What this opportunity is
The Department of Homeland Security is seeking a contractor to provide environmental and engineering services for wastewater sampling and analysis at the U.S. Coast Guard Yard in Maryland, under a Total Small Business Set-Aside. The work involves quarterly sampling, laboratory analysis, and reporting to ensure compliance with a local wastewater discharge permit. Interested small businesses should note that this is a solicitation notice, indicating they should prepare to submit bids rather than simply track the opportunity.
Analysis by Mindy, grounded in the SAM.gov notice.
Description
SOW – USCG Yard Wastewater Sampling Contract
Statement of Work
Department of Homeland Security
United States Coast Guard
Background
The U.S. Coast Guard Yard (Yard) currently holds a Wastewater Discharge Permit (permit #120052) with Anne Arundel County in Maryland. The permit authorizes the discharge of wastewater into the county sewer system in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in the permit. To comply with the permit, the Yard must meet the wastewater discharge standards established in the permit.
Scope
The contractor shall provide professional environmental and engineering services for wastewater sampling, analyzing, and reporting for the Yard as detailed in the statement of work.
APPLICABLE DOCUMENTS
The following documents provide specifications, standards, or guidelines that must be complied with to meet the requirements of this contract:
Anne Arundel County Wastewater Discharge Permit No. 120052 (attached)
APPLICABLE REGULATIONS
The following regulations provide standards and guidelines that must be complied with to meet the requirements of this contract:
40 CFR 136 and EPA Guidelines #600/4-82-029
SPECIFIC REQUIREMENTS/TASKS
2.1 TASK 1. General
Quarterly (four times per year) field sampling, laboratory analysis, and reporting associated with the permitted discharge of wastewater from the building 18 sewage pump station shall be performed as detailed in the Statement of Work.
2.2 TASK 2. Labor Requirements
All work shall be conducted by a qualified consulting environmental firm. The consultant shall supply all professional services, labor, tools, transportation and equipment to perform the field and administrative work required to complete sampling reports. Personnel performing the work must be able to conduct work in a confined space.
2.3 TASK 3. Work
The contractor shall complete sampling events four times per year in accordance with Wastewater Discharge Permit No. 120052 and sections 2.3.1 through 2.3.3 of the Statement of Work.
2.3.1 Monitoring Requirements
The sampling location shall be the permitted sewage pumping station, also identified as building 18 in Wastewater Permit #120052.
Sampling for each period shall be conducted for three (3) consecutive days and shall produce a set of data for each day. In the event of equipment failure, the three (3) day monitoring period will restart at no cost to the Yard. Sampling for all periods shall be conducted a minimum of two months apart. The monitoring shall consist of sampling and analysis of the regulated wastewater for the pollutants listed in Table 1 of Wastewater Permit #120052.
Samples shall be collected in accordance with 40 CFR 136 and EPA Guidelines #600/4-82-029. Composite samples shall be collected over a 24-hour period. If the period of discharges is less than 24-hours, the samples shall be collected over the period of discharge in one working day. In the event of equipment failure additional sampling shall be conducted at no cost to the Yard. At a minimum, the composites should consist of equal volume collected in two-hour intervals. LEL and pH monitoring must be performed on site using portable meters. Contractor shall be able to provide equipment calibration records upon request. Laboratory analysis of samples collected shall be performed in accordance with 40 CFR Part 136.
Below is a list of the pollutants that shall be sampled, their sampling method, and frequency:
POLLUTANT
SAMPLING
METHOD
QUARTERLY SAMPLING FREQUENCY
Cadmium
Composite
Each day for 3 consecutive days
Chromium
Composite
Each day for 3 consecutive days
Copper
Composite
Each day for 3 consecutive days
Lead
Composite
Each day for 3 consecutive days
Nickel
Composite
Each day for 3 consecutive days
Zinc
Composite
Each day for 3 consecutive days
Cyanide
Grab
Once/day for 3 consecutive days
BOD5
Composite
Each day for 3 consecutive days
COD
Composite
Each day for 3 consecutive days
Suspended Solids
Composite
Each day for 3 consecutive days
Petroleum-based grease and oil
Grab
Once/day for 3 consecutive days
Lower Explosive Limit
Tested onsite
Once/day for 3 consecutive days
pH
Tested onsite
Once/day for 3 consecutive days
For each measurement of sample taken pursuant to the requirements of this permit, the permittee shall record the following information:
The exact place, type, date and time of sampling;
The type of sample (grab or composite);
The analysis requested;
The turn-around time required for sampling results;
The date(s) the analyses were performed;
The person(s) who performed the analyses;
The analytical techniques or methods used;
The results of all required analyses; and
The minimum detection limit of each analysis.
The Contractor shall notify the Yard Project Manager and/or Contracting Officer’s Representative (COR) within two (2) hours where there is violation including any daily maximum or minimum effluent limitation, slug loading, or upsets (refer to County Wastewater Discharge Permit No. 120052).
The contractor will complete the chain-of-custody and transport samples to an analytical laboratory certified by the Maryland Department of Health and Mental Hygiene for analyzing drinking water samples.
2.3.2 Reporting Requirements
Monitoring results shall be summarized and reported to the Yard with copies of the original laboratory report no later than the following dates:
QUARTER
PERMIT SAMPLING PERIOD
MONITORING RESULTS DUE TO YARD BY
1
December 15th – March 14th
March 1st
2
March 15th – June 14th
June 1st
3
June 15th – September 14th
September 1st
4
September 15th – December 14th
December 1st
Additionally, the contractor shall prepare, in tabular format, a summary of the sampling results along with a listing of the permit limitation or relevant standard for comparison and th…
Source: SAM.gov, as posted. Verify the current solicitation before responding.