CONTACT INFORMATION|4|N792.15| LPA|NA|danielle.m.junod.civ@us.navy.mil|
ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19||||||||||||||||||||
INSPECTION AND ACCEPTANCE OF SUPPLIES|26|x||||||||||||x||||||||||||||
WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|Invoice and Receiving Report Combo|Source |TBD|N00383|TBD|TBD|See schedule|TBD|||||||||
NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1||
WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUN 2003)|6|One year after delivery date|45 days after discovery of the defect|||||
EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2|||
BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11||||||||||||
LIMITATIONS ON PASS-THROUGH CHARGES (JUN 2020)|1||
ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2025)|13||||||||||||||
BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5||||||
BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM (FEB 2024)|1||
ROYALTY INFORMATION (APR 1984)|1||
ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2025)(DEVIATION 2025-O0003 AND 2025-O0004))|12|336413|1250|||||||||||
NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||DOD-A1A|
The purpose of this amendment is to extend the solicitation date to 16 JUL 2026.
The purpose of the amendment is to extend the solicitation date to December 31, 2025.
\
This solicitation is for repair.
This is a sole source requirement.
The Government physically does not have in its possession sufficient, accurate, or legible data to contract with other than the current source.
These items require Government Source Approval prior to award. If you are not an approved source, you must submit, together with your proposal, the information detailed in the NAVSUP WSS Source Approval Brochure which can be obtained on the internet at h
https://www.navsup.navy.mil/public/navsup/wss/business_opps/. Offers received which fail to provide all data required by the source approval brochure will not be considered for award under this solicitation.
For information or questions regarding this notice, please contact Danielle Junod at the email address: danielle.m.junod.civ@us.navy.mil
NAVSUP WSS Requests proposals submitted in response to this solicitation remain valid for a minimum of 120 days following submission.
All contractual documents related to the instant procurement are considered to be "issued" by the Government when copies are either deposited in the mail, transmitted by facsimile, or sent by other electronic commerce methods, such as email. The Government's
acceptance of the contractor's proposal constitutes bilateral agreement to "issue" contractual documents as detailed herein.
\
1. SCOPE
1.1 . Markings shall be in accordance with MIL-STD-130.
1.2 Articles to be furnished hereunder shall be manufactured, tested and inspected in accordance with ;Meggitt; drawing number ( ;79318; ) ;423775-1; , Revision ;Latest; and all details and specifications referenced therein.
1.3 Unless expressly provided for elsewhere in this clause, equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, or any other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not be
provided by the Government or any other source and is the sole responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced specification.
1.4 If MIL-STD-454 is referenced in the drawings or in the specification, the contractor is expected to show compliance with IPC/EIAJ-STD-001C.
2. APPLICABLE DOCUMENTS - NOT APPLICABLE
3. REQUIREMENTS
3.1 1.0 GENERAL
3.1.1 This Statement of Work (SOW) establishes the criteria for repair and testing /inspection of the subject item. It includes inspection, component repair and replacement,reassembly and testing procedures required to return units back into a servicable
condition.
3.2 2.0 DEFINITIONS.
3.2.1 CONTRACTOR: Is defined as the successful offeror awarded a contract, orderor issued a project work order. The term "contract" encompasses a contract, an order, or a project work order.
3.2.2 OVERHAUL: An overhauled part is one which has been disassembled, cleaned, inspected, repaired as necessary (by replacing or repairing all components which have been found to exceed limits established by the repair/overhaul manual) reassembled and tested
in accordance with the approved repair/overhaul manual listed in this SOW and returned to a Ready for Issue (RFI) condition (Refer to contract schedule for items to be overhauled).
3.2.3 REPAIR: A repaired part is one which has been restored to a Ready for Issue(RFI) condition (by replacing or repairing those components found to be defective, broken, damaged or inoperative during the initial evaluation and troubleshooting phase) and
tested in accordance with the approved repair/overhaul manual listed in this SOW (Refer to contract schedule for items to be repaired).
3.3 3.0 SCOPE
3.3.1 GENERAL. The items to be furnished hereunder shall be overhauled, upgraded,repaired, tested, inspected, and accepted in accordance with the terms and conditions specified in this contract. Unless expressly provided Government Furnished Property,
including equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, special test equipment, or any other manufacturing aid required for the repair, manufacture, and/or testing of the subject item(s) will not be provided by the Government and
shall be the responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing, manual, or specification for the contract items.
3.3.2 REPAIR UPGRADE REQUIREMENTS:The contractor shall provide the necessary
facility, labor, materials, parts,…
Source: SAM.gov, as posted. Verify the current solicitation before responding.