Federal Contractor Profile
Urban Electric, INC
$49M obligated·267 awards·1 agencies·5 NAICS
Federal Contracts
Showing contracts 251–300 of 537 total. Sorted by action date, most recent first. Excludes $0 modifications.
| Date | Agency | PIID | NAICS | Description | Amount |
|---|---|---|---|---|---|
| Mar 23, 2022 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH22F00715 | 238210 | REMOVE AND INSTALL TWO 120-GALLON FUEL STORAGE PROPANE TANKS IN ACCORDANCE WITH SECTION 3, SUB-SECTION 3B OF THE PSW SOW AND DRAWINGS AT THE EPH VOR LOCATED IN EPHRATA, WA. THE WORK WILL ALSO INCLUDE REPLACING THE CONCRETE PAD AND REPLACING THE EXIST | $74K |
| Mar 23, 2022 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH22F00716 | 238210 | REMOVE AND INSTALL TWO 120-GALLON FUEL STORAGE PROPANE TANKS IN ACCORDANCE WITH SECTION 3, SUB-SECTION 3B OF THE PSW SOW AND DRAWINGS AT THE QKI RCAG LOCATED IN WALLUA, WA. THE WORK WILL ALSO INCLUDE REPLACING THE CONCRETE PAD AND REPLACING THE EXIST | $71K |
| Mar 23, 2022 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH22F00717 | 238210 | REMOVE AND INSTALL TWO 120-GALLON FUEL STORAGE PROPANE TANKS IN ACCORDANCE WITH SECTION 3, SUB-SECTION 3B OF THE PSW SOW AND DRAWINGS AT THE YKMB VOR LOCATED IN YAKIMA, WA. THE WORK WILL ALSO INCLUDE REPLACING THE CONCRETE PAD, THE EXISTING FUEL LINE | $68K |
| Mar 23, 2022 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH22F00718 | 238210 | REMOVE AND INSTALL TWO 120-GALLON FUEL STORAGE PROPANE TANKS IN ACCORDANCE WITH SECTION 3, SUB-SECTION 3B OF THE PSW SOW AND DRAWINGS AT THE YKMC RTR LOCATED IN YAKIMA, WA. THE WORK WILL ALSO INCLUDE REPLACING THE CONCRETE PAD, THE EXISTING FUEL LINE | $68K |
| Mar 23, 2022 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH22F00719 | 238210 | REMOVE AND INSTALL TWO 120-GALLON FUEL STORAGE PROPANE TANKS IN ACCORDANCE WITH SECTION 3, SUB-SECTION 3B OF THE PSW SOW AND DRAWINGS AT THE YKMD RCAG LOCATED IN YAKIMA, WA. THE WORK WILL ALSO INCLUDE REPLACING THE CONCRETE PAD, THE EXISTING FUEL LIN | $74K |
| Mar 17, 2022 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH19F01674 | 238210 | CONDUCT SITE SURVEY FOR FST INSTALLATION AT SACHSE, TX (HQZ TANK) PER CONTRACT AND ATTACHED SOW. **FY20 SITE SURVEYS SHOULD BE COMPLETED IN THE MONTH OF OCTOBER 2019** | $27K |
| Mar 17, 2022 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH19F01681 | 238210 | CONDUCT SITE SURVEY FOR FST INSTALLATION AT MIAMI, FL (MFAB TANK) PER CONTRACT AND ATTACHED SOW. **FY20 SITE SURVEYS SHOULD BE COMPLETED IN THE MONTH OF OCTOBER 2019** | $12K |
| Feb 4, 2022 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH20F01320 | 238210 | CONDUCT SITE SURVEYS AND DEVELOP SITE SPECIFIC DESIGNS FOR VARIOUS LOC IDS PER URBAN ELECTRIC'S FY21 INSTALLATIONS. | $58K |
| Jan 25, 2022 | Department of Transportation697DCK REGIONAL ACQUISITIONS SVCS | 697DCK20C00206 | 237130 | REPLACE GS_RVR_LOC AND MALSR ON RUNWAY 22 AT ELLINGTON FIELD(EFD), HOUSTON, TX | $125K |
| Jan 13, 2022 | Department of Transportation697DCK REGIONAL ACQUISITIONS SVCS | 697DCK20C00206 | 237130 | REPLACE GS_RVR_LOC AND MALSR ON RUNWAY 22 AT ELLINGTON FIELD(EFD), HOUSTON, TX | $21K |
| Dec 17, 2021 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH19F01598 | 238210 | CONDUCT SITE SURVEY FOR FST INSTALLATION AT DULUTH, MN (DLH TANK) PER CONTRACT AND ATTACHED SOW. **FY20 SITE SURVEYS SHOULD BE COMPLETED IN THE MONTH OF SEPTEMBER 2019** | $5K |
