Castle Creek Bridge Repair

AGRICULTURE, DEPARTMENT OF

Notice type
Combined Synopsis/Solicitation
Solicitation #
127EAW26Q0039
NAICS
237310
PSC
Z2LB
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Posted
June 10, 2026
Response due
July 8, 2026
Place of performance
CA

What this opportunity is

The Department of Agriculture is seeking a contractor for the Castle Creek Bridge Repair project, classified under NAICS 237310. This opportunity is a Total Small Business Set-Aside, making it suitable for small businesses. The notice type is a Combined Synopsis/Solicitation, indicating that interested parties should prepare to respond to the solicitation rather than just track it for information. The work will take place in California.

Analysis by Mindy, grounded in the SAM.gov notice.

Description

Castle Creek Bridge Repair Table of Contents Preface ........................................................................................................................ 3 101 - Terms¸ Format¸ and Definitions ............................................................................ 4 101.01 Meaning of Terms............................................................................................ 4 101.03 Abbreviations. ................................................................................................ 4 101.04 Definitions. .................................................................................................... 5 102 - Bid¸ Award¸ and Execution of Contract................................................................. 9 Delete Section 102. ................................................................................................... 9 103 - Scope of Work .................................................................................................. 10 Delete Subsections 103.02, 103.03, 103.04, 103.05. .................................................. 10 104 - Control of Work ................................................................................................. 11 Delete Subsections 104.01, 104.02, 104.04. .............................................................. 11 104.06 Use of Roads by Contractor. .......................................................................... 11 106 - Acceptance of Work .......................................................................................... 12 106.01 Conformity with Contract Requirements. ....................................................... 12 106.02 Visual Inspection. ......................................................................................... 14 107 - Legal Relations and Responsibility to the Public ................................................ 15 Delete Subsection 107.05. ....................................................................................... 15 108 - Prosecution and Progress ................................................................................. 16 Delete Section 108. ................................................................................................. 16 109 - Measurement and Payment ............................................................................... 17 Delete Subsections 109.06, 109.07, 109.08, 109.09. .................................................. 17 109.02 Measurement Terms and Definitions. ............................................................. 17 155 - Schedules for Construction Contracts ................................................................ 18 Delete Section 155. ................................................................................................. 18 156 - Public Traffic ..................................................................................................... 19 Section 156. – PUBLIC TRAFIC .................................................................................. 19 201 - Clearing and Grubbing ...................................................................................... 22 201.04(d) Clearing. .................................................................................................. 22 -- 1 of 24 -- Castle Creek Bridge Repair 201.04 Clearing. ...................................................................................................... 22 201.06 Disposal. ..................................................................................................... 22 207 - Earthwork Geotextiles ....................................................................................... 23 207.04(c)(1) First layer placement and compaction. ................................................... 23 208 - Structure Excavation and Backfill for Selected Major Structures ......................... 24 208.07 Dewatering................................................................................................... 24 -- 2 of 24 -- Castle Creek Bridge Repair Preface Preface_wo_03_30_2026 Delete all but the first paragraph and add the following: The Forest Service, US Department of Agriculture has adopted FP-14 for construction of National Forest System Roads. -- 3 of 24 -- Castle Creek Bridge Repair 101 - Terms¸ Format¸ and Definitions 101.01_National_11_9_2016 Add the following paragraph to Subsection 101.01: 101.01 Meaning of Terms. Delete all references to the TAR (Transportation Acquisition Regulations) in the specifications. 101.03_National_11_9_2016 Add the following to Subsection 101.03: 101.03 Abbreviations. (a) Acronyms. AGAR — Agriculture Acquisition Regulations AFPA — American Forest and Paper Association FSAR — Forest Service Acquisition Regulations MSHA — Mine Safety and Health Administration NESC — National Electrical Safety Code WCLIB — West Coast Lumber Inspection Bureau (f) Miscellaneous unit abbreviations. MP — milepost location ppm — parts per million volume STA station location -- 4 of 24 -- Castle Creek Bridge Repair 101.04_National_11_9_2016 Make the following changes to Subsection 101.04: 101.04 Definitions. Delete these definitions and replace the following: Bid Schedule — The Schedule of Items. Bridge — A structure, including supports, erected over a depression or an obstruction such as water along a road, a trail, or a railway and having a deck for carrying traffic or other loads. Contractor — The individual or legal entity contracting with the Government for performance of prescribed work. In a timber sale contract, the contractor is the “Purchaser”. Culvert — Any structure with a bottom, regardless of fill depth, depth of invert burial, or presence of horizontal driving surface, or any bottomless (natural channel) structure with footings that will not have wheel loads in direct contact with the top of the structure. Drawings — (Public Works Contracts) Design sheets or fabrication, erection, or construction

Source: SAM.gov, as posted. Verify the current solicitation before responding.

Pursue this opportunity with Mindy

See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.

View the original notice on SAM.gov ↗

Similar Active Opportunities (NAICS 237310)