Army G-1 AECW Warehouse Supply Cages

DEPT OF DEFENSE

Notice type
Sources Sought
Solicitation #
W81PN2-26-RFI-AECW4
NAICS
337215
PSC
7125
Set-aside
No Set aside used
Posted
June 11, 2026
Response due
June 17, 2026
Place of performance
Franklin, IN

What this opportunity is

The Department of Defense is seeking to purchase, deliver, assemble, and install wire mesh warehouse supply cages for the Army Expeditionary Civilian Work Force at Camp Atterbury, Indiana. This opportunity is open to all businesses, as there is no set-aside for small businesses. The notice type is a Sources Sought, indicating that the government is gathering information and does not currently intend to solicit bids. Interested contractors should monitor for future announcements related to this project.

Analysis by Mindy, grounded in the SAM.gov notice.

Description

Statement of Work (SOW): AECW Warehouse Supply Cages I. Introduction This Statement of Work (SOW) defines the requirements for the purchase, delivery, assembly, and installation of wire mesh warehouse caging for the Army Expeditionary Civilian Work Force (AECW). • Location: Building 448, Camp Atterbury, Indiana. • Facility Details: One-story structure with a loading dock available for ground-level delivery. • Floor Type: Standard concrete; the Contractor shall provide all necessary floor anchors. Floor slope is insignificant and should not require adjustable floor shoes • Site Preparation: No known overhead obstructions (pipes, sprinklers, HVAC) exist at the 10.5-foot installation height. Some equipment will need to be re-positioned during installation. II. Technical Specifications The Contractor shall provide caging materials that meet the following government grade standards (in accordance with the Unified Facilities Guide Specifications): • Mesh Gauge: 10-gauge wire with a 2" x 1" diamond or square pattern. • Height: All cage walls and partitions shall be 10.5 feet in height from floor level. • Ceilings: All cages require full wire mesh tops/ceilings. • Hardware: All doors must be equipped with standard keyed cylinder locks. III. Installation Requirements The installation consists of three (3) interconnected cages extending from the East Wall vertical support I-Beam. This support beam has no visible slope and is mounted on a concreate pillar with a height of 9 inches and a depth of 3 inches. 1. NAVY CAGE (CLIN 0001) • Dimensions: Extends West approximately 18 ft 7 in. from the East Wall (Steel) I-Beam support to the center and then turns 90 degrees South for approximately 23 ft. • Function: The West wall of this unit acts as the divider for the U.S. Navy and Defense Intelligence Agency (DIA) cages. -- 1 of 3 -- • Anchoring: West Wall shall anchor flush and center on the inward sloping vertical support beam. The South Wall vertical support beam separating the Navy and DIA cages is mounted on a concrete pillar with a height of approximately 9 inches above the floor and a depth of 3 inches to the base of the beam. The South Wall vertical support beam has an approximate 4.5:1 rise. The southeast corner of ceiling for the NAVY cage will require mounting to the vertical support I-Beam in the southeast corner of the warehouse. This support beam has no visible slope and is mounted on a concreate pillar with a height of 9 inches and a depth of 3 inches. • Gate: One (1) 4'x8' sliding door, centered on the North Wall. 2. DIA CAGE (CLIN 0002) • Dimensions: Installed flush and centered at the North Wall corner of the Navy cage and extends West approximately 19 ft 10.5 in. to center and then turns 90 degrees South for approximately 23 ft to form the DIA and AECW dividing wall. • Function: The West wall of this unit acts as the divider for the DIA and AECW cages. • Anchoring: West Wall of the DIA cage shall anchor flush and center on the inward sloping vertical support beam. The South Wall vertical support beam separating the DIA and the AECW Excess cage is mounted on a concrete pillar with a height of approximately 9 inches above the floor and a depth of 3 inches to the base of the beam. The South Wall vertical support beam has an approximate 4.5:1 rise. • Gate: One (1) 4'x8' sliding door, centered on the North Wall. • Ceiling: Estimate should include C-Channel Stiffeners due to span 3. AECW EXCESS CAGE (CLIN 0003) • Dimensions: Installed flush and centered at the North Wall corner of the DIA CAGE. Extends West approximately 28’ 9-3/8” and then turns 90 degrees South for approximately 23 ft. • Function: The West wall of this unit acts as the divider for the AECW Cage and the AECW Disposition area. • Anchoring: West Wall of the AECW Excess cage shall anchor flush and center on the inward sloping vertical support beam. The South Wall vertical support beam separating the AECW Excess cage from the Disposition area is mounted on a concrete pillar with a height of approximately 9 inches above the floor and a depth of 3 inches to the base of the beam. The South Wall vertical support beam has an approximate 4.5:1 rise. -- 2 of 3 -- • Gate: One (1) 4'x8' sliding door, centered on the North Wall. • Ceiling: Estimate should include C-Channel Stiffeners due to span 4. Debris Removal • The contractor shall remove and dispose of all packaging materials (pallets, strapping, cardboard) related to installation. IV. Security & Access • Clearance: There are no security clearance requirements necessitating background checks or base pass sponsorship for entry. • Delivery: All products are to be delivered, assembled, and installed on-site. The Contractor is responsible for coordinating all equipment needed for offloading at the customer loading dock. • Government Furnished Equipment: The Contractor shall provide all tools and equipment required to complete this requirement, however, AECW has a forklift on site that may be utilized to assist if needed. V. Period of Performance • The contractor shall deliver and install within 3 months of contract award. Delivery and install shall be in accordance with proposed project milestone report submitted during solicitation. VI. General Requirements • Work Hours: Standard installation hours are 0800–1630, Monday through Friday, excluding Federal Holidays. Any deviations must be approved by the AECW Point of Contact (POC). VII. Post-Award Requirements • Warranty (CLIN 0004): A minimum 1-year manufacturer warranty and a 1-year workmanship warranty must be included. • Submittals (CLIN 0005): Upon award, the contractor shall provide CAD drawings or shop drawings for approval before manufacturing the panels to ensure the "interconnected" dimensions are understood by both parties. -- 3 of 3 --

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.

View the original notice on SAM.gov ↗

Similar Active Opportunities (NAICS 337215)