX) SUPPORT. THIS CONTRACT IS A RESULT OF A PI TRANSFER FROM NNG05EC85C. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE IBEX MISSION INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS (PAYLOAD, SPACECRAFT, LAUNCH VEHICLE, SPACECRAFT TO LAUNCH-VEHICLE INTERFACES, LAUNCH AND FLIGHT OPERATIONS) AND 3) POST-OPERATIONS DATA ANALYSIS AND ARCHIVING. IN PERFORMANCE OF THIS EFFORT, THE IBEX TEAM SHALL: A. MANAGE THE PROJECT, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS SPECIFIED IN 3.0 MANAGEMENT, ABOVE. B. PROVIDE DAY-TO-DAY MANAGEMENT AND COORDINATION OF THE PROJECT AS DELEGATED BY THE PI TO THE PROJECT MANAGER (PM), INCLUDING MONITORING AND REPORTING TECHNICAL PROGRESS AND FINANCIAL STATUS, IMPLEMENTING THE RISK MANAGEMENT PLAN AND CONDUCTING MISSION LEVEL REVIEWS AS SPECIFIED IN SECTION 4.3, SYSTEM LEVEL REVIEWS. C. CONDUCT REVIEWS FOR ALL PAYLOAD SENSORS, PAYLOAD SUPPORT INFRASTRUCTURE AND ASSOCIATED GSE. D. PERFORM SCIENTIFIC ANALYSES IN SUPPORT OF THE MISSION SCIENCE REQUIREMENTS. E. PERFORM SYSTEMS ENGINEERING TO COORDINATE THE DESIGN OF THE INSTRUMENT COMPLEMENT AND SPACECRAFT BUS COMPONENTS AND TO ENSURE THE COMPATIBILITY OF THE SPACE-TO-GROUND AND NETWORK COMMUNICATIONS. F. PERFORM TRADE STUDIES TO ELIMINATE AND MITIGATE RISKS G. DELIVER THE IBEX FLIGHT SEGMENT TO VANDENBERG AIR FORCE BASE (VAFB), SUPPORT INTEGRATION WITH THE LAUNCH VEHICLE, AND ASSIST THE LAUNCH OPERATIONS H. ESTABLISH THE MISSION CONTROL CENTER (MCC) AND IBEX SCIENCE OPERATIONS AND DATA ANALYSIS CENTER (ISOC) INCLUDING ALL COMPUTERS, NETWORKS, AND OPERATING SOFTWARE, INSTRUMENT DATABASES AND PROCEDURES NECESSARY TO FUNCTIONALLY TEST AND LATER CONTROL THE SPACECRAFT I. HOLD SCIENCE TEAM MEETINGS AS WELL AS TECHNICAL INTERCHANGE MEETINGS. J. BASELINE THE SCIENCE REQUIREMENTS AND SCIENCE ANALYSIS PLAN INTO AN IBEX MISSION DEFINITION REQUIREMENTS AGREEMENT (MDRA) AND THE IBEX DATA MANAGEMENT PLAN. K. IMPLEMENT AN APPROVED MISSION ASSURANCE PLAN. L. IMPLEMENT A SYSTEMS ENGINEERING FUNCTION TO VERIFY PERFORMANCE SPECIFICATION COMPLIANCE TO THE MISSION SCIENCE REQUIREMENTS. M. DESIGN, FABRICATE, INTEGRATE AND TEST THE PAYLOAD, SPACECRAFT, SOLID ROCKET MOTOR AND LAUNCH VEHICLE ADAPTER, AND INTEGRATE THE IBEX FLIGHT SEGMENT WITH THE LAUNCH VEHICLE. N. IMPLEMENT A SAFETY PROGRAM INCLUDING THE GENERATION OF THE MISSILE SYSTEM PRE-LAUNCH SAFETY PACKAGE (MSPSP). O. SUPPORT LAUNCH, PERFORM ON-ORBIT CHECKOUT, AND ESTABLISH ON-ORBIT DATA ACQUISITION CONTACT WITH THE PAYLOAD. WITHIN THE FIRST 30 DAYS AFTER LAUNCH, INITIAL ENGINEERING AND SCIENCE CHECKOUT AND VERIFICATION OF SPACECRAFT IN-FLIGHT OPERATION WILL BE PERFORMED. P. PROVIDE THE SERVICES OF THE MCC AND THE ISOC. Q. CONDUCT THE E/PO PROGRAM IN COOPERATION WITH THE IDENTIFIED TEAM MEMBERS. | $135K → |
