Federal Contractor Profile
Urban Electric, INC
$49M obligated·267 awards·1 agencies·5 NAICS
Federal Contracts
Showing contracts 201–250 of 537 total. Sorted by action date, most recent first. Excludes $0 modifications.
| Date | Agency | PIID | NAICS | Description | Amount |
|---|---|---|---|---|---|
| Sep 14, 2022 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH22F01747 | 238210 | BIL FUNDING FOR EG INSTALLATION FOR WHITE TOP MOUNTAIN, VA (TRID) RCAG JCN:22005475 | $252K |
| Sep 14, 2022 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH22F01751 | 238210 | BIL FUNDING FOR EG INSTALLATION FOR NASHVILLE, TN (BNAD) VOR JCN:22005472 | $252K |
| Sep 14, 2022 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH22F01752 | 238210 | BIL FUNDING FOR EG INSTALLATION FOR SNOWBIRD, TN (SOT) VOR JCN:22005474 | $252K |
| Sep 14, 2022 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH22F01753 | 238210 | BIL FUNDING FOR EG INSTALLATION FOR WASHINGTON, DC (DCAG) TDWR JCN:22006704 | $252K |
| Sep 14, 2022 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH22F01754 | 238210 | BIL FUNDING EG INSTALLATION FOR GREENSBORO, NC (GSOA) RTR JCN:22005473 | $252K |
| Sep 14, 2022 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH22F01769 | 238210 | BIL FUNDING FOR SITE SURVEY, DESIGN, AND EG INSTALLATION AT LITTLE ROCK, AR (AAY) ALS JCN:22007764 | $288K |
| Sep 13, 2022 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH22F01743 | 238210 | BIL FUNDING FOR LPGBS OPTIMIZATION AT MDW. | $641K |
| Sep 13, 2022 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH22F01174 | 238210 | CONDUCT FST DIESEL TANK INSTALLATION PER ATTACHED SOW, APPROVED DESIGN DRAWINGS, AND BASELINE COST PROPOSAL AT TYNDALL AFB, FL (PAM ARSR), JCN 18028021, CATEGORY 1. SITE SURVEY/DESIGN TO #: 6973GH-20-F-01331 PEL: BRYAN PENNAMON 404-305-7456 PIM: | $45K |
| Sep 13, 2022 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH22F01732 | 238210 | BIL FUNDING FOR SITE SURVEY, DESIGN, EG INSTALLATION AND LPGBS FOR ROCHESTER, NY (MCU) ALS JCN:22001752 / LPGBS BIL JCN 22002162 | $310K |
| Sep 13, 2022 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH22F01733 | 238210 | BIL FUNDING FOR SITE SURVEY, DESIGN, AND EG INSTALLATION FOR ERIE, PA (ERI) ASR JCN:22001753 | $310K |
| Sep 12, 2022 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH22F01658 | 238210 | BIL FUNDING FOR SITE SURVEY, DESIGN, AND INSTALLATION FOR MEMPHIS, TN (MEME) RCAG JCN:22002706 | $288K |
| Sep 12, 2022 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH22F01659 | 238210 | BIL FUNDING FOR SITE SURVEY, DESIGN, AND EG INSTALLATION AT MEMPHIS, TN (MEMF) VOR JCN:22002708 | $288K |
| Sep 12, 2022 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH22F01665 | 238210 | BIL FUNDING FOR SITE SURVEY, DESIGN, AND INSTALLATION AT OCEANA, VA (QVR) ARSR JCN:22006702 | $288K |
| Sep 12, 2022 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH22F01668 | 238210 | BIL FUNDING FOR SITE SURVEY, DESIGN, AND INSTALLATION AT ORLANDO, FL (MCOB) RTR JCN:22002409 | $288K |
| Sep 12, 2022 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH22F01711 | 238210 | BIL FUNDING FOR SITE SURVEY, DESIGN, EG INSTALLATION AND LPGBS FOR COVINGTON, KY (CVGC) ASR JCN:22001367 / LPGBS BIL JCN 1404499 | $310K |
