Black Butte Oxidation Pond Liners
DEPT OF DEFENSE
Notice type
Solicitation
Solicitation #
W9123826QA026
NAICS
562991
PSC
Z1ND
Set-aside
Small Business Set Aside - Total
Posted
August 5, 2026
Response due
August 13, 2026
Place of performance
Orland, CA
Description
Performance Work Statement
Black Butte Dam & Lake Oxidation Pond Liner Replacement Project
31 March 2026 3 August 2026
1. Location: U.S. Army Corps of Engineers, Black Butte Dam & Lake, 19225 Newville Rd.,
Orland, CA 95963
1.1. Work site locations:
1.1.1. Buckhorn Recreation Area
500 Buckhorn Rd.
Orland, CA 95963
Geographic Coordinates: 39.82474, -122.37686
1.1.2. Eagle Pass Recreation Area
19225 Newville Rd.
Orland, CA 95963
Geographic Coordinates: 39.80179, -122.32992500
1.1.3. Orland Buttes Recreation Area
Orland Buttes Entry RD & County Rd 206
Orland, CA 95963
Geographic Coordinates: 39.76287, -122.34048
2. Background: Black Butte Dam and Lake includes three recreation areas, each served by an
independent, lagoon-based wastewater treatment system comprised of a septic tank (primary
treatment) and oxidation pond (secondary treatment). The ponds vary in size and treatment
capacity and have been in continuous operation since 1979.
Wastewater generated at each recreation area receives primary treatment in septic tanks prior
to discharge into the oxidation ponds. The ponds are engineered, man-made basins with large
surface areas designed to provide secondary biological treatment through natural aerobic and
anaerobic processes. In addition to treatment, the ponds provide effluent storage and seasonal
volume reduction through evaporation.
As a result of prolonged operational exposure, the existing pond liners have deteriorated and
no longer provide reliable containment, creating the need for liner replacements.
3. Description: The required contractor services are to replace three (3) existing oxidation pond
liners and restore them to fully operational sewage treatment systems.
The work includes removal and replacement of the existing pond liners in the following
recreation areas:
• Buckhorn Recreation Area – approximately 12,500 square feet
• Eagle Pass Recreation Area – approximately 8,500 7,000 square feet
• Orland Buttes Recreation Area – approximately 8,000 square feet
-- 1 of 13 --
The square footage values provided above represent the approximate liner surface areas and
do not include additional material required for overlaps, anchor trenches, or other installation
requirements necessary to ensure proper liner performance and system integrity.
3.1. General Requirements: The Contractor shall furnish all labor, materials, equipment,
supervision, and services necessary to complete this project. All materials and equipment
shall be suitable for their intended application and suitable for the environmental
conditions in which they will be installed.
3.1.1. The Contractor shall be responsible for the complete installation of the pond liner
systems and shall ensure the oxidation ponds are fully functional and watertight
upon completion. The completed installation shall be free of leaks, defects, and
installation deficiencies.
3.1.2. The Contractor shall inspect the project site to verify existing conditions, confirm
quantities of work, and identify any conditions that may affect performance of the
work. The Contractor shall establish and maintain any required perimeter controls,
including but not limited to safety barriers and site access controls, as necessary to
safely and properly execute the work.
3.2. Pre-Work Coordination and Submittals: The Contractor shall coordinate with the U.S.
Army Corps of Engineers (USACE) Contracting Officer’s Representative (COR) to
ensure a clear understanding of the project scope, requirements, and performance
expectations. Prior to commencing on-site work, the Contractor shall conduct an in-
person Pre-Work Meeting and submit a complete Pre-Work Submittal Package for
Government review and approval.
The Pre-Work Submittal Package shall include the Accident Prevention Plan (APP),
Quality Control Plan (QCP), Work Plan, Liner Panel Placement Plan, and Waste
Disposal Plan. These submittals shall be provided within 14 calendar days of contract
award. The Government will review submittals within 5 calendar days. If revisions are
required, the Contractor shall address all comments and resubmit within 5 calendar
days of notification.
The Contractor shall also complete all applicable requirements identified in Section 9.0,
Antiterrorism and Operations Security, prior to mobilization.
3.2.1. Pre-Work Meeting: The prime Contractor shall coordinate with the COR to
schedule an in-person Pre-Work Meeting to discuss all aspects of contract
performance. At least 7 calendar days prior to the meeting, the Contractor shall
submit a Certificate of Insurance and identify the onsite supervisor and alternate.
The COR will establish the date, time, and location of the meeting.
3.2.1.1. Insurance Requirements - The Contractor shall procure and maintain
insurance for all employees during the entire period of his/her performance
under this contract.
3.2.1.1.1. Workmen’s Compensation and Employers’ Liability Insurance.
3.2.1.1.2. Workmen’s Compensation and Occupational Disease Coverage in
-- 2 of 13 --
accordance with statutory limits.
3.2.1.1.3. Employers’ Liability coverage with a minimum limit of $100,000.
3.2.1.1.4. Comprehensive Automobile Liability Insurance: Bodily Injury
coverage with minimum limits of $200,000 per person and $500,000
per occurrence.
3.2.1.1.5. Property Damage Coverage with a minimum limit of $20,000 per
occurrence.
3.2.2. Accident Prevention Plan: The Contractor shall prepare and submit a site-specific
APP prior to the start of on-site work. The APP shall comply with USACE EM 385-
1-1 and include all required elements outlined in Appendix A, “Minimum Basic
Outline for Preparation of Accident Prevention Plan.” Activity Hazard Analyses
(AHAs) shall be included as appendices to the APP.
The APP and associated activities shall, at a minimum, comply with the most current
versions of the following:
3.2.2.1 EM 385-1-1, U.S. Army Corps of Engineers Safety and Occupational Health
Requirements Manual, dated 15 March 2024.
3.2.2.2 29 CFR 1910, Occupatio…
Source: SAM.gov, as posted. Verify the current solicitation before responding.
Pursue this opportunity with Mindy
See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.
View the original notice on SAM.gov ↗Similar Active Opportunities (NAICS 562991)
S--324933E PUMPING OF VAULT TOILETS
INTERIOR, DEPARTMENT OF THE · Combined Synopsis/Solicitation · due August 31, 2026
Portable Latrine and Handwashing Station Rental & Servicing
DEPT OF DEFENSE · Solicitation · due August 26, 2026
Rental of (2) CHEM Toilets NLON
DEPT OF DEFENSE · Combined Synopsis/Solicitation · due July 3, 2026
Lease of Portable Toilets and Hand Washing Station for US Naval Base, Japan
DEPT OF DEFENSE · Solicitation · due August 26, 2026
USBP Tucson Sector Portable Restrooms and Maintenance Services
HOMELAND SECURITY, DEPARTMENT OF · Award Notice
Aspen/Sopris Ranger District-Vault Pumping Services
AGRICULTURE, DEPARTMENT OF · Combined Synopsis/Solicitation · due August 28, 2026