| Feb 19, 2026 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | 541715 | INTERSTELLAR MAPPING AND ACCELERATION PROBE (IMAP) IS A WATERSHED MISSION THAT SIMULTANEOUSLY INVESTIGATES THE ACCELERATION OF ENERGETIC PARTICLES AND INTERACTION OF THE SOLAR WIND WITH THE LOCAL INTERSTELLAR MEDIUM. IMAP WILL 1) ADVANCE THE UNDERSTANDING OF THE TEMPORAL AND SPATIAL EVOLUTION OF THE BOUNDARY REGION IN WHICH THE SOLAR WIND AND INTERSTELLAR MEDIUM INTERACT, 2) IDENTIFY AND ADVANCE THE UNDERSTANDING OF PROCESSES RELATED TO THE INTERACTIONS OF THE MAGNETIC FIELD OF THE SUN AND THE LOCAL INTERSTELLAR MEDIUM, 3) IMPROVE THE UNDERSTANDING OF THE COMPOSITION AND PROPERTIES OF THE LOCAL INTERSTELLAR MEDIUM, AND 4) IDENTIFY AND ADVANCE THE UNDERSTANDING OF PARTICLE INJECTION AND ACCELERATION PROCESSES NEAR THE SUN, IN THE HELIOSPHERE AND HELIOSHEATH. IMAP IS BASED ON A COMPLETE AND SYNERGISTIC SET OF OBSERVATIONS. IN SITU AT 1AU, THIS REQUIRES DETAILED OBSERVATIONS OF THE SOLAR WIND ELECTRONS AND IONS SUPRATHERMAL, PICKUP, AND ENERGETIC ION POPULATIONS AND MAGNETIC FIELD. FOR THE OUTER HELIOSPHERE INTERACTION, IT REQUIRES ADVANCED GLOBAL OBSERVATIONS OF THE REMOTE PLASMA AND ENERGETIC IONS OVER A BROAD ENERGY RANGE VIA ENERGETIC NEUTRAL ATOM (ENA) IMAGING, AS WELL AS PRECISE OBSERVATION OF THE NEUTRAL INTERSTELLAR ATOMS PENETRATING THE HELIOSPHERE. COMPLEMENTARY OBSERVATIONS OF INTERSTELLAR DUST AND THE UV GLOW OF INTERSTELLAR NEUTRALS, WHILE NOT REQUIRED FOR THE THRESHOLD MISSION, ADD IMPORTANT CONTEXT AND INSIGHTS TO DEEPEN PHYSICAL UNDERSTANDING OF THE BASELINE MISSION. THESE OBSERVATIONAL NEEDS WILL REQUIRE AN INTEGRATED AND COORDINATED SUITE OF 10 INSTRUMENTS THAT SPAN BOTH THE IN SITU AND REMOTE IMAGING ASPECTS OF THE INVESTIGATION. AS THE PI INSTITUTION PRINCETON UNIVERSITY OVERSEES THE DEVELOPMENT OF IMAP TO ENSURE COST, RISK, AND SCIENCE OBJECTIVES ARE MET IN THE CONTEXT OF AN OVERALL PLAN TO DEVELOP, INTEGRATE, TEST, LAUNCH, COMMISSION, AND OPERATE THE IMAP MISSION. PRINCETON WILL DEVELOP THE SOLAR WIND AND PICKUP ION (SWAPI) INSTRUMENT, MANAGE THE MISSION SCIENCE TEAM, DEVELOP THE INTERSTELLAR DUST EXPERIMENT (IDEX) INSTRUMENT DATA PIPELINE, INITIATE THE FUTURE LEADERS PROGRAM, AND OVERSEE THE MISSION STUDENT COLLABORATION. | $337K → |