| Dec 13, 2021 | Department of Transportation697DCK REGIONAL ACQUISITIONS SVCS | 697DCK20C00206 | 237130 | REPLACE GS_RVR_LOC AND MALSR ON RUNWAY 22 AT ELLINGTON FIELD(EFD), HOUSTON, TX | $41K |
| Dec 1, 2021 | Department of Transportation697DCK REGIONAL ACQUISITIONS SVCS | 697DCK21C00140 | 237130 | CONSTRUCTION TO RELOCATE REMOTE TRANSMITTAL/RECIEVER(RTR) FACILITY AND INSTALLATION OF FIBER OPTIC SYSTEM AT PENSACOLA INTERNATIONAL AIRPORT, PENSACOLA, FLORIDA | $3K |
| Nov 30, 2021 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH19F01680 | 238210 | CONDUCT SITE SURVEY FOR FST INSTALLATION AT DAL-FT WORTH, TX (FLQ TANK) PER CONTRACT AND ATTACHED SOW. **FY20 SITE SURVEYS SHOULD BE COMPLETED IN THE MONTH OF OCTOBER 2019** | $43K |
| Nov 30, 2021 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH21F00802 | 238210 | CONDUCT SITE SURVEY FOR THE FY22 ENGINE GENERATOR WITH SUBBASE TANK INSTALLATION PER CONTRACT AND ATTACHED SOW BATTLE MTN., NV (BAME ARSR) JCN: 18067823 | $24K |
| Nov 30, 2021 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH21F00803 | 238210 | CONDUCT SITE SURVEY FOR THE FY22 ENGINE GENERATOR WITH SUBBASE TANK INSTALLATION PER CONTRACT AND ATTACHED SOW AT CASPER, WY (CPRA ASR) JCN: 1501746 | $25K |
| Nov 30, 2021 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH21F00855 | 238210 | CONDUCT SITE SURVEY AND DEVELOP SITE SPECIFIC DESIGN FOR THE FY22 ENGINE GENERATOR WITH SUBBASE TANK INSTALLATION PER CONTRACT AND ATTACHED SOW AT BATTLE MTN, NV (BAM ARSR) JCN: 1501595 | $26K |
| Nov 23, 2021 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH19F01676 | 238210 | CONDUCT SITE SURVEY FOR FST INSTALLATION AT DAL-FT WORTH, TX (PPZ TANK) PER CONTRACT AND ATTACHED SOW. **FY20 SITE SURVEYS SHOULD BE COMPLETED IN THE MONTH OF OCTOBER 2019** | $2K |
| Nov 19, 2021 | Department of Transportation697DCK REGIONAL ACQUISITIONS SVCS | 697DCK20C00206 | 237130 | REPLACE GS_RVR_LOC AND MALSR ON RUNWAY 22 AT ELLINGTON FIELD(EFD), HOUSTON, TX | $5K |
| Oct 27, 2021 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH19F01416 | 238210 | CONDUCT SITE SURVEY FOR FST INSTALLATION AT MINNEAPOLIS, MN (MSPG TANK) PER CONTRACT AND ATTACHED SOW. **FY20 SITE SURVEYS SHOULD BE COMPLETED IN THE MONTH OF AUGUST 2019** | $2K |
| Oct 14, 2021 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH19F01693 | 238210 | CONDUCT SITE SURVEY FOR FST INSTALLATION AT CLINTON, OK (BFV TANK) PER CONTRACT AND ATTACHED SOW. **FY20 SITE SURVEYS SHOULD BE COMPLETED IN THE MONTH OF NOVEMBER 2019** | $7K |
| Sep 20, 2021 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH19F01595 | 238210 | CONDUCT SITE SURVEY FOR FST INSTALLATION AT DUTCH HARBOR, AK (DUT TANK) PER CONTRACT AND ATTACHED SOW. **FY20 SITE SURVEYS SHOULD BE COMPLETED IN THE MONTH OF SEPTEMBER 2019** | $10K |
| Sep 14, 2021 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH20F01314 | 238210 | CONDUCT SITE SURVEYS AND DEVELOP SITE SPECIFIC DESIGNS FOR VARIOUS LOC IDS PER URBAN ELECTRIC'S FY21 INSTALLATIONS. | $6K |
| Sep 13, 2021 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH19F01598 | 238210 | CONDUCT SITE SURVEY FOR FST INSTALLATION AT DULUTH, MN (DLH TANK) PER CONTRACT AND ATTACHED SOW. **FY20 SITE SURVEYS SHOULD BE COMPLETED IN THE MONTH OF SEPTEMBER 2019** | $33K |
| Sep 13, 2021 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH20F01316 | 238210 | CONDUCT SITE SURVEYS AND DEVELOP SITE SPECIFIC DESIGNS FOR VARIOUS LOC IDS PER URBAN ELECTRIC'S FY21 INSTALLATIONS. | $6K |
