Y--GOGA 244458 & FOPO 186401 Construct Bike Path at W
INTERIOR, DEPARTMENT OF THE
Notice type
Solicitation
Solicitation #
140P2026R0066
NAICS
237310
PSC
Y1LB
Posted
June 18, 2026
Response due
July 17, 2026
Place of performance
San Francisco, CA
What this opportunity is
The Department of the Interior is soliciting bids for the construction of a bike path at the Golden Gate National Recreation Area in California. This opportunity is suitable for small businesses that specialize in heavy construction, specifically in the NAICS code 237310. The notice type indicates that bidders should track the solicitation, as it is not a formal bid opportunity. The contract involves two separate projects: widening and reconstructing Long Avenue for safer multi-modal access, and constructing and installing improvements to the West Bluff Trail/Arrival Area.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
GOLDEN GATE NATIONAL RECREATION AREA
PRESIDIO OF SAN FRANCISCO
Construct and Install Improvements to
West Bluff Trail/Arrival Area
GOGA
PMIS 244458
FORT POINT
Widen and Reconstruct Long Avenue
for Safer Multi-Modal Access
FOPO
PMIS 186401
DIVISION 01 SPECIFICATIONS
NATIONAL PARK SERVICE (NPS)
DENVER SERVICE CENTER (DSC)
July 2025
-- 1 of 200 --
GOGA – 244459 / FOPO – 186401 TOC - 1
Table of Contents
Number of Pages
Division 01: General Requirements
01 11 00 Summary of Work .............................................................................................................. 5
01 26 01 Contract Modification Procedures ...................................................................................... 6
01 27 00 Definition of Contract Line Items ....................................................................................... 2
01 31 00 Project Management and Coordination .............................................................................. 9
01 32 16 Construction Schedule ........................................................................................................ 9
01 32 33 Photo Documentation ......................................................................................................... 2
01 33 23 Submittal Procedures .......................................................................................................... 8
01 33 23A GOGA 244458 Submittal List ............................................................................................ 4
01 33 23B FOPO 186401 Submittal List.............................................................................................. 2
01 34 00 Natural Habitat Requirements............................................................................................. 4
01 35 13.22 Archeological Protection .................................................................................................... 3
01 35 23 Safety Requirements ........................................................................................................... 5
01 35 40 Soils Management............................................................................................................... 6
01 35 50 Tree Preservation ................................................................................................................ 2
01 40 00 Quality Requirements ......................................................................................................... 8
01 40 00A GOGA 244458 Statement of Structural Tests and Special Inspections ............................ 24
01 40 00B FOPO 186401 Statement of Structural Tests and Special Inspections ............................. 21
01 40 00C Accessibility Inspection Report ........................................................................................ 14
01 42 00 Reference Standards ......................................................................................................... 12
01 50 00 Temporary Facilities and Controls.................................................................................... 10
01 50 02 Trucking .............................................................................................................................. 2
01 57 19.12 Noise and Acoustics Management ...................................................................................... 3
01 57 23 Under-an-Acre Pollution Prevention .................................................................................. 7
01 67 00 Product Requirements ......................................................................................................... 9
01 73 40 Execution ............................................................................................................................ 7
01 74 19 Construction Waste Management and Disposal ................................................................. 7
01 74 19A Project Waste Management Plan Worksheet Sample ......................................................... 1
01 77 00 Closeout Procedures ........................................................................................................... 4
01 77 00A GOGA 244458 Closeout and Operations & Maintenance Requirements ........................... 1
01 77 00B FOPO 186401 Closeout and Operations & Maintenance Requirements ............................ 1
-- 2 of 200 --
GOGA-244458 / FOPO-186401 01 11 00 - 1
051121 SUMMARY OF WORK
NPS DSC Division 1 Specifications
National Park Service (NPS) - Denver Service Center (DSC) | 10-19-21
GOGA-244458 / FOPO-186401
SECTION 01 11 00 - SUMMARY OF WORK
PART 1 - GENERAL
1.1 SUMMARY
A. Section includes the following:
1. Work Covered by Contract Documents
2. Work Under Other Contracts
3. Government-Furnished Materials
4. Contractor Use of Site
5. Public Use of Site
6. Occupancy Requirements for Buildings
7. Conduct of Operations
8. Work Restrictions
9. Special Construction Requirements
10. Under-an-acre Pollution Prevention Plan
11. Soils Investigation Report
12. Additional Reports
1.2 WORK COVERED BY CONTRACT DOCUMENTS
A. Project Location: The project location is in the Golden Gate National Recreation Area (GGNRA)
along Long Avenue and in a portion of Crissy Field within the Presidio of San Francisco Historic
District. The project site includes the West Bluff Picnic Area parking lot and the Mason Street
Marine Drive intersection (CLIN 1 / GOGA 244458); the plaza area formed at the Marine Drive
and Long Avenue intersection (CLIN 2 / FOPO 186401); and Long Avenue to Lincoln Blvd.
crosswalk (CLIN 3 / FOPO 186401).
B. The Work consists of:
1. Safety improvements for bicyclists and pedestrians on Long Avenue, at the intersection of
Long Avenue and Marine Drive, and in the West Bluff parking area. A portion of Long
Avenue will be widened to include a bike lane in the uphill (eastbound) direction and
marked with a shared bicycle/vehicle lane in the downh…
Source: SAM.gov, as posted. Verify the current solicitation before responding.
Pursue this opportunity with Mindy
See who holds it now, who else is bidding, and draft your response — grounded in real government data, not generic AI.