| Jan 27, 2026 | Department of EnergySC CHICAGO SERVICE CENTER | 611310 | MANAGEMENT AND OPERATING CONTRACT FOR THE OPERATION OF THE PRINCETON PLASMA PHYSICS LABORATORY (PPPL) | $278K → |
| Jan 14, 2026 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | 541715 | INTERSTELLAR MAPPING AND ACCELERATION PROBE (IMAP) IS A WATERSHED MISSION THAT SIMULTANEOUSLY INVESTIGATES THE ACCELERATION OF ENERGETIC PARTICLES AND INTERACTION OF THE SOLAR WIND WITH THE LOCAL INTERSTELLAR MEDIUM. IMAP WILL 1) ADVANCE THE UNDERSTANDING OF THE TEMPORAL AND SPATIAL EVOLUTION OF THE BOUNDARY REGION IN WHICH THE SOLAR WIND AND INTERSTELLAR MEDIUM INTERACT, 2) IDENTIFY AND ADVANCE THE UNDERSTANDING OF PROCESSES RELATED TO THE INTERACTIONS OF THE MAGNETIC FIELD OF THE SUN AND THE LOCAL INTERSTELLAR MEDIUM, 3) IMPROVE THE UNDERSTANDING OF THE COMPOSITION AND PROPERTIES OF THE LOCAL INTERSTELLAR MEDIUM, AND 4) IDENTIFY AND ADVANCE THE UNDERSTANDING OF PARTICLE INJECTION AND ACCELERATION PROCESSES NEAR THE SUN, IN THE HELIOSPHERE AND HELIOSHEATH. IMAP IS BASED ON A COMPLETE AND SYNERGISTIC SET OF OBSERVATIONS. IN SITU AT 1AU, THIS REQUIRES DETAILED OBSERVATIONS OF THE SOLAR WIND ELECTRONS AND IONS SUPRATHERMAL, PICKUP, AND ENERGETIC ION POPULATIONS AND MAGNETIC FIELD. FOR THE OUTER HELIOSPHERE INTERACTION, IT REQUIRES ADVANCED GLOBAL OBSERVATIONS OF THE REMOTE PLASMA AND ENERGETIC IONS OVER A BROAD ENERGY RANGE VIA ENERGETIC NEUTRAL ATOM (ENA) IMAGING, AS WELL AS PRECISE OBSERVATION OF THE NEUTRAL INTERSTELLAR ATOMS PENETRATING THE HELIOSPHERE. COMPLEMENTARY OBSERVATIONS OF INTERSTELLAR DUST AND THE UV GLOW OF INTERSTELLAR NEUTRALS, WHILE NOT REQUIRED FOR THE THRESHOLD MISSION, ADD IMPORTANT CONTEXT AND INSIGHTS TO DEEPEN PHYSICAL UNDERSTANDING OF THE BASELINE MISSION. THESE OBSERVATIONAL NEEDS WILL REQUIRE AN INTEGRATED AND COORDINATED SUITE OF 10 INSTRUMENTS THAT SPAN BOTH THE IN SITU AND REMOTE IMAGING ASPECTS OF THE INVESTIGATION. AS THE PI INSTITUTION PRINCETON UNIVERSITY OVERSEES THE DEVELOPMENT OF IMAP TO ENSURE COST, RISK, AND SCIENCE OBJECTIVES ARE MET IN THE CONTEXT OF AN OVERALL PLAN TO DEVELOP, INTEGRATE, TEST, LAUNCH, COMMISSION, AND OPERATE THE IMAP MISSION. PRINCETON WILL DEVELOP THE SOLAR WIND AND PICKUP ION (SWAPI) INSTRUMENT, MANAGE THE MISSION SCIENCE TEAM, DEVELOP THE INTERSTELLAR DUST EXPERIMENT (IDEX) INSTRUMENT DATA PIPELINE, INITIATE THE FUTURE LEADERS PROGRAM, AND OVERSEE THE MISSION STUDENT COLLABORATION. | $6.0M → |
| Dec 18, 2025 | Department of EnergySC CHICAGO SERVICE CENTER | 611310 | MANAGEMENT AND OPERATING CONTRACT FOR THE OPERATION OF THE PRINCETON PLASMA PHYSICS LABORATORY (PPPL) | $38M → |