| Jun 24, 2021 | Department of Transportation697DCK REGIONAL ACQUISITIONS SVCS | 697DCK20C00206 | 237130 | REPLACE GS_RVR_LOC AND MALSR ON RUNWAY 22 AT ELLINGTON FIELD(EFD), HOUSTON, TX | $237K |
| Jun 11, 2021 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH19F01676 | 238210 | CONDUCT SITE SURVEY FOR FST INSTALLATION AT DAL-FT WORTH, TX (PPZ TANK) PER CONTRACT AND ATTACHED SOW. **FY20 SITE SURVEYS SHOULD BE COMPLETED IN THE MONTH OF OCTOBER 2019** | $59K |
| Jun 4, 2021 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH19F01559 | 238210 | CONDUCT SITE SURVEY FOR FST INSTALLATION AT ADAK, AK (ADK TANK) PER CONTRACT AND ATTACHED SOW. **FY20 SITE SURVEYS SHOULD BE COMPLETED IN THE MONTH OF SEPTEMBER 2019** | $120K |
| Jun 3, 2021 | Department of Transportation697DCK REGIONAL ACQUISITIONS SVCS | 697DCK21C00140 | 237130 | CONSTRUCTION TO RELOCATE REMOTE TRANSMITTAL/RECIEVER(RTR) FACILITY AND INSTALLATION OF FIBER OPTIC SYSTEM AT PENSACOLA INTERNATIONAL AIRPORT, PENSACOLA, FLORIDA | $1.3M |
| Jun 3, 2021 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH21F00746 | 238210 | CONDUCT SITE SURVEYS AND DEVELOP SITE SPECIFIC DESIGNS FOR VARIOUS LOC IDS PER URBAN ELECTRIC'S FY21 INSTALLATIONS. | $3K |
| May 26, 2021 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH19F01417 | 238210 | CONDUCT SITE SURVEY FOR FST INSTALLATION AT MINNEAPOLIS, MN (MSPI TANK) PER CONTRACT AND ATTACHED SOW. **FY20 SITE SURVEYS SHOULD BE COMPLETED IN THE MONTH OF AUGUST 2019** | $37K |
| May 26, 2021 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH19F01418 | 238210 | CONDUCT SITE SURVEY FOR FST INSTALLATION AT MINNEAPOLIS, MN (MSPK TANK) PER CONTRACT AND ATTACHED SOW. **FY20 SITE SURVEYS SHOULD BE COMPLETED IN THE MONTH OF AUGUST 2019** | $24K |
| May 20, 2021 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH19F01412 | 238210 | CONDUCT SITE SURVEY FOR FST INSTALLATION AT MINNEAPOLIS, MN (MSPL TANK) PER CONTRACT AND ATTACHED SOW. **FY20 SITE SURVEYS SHOULD BE COMPLETED IN THE MONTH OF AUGUST 2019** | $27K |
| May 20, 2021 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH19F01416 | 238210 | CONDUCT SITE SURVEY FOR FST INSTALLATION AT MINNEAPOLIS, MN (MSPG TANK) PER CONTRACT AND ATTACHED SOW. **FY20 SITE SURVEYS SHOULD BE COMPLETED IN THE MONTH OF AUGUST 2019** | $29K |
| May 19, 2021 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH19F01419 | 238210 | CONDUCT SITE SURVEY FOR FST INSTALLATION AT SEATTLE, WA (SZI TANK) PER CONTRACT AND ATTACHED SOW. **FY20 SITE SURVEYS SHOULD BE COMPLETED IN THE MONTH OF AUGUST 2019** | $6K |
| May 19, 2021 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH19F01674 | 238210 | CONDUCT SITE SURVEY FOR FST INSTALLATION AT SACHSE, TX (HQZ TANK) PER CONTRACT AND ATTACHED SOW. **FY20 SITE SURVEYS SHOULD BE COMPLETED IN THE MONTH OF OCTOBER 2019** | $38K |
| May 19, 2021 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH20F01314 | 238210 | CONDUCT SITE SURVEYS AND DEVELOP SITE SPECIFIC DESIGNS FOR VARIOUS LOC IDS PER URBAN ELECTRIC'S FY21 INSTALLATIONS. | $222K |
| May 19, 2021 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH20F01315 | 238210 | CONDUCT SITE SURVEYS AND DEVELOP SITE SPECIFIC DESIGNS FOR VARIOUS LOC IDS PER URBAN ELECTRIC'S FY21 INSTALLATIONS. | $180K |
| May 19, 2021 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH20F01316 | 238210 | CONDUCT SITE SURVEYS AND DEVELOP SITE SPECIFIC DESIGNS FOR VARIOUS LOC IDS PER URBAN ELECTRIC'S FY21 INSTALLATIONS. | $205K |
