626-24-203_Cooling Tower and Chillers

VETERANS AFFAIRS, DEPARTMENT OF

Notice type
Solicitation
Solicitation #
36C24926R0054-1
NAICS
238220
PSC
Z2DA
Set-aside
Service-Disabled Veteran-Owned Small Business Set Aside
Posted
July 14, 2026
Response due
August 5, 2026
Place of performance
Nashville, TN

Description

PROJECT # 626-24-203 Nashville VA - Upgrade Cooling Tower and Chiller VA TENNESSEE VALLEY HEALTHCARE SYSTEM 1310 24TH AVE S NASHVILLE, TN 37212 SPECIFICATIONS BID DOCUMENTS REVISION 2 MAY 27, 2026 PREPARED BY -- 1 of 913 -- VA TENNESSEE VALLEY HEALTHCARE SYSTEM NASHVILLE UPGRADE COOLING TOWER AND CHILLER PROJECT NO. 626-24-203 08-01-2025 TABLE OF CONTENTS 00 01 10 - 1 DEPARTMENT OF VETERANS AFFAIRS VHA MASTER SPECIFICATIONS TABLE OF CONTENTS Section 00 01 10 SECTION NO DIVISION AND SECTION TITLES DATE DIVISION 00 - SPECIAL SECTIONS 00 01 15 List of Drawing Sheets 05-20 DIVISION 01 - GENERAL REQUIREMENTS 01 00 00 General Requirements 11-21 01 32 16.15 Project Schedules (Small Projects – Design/Bid/Build 01-24 01 33 23 Shop Drawings, Product Data, and Samples 06-25 01 35 26 Safety Requirements 05-24 01 42 19 Reference Standards 11-20 01 45 00 Quality Control 02-21 01 45 35 Special Inspections 06-21 01 57 19 Temporary Environmental Controls 01-21 01 74 19 Construction Waste Management 04-22 01 81 13 Sustainable Construction Requirements 10-17 01 91 00 General Commissioning Requirements 04-22 DIVISION 02 – EXISTING CONDITIONS 02 82 13.21 Asbestos Roofing Abatement 01-21 02 83 33.13 Lead-Based Paint Removal and Disposal 01-21 DIVISION 03 – CONCRETE 03 30 53 (Short-Form) Cast-in-Place Concrete 01-21 DIVISION 04 – MASONRY DIVISION 05 – METALS 05 12 00 Structural Steel Framing 11-18 05 50 00 Metal Fabrications 08-18 05 51 00 Metal Stairs 01-21 DIVISION 06 – WOOD, PLASTICS AND COMPOSITES DIVISION 07 - THERMAL AND MOISTURE PROTECTION 07 52 16.11 Cold Adhesive Styrene-Butadiene-Styrene Modified Bituminous Membrane Roofing 12-21 07 60 00 Flashing and Sheet Metal 01-21 -- 2 of 913 -- VA TENNESSEE VALLEY HEALTHCARE SYSTEM NASHVILLE UPGRADE COOLING TOWER AND CHILLER PROJECT NO. 626-24-203 08-01-2025 TABLE OF CONTENTS 00 01 10 - 2 SECTION NO DIVISION AND SECTION TITLES DATE 07 81 00 Applied Fireproofing 07-23 07 84 00 Firestopping 01-21 07 92 00 Joint Sealants 04-22 DIVISION 08 - OPENINGS 08 11 13 Hollow Metal Doors and Frames 01-21 08 71 00 Door Hardware 03-24 08 90 00 Louvers and Vents 01-21 DIVISION 09 – FINISHES DIVISION 10 – SPECIALTIES DIVISION 11 – EQUIPMENT DIVISION 12 – FURNISHINGS DIVISION 13 - SPECIAL CONSTRUCTION 13 05 41 Seismic Restraint Requirements for Non-Structural Components 01-21 DIVISION 14– CONVEYING EQUIPEMENT DIVISION 21- FIRE SUPPRESSION DIVISION 22 – PLUMBING 22 05 11 Common Work Results for Plumbing 01-23 22 05 23 General-Duty Valves for Plumbing Piping 09-20 22 07 11 Plumbing Insulation 09-19 22 08 00 Commissioning of Plumbing Systems 11-16 22 11 00 Facility Water Distribution 05-21 22 13 00 Facility Sanitary and Vent Piping 09-20 22 40 00 Plumbing Fixtures 05-24 DIVISION 23 – HEATING, VENTILATING, AND AIR CONDITIONING (HVAC) 23 05 11 Common Work Results for HVAC 03-23 23 05 12 General Motor Requirements for HVAC and Steam Generation Equipment 