| Nov 12, 2025 | Department of DefenseW4LD USA HECSA | 541715 | SERDP ER25-4757 PRINCETON UNIVERSITY - BIODEGRADATION OF PER- AND POLYFLUORINATED ALKYL SUBSTANCES IN AFFF-IMPACTED SEDIMENTS BY ACIDIMICROBIUM SP. A6 BRIDGING THE GAP BETWEEN LABORATORY EXPERIMENTS AND FIELD DEMONSTRATION - PART I | $225K → |
| Nov 10, 2025 | Department of EnergySC CHICAGO SERVICE CENTER | 611310 | MANAGEMENT AND OPERATING CONTRACT FOR THE OPERATION OF THE PRINCETON PLASMA PHYSICS LABORATORY (PPPL) | $2.4M → |
| Nov 3, 2025 | Department of DefenseW4LD USA HECSA | 541715 | SERDP ER25-4757 PRINCETON UNIVERSITY - BIODEGRADATION OF PER- AND POLYFLUORINATED ALKYL SUBSTANCES IN AFFF-IMPACTED SEDIMENTS BY ACIDIMICROBIUM SP. A6 BRIDGING THE GAP BETWEEN LABORATORY EXPERIMENTS AND FIELD DEMONSTRATION - PART I | $25K → |
| Oct 28, 2025 | Department of EnergySC CHICAGO SERVICE CENTER | 611310 | MANAGEMENT AND OPERATING CONTRACT FOR THE OPERATION OF THE PRINCETON PLASMA PHYSICS LABORATORY (PPPL) | $1.3M → |
| Oct 9, 2025 | Department of EnergySC CHICAGO SERVICE CENTER | 611310 | MANAGEMENT AND OPERATING CONTRACT FOR THE OPERATION OF THE PRINCETON PLASMA PHYSICS LABORATORY (PPPL) | $336K → |
| Sep 30, 2025 | Department of EnergySC CHICAGO SERVICE CENTER | 611310 | MANAGEMENT AND OPERATING CONTRACT FOR THE OPERATION OF THE PRINCETON PLASMA PHYSICS LABORATORY (PPPL) | $58M → |
| Sep 30, 2025 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | 334511 | IGF::OT::IGF THIS CONTRACT IS FOR IBEX INTERSTELLAR BOUNDARY EXPLORER (IBEX) SUPPORT. THIS CONTRACT IS A RESULT OF A PI TRANSFER FROM NNG05EC85C. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE IBEX MISSION INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS (PAYLOAD, SPACECRAFT, LAUNCH VEHICLE, SPACECRAFT TO LAUNCH-VEHICLE INTERFACES, LAUNCH AND FLIGHT OPERATIONS) AND 3) POST-OPERATIONS DATA ANALYSIS AND ARCHIVING. IN PERFORMANCE OF THIS EFFORT, THE IBEX TEAM SHALL: A. MANAGE THE PROJECT, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS SPECIFIED IN 3.0 MANAGEMENT, ABOVE. B. PROVIDE DAY-TO-DAY MANAGEMENT AND COORDINATION OF THE PROJECT AS DELEGATED BY THE PI TO THE PROJECT MANAGER (PM), INCLUDING MONITORING AND REPORTING TECHNICAL PROGRESS AND FINANCIAL STATUS, IMPLEMENTING THE RISK MANAGEMENT PLAN AND CONDUCTING MISSION LEVEL REVIEWS AS SPECIFIED IN SECTION 4.3, SYSTEM LEVEL REVIEWS. C. CONDUCT REVIEWS FOR ALL PAYLOAD SENSORS, PAYLOAD SUPPORT INFRASTRUCTURE AND ASSOCIATED GSE. D. PERFORM SCIENTIFIC