| Apr 21, 2021 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH21F00855 | 238210 | CONDUCT SITE SURVEY AND DEVELOP SITE SPECIFIC DESIGN FOR THE FY22 ENGINE GENERATOR WITH SUBBASE TANK INSTALLATION PER CONTRACT AND ATTACHED SOW AT BATTLE MTN, NV (BAM ARSR) JCN: 1501595 | $5K |
| Apr 15, 2021 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH21F00802 | 238210 | CONDUCT SITE SURVEY FOR THE FY22 ENGINE GENERATOR WITH SUBBASE TANK INSTALLATION PER CONTRACT AND ATTACHED SOW BATTLE MTN., NV (BAME ARSR) JCN: 18067823 | $5K |
| Apr 15, 2021 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH21F00803 | 238210 | CONDUCT SITE SURVEY FOR THE FY22 ENGINE GENERATOR WITH SUBBASE TANK INSTALLATION PER CONTRACT AND ATTACHED SOW AT CASPER, WY (CPRA ASR) JCN: 1501746 | $5K |
| Apr 12, 2021 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH21F00763 | 238210 | CONDUCT SITE SURVEY AND DEVELOP SITE SPECIFIC DESIGN FOR THE FY22 DIESEL FUEL STORAGE TANK INSTALLATION PER CONTRACT AND ATTACHED SOW AT MELBOURNE, FL (MLBB ARSR) 18027974 SITE SURVEY @ $5,402 DESIGN @ $9,000 (BASELINE) | $14K |
| Apr 12, 2021 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH21F00764 | 238210 | CONDUCT SITE SURVEY AND DEVELOP SITE SPECIFIC DESIGN FOR THE FY22 DIESEL FUEL STORAGE TANK INSTALLATION PER CONTRACT AND ATTACHED SOW AT CITY, STATE NASHWAUK, MN (QJD ARSR) JCN: 1501135 SITE SURVEY @ $5,402 DESIGN @ $9,000 (BASELINE) | $14K |
| Apr 12, 2021 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH21F00765 | 238210 | CONDUCT SITE SURVEY AND DEVELOP SITE SPECIFIC DESIGN FOR THE FY22 DIESEL FUEL STORAGE TANK INSTALLATION PER CONTRACT AND ATTACHED SOW AT JACKSON, MS (JANC ASR) JCN: 1503297 SITE SURVEY @ $5,402 DESIGN @ $9,000 (BASELINE) | $14K |
| Apr 12, 2021 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH21F00768 | 238210 | CONDUCT SITE SURVEY AND DEVELOP SITE SPECIFIC DESIGN FOR THE FY22 DIESEL FUEL STORAGE TANK INSTALLATION PER CONTRACT AND ATTACHED SOW AT WILMINGTON, NC (ILM ATCT) JCN: 1503279 SITE SURVEY @ $5,402 DESIGN @ $9,000 (BASELINE) | $14K |
| Apr 12, 2021 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH21F00769 | 238210 | CONDUCT SITE SURVEY AND DEVELOP SITE SPECIFIC DESIGN FOR THE FY22 DIESEL FUEL STORAGE TANK INSTALLATION PER CONTRACT AND ATTACHED SOW AT LAS VEGAS, NV (LASC ASR) JCN: 18027111 SITE SURVEY @ $5,402 DESIGN @ $9,000 (BASELINE) | $14K |
| Apr 12, 2021 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH21F00770 | 238210 | CONDUCT SITE SURVEY AND DEVELOP SITE SPECIFIC DESIGN FOR THE FY22 DIESEL FUEL STORAGE TANK INSTALLATION PER CONTRACT AND ATTACHED SOW AT RENO, NV (RNOD LOC) JCN: 18027489 SITE SURVEY @ $5,402 DESIGN @ $9,000 (BASELINE) | $14K |
| Apr 12, 2021 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH21F00771 | 238210 | CONDUCT SITE SURVEY AND DEVELOP SITE SPECIFIC DESIGN FOR THE FY22 DIESEL FUEL STORAGE TANK INSTALLATION PER CONTRACT AND ATTACHED SOW AT ASPEN, CO (ASEB ATCBI) JCN: 18064828 SITE SURVEY @ $5,402 DESIGN @ $9,000 (BASELINE) | $14K |
| Apr 12, 2021 | Department of Transportation6973GH FRANCHISE ACQUISITION SVCS | 6973GH21F00772 | 238210 | CONDUCT SITE SURVEY AND DEVELOP SITE SPECIFIC DESIGN FOR THE FY22 DIESEL FUEL STORAGE TANK INSTALLATION PER CONTRACT AND ATTACHED SOW AT RENO, NV (RNOC GS) JCN: 18027488 SITE SURVEY @ $5,402 DESIGN @ $9,000 (BASELINE) | $14K |