What this opportunity is
The Department of Defense is soliciting bids for the repair of antenna control equipment under NAICS 334220 and PSC 5985. This opportunity is suitable for small businesses, particularly those with capabilities in electronic repair and compliance with government inspection standards. Interested contractors should note that the solicitation requires a Repair Turnaround Time (RTAT) of 350 days and that quotes must include pricing and RTAT details. This is a solicitation notice, so tracking the opportunity is essential for potential bidders.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
CONTACT INFORMATION|4|N7M2.16|EA1|771-229-0493|ETHAN.K.LENTZ.CIV@US.NAVY.MIL|
ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19||||||||||||||||||||
INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2|||
INSPECTION AND ACCEPTANCE OF SUPPLIES|26|||||||||||||||||||||||||||
WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|COMBO INVOICE AND RECEIVING||TO BE DETERMINED (TBD)|N00104|TBD|TBD|SEE SCHEDULE|SEE SCHEDULE|SEE SCHEDULE||TBD||||||
NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|WSS|
MANDATORY USE OF WORKFLOW PRO (WFP) MOD ASSIST MODULE|1|ALEXANDRA.R.DURHAM.CIV@US.NAVY.MIL|
NOTICE OF CYBERSECURITY MATURITY MODEL CERTIFICATION LEVEL REQUIREMENTS (NOV 2025))|1||
SMALL BUSINESS SUBCONTRACTING PLAN (DOD CONTRACTS)-BASIC (DEV 2026-O0037)(FEB 2026))|2|||
OPTION FOR INCREASED QUANTITY (MAR 1989)|1|365 DARO|
CONTRACTOR PURCHASING SYSTEM ADMINISTRATION-BASIC (DEVIATION 2026-O0015)|1||
SECURITY PROHIBITIONS AND EXCLUSIONS (CLASS DEVIATION 2026-O0025)(FEB 2026)|7||||||||
BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024)|1||
ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2026-O0043)(FEB 2026))|13||||||||||||||
NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X|
CASREP ACCELERATED DELIVERY IS ENCOURAGED AND ACCEPTED AT NO ADDITIONAL COST TO GOVERNMENT.
All freight is FOB Origin.
This RFQ is for repair. The resultant award of this solicitation will be issued bilaterally, requiring the contractor's signed acceptance prior to execution. Verify nomenclature, part number, and NSN prior to responding.
The Government is seeking a Repair Turnaround Time (RTAT) of: 350 DARO.
Government Source Inspection (GSI) is required.
Please note freight is handled by the Navy as per the Commercial Asset Visibility (CAV) Statement of Work.
Your quote should include the following information:
QUOTE AMOUNT AND RTAT
Unit Price:__________
Total Price:__________
Repair Turnaround Time (RTAT): _______ days
If your company is not quoting the Government's Required Repair Turnaround Time (RTAT) or earlier, provide your company's capacity constraints?
_________________________________________________________________
_________________________________________________________________
_________________________________________________________________
Repair Turnaround Time (RTAT): the resultant contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract. For purposes of this section, Return is defined as physical receipt of the F-condition
asset at the contractor's facility as reflected in the Action Date entry in the Commercial Asset Visibility (CAV) system. In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth
regular business day after receipt and the Action Date entered in CAV must be dated to reflect the actual date of physical receipt. The Contractor must obtain final inspection and acceptance by the Government for all assets within the RTATs established in this
contract.
Check one: Firm-fixed-Price ___ Estimated ___ Not-to Exceed (NTE): ___
Return Material Authorization # (RMA), if applicable:__________
Delivery Vehicle (if Delivery Order requested) (if your company has a current BOA/IDIQ, for example) :__________________
IF ITEM NOT PREVIOUSLY PURCHASED BY NAVSUP WSS - or - PRICES INCREASED
Provide the NSN of a similar item or, if current NSN is an upgrade part, provide the previous NSN.
If previously sold to another buying activity or in the commercial marketplace, provide a copy of your company's invoice (redacted versions are acceptable).
If pricing is not in line with historical pricing, provide the basis of your company's pricing.
TESTING AND EVALUATION IF BEYOND REPAIR
T&E fee/price (if asset is determined BR/BER): If an item is determined BR, and the contractor provides documentation that costs were incurred during evaluation and determination of BR, the contracting officer will negotiate a reduced contract price, not-to
exceed (NTE) $___________associated with the repair effort to reflect the BR status of the equipment.
The T&E fee (if asset is determined BR/BER) was determined/computed based on:______________________________________.
AWARDEE INFO & PERFORMANCE LOCATION
Awardee CAGE: __________
Inspection & Acceptance CAGE, if not same as "awardee CAGE": __________
Facility/Subcontractor CAGE (where the asset should be shipped), if not same as "awardee CAGE":__________
IOT COMPARE REPAIR PRICE TO PRICE TO BUY NEW
New unit price:__________
New unit delivery lead-time:__________
The Government intends to add an option quantity to the resultant contract. In reference to the option quantity, the Government may increase the quantity of supplies called for in the Schedule at the unit price specified. The Contracting Officer may exercise the
option by written notice to the Contractor within the number of days in FAR 52.217-6 herein. Delivery of the added items shall continue at the same rate as the like items called for under the contract, unless the parties otherwise agree.
IMPORTANT NOTE: Any asset for which the contractor does not meet the required RTAT will incur a price reduction per unit/per month the contractor is late - any delay determined to be excusable (e.g. Government Delay) will not result in a price reduction. If a
price reduction is required due to unexcusable contractor delay, the Contracting Officer will implement the aforementioned price reduction via a "reconciliation modification" at the end of the contract performance. Price reductions made pursuant to this section
shall not limit other remedies available to the Government for failure to meet required RTATs, including but not limited to the Government's right to terminate for default.
In reference to the above important note, the contractor provid…
Source: SAM.gov, as posted. Verify the current solicitation before responding.