The Department of Homeland Security is soliciting a contract for the procurement of fire alarm systems through a Total Small Business Set-Aside, making this opportunity suitable for small businesses. The contract falls under NAICS code 336611, which pertains to aircraft and aircraft parts manufacturing, but the PSC code J020 indicates the actual procurement is for fire alarm systems. Bidders should track the Combined Synopsis/Solicitation notice to stay informed about the procurement process, as it will provide updates and instructions for responding.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
LAST UPDATED: 06/27/2026 PAGE 1/3
STATEMENT OF WORK (SOW)
FOR
USCGC HUDSON Fire Alarm System Upgrade
USCGC HUDSON has a faulty fire alarm system and has an immediate need for technical
support for tasks outlined in this Statement of Work (SOW).
1.0 GENERAL
1.1 BACKGROUND
The 160’ WLIC asset, USCGC HUDSON, has a faulty fire alarm system and requires
replacement/upgrade
1.2 SCOPE
The scope of this contract is defined by the efforts and tools required to support USCGC
HUDSON. The Contractor shall provide all labor, materials, and tools necessary to upgrade the
current faulty system.
1.3 OBJECTIVE
The goal is to return CGC HUDSON’s fire alarm system to designed system parameters by
replacing the faulty system (AFP-200 FACP Notifier and peripherals) with NFS-320 Notifier,
LCD-80 remote annunciator, and smoke detectors.
1.4 APPLICABLE DOCUMENTS
1.4.1 Compliance Documents
The following documents provide specifications, standards, or guidelines that must be complied
with in order to meet the requirements of this contract:
Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 0000, 2020,
General Requirements
Honeywell Fire Alarm Control Panel NFS-320/E/C Installation, Operation, and
Programming Manual
2.0 SPECIFIC REQUIREMENTS/TASKS
Unless otherwise stated, this contract applies to on-site support for USCGC HUDSON in Miami
FL.
2.1 Remove AFP-200 system and install NFS-320
-- 1 of 3 --
LAST UPDATED: 06/27/2026 PAGE 2/3
The Contractor shall perform any inspections or evaluations, as deemed necessary, to
determine best path forward prior to commencing work.
2.1.1 The Contractor shall remove existing fire alarm system (AFP-200 FACP).
2.1.2 The Contractor shall install NFS-320 FACP, LCD-80 remote annunciator,
smoke detectors, and all associated peripherals required for proper
system functionality and monitoring throughout the vessel.
2.2 Test Thoroughly and Document
The Contractor shall ensure the system is fully functional by preforming a system operational
test to be witnessed by Engineer Petty Officer (EPO) or the EPO’s designated representative.
2.2.1 The Contractor shall provide a trip report documenting all findings no later
than 48 hours after returning to the home office.
3.0 CONTRACTOR PERSONNEL
3.1 The Contractor shall provide qualified personnel to perform all
requirements specified in this SOW.
4.0 OTHER APPLICABLE CONDITIONS
4.1 PERIOD OF PERFORMANCE
The period of performance for this contract shall not exceed 30 calendar days from the date of
award.
4.2 PLACE OF PERFORMANCE
The primary place of performance will be at CGC HUDSON at 100 MacArthur Cswy, Miami
Beach, FL 3313.
4.3 HOURS OF OPERATION
Contractor employees shall generally perform all work between the hours of 0730 and 1600
EST, Monday through Friday (except Federal holidays). However, there may be occasions
when Contractor employees shall be required to work other than normal business hours,
including weekends and holidays, to fulfill requirements under this SOW. Precise times may be
negotiated with the cutter Engineer Petty Officer (EPO) as scheduling is subject to ship’s
operations.
4.4 TRAVEL
Contractor travel may be required to support this requirement. All travel required by this task
shall be provided by the Contractor.
4.5 Daily Progress Reports
The Contractor shall hold a daily progress meeting with the Engineer Petty Officer and/or
Commanding Officer upon arrival at the asset each morning of the visit. This report shall include
a summary of all Contractor work performed, an assessment of technical progress, schedule
-- 2 of 3 --
LAST UPDATED: 06/27/2026 PAGE 3/3
status, and discuss any hazardous work conditions or necessary precautions the crew need to
be made aware of prior to commencing work.
4.6 General Report Requirements
The Contractor shall provide all written reports in electronic format with read/write capability
using applications that are compatible with DHS workstations (Windows and Microsoft Office
Applications).
5.0 GOVERNMENT FURNISHED RESOURCES
Alarm smoke 016857243 FSP-951 QTY: 16
Fire alarm kit 01F185529 CG87FANFS QTY:1
Display remote 01F122795 LCD2-80 QTY:1
6.0 CONTRACTOR FURNISHED PROPERTY
The Contractor shall furnish all materials, equipment, and services necessary to fulfill the
requirements of this contract, except for the Government Furnished Resources specified in
Section 5.0.
7.0 GOVERNMENT ACCEPTANCE PERIOD
The EPO will inspect deliverables prior to acceptance and provide the contractor with an e-mail
that provides documented reasons for non-acceptance. If the deliverable is acceptable, the
EPO will send an e-mail to the Contractor notifying it that the deliverable has been accepted.
8.0 DELIVERABLES
The Contractor shall provide a trip report IAW 2.2 of this SOW.
-- 3 of 3 --