313 nm Laser System

COMMERCE, DEPARTMENT OF

Notice type
Combined Synopsis/Solicitation
Solicitation #
NB688000-26-02305
NAICS
334516
PSC
6640
Posted
July 24, 2026
Response due
August 3, 2026
Place of performance
Boulder, CO

What this opportunity is

The Department of Commerce is buying a 313 nm Laser System, classified under NAICS 334516 and PSC 6640. This procurement is suitable for businesses that can provide analytical laboratory instrument manufacturing. As a Combined Synopsis/Solicitation notice, this means that the government is both announcing the procurement and soliciting bids in a single document, so interested businesses should track and respond promptly. The work will be performed in Colorado.

Analysis by Mindy, grounded in the SAM.gov notice.

Description

Requirements / Specification Document Requirements / Specifications: 313 nm Fiber Laser Systems 1 Version 1.0 (2019) Double-click on  for further assistance. Use this document to detail specifications/requirements for an item and/or ancillary services.  TITLE: 313 nm Fiber Laser Systems  Requesting Lab/Division/Group: Physical Measurements Lab/Time and Frequency Division/Ion Storage Group NB688000-26-02305 General Statement of Need  The Time and Frequency division, as part of Chronos, requires two laser sources 313 nm to support development of optical clocks based on quantum logic spectroscopy of trapped ions. Items and/or Ancillary Services  Item 1: 313 nm Fiber Laser System Quantity: Two (2) Specifications: CW laser with > 100 mW output at 313 nm 1: CW laser systems at 313 nm 2: Wavelength: 313.165 nm center wavelength 3: Tuning range: tunable to 313.133 nm and 313.197 nm, modehop free 4: Linewidth: < 40 kHz linewidth 5: Power: > 100 mW output power at 313 nm 6: PZT tuning: 3 GHz tuning range with > 5 kHz bandwidth 7: Current tuning range: 200 MHz tuning range with > 1 MHz bandwidth 8: Output mode: Collimated output mode M^2<1.3 with linear polarization 9: Other specifications a: Monitor output, at least 5 mW at 626 nm b: Physical layout - Rack-mounted laser sources/amplifiers and Frequency conversion to UV on optical table with footprint on table ~ 12”x16” Separately Priced Options and Services: Item 2: [List minimum specifications. Quantity: [Enter quantity here.] Specifications: [Enter quantity here.] Item3: Service Requirements / Item Specifications Section  Requirements/Specifications  Planning Considerations ☒ N/A ☐ List any visits required to allow potential vendors to see site specific constraints. [Explain requirement here] ☐ US citizen required on-site (foreign nationals require preregistration 30 days prior) -- 1 of 4 -- Requirements / Specification Document Requirements / Specifications: 313 nm Fiber Laser Systems 2 Version 1.0 (2019) Double-click on  for further assistance. ☐ Vendor rep on-site more than three days ☐ Other considerations: [List other considerations to ensure an accurate quote] Shipping & Delivery ☐ N/A Delivery in 5 months ARO preferred Shipping criteria: ☒ Partial delivery acceptable ☐ Direct delivery to building required [Explain need for requirement here] Building has: ☐ Loading dock ☐ Containerization preference: [Choose container] Other requirements: [List any other requirements here] Delivery date criteria: ☒ Delivery of goods, installation, and training shall be completed no later than: 20 weeks ARO ☐ Deliver no earlier than: [Insert date here] ☐ Other: [List other shipping, delivery, or specil requirements] Electronic Media ☐ N/A [Enter electronic media requirements by item here.] ☒ Software ☒ Electronic manuals ☐ License Key ☐ Other: [List any other Electronic Media requirements here] [Enter email address for software delivery here] Installation ☒ N/A Vendor technician will be on site to install system and confirm performance ☐ Vendor technician on site ☐ Rigging ☐ Uncrating / Unpackaging ☐ Removal of packaging material ☐ Equipment set up ☐ Start-up services ☐ Turn key installation ☐ Other Click or tap here to enter text. Note: When installation is required, TPOC or COR shall be the coordination point. Facility / Utility Considerations ☒ N/A Typical 60 Hz, 120 V power available ☐ OFPM Work Order Number(s) [List any Work Order Number(s) here] ☐ Power available Voltage: [Enter voltage here] (V) Max Current: [Enter max current draw here] (A) Phase: [Choose phase] Frequency: [Typically 60Hz] (Hz) NEMA Plug Type: [Enter plug type here] (i.e.: NEMA L5-20P) Environment: [Choose environment] Other power consideration: [List any other power considerations here] ☐ Utility connections: [List relevant available utilities, pressure(s), and flowrate(s)] ☐ Other considerations: [List other considerations to ensure an accurate -- 2 of 4 -- Requirements / Specification Document Requirements / Specifications: 313 nm Fiber Laser Systems 3 Version 1.0 (2019) Double-click on  for further assistance. quote] Warranty  ☐ N/A Base Manufacturer Warranty is acceptable 2 years warranty of output power specification What is included? ☐ Labor ☐ Parts ☐ Travel ☐ Cost and liability for returns ☐ Other: [Enter other requirements here] ☒ Warranty length: 2 Years Period Length:[Ex. month, 6 month, year etc.] Training ☒ N/A Minimal training should be required for users of this system beyond the information contained in the user manual and any training necessary can be performed as part of the vendor installation. ☐ On-site ☐ Off-site location: [Enter location(s) here] ☐ Number of trainees: [Enter number of trainees here] Scope of training: ☐ Operations ☐ Maintenance ☐ Troubleshooting ☐ Safety ☐ Other: [Enter other scope requirements here] ☐ Training materials to be provided: [Describe requirement here] ☐ Other: [Enter other training requirements here] Note: When training is required, TPOC or COR shall be the coordination point. Inspection and Acceptance ☐ N/A [Enter inspection requirements per item here] ☐ Planned government acceptance testing (7 business days) ☒ Gov’t acceptance expected to take longer than 7 business days: 14 days ☐ Inspection and acceptance plan: [Explain here] ☐ Other: [Enter other requirements here] Maintenance ☒ N/A [Describe your maintenance requirements per item here] Period Length: [Ex. month, 6 month, year etc.] What is included? ☐ Labor ☐ Spare parts ☐ Consumables ☐ Travel ☐ Cost and liability for returns ☐ Software updates ☐ Manuals ☐ Service plan length: [Enter service plan length here] ☐ Other: [Enter other requirements here] ☐ Requirements: [Enter requirements here] (i.e.: onsite within 72 hours, etc.) ☐ Option Period 1 ☐ Option Period 2 ☐ Option Period 3 ☐ Option Period 4 Government Furnished Material / Equipment [List any government furnished material/equipment per item here] ☐ Samples for testing ☐ Government equ

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.

View the original notice on SAM.gov ↗

Similar Active Opportunities (NAICS 334516)