ANALYSES IN SUPPORT OF THE MISSION SCIENCE REQUIREMENTS. E. PERFORM SYSTEMS ENGINEERING TO COORDINATE THE DESIGN OF THE INSTRUMENT COMPLEMENT AND SPACECRAFT BUS COMPONENTS AND TO ENSURE THE COMPATIBILITY OF THE SPACE-TO-GROUND AND NETWORK COMMUNICATIONS. F. PERFORM TRADE STUDIES TO ELIMINATE AND MITIGATE RISKS G. DELIVER THE IBEX FLIGHT SEGMENT TO VANDENBERG AIR FORCE BASE (VAFB), SUPPORT INTEGRATION WITH THE LAUNCH VEHICLE, AND ASSIST THE LAUNCH OPERATIONS H. ESTABLISH THE MISSION CONTROL CENTER (MCC) AND IBEX SCIENCE OPERATIONS AND DATA ANALYSIS CENTER (ISOC) INCLUDING ALL COMPUTERS, NETWORKS, AND OPERATING SOFTWARE, INSTRUMENT DATABASES AND PROCEDURES NECESSARY TO FUNCTIONALLY TEST AND LATER CONTROL THE SPACECRAFT I. HOLD SCIENCE TEAM MEETINGS AS WELL AS TECHNICAL INTERCHANGE MEETINGS. J. BASELINE THE SCIENCE REQUIREMENTS AND SCIENCE ANALYSIS PLAN INTO AN IBEX MISSION DEFINITION REQUIREMENTS AGREEMENT (MDRA) AND THE IBEX DATA MANAGEMENT PLAN. K. IMPLEMENT AN APPROVED MISSION ASSURANCE PLAN. L. IMPLEMENT A SYSTEMS ENGINEERING FUNCTION TO VERIFY PERFORMANCE SPECIFICATION COMPLIANCE TO THE MISSION SCIENCE REQUIREMENTS. M. DESIGN, FABRICATE, INTEGRATE AND TEST THE PAYLOAD, SPACECRAFT, SOLID ROCKET MOTOR AND LAUNCH VEHICLE ADAPTER, AND INTEGRATE THE IBEX FLIGHT SEGMENT WITH THE LAUNCH VEHICLE. N. IMPLEMENT A SAFETY PROGRAM INCLUDING THE GENERATION OF THE MISSILE SYSTEM PRE-LAUNCH SAFETY PACKAGE (MSPSP). O. SUPPORT LAUNCH, PERFORM ON-ORBIT CHECKOUT, AND ESTABLISH ON-ORBIT DATA ACQUISITION CONTACT WITH THE PAYLOAD. WITHIN THE FIRST 30 DAYS AFTER LAUNCH, INITIAL ENGINEERING AND SCIENCE CHECKOUT AND VERIFICATION OF SPACECRAFT IN-FLIGHT OPERATION WILL BE PERFORMED. P. PROVIDE THE SERVICES OF THE MCC AND THE ISOC. Q. CONDUCT THE E/PO PROGRAM IN COOPERATION WITH THE IDENTIFIED TEAM MEMBERS. | $533K → |
| Sep 15, 2025 | National Aeronautics and Space AdministrationNASA GODDARD SPACE FLIGHT CENTER | 334511 | IGF::OT::IGF THIS CONTRACT IS FOR IBEX INTERSTELLAR BOUNDARY EXPLORER (IBEX) SUPPORT. THIS CONTRACT IS A RESULT OF A PI TRANSFER FROM NNG05EC85C. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CONDUCT OF ALL PHASES AND ASPECTS OF THE IBEX MISSION INCLUDING: 1) LIFE-CYCLE PROJECT MANAGEMENT 2) DESIGN, TEST, DEVELOPMENT, AND OPERATIONS (PAYLOAD, SPACECRAFT, LAUNCH VEHICLE, SPACECRAFT TO LAUNCH-VEHICLE INTERFACES, LAUNCH AND FLIGHT OPERATIONS) AND 3) POST-OPERATIONS DATA ANALYSIS AND ARCHIVING. IN PERFORMANCE OF THIS EFFORT, THE IBEX TEAM SHALL: A. MANAGE THE PROJECT, PROVIDE COST AND SCHEDULE INFORMATION