626-24-203_Cooling Tower and Chillers
VETERANS AFFAIRS, DEPARTMENT OF
Notice type
Solicitation
Solicitation #
36C24926R0054-1
NAICS
238220
PSC
Z2DA
Set-aside
Service-Disabled Veteran-Owned Small Business Set Aside
Posted
July 14, 2026
Response due
August 5, 2026
Place of performance
Nashville, TN
Description
PROJECT # 626-24-203
Nashville VA - Upgrade Cooling Tower and Chiller
VA TENNESSEE VALLEY HEALTHCARE SYSTEM
1310 24TH AVE S
NASHVILLE, TN 37212
SPECIFICATIONS
BID DOCUMENTS REVISION 2
MAY 27, 2026
PREPARED BY
-- 1 of 913 --
VA TENNESSEE VALLEY HEALTHCARE SYSTEM NASHVILLE
UPGRADE COOLING TOWER AND CHILLER
PROJECT NO. 626-24-203
08-01-2025
TABLE OF CONTENTS
00 01 10 - 1
DEPARTMENT OF VETERANS AFFAIRS
VHA MASTER SPECIFICATIONS
TABLE OF CONTENTS
Section 00 01 10
SECTION NO DIVISION AND SECTION TITLES DATE
DIVISION 00 - SPECIAL SECTIONS
00 01 15 List of Drawing Sheets 05-20
DIVISION 01 - GENERAL REQUIREMENTS
01 00 00 General Requirements 11-21
01 32 16.15 Project Schedules (Small Projects – Design/Bid/Build 01-24
01 33 23 Shop Drawings, Product Data, and Samples 06-25
01 35 26 Safety Requirements 05-24
01 42 19 Reference Standards 11-20
01 45 00 Quality Control 02-21
01 45 35 Special Inspections 06-21
01 57 19 Temporary Environmental Controls 01-21
01 74 19 Construction Waste Management 04-22
01 81 13 Sustainable Construction Requirements 10-17
01 91 00 General Commissioning Requirements 04-22
DIVISION 02 – EXISTING CONDITIONS
02 82 13.21 Asbestos Roofing Abatement 01-21
02 83 33.13 Lead-Based Paint Removal and Disposal 01-21
DIVISION 03 – CONCRETE
03 30 53 (Short-Form) Cast-in-Place Concrete 01-21
DIVISION 04 – MASONRY
DIVISION 05 – METALS
05 12 00 Structural Steel Framing 11-18
05 50 00 Metal Fabrications 08-18
05 51 00 Metal Stairs 01-21
DIVISION 06 – WOOD, PLASTICS AND COMPOSITES
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 52 16.11 Cold Adhesive Styrene-Butadiene-Styrene Modified
Bituminous Membrane Roofing
12-21
07 60 00 Flashing and Sheet Metal 01-21
-- 2 of 913 --
VA TENNESSEE VALLEY HEALTHCARE SYSTEM NASHVILLE
UPGRADE COOLING TOWER AND CHILLER
PROJECT NO. 626-24-203
08-01-2025
TABLE OF CONTENTS
00 01 10 - 2
SECTION NO DIVISION AND SECTION TITLES DATE
07 81 00 Applied Fireproofing 07-23
07 84 00 Firestopping 01-21
07 92 00 Joint Sealants 04-22
DIVISION 08 - OPENINGS
08 11 13 Hollow Metal Doors and Frames 01-21
08 71 00 Door Hardware 03-24
08 90 00 Louvers and Vents 01-21
DIVISION 09 – FINISHES
DIVISION 10 – SPECIALTIES
DIVISION 11 – EQUIPMENT
DIVISION 12 – FURNISHINGS
DIVISION 13 - SPECIAL CONSTRUCTION
13 05 41 Seismic Restraint Requirements for Non-Structural
Components
01-21
DIVISION 14– CONVEYING EQUIPEMENT
DIVISION 21- FIRE SUPPRESSION
DIVISION 22 – PLUMBING
22 05 11 Common Work Results for Plumbing 01-23
22 05 23 General-Duty Valves for Plumbing Piping 09-20
22 07 11 Plumbing Insulation 09-19
22 08 00 Commissioning of Plumbing Systems 11-16
22 11 00 Facility Water Distribution 05-21
22 13 00 Facility Sanitary and Vent Piping 09-20
22 40 00 Plumbing Fixtures 05-24
DIVISION 23 – HEATING, VENTILATING, AND AIR
CONDITIONING (HVAC)
23 05 11 Common Work Results for HVAC 03-23
23 05 12 General Motor Requirements for HVAC and Steam
Generation Equipment
03-23
23 05 41 Noise and Vibration Control for HVAC Piping and 03-23
-- 3 of 913 --
VA TENNESSEE VALLEY HEALTHCARE SYSTEM NASHVILLE
UPGRADE COOLING TOWER AND CHILLER
PROJECT NO. 626-24-203
08-01-2025
TABLE OF CONTENTS
00 01 10 - 3
SECTION NO DIVISION AND SECTION TITLES DATE
Equipment
23 05 93 Testing, Adjusting, and Balancing for HVAC 03-23
23 07 11 HVAC and Boiler Plant Insulation 02-20
