Federal Contractor Profile
The University Of Southern Mississippi
$37M obligated·85 awards·9 agencies·16 NAICS
Federal Contracts
Showing contracts 251–254 of 254 total. Sorted by action date, most recent first. Excludes $0 modifications.
| Date | Agency | PIID | NAICS | Description | Amount |
|---|---|---|---|---|---|
| Nov 6, 2015 | National Aeronautics and Space AdministrationSTENNIS SPACE CENTER | NNS16AA10T | 541712 | IGF::OT::IGF PERFORM A REVIEW AND ANALYSIS OF STENNIS SPACE CENTERS (SSC) EXPENDITURE DATA FOR FISCAL YEAR 2015 TO DETERMINE OVERALL ECONOMIC IMPACT BY THE CENTER WITH PARTICULAR EMPHASIS ON THE LOCAL COMMUNITY (50-MILE RADIUS). THIS ANALYSIS SHALL BE COMPLETED WITH THE SOFTWARE PACKAGE IMPLAN WHICH IS SPECIFICALLY DESIGNED TO ESTIMATE ECONOMIC MODELS. KEY STATISTICAL INFORMATION WILL BE PROVIDED BY STENNIS SPACE CENTER TO INCLUDE EXPENDITURES FOR PAYROLL EXPENDITURES FOR SUPPLIES, SERVICES AND CONSTRUCTION PROJECTS EXPENDITURE BREAKDOWN WITHIN 50-MILE RADIUS AND OUTSIDE 50-MILE RADIUS BREAKDOWN OF PERSONNEL BY COUNTY PARISH, SKILLS, AND EDUCATION LEVEL ALL WORK IN THE FIELD AND DOCUMENTATION PREPARATION IS TO BE PERFORMED BY OR PERSONALLY SUPERVISED BY A PH.D. LEVEL ECONOMIST. COMPLETION DATE OF FEBRUARY 15, 2016. | $10K |
| Oct 27, 2015 | Department of CommerceEASTERN ACQUISITION DIVISION KANSAS CITY | DOCWC133R16SU0008 | 611310 | IGF::OT::IGF 22 REGISTRATION FEES FOR NOAA SEA GRANT TO ATTEND THE 2015 SEA GRANT ASSOCIATION (SGA) AND NATIONAL SEA GRANT ADVISORY BOARD (NSGAB) FALL MEETING IN HONOLULU, HI FROM 11/3/2015 THROUGH 11/6/2015. | $9K |
| Oct 22, 2015 | National Aeronautics and Space AdministrationSTENNIS SPACE CENTER | NNS14AA59T | 541712 | IGF::OT::IGF RESEARCH AND ANALYSIS ACTIVITIES ARE REQUIRED TO PROVIDE THE NECESSARY INPUTS TO ADEQUATELY PERFORM ANALYSES, STRATEGIC PLANNING, PROJECT FORMULATION, AND NEW BUSINESS DEVELOPMENT. NASA S PROJECT PLANNING, DEVELOPMENT AND ANALYSIS (PDA) OFFICE WITHIN THE PROJECT DIRECTORATE WILL CONDUCT DETAILED STRATEGIC ANALYSIS AND SUBSEQUENT PLANNING FOR TEST COMPLEX INFRASTRUCTURE INVESTMENT STRATEGIES, THE FORMULATION OF INFRASTRUCTURE PROJECTS ALIGNED TO THOSE INVESTMENT STRATEGIES, AND THE BUSINESS CASE DEVELOPMENT TO SUPPORT FUNDING OPPORTUNITIES. PDA WILL ALSO CONTINUE NEW BUSINESS DEVELOPMENT ACTIVITIES SUPPORTING NASA, OTHER GOVERNMENTAL AGENCIES (OGA) AND COMMERCIAL CUSTOMERS. CONDUCT STRATEGIC PLANNING BY DETERMINING DETAILED RESEARCH AND ANALYSIS, PROVIDING TECHNICAL REVIEWS/ANALYSES, AND HISTORICAL ANALOGS OF DEVELOPING NASA AND COMMERCIAL PROGRAM REQUIREMENTS