Building 668 Asphalt Shingle Roof Replacement - Devens, MA

DEPT OF DEFENSE

Notice type
Solicitation
Solicitation #
W15QKN-26-Q-A119
NAICS
236220
PSC
Z1AZ
Set-aside
8a Competed
Posted
June 18, 2026
Response due
June 26, 2026
Place of performance
Hanscom AFB, MA

What this opportunity is

The Department of Defense is soliciting bids for the replacement of the asphalt shingle roof on Building 668 at the Devens, MA location. This opportunity is set aside for 8(a) competitors, making it suitable for small businesses that have been certified as 8(a) participants. The notice type indicates that the government will accept bids, requiring offerors to submit a formal proposal.

Analysis by Mindy, grounded in the SAM.gov notice.

Description

CONSTRUCTION SPECIFICATIONS FOR BUILDING 668 ASPHALT SHINGLE ROOF REPLACEMENT DEVENS RFTA DEVENS, MA 01434 December 2025 Project No. -- 1 of 51 -- SECTION 00 01 10 TABLE OF CONTENTS DIVISION 01 – GENERAL REQUIREMENTS 01 10 00 GENERAL REQUIREMENTS 01 45 00.10 20 QUALITY CONTROL FOR MINOR CONSTRUCTION 01 57 20 ENVIRONMENTAL PROTECTION (FORT DEVENS) DIVISION 07 - THERMAL AND MOISTURE PROTECTION 07 31 13 ASPHALT SHINGLE ROOF SYSTEM DIVISION 26 – ELECTRICAL SYSTEMS 26 41 01.00 10 LIGHTNING PROTECTION SYSTEM -- 2 of 51 -- Section 01 10 00 – General Requirements Page 1 of 17 SECTION 01 10 00 GENERAL REQUIREMENTS PART 1 GENERAL 1.0 SUMMARY OF WORK The objectives of this project are to repair by replacement the 3 rd story roof of U.S. Army Garrison Devens RFTA Building 668. The existing 3rd story roof of Building 668 consists of existing asphalt shingle roofing with unknown underlayment supported by a low-pitch plywood deck sheeting. The built-up roofing is to be removed and replaced with a asphalt shingle roof. Existing lightning protection is to be removed and reinstalled upon completion of the new roofing system. The general description below is given to indicate the approximate scope of the Work necessary to complete the project. It does not limit the work required under the drawings and specifications. 1.1 REFERENCES A. Where references (e.g. ASTM, ACI, etc.) are noted for compliance throughout this Statement of Work, Contractor shall use the most current and up to date copy at time of actual construction. B. Contractors shall be responsible for providing their own copies of references. -- 3 of 51 -- Section 01 10 00 – General Requirements Page 2 of 17 1.2 DEFINITIONS A. Drawings – That part of the Contract Documents which graphically shows the scope, extent, and character of the Work to be performed by the Contractor. Shop Drawings and other Contractor submittals are not Drawings as so defined. B. Existing Conditions - Including but not limited to, all existing buildings and interior utilities (HVAC, electricity, plumbing, etc.), structures, fences, roads, sidewalks, pavement, curbs, above and underground utilities and equipment, existing improvements, vegetation (trees, shrubs, grass, etc.), and underground facilities. C. Furnish – When used in connection with services, materials, or equipment, shall mean to supply and deliver said services, materials, or equipment to the Site (or some other specified location) ready for use or installation and in usable or operable condition. D. Install Perform or Provide – When used in conjunction with services, materials, or equipment, shall mean to put into use or place in final position said services, materials, or equipment complete and ready for intended use. E. Shop Drawings – All drawings, diagrams, illustrations, schedules, and other data or information which are specifically prepared or assembled by or for the Contractor and submitted by Contractor to illustrate some portion of the Work. F. Site – Including but not limited to land, buildings, structures and or areas indicated in the Contract Documents as being furnished by the Government upon which the Work is to be performed, including rights-of-way and easements for access thereto, and such other lands furnished by the Government which are designated for use by the Contractor. G. Underground Facilities – All underground pipelines, conduits, cables, wires, manholes, vaults, tanks, tunnels, or other such facilities or attachments, and any encasements containing such facilities, including those that convey electricity, gases, steam, liquid petroleum products, telephone or other communications, cable television, water, wastewater, storm water, other liquids or chemicals, or traffic or other control systems. H. Work – The entire construction, on- and off-site, or the various separate identifiable parts thereof required to be provided under this Contract. Work includes and is the result of performing or providing all labor, services, submittals, and documentation necessary to produce such construction, and furnishing, installing, and incorporating all materials and equipment into such construction, all as required by this Contract. I. Unless stated otherwise in the Contract, words or phrases which have a well-known technical or construction industry or trade meaning -- 4 of 51 -- Section 01 10 00 – General Requirements Page 3 of 17 shall be used in the Contract in accordance with such recognized meaning. 1.3 WORK COVERED BY THE CONTRACT DOCUMENTS A. Item No. 0001 REPAIR ROOF, BUILDING 668 The Contractor shall furnish all plant, labor and material, equipment, supervision, incidentals, and services required to perform and complete the work necessary to fully remove and replace the third story existing asphalt roof to Building 668 as specified herein and as shown on the attached drawings. DEMOLITION The Contractor shall fully remove the existing roof system down to the existing plywood deck sheeting and the removal and safe keeping of the existing lightning protection system. Upon removal of existing roof system, Contractor shall survey and inspect roof area for deterioration. Contractor shall provide a written report with photos of the conditions found. During construction, the interior side of roof deck system shall be surveyed for any damage as a result of attaching or installing new nailers. Contractor shall repair all damages to the structures and appurtenances. CONSTRUCTION Roof System: Provide roofing system to include, asphalt shingles, underlayment, and other materials as specified in Sections 07 31 13 Asphalt Shingle Roof System. -- 5 of 51 -- Section 01 10 00 – General Requirements Page 4 of 17 Snow Guard: I nstall a snow guard system above each entrance way and above low roof section. Roof Fall Protection System: Contractor shall provide a fall protection system to include an anchor system with eyelets for a safety rope attachment to the personnel safety harness f

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.

View the original notice on SAM.gov ↗

Similar Active Opportunities (NAICS 236220)