| Sep 12, 2022 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH22F01660 | 238210 | BIL FUNDING FOR SITE SURVEY, DESIGN, AND EG INSTALLATION AT NASHVILLE, TN (BNAH) TDWR JCN:22002705 | $288K |
| Sep 12, 2022 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH22F01713 | 238210 | BIL FUNDING FOR SITE SURVEY, DESIGN, AND EG INSTALLATION AND LPGBS AT FT MYERS, FL (RSWA) ASR JCN:22001381 / LPGBS BIL JCN 1504699 | $310K |
| Sep 12, 2022 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH22F01716 | 238210 | BIL FUNDING FOR EG INSTALLATION AT WORCESTER, MA (ORH) ATCT JCN:22005470 | $273K |
| Sep 7, 2022 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH22F01184 | 238210 | CONDUCT FST DIESEL TANK INSTALLATION PER ATTACHED SOW, APPROVED DESIGN DRAWINGS, AND BASELINE COST PROPOSAL AT TAMPA, FL (AMP ALS), JCN 1502882, CATEGORY 1. SITE SURVEY/DESIGN TO #: 6973GH-20-F-01330 PEL: BRYAN PENNAMON 404-305-7456 PIM: NATHANIE | $25K |
| Sep 2, 2022 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH22F01177 | 238210 | CONDUCT FST DIESEL TANK INSTALLATION PER ATTACHED SOW, APPROVED DESIGN DRAWINGS, AND BASELINE COST PROPOSAL AT TALLAHASSEE, FL (PLQ ALS), JCN 18028059, CATEGORY 1. SITE SURVEY/DESIGN TO #: 6973GH-20-F-01329 PEL: BRYAN PENNAMON 404-305-7456 PIM: N | $21K |
| Sep 2, 2022 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH22F01181 | 238210 | CONDUCT FST DIESEL TANK INSTALLATION PER ATTACHED SOW, APPROVED DESIGN DRAWINGS, AND BASELINE COST PROPOSAL AT MELBOURNE, FL (MLBB ARSR), JCN 18027974, CATEGORY 1. SITE SURVEY/DESIGN TO #: 6973GH-21-F-00763 PEL: SAMUEL DECK 404-906-1672 PIM: NATH | $35K |
| Aug 23, 2022 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH22F01511 | 238210 | BIPARTISAN INFRASTRUCTURE LAW (BIL): CONDUCT FST PROPANE TANK INSTALLATION PER ATTACHED SOW, APPROVED DESIGN DRAWINGS, AND COST BASELINE PROPOSAL AT ALBUQUERQUE, NM ABQC RTR. SITE SPECIFIC PROPOSAL IS DUE 30 DAYS AFTER RECEIPT OF TASK ORDER. | $93K |
| Aug 23, 2022 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH22F01512 | 238210 | BIPARTISAN INFRASTRUCTURE LAW (BIL): CONDUCT FST PROPANE INSTALLATION PER ATTACHED SOW, APPROVED DESIGN DRAWINGS, AND BASELINE COST PROPOSAL AT ALBUQUERQUE, NM (ABQD RTR) * SITE SPECIFIC PROPOSAL IS DUE 30 DAYS AFTER RECEIPT OF TASK ORDER. | $93K |
| Aug 19, 2022 | Department of Transportation697DCK REGIONAL ACQUISITIONS SVCS | 697DCK20C00206 | 237130 | REPLACE GS_RVR_LOC AND MALSR ON RUNWAY 22 AT ELLINGTON FIELD(EFD), HOUSTON, TX | $145K |
| Aug 12, 2022 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH22F01179 | 238210 | CONDUCT FST DIESEL TANK INSTALLATION PER ATTACHED SOW, APPROVED DESIGN DRAWINGS, AND BASELINE COST PROPOSAL AT SQUAW BUTTE, ID (QULM RCAG), JCN 18027436, CATEGORY 1. SITE SURVEY/DESIGN TO #: 6973GH-20-F-01318 PEL: FREDERICK DRUMHELLER 206-231-2742 | $51K |
| Aug 12, 2022 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH22F01183 | 238210 | CONDUCT FST DIESEL TANK INSTALLATION PER ATTACHED SOW, APPROVED DESIGN DRAWINGS, AND BASELINE COST PROPOSAL AT BAKER, OR (BKEM RCAG), JCN 1501652, CATEGORY 1. SITE SURVEY/DESIGN TO #: 6973GH-20-F-01319 PEL: FREDERICK DRUMHELLER 206-231-2742 PIM: | $31K |
| Aug 4, 2022 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH22F00716 | 238210 | REMOVE AND INSTALL TWO 120-GALLON FUEL STORAGE PROPANE TANKS IN ACCORDANCE WITH SECTION 3, SUB-SECTION 3B OF THE PSW SOW AND DRAWINGS AT THE QKI RCAG LOCATED IN WALLUA, WA. THE WORK WILL ALSO INCLUDE REPLACING THE CONCRETE PAD AND REPLACING THE EXIST | $3K |