03-23 23 05 41 Noise and Vibration Control for HVAC Piping and 03-23 -- 3 of 913 -- VA TENNESSEE VALLEY HEALTHCARE SYSTEM NASHVILLE UPGRADE COOLING TOWER AND CHILLER PROJECT NO. 626-24-203 08-01-2025 TABLE OF CONTENTS 00 01 10 - 3 SECTION NO DIVISION AND SECTION TITLES DATE Equipment 23 05 93 Testing, Adjusting, and Balancing for HVAC 03-23 23 07 11 HVAC and Boiler Plant Insulation 02-20 23 08 00 Commissioning of HVAC Systems 03-23 23 09 23 Direct-Digital Control System for HVAC 03-23 23 21 13 Hydronic Piping 06-25 23 21 23 Hydronic Pumps 03-23 03-24 23 25 00 HVAC Water Treatment 03-23 23 31 00 HVAC Ducts and Casings 03-23 23 65 00 Cooling Towers 03-23 DIVISION 25 – INTEGRATED AUTOMATION DIVISION 26 – ELECTRICAL 26 05 11 Requirements for Electrical Installations 11-22 26 05 19 Low-Voltage Electrical Power Conductors and Cables 11-22 26 05 26 Grounding and Bonding for Electrical Systems 11-22 26 05 33 Raceway and Boxes for Electrical Systems 11-22 26 05 73 Overcurrent Protective Device Coordination Study 11-22 26 08 00 Commissioning of Electrical Systems 11-22 26 22 00 Low-Voltage Transformers 11-22 26 24 16 Panelboards 11-22 26 27 26 Wiring Devices 11-22 26 29 11 Motor Controllers 11-22 26 29 21 Enclosed Switches and Circuit Breakers 11-22 26 36 23 Automatic Transfer Switches 11-22 26 41 00 Facility Lightning Protection 11-22 26 43 13 Surge Protective Devices 11-22 26 56 00 Exterior Lighting 11-22 DIVISION 27 – COMMUNICATIONS 27 05 11 Requirements for Communications Installations 09-19 27 05 26i Grounding and Bonding for Communications Systems 06-15 27 05 33i Conduits and Backboxes for Communications Systems 12-22 27 05 53i Identification for Communications Systems 12-22 27 08 00 Commissioning of Communications Systems 11-16 27 10 00i Structured Cabling 12-22 27 15 13i Communications Copper Horizontal Cabling 12-22 DIVISION 28 – ELECTRONIC SAFETY AND SECURITY -- 4 of 913 -- VA TENNESSEE VALLEY HEALTHCARE SYSTEM NASHVILLE UPGRADE COOLING TOWER AND CHILLER PROJECT NO. 626-24-203 08-01-2025 TABLE OF CONTENTS 00 01 10 - 4 SECTION NO DIVISION AND SECTION TITLES DATE DIVISION 31 – EARTHWORK DIVISION 32 – EXTERIOR IMPROVEMENTS DIVISION 33 – UTILITIES DIVISION 34 – TRANSPORTATION DIVISION 48 – Electrical Power Generation -- 5 of 913 -- VA TENNESSEE VALLEY HEALTHCARE SYSTEM NASHVILLE UPGRADE COOLING TOWER AND CHILLER PROJECT NO. 626-24-203 05-01-20 LIST OF DRAWING SHEETS 00 01 15 - 1 SECTION 00 01 15 LIST OF DRAWING SHEETS The drawings listed below accompanying this specification form a part of the contract. Drawing No. Title GENERAL GI000 COVER SHEET GI001 ICRA PLAN GENERAL: 2 STRUCTURAL S101 STRUCTURAL NOTES AND PARTIAL ROOF PARTIAL ROOF PLAN S102 ENLARGED PLATFORM FRAMING PLANS S103 SECTIONS STRUCTURAL: 3 ARCHITECTURE AE401 ENLARGED DETAILS ARCHITECTURE: 1 PLUMBING P001 LEGEND & DRAWING INDEX P101 BASEMENT & FIRST FLOOR PLAN P102 SECOND FLOOR PLAN PLUMBING: 3 MECHANICAL M001 LEGEND, DRAWING INDEX, & GENERAL NOTES MD100 BASEMENT FLOOR PLAN DEMOLITION PLAN MD101 FIRST FLOOR PLAN - DEMOLITION PLAN MD102 SECOND FLOOR PLAN (FAN ROOM #2 &

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.

View the original notice on SAM.gov ↗

Similar Active Opportunities (NAICS 238220)