1,500-gallon liquid nitrogen tank and vaporizer lease + Liquid Nitrogen refill agreement

HEALTH AND HUMAN SERVICES, DEPARTMENT OF

Notice type
Combined Synopsis/Solicitation
Solicitation #
75F40126Q133840
NAICS
325120
PSC
6830
Set-aside
No Set aside used
Posted
July 24, 2026
Response due
July 31, 2026

What this opportunity is

The Department of Health and Human Services is buying a 1,500-gallon liquid nitrogen tank and vaporizer lease, along with a liquid nitrogen refill agreement. This procurement is suitable for any business size, as it is conducted as full and open under NAICS code 325120. Since this is a Combined Synopsis/Solicitation, businesses should track this opportunity closely as quotes are being requested and no separate solicitation will be issued.

Analysis by Mindy, grounded in the SAM.gov notice.

Description

75F40126Q133840 1 of 18 This is a combined synopsis/solicitation for commercial items prepared in accordance with the Federal Acquisition Regulation (FAR) RFO Part 12, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested and a written solicitation will not be issued. The solicitation number is 75F40126Q133840. This solicitation is issued as a Request for Quote (RFQ). The associated North American Industry Classification System (NAICS) code for this acquisition is 325120 – Industrial Gas Manufacturing; the applicable Small Business Size Standard is 1,200 employees. This requirement is conducted as full and open. Any sized business under the applicable NAICS code may submit a quote. Requirement The Food and Drug Administration (FDA), Center for Veterinary Medicine (CVM), Office of Applied Science (OAS) requires the lease of a 1,500-gallon liquid nitrogen tank and vaporizer, as well as the refill of liquid nitrogen. Vaporized liquid nitrogen is utilized to support the facility’s mass spectrophotometers. This requirement is for a Base Year plus four (4) Option Years. Schedule of Supplies or Services and Prices/Costs. Item #1: Base Year ITEM Description QTY Unit of Issue Unit Price Extended Price 1 Lease of Nitrogen Tank and Vaporizer (Monthly) 12 Month $ ________ $ _________ 2 Purchase of Liquid Nitrogen (EST 2,600 gal/month) EST 31,200 per gallon $ ________ $ _________ Total Base Year Price $ ____________________ Item #2: Option Year 1 ITEM Description QTY Unit of Issue Unit Price Extended Price 3 Lease of Nitrogen Tank and Vaporizer (Monthly) 12 Month $ ________ $ _________ 4 Purchase of Liquid Nitrogen (EST 2,600 gal/month) EST 31,200 per gallon $ ________ $ _________ Total Option Year 1 Price $ ____________________ -- 1 of 18 -- 75F40126Q133840 2 of 18 Item #3: Option Year 2 ITEM Description QTY Unit of Issue Unit Price Extended Price 5 Lease of Nitrogen Tank and Vaporizer (Monthly) 12 Month $ ________ $ _________ 6 Purchase of Liquid Nitrogen (EST 2,600 gal/month) EST 31,200 per gallon $ ________ $ _________ Total Option Year 2 Price $ ____________________ Item #4: Option Year 3 ITEM Description QTY Unit of Issue Unit Price Extended Price 7 Lease of Nitrogen Tank and Vaporizer (Monthly) 12 Month $ ________ $ _________ 8 Purchase of Liquid Nitrogen (EST 2,600 gal/month) EST 31,200 per gallon $ ________ $ _________ Total Option Year 3 Price $ ____________________ Item #5: Option Year 4 ITEM Description QTY Unit of Issue Unit Price Extended Price 9 Lease of Nitrogen Tank and Vaporizer (Monthly) 12 Month $ ________ $ _________ 10 Purchase of Liquid Nitrogen (EST 2,600 gal/month) EST 31,200 per gallon $ ________ $ _________ Total Option Year 4 Price $ ____________________ Grand Total, Base + 4 Option Years $ ____________________ -- 2 of 18 -- 75F40126Q133840 3 of 18 Minimum Requirements: 1. Tank Lease & Installation: One (1) 1,500-gallon liquid nitrogen tank shall be delivered and installed (to include all freight, rigging, and crane services) on a yearly lease basis. Installation shall occur on the existing 20’ x 12’ fenced-in concrete pad located outside the MOD2 Building A loading dock. 2. Vaporizer Lease & Installation: One (1) 5,000 cubic foot per hour liquid nitrogen vaporizer and appropriate pressure regulator assembly shall be delivered and installed (to include all freight, rigging, and crane services) on an annual lease basis on the existing concrete pad outside MOD2 Building A. The Contractor shall supply all necessary components to connect the tank to the facility. 3. Liquid Nitrogen Delivery: Liquid nitrogen shall be delivered to refill the 1,500-gallon tank on an as-needed basis (estimated to occur bi-weekly). Current gas usage is estimated at 2,600 gallons per month; however, usage may vary based on planned studies or operational status. If usage consistently exceeds this estimate, the contract may be modified to acquire additional liquid nitrogen. 4. Gas Purity & Pressure: Delivered liquid nitrogen shall provide nitrogen gas at a minimum purity of 99.998% through the existing piping system at a minimum pressure of 150 psi. 5. Response Time: Certified service technicians shall be available to respond to system malfunctions or technical issues within 24 hours of notification. 6. Redundancy & Delivery Capacity: The Contractor shall possess the operational capacity to deliver liquid nitrogen without interruption, including during unexpected vehicle maintenance or breakdowns. To ensure continuous service, the Contractor shall maintain more than one (1) delivery truck in its fleet. 7. Production Facility Redundancy: The Contractor shall operate more than one (1) liquid nitrogen production plant within a 100-mile radius of CVM/OAS/MOD 2. This geographic redundancy is required to ensure uninterrupted delivery in the event of a natural disaster or plant accessibility issues. CVM/OAS analytical instruments cannot experience shutdowns due to a lack of liquid nitrogen supply, as this would result in a significant loss of active research. 8. Telemetry & Monitoring: The Contractor shall install and maintain a tank level and pressure monitor on the tank. The Contractor shall provide an adequate monitoring system to guarantee that the facility’s supply of liquid nitrogen is never depleted. Under the current facility configuration, a separate reserve tank is not required. 9. Demarcation & Final Assembly: The FDA/CVM will provide only the stainless steel piping extending from the building. The Contractor shall be responsible for the final assembly, including the pressure regulator(s) and any other component required to connect the building infrastructure to the tank. -- 3 of 18 -- 75F40126Q133840 4 of 18 10. Regulatory Compliance: The Contractor shall comply with all applicable Occupational Safety and Health Administration (OSHA),

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.

View the original notice on SAM.gov ↗

Similar Active Opportunities (NAICS 325120)