| Aug 4, 2022 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH22F01419 | 238210 | *BIPARTISAN INFRASTRUCTURE LAW (BIL)* CONDUCT FST INSTALLATION PER ATTACHED SOW TITLED STANDARD DIESEL FST REPLACEMENT , APPROVED JAXC ALS DRAWINGS, AND BASELINE COST PROPOSAL AT JACKSONVILLE, FL (JAXC) ALS, JCN 18027877. SITE SURVEY/DESIGN TO#: 6973 | $211K |
| Jul 27, 2022 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH22F01088 | 238210 | BIL UPS INSTALLATION COST FOR THE QNK ARSR IN LINCOLNTON, GA | $2K |
| Jul 19, 2022 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH22F00717 | 238210 | REMOVE AND INSTALL TWO 120-GALLON FUEL STORAGE PROPANE TANKS IN ACCORDANCE WITH SECTION 3, SUB-SECTION 3B OF THE PSW SOW AND DRAWINGS AT THE YKMB VOR LOCATED IN YAKIMA, WA. THE WORK WILL ALSO INCLUDE REPLACING THE CONCRETE PAD, THE EXISTING FUEL LINE | $2K |
| Jun 29, 2022 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH22F01258 | 238210 | CHANGE ORDER FOR MOBILIZATION/DEMOBILIZATION BEFORE AND AFTER MORATORIUM, ADDITIONAL EQUIPMENT AND TEMP TANK RENTALS, AND ADDITIONAL REMOVAL AND INSTALLATION OF BOLLARDS AT DALLAS-FT. WORTH, TX (FLQ ALS), JCN: 1500656, OLD TO #: 6973GH-19-F-01680 | $10K |
| Jun 27, 2022 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH19F01674 | 238210 | CONDUCT SITE SURVEY FOR FST INSTALLATION AT SACHSE, TX (HQZ TANK) PER CONTRACT AND ATTACHED SOW. **FY20 SITE SURVEYS SHOULD BE COMPLETED IN THE MONTH OF OCTOBER 2019** | $2K |
| Jun 17, 2022 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH22F01174 | 238210 | CONDUCT FST DIESEL TANK INSTALLATION PER ATTACHED SOW, APPROVED DESIGN DRAWINGS, AND BASELINE COST PROPOSAL AT TYNDALL AFB, FL (PAM ARSR), JCN 18028021, CATEGORY 1. SITE SURVEY/DESIGN TO #: 6973GH-20-F-01331 PEL: BRYAN PENNAMON 404-305-7456 PIM: | $211K |
| Jun 17, 2022 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH22F01176 | 238210 | CONDUCT FST DIESEL TANK INSTALLATION PER ATTACHED SOW, APPROVED DESIGN DRAWINGS, AND BASELINE COST PROPOSAL AT CASCADE, ID (QCKM ARSR) JCN 1502312, CATEGORY 1. SITE SURVEY/DESIGN TO #: 6973GH-20-F-01313 PEL: FREDERICK DRUMHELLER 206-231-2742 PIM: | $211K |
| Jun 17, 2022 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH22F01177 | 238210 | CONDUCT FST DIESEL TANK INSTALLATION PER ATTACHED SOW, APPROVED DESIGN DRAWINGS, AND BASELINE COST PROPOSAL AT TALLAHASSEE, FL (PLQ ALS), JCN 18028059, CATEGORY 1. SITE SURVEY/DESIGN TO #: 6973GH-20-F-01329 PEL: BRYAN PENNAMON 404-305-7456 PIM: N | $211K |
| Jun 17, 2022 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH22F01179 | 238210 | CONDUCT FST DIESEL TANK INSTALLATION PER ATTACHED SOW, APPROVED DESIGN DRAWINGS, AND BASELINE COST PROPOSAL AT SQUAW BUTTE, ID (QULM RCAG), JCN 18027436, CATEGORY 1. SITE SURVEY/DESIGN TO #: 6973GH-20-F-01318 PEL: FREDERICK DRUMHELLER 206-231-2742 | $211K |
| Jun 17, 2022 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH22F01180 | 238210 | CONDUCT FST DIESEL TANK INSTALLATION PER ATTACHED SOW, APPROVED DESIGN DRAWINGS, AND BASELINE COST PROPOSAL AT NASHWAUK, MN (QJD ARSR), JCN 1501135, CATEGORY 1. SITE SURVEY/DESIGN TO #: 6973GH-21-F-00764 PEL: JOSHUA BENITEZ 682-410-2136 PIM: GEOR | $211K |
