What this opportunity is
The Department of Defense is seeking a contractor for the design and construction of a 1,200 square foot mezzanine in Building 238, South Center, Utah. This opportunity is set aside for total small businesses under NAICS 236210, making it suitable for small construction firms with experience in design and structural work. The notice type is a Combined Synopsis/Solicitation, indicating that interested businesses should track the opportunity closely and prepare to submit bids as detailed specifications are provided.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
Statement of Work: Mezzanine Construction
Project Design and Construction of a 1200 sq. ft.
Mezzanine in Building 238, South Center
1.0 Project Overview & Summary
This Statement of Work outlines the requirements for the design and construction of a new
1200 square foot (30’ x 40’) enclosed mezzanine to be located in the South Center section
of Building 238.
The scope of this project includes the construction of a new mezzanine and stairs with a
fully enclosed space featuring an office, a break room, and a multi-purpose area
designated for use as both a computer lab and a general meeting space.
The project encompasses all associated structural, electrical/lighting, data, and fire
alarm/suppression systems. Careful consideration must be given to the placement of
support columns to maximize usable workspace and allow for general repair work and tool
box storage on the ground floor. All work must adhere to applicable life safety and building
codes.
2.0 Scope of Work
The contractor shall provide all labor, materials, and equipment necessary to perform the
following:
• Design: Provide a complete design package for the new mezzanine, adhering to all
specified codes and standards. The design should prioritize a maximum of nine (9)
support columns and avoid new footings where possible. If this approach is not
feasible or is cost-prohibitive, a reasonable alternative or a dual-option proposal is
required.
• Construction: Fabricate and erect the new mezzanine steel structure and decking
and stairs.
• Enclosure: Frame and finish all walls and the ceiling for the upper level.
-- 1 of 4 --
• Interior Finishes: Install flooring, cabinetry, and other specified finishes.
• Utilities: Install all required systems, electrical, data, and lighting for both the upper
mezzanine level and the area below. Coordinate with the customer for plumbing
hookups (accomplished by customer).
• Safety Systems: Integrate fire alarm and suppression systems as required by code.
• Contractor will be able to use caged area to stage materials where the mezzanine is
needing to be built.
3.0 Technical Specifications
Category Requirement Details
Structure Dimensions &
Location
30’ x 40’ mezzanine located in the south-center portion of Building
238.
Support
Columns
Design for a maximum of nine (9) columns, bolted to the existing
concrete slab. No new footings are preferred.
Clear Height
(Below)
A minimum of 11'0" clear height from the ground floor to the
underside of the mezzanine.
Load Bearing The structure and stairs must be rated for its intended
office/assembly occupancy and meet all applicable facility codes.
Paint All steel components are to be painted light grey using a durable,
industrial-grade primer and paint.
Interior
Finishes
Flooring Main Area/Office: Carpet tiles. Break Room: LVP (Luxury Vinyl Plank)
wood planks and rubber wall base in all areas. (Contractor to provide
options for customer selection.)
-- 2 of 4 --
Electrical
& Data
Data Install data runs to all designated computer locations within the
multi-purpose area and office.
Break Room
Circuits
Provide three (3) dedicated circuits/receptacles for
refrigerators. Provide four (4) dedicated circuits for microwaves with
receptacles at appropriate counter height.
Plumbing Scope &
Coordination
The contractor shall stub out plumbing supply and drain lines. The
final installation and connection will be performed by the customer.
The design must ensure customer can meet all plumbing codes.
Break Room
Fixtures
Rough in plumbing for double sink basin.
Lighting
Type &
Standards
All lighting shall be LED with Dimmer switches and meet applicable
standards for brightness. The proposal must include designed
Lumen counts for each area.
Locations Install lighting fixtures on the enclosed upper level and on the
underside of the mezzanine to illuminate the ground-level workshop
area.
4.0 Codes and Standards Compliance
All design and construction work must conform to the latest editions of the following:
• Unified Facility Criteria (UFC)
• Hill Air Force Base Facility Design Standards
• All applicable local and national building, electrical, plumbing, mechanical, and fire
safety codes.
-- 3 of 4 --
-- 4 of 4 --
Source: SAM.gov, as posted. Verify the current solicitation before responding.