The Department of Defense is seeking to purchase, deliver, assemble, and install wire mesh warehouse supply cages for the Army Expeditionary Civilian Work Force at Camp Atterbury, Indiana. This opportunity is open to all businesses, as there is no set-aside for small businesses. The notice type is a Sources Sought, indicating that the government is gathering information and does not currently intend to solicit bids. Interested contractors should monitor for future announcements related to this project.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
Statement of Work (SOW): AECW Warehouse Supply Cages
I. Introduction
This Statement of Work (SOW) defines the requirements for the purchase, delivery,
assembly, and installation of wire mesh warehouse caging for the Army Expeditionary
Civilian Work Force (AECW).
• Location: Building 448, Camp Atterbury, Indiana.
• Facility Details: One-story structure with a loading dock available for ground-level
delivery.
• Floor Type: Standard concrete; the Contractor shall provide all necessary floor
anchors. Floor slope is insignificant and should not require adjustable floor shoes
• Site Preparation: No known overhead obstructions (pipes, sprinklers, HVAC) exist at
the 10.5-foot installation height. Some equipment will need to be re-positioned
during installation.
II. Technical Specifications
The Contractor shall provide caging materials that meet the following government grade
standards (in accordance with the Unified Facilities Guide Specifications):
• Mesh Gauge: 10-gauge wire with a 2" x 1" diamond or square pattern.
• Height: All cage walls and partitions shall be 10.5 feet in height from floor level.
• Ceilings: All cages require full wire mesh tops/ceilings.
• Hardware: All doors must be equipped with standard keyed cylinder locks.
III. Installation Requirements
The installation consists of three (3) interconnected cages extending from the East Wall
vertical support I-Beam. This support beam has no visible slope and is mounted on a
concreate pillar with a height of 9 inches and a depth of 3 inches.
1. NAVY CAGE (CLIN 0001)
• Dimensions: Extends West approximately 18 ft 7 in. from the East Wall (Steel) I-Beam
support to the center and then turns 90 degrees South for approximately 23 ft.
• Function: The West wall of this unit acts as the divider for the U.S. Navy and Defense
Intelligence Agency (DIA) cages.
-- 1 of 3 --
• Anchoring: West Wall shall anchor flush and center on the inward sloping vertical
support beam. The South Wall vertical support beam separating the Navy and DIA
cages is mounted on a concrete pillar with a height of approximately 9 inches above
the floor and a depth of 3 inches to the base of the beam. The South Wall vertical
support beam has an approximate 4.5:1 rise. The southeast corner of ceiling for the
NAVY cage will require mounting to the vertical support I-Beam in the southeast
corner of the warehouse. This support beam has no visible slope and is mounted on
a concreate pillar with a height of 9 inches and a depth of 3 inches.
• Gate: One (1) 4'x8' sliding door, centered on the North Wall.
2. DIA CAGE (CLIN 0002)
• Dimensions: Installed flush and centered at the North Wall corner of the Navy cage
and extends West approximately 19 ft 10.5 in. to center and then turns 90 degrees
South for approximately 23 ft to form the DIA and AECW dividing wall.
• Function: The West wall of this unit acts as the divider for the DIA and AECW cages.
• Anchoring: West Wall of the DIA cage shall anchor flush and center on the inward
sloping vertical support beam. The South Wall vertical support beam separating the
DIA and the AECW Excess cage is mounted on a concrete pillar with a height of
approximately 9 inches above the floor and a depth of 3 inches to the base of the
beam. The South Wall vertical support beam has an approximate 4.5:1 rise.
• Gate: One (1) 4'x8' sliding door, centered on the North Wall.
• Ceiling: Estimate should include C-Channel Stiffeners due to span
3. AECW EXCESS CAGE (CLIN 0003)
• Dimensions: Installed flush and centered at the North Wall corner of the DIA CAGE.
Extends West approximately 28’ 9-3/8” and then turns 90 degrees South for
approximately 23 ft.
• Function: The West wall of this unit acts as the divider for the AECW Cage and the
AECW Disposition area.
• Anchoring: West Wall of the AECW Excess cage shall anchor flush and center on the
inward sloping vertical support beam. The South Wall vertical support beam
separating the AECW Excess cage from the Disposition area is mounted on a
concrete pillar with a height of approximately 9 inches above the floor and a depth of
3 inches to the base of the beam. The South Wall vertical support beam has an
approximate 4.5:1 rise.
-- 2 of 3 --
• Gate: One (1) 4'x8' sliding door, centered on the North Wall.
• Ceiling: Estimate should include C-Channel Stiffeners due to span
4. Debris Removal
• The contractor shall remove and dispose of all packaging materials (pallets,
strapping, cardboard) related to installation.
IV. Security & Access
• Clearance: There are no security clearance requirements necessitating background
checks or base pass sponsorship for entry.
• Delivery: All products are to be delivered, assembled, and installed on-site. The
Contractor is responsible for coordinating all equipment needed for offloading at the
customer loading dock.
• Government Furnished Equipment: The Contractor shall provide all tools and
equipment required to complete this requirement, however, AECW has a forklift on
site that may be utilized to assist if needed.
V. Period of Performance
• The contractor shall deliver and install within 3 months of contract award. Delivery
and install shall be in accordance with proposed project milestone report submitted
during solicitation.
VI. General Requirements
• Work Hours: Standard installation hours are 0800–1630, Monday through Friday,
excluding Federal Holidays. Any deviations must be approved by the AECW Point of
Contact (POC).
VII. Post-Award Requirements
• Warranty (CLIN 0004): A minimum 1-year manufacturer warranty and a 1-year
workmanship warranty must be included.
• Submittals (CLIN 0005): Upon award, the contractor shall provide CAD drawings or
shop drawings for approval before manufacturing the panels to ensure the
"interconnected" dimensions are understood by both parties.