TO NASA AS SPECIFIED IN 3.0 MANAGEMENT, ABOVE. B. PROVIDE DAY-TO-DAY MANAGEMENT AND COORDINATION OF THE PROJECT AS DELEGATED BY THE PI TO THE PROJECT MANAGER (PM), INCLUDING MONITORING AND REPORTING TECHNICAL PROGRESS AND FINANCIAL STATUS, IMPLEMENTING THE RISK MANAGEMENT PLAN AND CONDUCTING MISSION LEVEL REVIEWS AS SPECIFIED IN SECTION 4.3, SYSTEM LEVEL REVIEWS. C. CONDUCT REVIEWS FOR ALL PAYLOAD SENSORS, PAYLOAD SUPPORT INFRASTRUCTURE AND ASSOCIATED GSE. D. PERFORM SCIENTIFIC ANALYSES IN SUPPORT OF THE MISSION SCIENCE REQUIREMENTS. E. PERFORM SYSTEMS ENGINEERING TO COORDINATE THE DESIGN OF THE INSTRUMENT COMPLEMENT AND SPACECRAFT BUS COMPONENTS AND TO ENSURE THE COMPATIBILITY OF THE SPACE-TO-GROUND AND NETWORK COMMUNICATIONS. F. PERFORM TRADE STUDIES TO ELIMINATE AND MITIGATE RISKS G. DELIVER THE IBEX FLIGHT SEGMENT TO VANDENBERG AIR FORCE BASE (VAFB), SUPPORT INTEGRATION WITH THE LAUNCH VEHICLE, AND ASSIST THE LAUNCH OPERATIONS H. ESTABLISH THE MISSION CONTROL CENTER (MCC) AND IBEX SCIENCE OPERATIONS AND DATA ANALYSIS CENTER (ISOC) INCLUDING ALL COMPUTERS, NETWORKS, AND OPERATING SOFTWARE, INSTRUMENT DATABASES AND PROCEDURES NECESSARY TO FUNCTIONALLY TEST AND LATER CONTROL THE SPACECRAFT I. HOLD SCIENCE TEAM MEETINGS AS WELL AS TECHNICAL INTERCHANGE MEETINGS. J. BASELINE THE SCIENCE REQUIREMENTS AND SCIENCE ANALYSIS PLAN INTO AN IBEX MISSION DEFINITION REQUIREMENTS AGREEMENT (MDRA) AND THE IBEX DATA MANAGEMENT PLAN. K. IMPLEMENT AN APPROVED MISSION ASSURANCE PLAN. L. IMPLEMENT A SYSTEMS ENGINEERING FUNCTION TO VERIFY PERFORMANCE SPECIFICATION COMPLIANCE TO THE MISSION SCIENCE REQUIREMENTS. M. DESIGN, FABRICATE, INTEGRATE AND TEST THE PAYLOAD, SPACECRAFT, SOLID ROCKET MOTOR AND LAUNCH VEHICLE ADAPTER, AND INTEGRATE THE IBEX FLIGHT SEGMENT WITH THE LAUNCH VEHICLE. N. IMPLEMENT A SAFETY PROGRAM INCLUDING THE GENERATION OF THE MISSILE SYSTEM PRE-LAUNCH SAFETY PACKAGE (MSPSP). O. SUPPORT LAUNCH, PERFORM ON-ORBIT CHECKOUT, AND ESTABLISH ON-ORBIT DATA ACQUISITION CONTACT WITH THE PAYLOAD. WITHIN THE FIRST 30 DAYS AFTER LAUNCH, INITIAL ENGINEERING AND SCIENCE CHECKOUT AND VERIFICATION OF SPACECRAFT IN-FLIGHT OPERATION WILL BE PERFORMED. P. PROVIDE THE SERVICES OF THE MCC AND THE ISOC. Q. CONDUCT THE E/PO PROGRAM IN COOPERATION WITH THE IDENTIFIED TEAM MEMBERS. | $13K → |
Want to win work like The Trustees Of Princeton University?
Their contracts will eventually end — and when they do, the government has to award that work again. Mindy tells you up to a year early, so you can be ready to compete for it.