The Department of Defense is seeking a contractor to perform roof inlet pipe lining repair services, specifically under NAICS code 238220 for foundation, structure, and building exterior contractors. This 8(a) sole-source set-aside opportunity is suited for small businesses certified under the 8(a) Business Development program. As a Sources Sought notice, interested parties should track the solicitation for future release, rather than submitting a bid at this time, as it is intended to gather market research and identify potential vendors.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
Page 1 of 10
Joint Base Myer – Henderson Hall (JBM-HH)
Directorate of Public Works
106 Stewart Rd. Bldg 313
Fort Myer, VA 22211
David S Mayeda
Civil Engineer
520-691-4600
david.s.mayeda.civ@army.mil
Date: 29 January 2026
Subject: Roof Inlet Pipe Lining Repair
Location: Spates Hall / Myer Building 407, Joint Base Myer-Henderson Hall, Fort Myer, VA 22211
WR# - JOR#: 202613-2
To: Prospective Contractors
Digitally signed by
MAYEDA.DAVID.STANFORD.141056 HTUN.WIN.ZAW.1 Digitally signed by
HTUN.WIN.ZAW.1387268088
NFORD.1410563688 3688 387268088 Date: 2026.01.29 09:49:17 -05'00'
Date: 2026.01.29 08:30:03 -05'00' _
Written By Approved By
The following items define the scope/statement of work and general approach to the completion of the
above referenced Roof Inlet Pipe Lining Repair project. This is a Construction scope of work.
SCOPE OF WORK
Construction Scope
Section 1 Background
Section 2 Construction Scope
• Selective Demolition
• Architectural Work
• Plumbing Work
Section 3 Government Provided Items
Section 4 Construction/Product Submittals
Section 5 Design General Conditions
Section 6 Construction General Conditions
Section 7 Reference
1. Background
Water infiltration into Fort Myer Spates Hall, Building 407 (MY B407) occurs from local roof
elements in 5 different areas of the building. Spates Hall recently modernized to serve as Garrison
MAYEDA.DAVID.STA
-- 1 of 14 --
Page 2 of 10
Dining Facility and allow Patton Hall (Bldg. 214) major renovation through replacement. Soft
-- 2 of 14 --
Page 3 of 10
Opening of Spates Hall to occur the week of 12 January 2026. Drywall and carpeting water damage
at this time of year provides a high risk for mold growth since the environmental cooling system has
been shut down for the season, which creates and accelerates Life, Health and Safety concerns. Pipe-
lining repair of selected interior roof drain lines is considered an emergency condition, which requires
expedited remedies and measures. This repair project requires the repair of damaged improvements
and restore adequate working environments.
2. Construction Scope
Five (5) Roof Inlet Drain Line Pipes (See attached Reference Sheet 1 and 2)
2.1. Selective Demolition
Roof drain piping work shall not be performed during rain event or when roof has or holds water
that requires roof drain operation.
2.1.1. Roof Drain #1 (All Purpose Room)
• Existing fire sprinkler-head is near work area. Care shall be taken while accessing work
area and performing repair work and should not directly impact or affect repair work
under this requirement. Fire sprinkler lines shall not be disturbed.
• Carefully remove and retain approximate 20 square feet (SF) ceiling tiles to access drain
line pipe from roof drain inlet and maintain for re-use. Maintain existing drop ceiling
grid.
• Carefully remove drain line cap to open drain line piping to perform lining repair work
and retain for use.
2.1.2. Roof Drain #2 (All Purpose Room)
• Existing fire sprinkler-head is near work area. Care shall be taken while accessing work
area and performing repair work and should not directly impact or affect repair work
under this requirement. Fire sprinkler lines shall not be disturbed.
• Carefully remove and retain approximate 20 square feet (SF) ceiling tiles to access drain
line pipe from roof drain inlet and maintain for re-use. Maintain existing drop ceiling
grid.
• Carefully remove drain line cap to open drain line piping to perform pipe-lining repair
work and retain for use.
2.1.3. Roof Drain #3 (Coat Room)
• Existing fire sprinkler-head is near work area. Care shall be taken while accessing work
area and performing repair work and should not directly impact or affect repair work
under this requirement. Fire sprinkler lines shall not be disturbed.
• Approximate 15 SF gypsum board ceiling has been removed to expose roof drain inlet
during previous rainstorm.
• Carefully remove drain line cap to open piping to perform pipe-lining repair work and
retain for use.
2.1.4. Roof Drain #4 (General Office)
• Carefully remove approximate 15 SF gypsum board ceiling to expose roof drain inlet and
pipe.
-- 3 of 14 --
Page 4 of 10
• Carefully remove drain line cap to open piping to perform pipe-lining repair work and
retain for use.
2.1.5. Roof Drain #5 (Existing Building Addition)
• Existing fire sprinkler-head is near work area. Care shall be taken while accessing work
area and performing repair work and should not directly impact or affect repair work
under this requirement. Fire sprinkler lines shall not be disturbed.
• Approximate 25 SF gypsum board ceiling has been removed to expose roof drain inlet
and pipe and waste. Two levels of ceiling is present under the existing skylight and shall
be maintained. Carefully remove existing drywall access door panel and re-use in upper
ceiling section. Clean and aesthetically soften (gently sand for repainting) lower ceiling
section around existing HVAC diffuser grate.
• Carefully remove drain line cap to open piping to perform pipe-lining repair work.
2.2. Architectural Work
2.2.1. Roof Drain #1 & #2 (Drop Ceiling Tile Grid)
• Carefully install ceiling tiles in existing grid.
2.2.2. Roof Drain #3 & #4 (Gypsum Board Ceiling)
• Install gypsum board, matching existing thickness, to close opening in ceiling. Apply
taping or grout to close seem around new gypsum board
• Apply paint base and minimum 2-coats of oil-based paint, matching existing color.
2.2.3. Roof Drain #4 (General Office-Gypsum Board Ceiling)
• Install gypsum board to close ceiling work area, matching existing thickness, to close
opening in ceiling. Apply taping or grout to close seem around new gypsum board
• Apply approximately 40 SF paint base and minimum 2-coats of oil-based paint, matching
existing color.
2.2.4. Roof Drain #5 (Existing Building Addition-Gypsum Board Ceiling)
• Install gypsum board to close ceiling work area, matching existing thickness, to close
opening and re-install in ceiling. …
Source: SAM.gov, as posted. Verify the current solicitation before responding.
Pursue this opportunity with Mindy
See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.