TO DETERMINE THE STRATEGIC IMPLICATIONS AND DEMAND FOR SSC CORE COMPETENCIES, FACILITY INFRASTRUCTURE, AND CONCEPTS OF OPERATION. DEVELOP IMPACT ANALYSIS ASSOCIATED WITH PROJECTED CHANGES IN PROGRAM TECHNICAL CONTENT, CONCEPTS OF OPERATIONS, AND FUNDING PROFILES AND THEIR EFFECT ON SSC BUSINESS BASE. CONDUCT TRADE STUDIES AND REVIEWS USING A BROAD BASE OF HISTORICAL AND RECENT TREND DATA. RESOLVE COMPLEX PROBLEMS OF PREDICTION AND FORECASTING WHICH RESULT FROM ASSUMPTIONS ASSOCIATED WITH THESE CHANGES. PROVIDE ON-GOING RESEARCH OF TEST COMPLEX UTILIZATION FOR BOTH CURRENT AND FUTURE PLANNED ACCOMMODATIONS FOR ALL TEST POSITIONS AND THE ASSOCIATED DEMAND ON TEST SUPPORT INFRASTRUCTURE.RESEARCH AND DOCUMENT CURRENT AND PROJECTED UTILIZATION OF TEST POSITIONS AGAINST NASA, OGA, AND COMMERCIAL CUSTOMER (I.E., CCP, CRS, ETC.) PROGRAM MILESTONES TO PROVIDE INSIGHT AND STATUS TO PROJECT DIRECTORATE MANAGEMENT (PD) MANAGEMENT. DOCUMENT RESULTS OF RESEARCH AND ANALYSES PERFORMED IN QUARTERLY PUBLISHED UTILIZATION SCHEDULES FOR INTERNAL AND EXTERNAL DISTRIBUTION (NOTE: INTERNAL UTILIZATION SCHEDULES WILL POSSIBLY INCLUDE FUTURE CUSTOMER SENSITIVE INFORMATION NOT FOR DISSEMINATION OUTSIDE OF SSC). RESEARCH AND PROVIDE ANALYSES OF THE FOUR GAS COMMODITY SYSTEMS FROM END TO END IDENTIFYING THE COMPONENTS (TRAILER OFFLOADING STATIONS, LOW PRESSURE STORAGE VESSELS, PUMPS, COMPRESSORS, TRANSFER PIPING, STORAGE VESSELS, ETC.) THAT MAKE UP THE SYSTEM, THE HISTORY OF THOSE COMPONENTS, AREAS OF RISK TO THE SYSTEMS, CURRENT CAPACITY OF THE SYSTEMS AND ANY RECOMMENDATIONS FOR FUTURE REHABILITATION AND EXPANSION BASED ON TEST UTILIZATION. RESEARCH THE PLANNED USE OF THE NAVIGATIONAL LOCK SYSTEM; CONDUCT ASSOCIATED RISK ASSESSMENT BASED ON UTILIZATION TO SUPPORT EXISTING AND FUTURE TEST PROJECTS. ASSIST IN PROJECT FORMULATION BY CONDUCTING TRADE STUDIES AND ANALYSIS OF ALTERNATIVES OF PROGRAMMATIC REQUIREMENTS THAT ADDRESS TECHNICAL, FUNDING, AND SCHEDULE PARAMETERS ASSOCIATED WITH CENTER IMPLEMENTATION. PROVIDE ANALYSIS OF TEST COMPLEX INFRASTRUCTURE PROJECTS LISTED IN THE PROJECT FUNDING PRIORITY | $30K |
| Oct 9, 2015 | National Aeronautics and Space AdministrationSTENNIS SPACE CENTER | NNS16AA06T | 541712 | IGF::OT::IGF STENNIS WOULD LIKE TO BE ABLE TO EXTEND THE OPERATIONAL RANGE OF SIMUTLATED-ALTITUDE ROCKET TEST STANDS TO ALLOW TESTING AT LOWER ENGINE POWER LEVELS. | $48K |
Get Alerted Before The University Of Southern Mississippi's Next Recompete
Mindy monitors active contracts and flags recompetes 12 months out so you can position to compete.
Start Free