| Jun 17, 2022 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH22F01181 | 238210 | CONDUCT FST DIESEL TANK INSTALLATION PER ATTACHED SOW, APPROVED DESIGN DRAWINGS, AND BASELINE COST PROPOSAL AT MELBOURNE, FL (MLBB ARSR), JCN 18027974, CATEGORY 1. SITE SURVEY/DESIGN TO #: 6973GH-21-F-00763 PEL: SAMUEL DECK 404-906-1672 PIM: NATH | $211K |
| Jun 17, 2022 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH22F01182 | 238210 | CONDUCT FST DIESEL TANK INSTALLATION PER ATTACHED SOW, APPROVED DESIGN DRAWINGS, AND BASELINE COST PROPOSAL AT JACKSON, MS (JANC ASR), JCN 1503297, CATEGORY 1. SITE SURVEY/DESIGN TO #: 6973GH-21-F-00765 PEL: SAMUEL DECK 404-906-1672 PIM: NATHANIE | $211K |
| Jun 17, 2022 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH22F01183 | 238210 | CONDUCT FST DIESEL TANK INSTALLATION PER ATTACHED SOW, APPROVED DESIGN DRAWINGS, AND BASELINE COST PROPOSAL AT BAKER, OR (BKEM RCAG), JCN 1501652, CATEGORY 1. SITE SURVEY/DESIGN TO #: 6973GH-20-F-01319 PEL: FREDERICK DRUMHELLER 206-231-2742 PIM: | $211K |
| Jun 17, 2022 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH22F01184 | 238210 | CONDUCT FST DIESEL TANK INSTALLATION PER ATTACHED SOW, APPROVED DESIGN DRAWINGS, AND BASELINE COST PROPOSAL AT TAMPA, FL (AMP ALS), JCN 1502882, CATEGORY 1. SITE SURVEY/DESIGN TO #: 6973GH-20-F-01330 PEL: BRYAN PENNAMON 404-305-7456 PIM: NATHANIE | $211K |
| Jun 17, 2022 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH22F01185 | 238210 | CONDUCT FST DIESEL TANK INSTALLATION PER ATTACHED SOW, APPROVED DESIGN DRAWINGS, AND BASELINE COST PROPOSAL AT WHITEHOUSE, FL (NEN ARSR), JCN 18027995, CATEGORY 1. SITE SURVEY/DESIGN TO #: 6973GH-20-F-01332 PEL: BRYAN PENNAMON 404-305-7456 PIM: N | $211K |
| Jun 17, 2022 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH22F01187 | 238210 | CONDUCT FST DIESEL TANK INSTALLATION PER ATTACHED SOW, APPROVED DESIGN DRAWINGS, AND BASELINE COST PROPOSAL AT WELLFLEET, NE (LBF ARSR), JCN 18026488, CATEGORY 1. SITE SURVEY/DESIGN TO #: 6973GH-21-F-00762 PEL: MARK MICHAEL 206-231-2684 PIM: FAIZ | $211K |
| Jun 7, 2022 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH22F01087 | 238210 | BIL FUNDED UPS INSTALLATION COST AT THE ATL TDWR, ATLANTA, GA | $68K |
| Jun 7, 2022 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH22F01088 | 238210 | BIL UPS INSTALLATION COST FOR THE QNK ARSR IN LINCOLNTON, GA | $97K |
| Jun 2, 2022 | Department of Transportation697DCK REGIONAL ACQUISITIONS SVCS | 697DCK21C00140 | 237130 | CONSTRUCTION TO RELOCATE REMOTE TRANSMITTAL/RECIEVER(RTR) FACILITY AND INSTALLATION OF FIBER OPTIC SYSTEM AT PENSACOLA INTERNATIONAL AIRPORT, PENSACOLA, FLORIDA | $89K |
| May 13, 2022 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH22F00974 | 238210 | UPS SITE SURVEY AND REPORT & TRAVEL | $6K |
| May 11, 2022 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH22F00979 | 238210 | UPS SITE SURVEY AND REPORT & TRAVEL | $6K |
| May 9, 2022 | Department of Transportation697DCK REGIONAL ACQUISITIONS SVCS | 697DCK20C00206 | 237130 | REPLACE GS_RVR_LOC AND MALSR ON RUNWAY 22 AT ELLINGTON FIELD(EFD), HOUSTON, TX | $49K |
| May 2, 2022 | Department of Transportation697DCK REGIONAL ACQUISITIONS SVCS | 697DCK20C00206 | 237130 | REPLACE GS_RVR_LOC AND MALSR ON RUNWAY 22 AT ELLINGTON FIELD(EFD), HOUSTON, TX | $70K |
Get Alerted Before Urban Electric, INC's Next Recompete
Mindy monitors active contracts and flags recompetes 12 months out so you can position to compete.
Start Free