Description
Statement of Work
Asbestos and Lead-Based Paint Sampling and Testing at
various US Coast Guard Units throughout California*
*See Tasks for specific locations
PART 1 - GENERAL
The intent of this requirement is to have the contractor provide asbestos and lead-based paint
sampling and testing services to aid in design development of future projects at multiple USCG
unit locations throughout California. The contractor shall furnish all labor, materials, and
equipment required to perform testing in designated rooms identified by the site Point of
Contact (POC).
The contractor shall collect at least onea sample for every different material at each identified
location. The minimum number of samples collected shall be in accordance with current
regulations. Testing shall be conducted in a manner that minimizes disturbances to unit
operations, with sampling locations chosen to be as inconspicuous as possible. If sample
collection results in material damage, the contractor shall apply sealants to prevent accidental
exposure.
The contractor shall submit a proposed schedule of sampling dates to the Government
Technical POC within 14 days of contract award, with approval or disapproval provided within 7
days. Site access and coordination details will be facilitated through the government technical
POC 14 days prior to sampling. For sites with multiple sampling requirements, efforts should be
made to conduct sampling activities on the same day. Final written test results and sampling
location details shall be provided for each sampling task to the government technical POC
within 14 days of sample collection completion.
PART 2 - FACILITY AND SECURITY REQUIRMENTS
2.1 Contractor vehicles must have valid registration and insurance, and vehicle
operators must have a valid driver license. All contractor personnel shall have valid
photo identification.
2.2 The contractor shall clean up all areas to ensure they are clear of debris daily. At
completion of the project all work areas will be returned to their original condition.
The contractor shall remove all waste material generated and dispose the waste
materials off installation in accordance with industry standards and applicable
environmental rules and regulations.
2.3 Minimize impact to Coast Guard operations. Work performed at US Coast Guard
unit locations throughout California (see Tasks for specific locations) shall be
completed between the hours of 7:00AM and 5:00PM, Monday through Friday
(excluding Federal Holidays) unless authorized by the contracting officer.
PART 3 - GOVERNMENT AND CONTRACTOR FURNISHED MATERIAL AND SERVICES
3.1 The government will provide electricity, parking, and laydown area as available from
the unit. Bathroom facilities will not be available for contractor personnel.
-- 1 of 4 --
3.2 The contractor shall provide all materials to complete the work necessary.
PART 4 - TECHNICAL POINT OF CONTACT DESIGNATION
4.1 Technical POC is CWO David Mann
Office: 571-607-1042
E-mail: david.s.mann@uscg.mil
PART 5 - TASKS
5.1 Mobilization
Mobilize all necessary equipment and personnel to perform asbestos and lead-
based paint sampling and testing services at identified project sites safely and
efficiently.
5.2 Coordination and Scheduling
Coordinate site access and schedules with the government technical POC. Submit
a proposed schedule of sampling dates to the POC for approval within 14 days of
contract award. Finalize specific site access requirements at least 14 days prior to
conducting sampling.
5.3 Site Preparation
Identify sampling locations in coordination with the designated site POC. Ensure
sampling minimizes disturbances to units, and sampling points are as
inconspicuous as possible. Provide sealant at sample locations where materials are
disturbed during the sampling process to prevent accidental disturbance.
5.4 Sampling and Testing — Location Specific Tasks
5.4.1 US Coast Guard Sector San Francisco, 1 Yerba Buena Road, San
Francisco, CA 94130. Collect and test samples for lead-based paint and
asbestos in bathrooms for Buildings 24 through 27. Collect at least one
samples for every different material at each building location. Conduct
one test per material if the same material is present across multiple
rooms.
5.4.2 US Coast Guard Sector San Francisco, 1 Yerba Buena Road, San
Francisco, CA 94130. Collect and test samples for lead-based paint and
asbestos in the gym locker rooms for Building 1. Collect at least one
samples for every different material in the building. Conduct one test per
material if the same material is present across multiple locations in the
building.
5.4.3 US Coast Guard Air Station San Francisco, 1020 North Access Road,
San Francisco, CA 94128. Collect and test samples for lead-based
paint and asbestos in the bathrooms and other areas in the designated
Hangar building. Collect at least one samples for every different material
in the building. Conduct one test per material if the same material is
present across multiple rooms.
-- 2 of 4 --
5.4.4 US Coast Guard Sector San Diego, 2710 N. Harbor Drive, San Diego,
CA 92101. Collect and test samples for lead-based paint and asbestos
in bathrooms for Building C2. Collect at least one samples for every
different material in the building. Conduct one test per material if the
same material is present across multiple rooms.
5.4.5 US Coast Guard Sector San Diego, 2710 N. Harbor Drive, San Diego,
CA 92101. Collect and test samples for lead-based paint and asbestos
in the duty berthing rooms in Building D. Conduct one test per material if
the same material is present across multiple rooms.
5.4.6 US Coast Guard Sector San Diego, 2710 N. Harbor Drive, San Diego,
CA 92101. Collect and test samples for lead-based paint and asbestos
in the Recreation (REC) Rooms in Building C. Collect at least one
samples for every different material in the building. Conduct one test per
material if the same material is present across multiple rooms.
5.4.7 US Coast Guard Station…