23 08 00 Commissioning of HVAC Systems 03-23
23 09 23 Direct-Digital Control System for HVAC 03-23
23 21 13 Hydronic Piping 06-25
23 21 23 Hydronic Pumps 03-23
03-24
23 25 00 HVAC Water Treatment 03-23
23 31 00 HVAC Ducts and Casings 03-23
23 65 00 Cooling Towers 03-23
DIVISION 25 – INTEGRATED AUTOMATION
DIVISION 26 – ELECTRICAL
26 05 11 Requirements for Electrical Installations 11-22
26 05 19 Low-Voltage Electrical Power Conductors and Cables 11-22
26 05 26 Grounding and Bonding for Electrical Systems 11-22
26 05 33 Raceway and Boxes for Electrical Systems 11-22
26 05 73 Overcurrent Protective Device Coordination Study 11-22
26 08 00 Commissioning of Electrical Systems 11-22
26 22 00 Low-Voltage Transformers 11-22
26 24 16 Panelboards 11-22
26 27 26 Wiring Devices 11-22
26 29 11 Motor Controllers 11-22
26 29 21 Enclosed Switches and Circuit Breakers 11-22
26 36 23 Automatic Transfer Switches 11-22
26 41 00 Facility Lightning Protection 11-22
26 43 13 Surge Protective Devices 11-22
26 56 00 Exterior Lighting 11-22
DIVISION 27 – COMMUNICATIONS
27 05 11 Requirements for Communications Installations 09-19
27 05 26i Grounding and Bonding for Communications Systems 06-15
27 05 33i Conduits and Backboxes for Communications Systems 12-22
27 05 53i Identification for Communications Systems 12-22
27 08 00 Commissioning of Communications Systems 11-16
27 10 00i Structured Cabling 12-22
27 15 13i Communications Copper Horizontal Cabling 12-22
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY
-- 4 of 913 --
VA TENNESSEE VALLEY HEALTHCARE SYSTEM NASHVILLE
UPGRADE COOLING TOWER AND CHILLER
PROJECT NO. 626-24-203
08-01-2025
TABLE OF CONTENTS
00 01 10 - 4
SECTION NO DIVISION AND SECTION TITLES DATE
DIVISION 31 – EARTHWORK
DIVISION 32 – EXTERIOR IMPROVEMENTS
DIVISION 33 – UTILITIES
DIVISION 34 – TRANSPORTATION
DIVISION 48 – Electrical Power Generation
-- 5 of 913 --
VA TENNESSEE VALLEY HEALTHCARE SYSTEM NASHVILLE
UPGRADE COOLING TOWER AND CHILLER
PROJECT NO. 626-24-203
05-01-20
LIST OF DRAWING SHEETS
00 01 15 - 1
SECTION 00 01 15
LIST OF DRAWING SHEETS
The drawings listed below accompanying this specification form a part of
the contract.
Drawing No. Title
GENERAL
GI000 COVER SHEET
GI001 ICRA PLAN
GENERAL: 2
STRUCTURAL
S101 STRUCTURAL NOTES AND PARTIAL ROOF PARTIAL ROOF
PLAN
S102 ENLARGED PLATFORM FRAMING PLANS
S103 SECTIONS
STRUCTURAL: 3
ARCHITECTURE
AE401 ENLARGED DETAILS
ARCHITECTURE: 1
PLUMBING
P001 LEGEND & DRAWING INDEX
P101 BASEMENT & FIRST FLOOR PLAN
P102 SECOND FLOOR PLAN
PLUMBING: 3
MECHANICAL
M001 LEGEND, DRAWING INDEX, & GENERAL NOTES
MD100 BASEMENT FLOOR PLAN DEMOLITION PLAN
MD101 FIRST FLOOR PLAN - DEMOLITION PLAN
MD102 SECOND FLOOR PLAN (FAN ROOM #2 &…
Source: SAM.gov, as posted. Verify the current solicitation before responding.
Pursue this opportunity with Mindy
See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.
View the original notice on SAM.gov ↗Similar Active Opportunities (NAICS 238220)
Air Conditioning Maintenance
JUSTICE, DEPARTMENT OF · Justification
Air Conditioning Repair
JUSTICE, DEPARTMENT OF · Justification
HVAC Cleaning and Insulation, JBPHH-HI, Hawaii Air National Guard
DEPT OF DEFENSE · Solicitation · due July 30, 2026
Water Treatment Service HVAC System
DEPT OF DEFENSE · Combined Synopsis/Solicitation · due July 30, 2026
J--FY26 HIHW VC and LC HVAC Repair and Replacement
COMMERCE, DEPARTMENT OF · Combined Synopsis/Solicitation · due July 28, 2026
Replace EVAP Cooler in Greenhouses - St. Paul, MN
AGRICULTURE, DEPARTMENT OF · Combined Synopsis/Solicitation · due August 13, 2026